CN208153864U - Floor waterproof construction - Google Patents
Floor waterproof construction Download PDFInfo
- Publication number
- CN208153864U CN208153864U CN201820432288.3U CN201820432288U CN208153864U CN 208153864 U CN208153864 U CN 208153864U CN 201820432288 U CN201820432288 U CN 201820432288U CN 208153864 U CN208153864 U CN 208153864U
- Authority
- CN
- China
- Prior art keywords
- floor
- clip
- pipeline
- waterproof construction
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model provides a kind of floor waterproof construction, belong to buildings waterproof antiseepage equipment technical field, it is installed on the junction of the pipeline and floor across floor, including enclosing clamp device of the excircle for being set to pipeline for clamping pipeline, clamp device is fixedly connected with floor.Floor waterproof construction provided by the utility model, after pipeline passes through floor, clamp device is set on the excircle of pipeline by pipeline clamping, and clamp device is fixedly connected with floor, make to achieve the effect that with floor relative displacement does not occur for pipeline, water leakage phenomenon occurs caused by avoiding due to pipeline movement, improves the waterproof, seepage control performance of floor.
Description
Technical field
The utility model belongs to buildings waterproof antiseepage equipment technical field, is to be related to a kind of floor waterproof more specifically
Structure.
Background technique
In construction projects, as the improvement of people's living standards, people to the quality requirement of present house also increasingly
Height, the waterproof, seepage control of floor requires to have a great impact to construction quality, therefore the waterproof, seepage control of floor poling requires increasingly
Attention by unit in charge of construction and resident.
In current construction, floor poling waterproofing process is that microdilatancy is perfused in two times in reserved opening and pipeline is thin
Stone concrete stays 20mm deep groove to fill after second is perfused microdilatancy pea gravel concreten in microdilatancy pea gravel concreten upper end
Waterproof mortar is perfused on floor top later in water test, is laid with one of waterproof layer finally for waterproof.This constructing structure mode
There is the deficiency of following several respects:
1, form of construction work is more complicated, and construction quality is not easy to control, and there are hidden leakage defects.
2, since the difference of linear expansion of pipeline and concrete and mortar is very big, along with pipeline internal medium temperature
Constantly variation, after expanding with heat and contract with cold, tube wall and concrete and mortar faying face are easy cracking.
3, the flowing of pipeline internal medium has pipeline certain souring, so that pipeline is driven to move down, so that
There is gap in pipeline and mortar interface, and water leakage phenomenon is caused to occur.
Utility model content
The purpose of this utility model is to provide a kind of floor waterproof constructions, existing in the prior art across building to solve
Mobile technical problem easily occurs for the pipeline of plate.
To achieve the above object, the technical solution adopted in the utility model is:A kind of floor waterproof construction is provided, is installed on
Across the pipeline of floor and the junction of the floor, including enclosing the excircle for being set to the pipeline for pipeline described in clamping
Clamp device, the clamp device are fixedly connected with the floor.
Further, the clamp device includes the first clip and docks with first clip for surrounding the pipeline
The second clip, first clip and second clip be equipped with protrude outward for the floor overlapped otic placode,
The otic placode is equipped with first through hole, the otic placode and the floor by across the first through hole bolt connect.
Further, the junction of first clip and second clip is equipped with for first clip and institute
The vertical plate that the second clip is fixedly connected is stated, at least provided with second through-hole, first clip and institute on the vertical plate
State the second clip by pass through second through-hole bolt connection.
Further, the vertical plate is equipped with the rubber being tightly connected for first clip and second clip
Piece.
Further, annular inner wall made of first clip and second clip surround is equipped with for sealing
Rubber strip.
Further, the inner wall of first clip is equipped with the first rubber pad for sealing, the second clip inner wall
Equipped with the second rubber pad for surrounding the pipeline with first rubber pad.
Further, the clamp device is two, is respectively arranged on the upper surface and lower end surface of the floor.
Further, the floor be equipped with third through-hole, the pipeline pass through the third through-hole and with the third
Between through-hole be equipped with gap, the clamp device be set to the gap in, in the gap in be equipped with for fix the floor and
The microdilatancy pea gravel concreten of the pipeline.
Further, the upper surface of the floor is equipped with the waterproof mortar for preventing the floor leak.
Further, further include the water string in the gap, the outer diameter of the water string with it is described
The aperture of third through-hole is identical.
The beneficial effect of floor waterproof construction provided by the utility model is:Compared with prior art, the utility model
After pipeline passes through floor clamp device is arranged by pipeline clamping, and tight in floor waterproof construction on the outer circumference surface of pipeline
Be fixedly mounted with to set and be fixedly connected with floor, make to achieve the effect that with floor relative displacement does not occur for pipeline, avoid since pipeline is mobile and
Caused water leakage phenomenon occurs, and improves the waterproof performance of floor.
Detailed description of the invention
It, below will be to embodiment or the prior art in order to illustrate more clearly of the technical scheme in the embodiment of the utility model
Attached drawing needed in description is briefly described, it should be apparent that, the accompanying drawings in the following description is only that this is practical new
Some embodiments of type for those of ordinary skill in the art without any creative labor, can be with
It obtains other drawings based on these drawings.
Fig. 1 is the structural schematic diagram one of floor waterproof construction provided by the embodiment of the utility model;
Fig. 2 is the structural schematic diagram two of floor waterproof construction provided by the embodiment of the utility model;
Fig. 3 is the enlarged drawing in Fig. 1 at A;
Fig. 4 is the connection schematic diagram of pipeline provided by the embodiment of the utility model and clamp device;
Fig. 5 is the structural schematic diagram of the first clip and the second clip provided by the embodiment of the utility model.
Wherein, each appended drawing reference in figure:
1- floor;11- third through-hole;The gap 111-;12- mounting groove;2- pipeline;3- clamp device;The first clip of 31-;
The second clip of 32-;33- otic placode;331- first through hole;34- vertical plate;The second through-hole of 341-;35- rubber strip.
Specific embodiment
In order to which technical problem to be solved in the utility model, technical solution and beneficial effect is more clearly understood, with
Lower combination accompanying drawings and embodiments, the present invention will be further described in detail.It should be appreciated that specific reality described herein
It applies example to be only used to explain the utility model, is not used to limit the utility model.
It should be noted that it can be directly another when element is referred to as " being fixed on " or " being set to " another element
On one element or indirectly on another element.When an element is known as " being connected to " another element, it can
To be directly to another element or be indirectly connected on another element.
It is to be appreciated that term " length ", " width ", "upper", "lower", "front", "rear", "left", "right", "vertical",
The orientation or positional relationship of the instructions such as "horizontal", "top", "bottom" "inner", "outside" is that orientation based on the figure or position are closed
System, is merely for convenience of describing the present invention and simplifying the description, rather than the device or element of indication or suggestion meaning are necessary
It with specific orientation, is constructed and operated in a specific orientation, therefore should not be understood as limiting the present invention.
In addition, term " first ", " second " are used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance
Or implicitly indicate the quantity of indicated technical characteristic.Define " first " as a result, the feature of " second " can be expressed or
Implicitly include one or more of the features.The meaning of " plurality " is two or two in the description of the present invention,
More than, unless otherwise specifically defined.
Referring to Fig. 1, existing be illustrated floor waterproof construction provided by the utility model.Floor waterproof construction, installation
It further include enclosing to be set to pipe including floor 1 and across the pipeline 2 of floor 1 in the junction for the pipeline 2 and floor 1 for passing through floor 1
The outer circumference surface in road 2 is used for the clamp device 3 of clamping pipeline 2, and clamp device 3 is fixedly connected with floor 1.
Floor waterproof construction provided by the utility model, compared with prior art, by using can by 2 clamping of pipeline,
The clamp device 3 that can be fixedly connected again with floor 1, eliminate pipeline 2 easily occur present in the conveying water flow process it is mobile
Risk, safely, effectively, the accident that water leaks caused by avoiding due to the movement of pipeline 2 occurs the waterproof measure for guaranteeing floor 1,
The waterproof effect for improving floor waterproof construction, reduce the prior art construction it is cumbersome, waterproof effect is bad, and industrialization degree is not
High problem.
The material that setting tool has incubation and thermal insulation function, such as rock wool, plastics, aluminium foil material are enclosed on the outer circumference surface of pipeline 2,
Prevent due to pipeline 2 transport supercooling perhaps overheat liquid when cause pipeline 2 expand or shrink, caused by pipeline 2 rupture
Problem.The utility model has the characteristics that safety, is applicable in, and has good promotion and practical value, meeting after extensive popularization and application
Generate good economic benefit.Pvc pipe or coating steel pipe can be used in pipeline 2, and pvc pipe inner wall is relatively smooth, the resistance to water flow
Power is smaller, and high temperature resistant, corrosion-resistant;Coating steel pipe plays fire-fighting, firm effect.
Further, Fig. 1 to Fig. 5 is please referred to, a kind of specific reality as floor waterproof construction provided by the utility model
Mode is applied, clamp device 3 includes the first clip 31 and docks the second clip 32 for surrounding pipeline 2 with the first clip 31, the
One clip 31 and the second clip 32 be equipped with protrude outward for overlapped the otic placode 33 of floor 1, be equipped with first on otic placode 33
Through-hole 331, otic placode 33 connect the first clip being cooperatively connected using two by passing through the bolt of first through hole 331 with floor 1
31 and second clip 32 be used as clamp device 3, keep installation process easy, it is only necessary to distinguish the first clip 31 and the second clip 32
It set on 2 two sides of pipeline, is then fixedly connected 2 clamping of pipeline, the ear on otic placode 33 and the second clip 32 on the first clip 31
Plate is corresponding, is fixedly connected with the first clip 31 and the second clip 32 with floor 1 by two otic placodes 33, easy for installation, disassembly
Also simple, first through hole 331 is set on otic placode 33, threaded hole is set on floor 1, by bolt by otic placode 33 and floor 1
It is fixedly connected.Sealing ring is set on the side of floor 1 in otic placode 33, prevents water flow from entering the connection of floor 1 Yu pipeline 2
Place.First through hole 331 can be set as strip hole, otic placode 33 is facilitated to be bolted with floor 1.
Further, Fig. 3 to Fig. 5 is please referred to, a kind of specific reality as floor waterproof construction provided by the utility model
Mode is applied, the first clip 31 is equipped with the junction of the second clip 32 and is fixedly connected for the first clip 31 with the second clip 32
Vertical plate 34, at least provided with second through-hole 341, the first clip 31 and the second clip 32 by passing through the on vertical plate 34
The bolt of two through-holes 341 connects the first clip 31 and the second clip 32 is cooperatively connected by 2 clamping of pipeline, in 31 He of the first clip
Vertical plate 34 is respectively set in the junction of second clip 32, and the second through-hole 341 is arranged on vertical plate 34, using bolt by
One clip 31 is fixedly connected with the second clip 32, while also by 2 clamping of pipeline.It is also to connect more that two connections of vertical plate 34, which are arranged,
Add conveniently.During installation, the mounting height of vertical plate 34 is higher than otic placode 33, otic placode 33 is first placed on and the fixed company of floor 1
Place is met, then by two groups of corresponding vertical plates 34 by 2 clamping of pipeline, and be bolted, finally again by otic placode 33 and floor 1
It is bolted.
Further, Fig. 1 to Fig. 5 is please referred to, a kind of specific reality as floor waterproof construction provided by the utility model
Mode is applied, vertical plate 34 is equipped with the sheet rubber being tightly connected for the first clip 31 and the second clip 32,31 He of the first clip
Sheet rubber is arranged on vertical plate 4 by passing through the bolt of the second through-hole 341 on vertical plate 34 and connecting in second clip 32, makes
First clip 31 and the second clip 32 are tightly connected closely, prevent water flow from passing through from the gap of vertical plate 34.
Further, it please refers to Fig.1 to Fig.3, a kind of specific reality as floor waterproof construction provided by the utility model
Mode is applied, annular inner wall made of the first clip 31 and the second clip 32 surround is equipped with the rubber strip 35 for sealing, rubber
Item 35 increases the frictional resistance between pipeline 2 and the first clip 31 and the second clip 32, when thering is water flow to flow through in pipeline 2,
The vibration and movement of pipeline 2 are reduced, guarantees the stability of pipeline 2, rubber itself is utilized in the work for keeping pipeline 2 stable
Elastic recovery further prevents the leakage of water, forms more efficiently dual waterproof system with basic waterproof.
Further, Fig. 1 to Fig. 5 is please referred to, a kind of specific reality as floor waterproof construction provided by the utility model
Mode is applied, the inner wall of the first clip 31 is equipped with the first rubber pad for sealing, and 32 inner wall of the second clip is equipped with and the first rubber
Pad surrounds the second rubber pad of pipeline 2, and the first rubber pad and the second rubber is respectively set on the first clip 31 and the second clip 32
Rubber mat, for preventing slot leakage of the water flow between pipeline 2 and the first clip 31 and the second clip 32, while the first rubber pad
And second rubber pad be used to increase frictional resistance between pipeline 2 and the first clip 31 and the second clip 32, reduce pipeline 2
Vibration and mobile, the stability of guarantee pipeline 2, the work for keeping pipeline 2 stable.It can also be in the first clip 31 and the second clip 32
Upper cover is equipped with the water-ring for preventing water flow from contacting with the first clip 31 and the second clip 32, and water-ring is covered on the first clip
31 and second on clip 32, and is tightly connected at the EDGE CONTACT position with the first clip 31 and the second clip 32, makes
One clip 31 and the second clip 32 are under sealing state, are prevented water flow from touching the first clip 31 and the second clip 32, are also prevented
Only there is water flow to enter at pipeline 2, moistureproof and waterproof improves the service life of pipeline 2, the first clip 31 and the second clip 32.
Further, Fig. 1 and Fig. 2 are please referred to, a kind of specific reality as floor waterproof construction provided by the utility model
Mode is applied, clamp device 3 is two, the upper surface and lower end surface of floor 1 is respectively arranged on, using two clamp devices 3, by pipeline
2 carry out dual fixation in the upper surface of floor 1 and lower end surface respectively, improve clamping force suffered by pipeline 2 and clamp device 3 with
Fixation between floor 1 keeps the stability of pipeline 2 higher, guarantees that pipeline 2 stablizes motionless normal work.
Further, referring to FIG. 1 to FIG. 4, as a kind of specific reality of floor waterproof construction provided by the utility model
Mode is applied, floor 1 is equipped with third through-hole 11, and pipeline 2 is equipped with gap across third through-hole 11 and third through-hole 11
111, clamp device 3 is set in gap 111, and the microdilatancy pea gravel concreten for fixing floor 1 Yu pipeline is equipped in gap 11,
The diameter of third through-hole 11 is greater than the outer diameter of pipeline 2, and there are gaps third through-hole 11 after third through-hole 11 for pipeline 2
111, clamp device 3 is mounted in gap 111, makes entire floor waterproof construction exquisite appearance, compact-sized, while in gap
Microdilatancy pea gravel concreten is filled in 111, floor 1, pipeline 2, clamp device 3 are linked as by the microdilatancy pea gravel concreten after hardening
One, keeps floor waterproof construction reliable and stable, and microdilatancy pea gravel concreten can prevent from generating mixed due to excessive temperature differentials
Solidifying soil cracking seam.
Further, it please refers to Fig.1 to Fig.3, a kind of specific reality as floor waterproof construction provided by the utility model
Mode is applied, the upper surface of floor 1 is equipped with the waterproof mortar for preventing 1 leak of floor, and waterproof mortar has good impermeability
With high bonding force, the waterproof and anticorrosion effect of floor waterproof construction is enhanced, waterproof mortar covers clamp device 3 and floor 1
Junction, clamp device 3 and pipeline 2 contact surface, eliminate this leak risk at two.It is also spread in the lower end surface of floor 1
If waterproof mortar, the waterproof performance of floor 1 is further enhanced.
Further, Fig. 1 to Fig. 5 is please referred to, a kind of specific reality as floor waterproof construction provided by the utility model
Mode is applied, further includes the water string in gap 111, the aperture phase of the outer diameter and third through-hole 11 of water string
Together, setting water string is used to prevent shearing of the pipeline 2 by vertical pipe 2 in construction, guarantees the intact normal work of pipeline 2
Make.
During the installation process, as shown in Figures 1 to 5, first pipeline 2 is placed in the third through-hole 11 of floor 1, then will
First clip 31 and the second clip 32 are individually positioned at third through-hole 11, entangle pipeline 2;By the first clip 31 and the second clip
32 otic placode 33 is aligned with the first through hole 331 of floor 1, and mounting groove 12 is arranged in the position of the corresponding otic placode 33 of floor 1, then
It is attached by bolt;Vertical plate 34 is choked pipeline 2 by passing through the bolt connection of the second through-hole 341;Finally in building
Perfusion microdilatancy pea gravel concreten and waterproof mortar in the third through-hole 11 of plate 1.
The above is only the preferred embodiments of the present utility model only, is not intended to limit the utility model, all practical at this
Made any modifications, equivalent replacements, and improvements etc., should be included in the guarantor of the utility model within novel spirit and principle
Within the scope of shield.
Claims (9)
1. floor waterproof construction is installed on the junction of the pipeline and the floor across floor, it is characterised in that:It is set including enclosing
It is used for the clamp device of pipeline described in clamping in the excircle of the pipeline, the clamp device is fixedly connected with the floor,
The clamp device includes the first clip and docks the second clip for surrounding the pipeline with first clip, and described
One clip and second clip be equipped with protrude outward for the floor overlapped otic placode, the otic placode is equipped with first
Through-hole, the otic placode and the floor by pass through the first through hole bolt connect.
2. floor waterproof construction as described in claim 1, it is characterised in that:The company of first clip and second clip
The place of connecing is equipped with the vertical plate being fixedly connected for first clip with second clip, on the vertical plate at least provided with
One the second through-hole, first clip and second clip by pass through second through-hole bolt connects.
3. floor waterproof construction as claimed in claim 2, it is characterised in that:The vertical plate is equipped with for first card
The sheet rubber that hoop and second clip are tightly connected.
4. floor waterproof construction as described in claim 1, it is characterised in that:First clip and second clip surround
Made of annular inner wall be equipped with for sealing rubber strip.
5. floor waterproof construction as described in claim 1, it is characterised in that:The inner wall of first clip is equipped with for sealing
The first rubber pad, the second clip inner wall, which is equipped with, surrounds the second rubber pad of the pipeline with first rubber pad.
6. floor waterproof construction as described in claim 1, it is characterised in that:The clamp device is two, is respectively arranged on institute
State the upper surface and lower end surface of floor.
7. floor waterproof construction as described in claim 1, it is characterised in that:The floor is equipped with third through-hole, the pipe
Road is equipped with gap across the third through-hole and the third through-hole, and the clamp device is set in the gap, institute
State the microdilatancy pea gravel concreten being equipped in gap for fixing the floor Yu the pipeline.
8. floor waterproof construction as claimed in claim 7, it is characterised in that:The upper surface of the floor is equipped with for preventing
State the waterproof mortar of floor leak.
9. floor waterproof construction as claimed in claim 7, it is characterised in that:It further include the waterproof jacket in the gap
Pipe, the outer diameter of the water string are identical as the aperture of the third through-hole.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820432288.3U CN208153864U (en) | 2018-03-28 | 2018-03-28 | Floor waterproof construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820432288.3U CN208153864U (en) | 2018-03-28 | 2018-03-28 | Floor waterproof construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208153864U true CN208153864U (en) | 2018-11-27 |
Family
ID=64379086
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820432288.3U Expired - Fee Related CN208153864U (en) | 2018-03-28 | 2018-03-28 | Floor waterproof construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208153864U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109340707A (en) * | 2018-12-07 | 2019-02-15 | 曹润栀 | A kind of light pipe illumination device waterproof construction |
CN111306368A (en) * | 2020-03-30 | 2020-06-19 | 黑龙江中科工程管理咨询有限公司 | Waterproof component for pipeline passing through floor slab and installation method thereof |
CN113513092A (en) * | 2021-08-05 | 2021-10-19 | 中交二公局第三工程有限公司 | Civil engineering waterproof structure and construction method thereof |
CN113738955A (en) * | 2021-09-06 | 2021-12-03 | 重庆工业职业技术学院 | Construction method of toilet drainage pipeline |
-
2018
- 2018-03-28 CN CN201820432288.3U patent/CN208153864U/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109340707A (en) * | 2018-12-07 | 2019-02-15 | 曹润栀 | A kind of light pipe illumination device waterproof construction |
CN111306368A (en) * | 2020-03-30 | 2020-06-19 | 黑龙江中科工程管理咨询有限公司 | Waterproof component for pipeline passing through floor slab and installation method thereof |
CN113513092A (en) * | 2021-08-05 | 2021-10-19 | 中交二公局第三工程有限公司 | Civil engineering waterproof structure and construction method thereof |
CN113513092B (en) * | 2021-08-05 | 2023-08-04 | 中交二公局第三工程有限公司 | Civil engineering waterproof structure and construction method thereof |
CN113738955A (en) * | 2021-09-06 | 2021-12-03 | 重庆工业职业技术学院 | Construction method of toilet drainage pipeline |
CN113738955B (en) * | 2021-09-06 | 2022-11-04 | 重庆工业职业技术学院 | Construction method of toilet drainage pipeline |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208153864U (en) | Floor waterproof construction | |
CN205617426U (en) | Cast -in -place bottom plate of utility tunnel and prefabricated outer panel connection structure | |
CN209873859U (en) | Waterproof sealing structure of corrugated steel pipe gallery | |
CN111749280B (en) | Deformation joint waterproof structure and method | |
CN207685861U (en) | Concrete pipe gallery side wall or roof deformation stitch waterproof construction | |
CN208473892U (en) | Two lining trolley plug mold device of buried water stop installation in tunnel-liner | |
CN210002439U (en) | underground station | |
CN210461973U (en) | Novel direct-buried heating power pipeline waterproof sleeve | |
CN111827363A (en) | Underground building deformation joint waterproof structure and construction method thereof | |
CN212295123U (en) | Building expansion joint waterproof leakage repairing device | |
CN211525710U (en) | Anti-overflow wall-penetrating embedded pipe fitting | |
CN209873861U (en) | Sealing device for lap joint of steel corrugated plate pipe gallery plates | |
CN208651833U (en) | The fixed structure of floor slab pipeline | |
CN113981904A (en) | Water stopping installation structure and method between new concrete and old concrete | |
CN209874001U (en) | Civil air defense engineering drainage device | |
CN108505545A (en) | A kind of underground pipe group wears the waterproofing process of building foundation raft plate | |
CN208565880U (en) | A kind of municipal pipeline junction preventing water leakage embedded structure | |
CN207878523U (en) | Concrete pipe gallery mid-board waterproof structure for deformation seams | |
CN206429791U (en) | A kind of four-way pipe | |
CN219364719U (en) | Waterproof water conservancy diversion structure that underground expansion joint was used | |
CN206592659U (en) | Wall water stop device for wall-passing well | |
CN214838950U (en) | Be applicable to HDPE pipe wall board waterproof sleeve pipe | |
CN217107060U (en) | Station and interval waterproof interface device | |
CN217601518U (en) | Sealing device for underground well chamber of direct-buried heat supply pipeline | |
CN216892881U (en) | Connection node of pre-laid high-polymer waterproof coiled material and elastomer SBS waterproof coiled material |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181127 Termination date: 20190328 |