CN208136889U CN201820403707.0U CN201820403707U CN208136889U CN 208136889 U CN208136889 U CN 208136889U CN 201820403707 U CN201820403707 U CN 201820403707U CN 208136889 U CN208136889 U CN 208136889U
Authority
CN
China
Prior art keywords
soil pressure
pressure cell
channel steel
fixedly mounted
cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820403707.0U
Other languages
Chinese (zh)
Inventor
张瑞棋
黄志军
王慧敏
王新刚
刘天韵
陈运涛
朱胜利
王彪
王一彪
李菲菲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Harbor Engineering Co Ltd
Tianjin Port Engineering Institute Ltd of CCCC Frst Harbor Engineering Co Ltd
Tianjin Harbor Engineering Quality Inspection Center Co Ltd
Original Assignee
CCCC First Harbor Engineering Co Ltd
Tianjin Port Engineering Institute Ltd of CCCC Frst Harbor Engineering Co Ltd
Tianjin Harbor Engineering Quality Inspection Center Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Harbor Engineering Co Ltd, Tianjin Port Engineering Institute Ltd of CCCC Frst Harbor Engineering Co Ltd, Tianjin Harbor Engineering Quality Inspection Center Co Ltd filed Critical CCCC First Harbor Engineering Co Ltd
Priority to CN201820403707.0U priority Critical patent/CN208136889U/en
Application granted granted Critical
Publication of CN208136889U publication Critical patent/CN208136889U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sampling And Sample Adjustment (AREA)

Abstract

The utility model discloses a kind of soil pressure cell secure mounting arrangements, including the channel steel for installing soil pressure cell and the sliding slot being preset on concrete structure outer matched with channel steel;The section of the channel steel is concave, the string holes for threading is offered on channel steel, soil pressure cell is fixed on the string holes position of the outer surface of channel steel, the cable of soil pressure cell passes through string holes, in use, soil pressure cell is adhered to channel steel surface with glue, the cable of soil pressure cell passes through string holes, it is placed in the cable of soil pressure cell in the cavity of channel steel, and cable is drawn upwards along channel steel, the channel steel for being fixed with soil pressure cell is placed on concrete structure along the chute.By this mounting structure, the problem of can be convenient, accurately carry out the installation of soil pressure cell, and easily covered by concrete after being buried to avoid soil pressure cell, further saves the set-up time, protection soil pressure cell, reduces installation cost.

Description

A kind of soil pressure cell fixed installation structure
Technical field
The utility model belongs to the technical field of rock-soil engineering in-situ test, and in particular to a kind of soil pressure cell fixed installation Structure.
Background technique
With the continuous promotion that China's economic status develops on a large scale in production globalization, ultra-large type hypogee, deep-sea immersed tube The construction such as tunnel, the interaction of structure and soil layer are most important for the applicability and reliability of assay structure.
Cloth in situ is generallyd use in geotechnical engineering field monitoring field in order to measure the soil pressure acted on structures If soil pressure cell measures the soil pressure acted on different directions, soil pressure cell generally transmits electricity by backboard, tablet, signal The composition such as cable, vibratory string and exciting electromagnetic coil.
The interfacial type of soil pressure cell is installed frequently with pre-buried mode in advance at present, i.e., will be native by the method for binding or welding Pressure cell is connected with structure reinforcing bars, to be fixed in concrete structural surface.But interface is easily led to using such mode Inbuilt soil pressure cell " survival rate " is lower, the deformation of the more difficult true reflection large-sized concrete structure of monitoring the data obtained and stress Dynamic process.By the induction and conclusion to engineering before, the shortcoming that tradition shifts to an earlier date pre-buried mode is mainly shown as following Three aspects:
(1) construction of soil pressure cell interfacial type installation takes a long time.Tradition shifts to an earlier date in pre-buried mode, soil pressure cell itself nothing It need to be connected using binding or welding with structure reinforcing bars, and be adjusted in real time according to thickness of concrete cover simultaneously by fixed device Whole installation site, therefore an embedded soil pressure cell takes a long time.Complicated structures are needed to test number According to more, then inbuilt soil pressure cell is just more, the time for needing to delay influences construction speed with regard to more.
(2) reliability of soil pressure cell interfacial type installation is lower.Tradition shifts to an earlier date in pre-buried mode, and soil pressure cell is embedded to be finished After be difficult to adjust its installation site.Formwork hoisting, concreting and the work progress such as vibrate are likely to cause soil pressure cell The offset or torsion of original installation site, deviateing gained monitoring data, original sets box position or soil pressure cell is embedded in concrete guarantor Lost in sheath interface soil pressure monitoring effect, therefore tradition shift to an earlier date pre-buried mode in soil pressure cell interfacial type installation it is reliable Property is lower.
(3) precision of soil pressure cell monitoring data is poor.Tradition shifts to an earlier date in pre-buried mode, past after soil pressure cell is embedded It is flushed with concrete structural surface toward being difficult to keep soil pressure cell surface, makes between the two that there are biggish gaps, therefore poured Soil pressure cell surface is easily led in work progress and covers one layer of thicker concrete, and gained monitoring data fail really to reflect boundary The stress condition of face soil pressure keeps the precision of monitoring data and reliability poor.
Therefore, the interfacial type mounting device of soil pressure cell a kind of is developed for the feasibility of new concrete structure and practical Journal of Sex Research is very necessary.
Utility model content
In order to overcome the above problem of the prior art, the purpose of the utility model is to provide a kind of fixed installations of soil pressure cell Structure can be convenient by this mounting structure, accurately carry out the installation of soil pressure cell, and can be buried to avoid soil pressure cell If the problem of easily being covered afterwards by concrete, further saves the set-up time, protection soil pressure cell, reduces installation cost.
The technical solution for completing above-mentioned utility model task is:
A kind of soil pressure cell fixed installation structure, matches pre- including the channel steel for installing soil pressure cell and with channel steel The sliding slot being located on concrete structure outer;
The section of the channel steel is concave, the string holes for threading is offered on channel steel, soil pressure cell is fixed on The cable of the string holes position of the outer surface of channel steel, soil pressure cell passes through string holes, and the cable of soil pressure cell is made to be placed in the cavity of channel steel It is interior, and cable is drawn upwards along channel steel.
Further, the sliding slot is two grooves being vertically arranged on concrete structure outer, between two grooves Distance it is consistent at a distance from two sides of channel steel so that two sides of channel steel can be installed into two grooves.
Further, the depth of groove is less than the width of two sides of channel steel, so that after channel steel is installed into groove, in slot There are gaps between steel and concrete structure outer surface, for accommodating the cable of soil pressure cell.
Further, soil pressure cell selects the soil pressure cell of cabling in the raised floor.
Further, the width of selected channel steel is slightly bigger than the diameter of soil pressure cell or the width of selected channel steel is equal to soil The diameter of pressure cell.
Further, the position of the string holes is depending on the burial place of soil pressure cell.
Further, channel steel Top Leading-out Hole and soil pressure cell cabling in the raised floor mouth are in the same size.
Further, soil pressure cell is the outer surface that channel steel is fixed on by way of bonding.
The construction method that structure is fixedly mounted in the soil pressure cell is as follows:
1, the channel steel size selected is slightly bigger than soil pressure cell diameter;
2, it is required according to design scheme, in casting concrete structure, reserves the sliding slot of channel steel;
3, the position that soil pressure is measured according to required for calculating, hole of bursting at the seams on channel steel;
4, soil pressure cell is adhered into channel steel surface with glue, the cable of soil pressure cell passes through string holes, makes the line of soil pressure cell Cable is placed in the cavity of channel steel, and cable is drawn upwards along channel steel;
5, the channel steel for being fixed with soil pressure cell is placed on concrete structure along the chute.
It the advantages of the utility model and has the beneficial effect that:
1, the accuracy rate of interfacial type soil pressure cell installation and the precision of monitoring data are improved.Pass through the peace of the utility model Assembling structure can accurately install soil pressure cell to setting box designated position, and the inbuilt soil pressure cell in haveing suffered work progress It is not displaced phenomenon, it is reachable in the accuracy rate of the product quality factor for not considering soil pressure cell, the installation of interfacial type soil pressure cell To 100%, while it ensure that the precision of monitoring data.
2, " survival rate " of soil pressure cell and the reliability of installation are improved.Channel steel has preferable anti-in the utility model Shield property, in the product quality factor for not considering soil pressure cell, can be increased to 100% for " survival rate " of interfacial type soil pressure cell.
3, the installation speed of interfacial type soil pressure cell is improved.The utility model by the sliding slot of advance reservation can it is quick, Soil pressure cell is easily and accurately installed, to greatly shorten the embedded time, being effectively guaranteed monitoring installation does not influence to tie Structure construction.
To sum up, structure is fixedly mounted in the adjustable position of the soil pressure cell of the utility model, can easily and accurately carry out soil pressure The interfacial type of power box is installed, and solves the problems, such as easily to be covered by concrete after soil pressure cell is embedded, further saves installation Time, reduces installation cost at " survival rate " that improves soil pressure cell, is to overcome a kind of insufficient ideal knot of existing mounting technique Structure, economic benefit and social benefit are very significant.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the channel steel of the utility model.
Fig. 2 is the structural schematic diagram that soil pressure cell is mounted on channel steel.
Fig. 3 is the structural schematic diagram of the sliding slot of the utility model.
Fig. 4 is the construction and installation schematic diagram of the utility model.
Wherein:1 is channel steel, and 1-1 is string holes, and 1-2 is the side of channel steel, and 2 be sliding slot, and 3 be soil pressure cell, and 3-1 is cable, A is concrete structure.
Specific embodiment
The technical solution of the utility model is further illustrated combined with specific embodiments below.
Embodiment one
As shown, a kind of soil pressure cell fixed installation structure involved in the utility model, including for installing soil pressure The channel steel 1 of power box and the sliding slot 2 being preset on concrete structure a exterior wall matched with channel steel;
The section of the channel steel 1 is concave, and the string holes 1-1 for threading is offered on channel steel, and soil pressure cell 3 is solid It is scheduled on the string holes position of the outer surface of channel steel, the cable 3-1 of soil pressure cell passes through string holes, the cable of soil pressure cell is made to be placed in channel steel Cavity in, and cable 3-1 is drawn upwards along channel steel.
The sliding slot 2 is two grooves being vertically arranged on concrete structure outer, and two grooves are parallel to each other, two The distance between groove is consistent at a distance from two sides of channel steel so that two sides of channel steel can be installed into two it is recessed In slot.
Embodiment two
Further, the depth of groove is less than the width of two side 1-2 of channel steel, so that after channel steel is installed into groove, There are gaps between channel steel and concrete structure outer surface, for accommodating the cable of soil pressure cell.
Further, soil pressure cell selects the soil pressure cell of cabling in the raised floor.
Further, the width of selected channel steel is slightly bigger than the diameter of soil pressure cell or the width of selected channel steel is equal to soil The diameter of pressure cell.
Further, the position of the string holes is depending on the burial place of soil pressure cell.
Further, channel steel Top Leading-out Hole and soil pressure cell cabling in the raised floor mouth are in the same size.
Further, soil pressure cell is the outer surface that channel steel is fixed on by way of bonding.
Embodiment three
The construction method that structure is fixedly mounted in the soil pressure cell is as follows:
1, the channel steel size selected is slightly bigger than soil pressure cell diameter;
2, it is required according to design scheme, in casting concrete structure, reserves the sliding slot of channel steel;
3, the position that soil pressure is measured according to required for calculating, hole of bursting at the seams on channel steel;
4, soil pressure cell is adhered into channel steel surface with glue, the cable of soil pressure cell passes through string holes, makes the line of soil pressure cell Cable is placed in the cavity of channel steel, and cable is drawn upwards along channel steel;
5, the channel steel for being fixed with soil pressure cell is placed in along the chute on concrete structure a.
Illustrative description has been done to the utility model above, it should explanation, in the core for not departing from the utility model In the case where the heart, it is any it is simple deformation, modification or other skilled in the art can not spend creative work etc. The protection scope of the utility model is each fallen with replacement.

Claims (10)

1. structure is fixedly mounted in a kind of soil pressure cell, which is characterized in that including the channel steel and and channel steel for installing soil pressure cell The sliding slot being preset on concrete structure outer matched;
The section of the channel steel is concave, the string holes for threading is offered on channel steel, soil pressure cell is fixed on channel steel Outer surface string holes position, the cable of soil pressure cell passes through string holes, is placed in the cable of soil pressure cell in the cavity of channel steel, and And cable is drawn upwards along channel steel.
2. structure is fixedly mounted in a kind of soil pressure cell according to claim 1, which is characterized in that the sliding slot is two perpendicular Groove on concrete structure outer is directly set.
3. structure is fixedly mounted in a kind of soil pressure cell according to claim 2, which is characterized in that between two grooves away from From consistent at a distance from the two of channel steel sides, so that two sides of channel steel can be installed into two grooves.
4. structure is fixedly mounted in a kind of soil pressure cell according to claim 2, which is characterized in that the depth of groove is less than slot The width of two sides of steel, so that there are skies between channel steel and concrete structure outer surface after channel steel is installed into groove Gap, for accommodating the cable of soil pressure cell.
5. structure is fixedly mounted in a kind of soil pressure cell according to claim 1, which is characterized in that soil pressure cell selects bottom The soil pressure cell of outlet.
6. structure is fixedly mounted in a kind of soil pressure cell according to claim 1, which is characterized in that the width of selected channel steel omits It is bigger than the diameter of soil pressure cell.
7. structure is fixedly mounted in a kind of soil pressure cell according to claim 1, which is characterized in that the width etc. of selected channel steel In the diameter of soil pressure cell.
8. structure is fixedly mounted in a kind of soil pressure cell according to claim 1, which is characterized in that the position root of the string holes Depending on the burial place of soil pressure cell.
9. structure is fixedly mounted in a kind of soil pressure cell according to claim 1, which is characterized in that channel steel Top Leading-out Hole and soil Pressure cell cabling in the raised floor mouth is in the same size.
10. structure is fixedly mounted in a kind of soil pressure cell according to claim 1, which is characterized in that soil pressure cell is to pass through The mode of bonding is fixed on the outer surface of channel steel.
CN201820403707.0U 2018-03-23 2018-03-23 A kind of soil pressure cell fixed installation structure Expired - Fee Related CN208136889U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820403707.0U CN208136889U (en) 2018-03-23 2018-03-23 A kind of soil pressure cell fixed installation structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820403707.0U CN208136889U (en) 2018-03-23 2018-03-23 A kind of soil pressure cell fixed installation structure

Publications (1)

Publication Number Publication Date
CN208136889U true CN208136889U (en) 2018-11-23

Family

ID=64290337

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820403707.0U Expired - Fee Related CN208136889U (en) 2018-03-23 2018-03-23 A kind of soil pressure cell fixed installation structure

Country Status (1)

Country Link
CN (1) CN208136889U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112523275A (en) * 2020-11-26 2021-03-19 华侨大学 Method for testing interaction between underground continuous wall and side wall of main structure in laminated wall structure of subway station

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112523275A (en) * 2020-11-26 2021-03-19 华侨大学 Method for testing interaction between underground continuous wall and side wall of main structure in laminated wall structure of subway station
CN112523275B (en) * 2020-11-26 2022-02-15 华侨大学 Method for testing interaction between underground continuous wall and side wall of main structure in laminated wall structure of subway station

Similar Documents

Publication Publication Date Title
CN104122201B (en) A kind of armored concrete bond stress and sliding measurement apparatus
US8776592B2 (en) Automatic hydrologic parameter measuring system for river flow and the method using the same
CN103575769B (en) A kind of piezoelectric transducer for monitoring steel bar corrosion and monitoring steel bar corrosion method
CN105352884B (en) Test the experimental method and component of concrete and coal, rock or concrete adhesion strength
CN210487229U (en) Shield tail synchronous grouting slurry buoyancy measuring device
CN105089498A (en) Experiment device and method for deep-water jetting, guiding pipe releasing and well drilling
CN109724909A (en) Measure the experimental rig of tunnel-liner resistance of chloride ion penetration and crack progressing
CN109505625B (en) Combined testing device for internal force and external force of shield tunnel segment and manufacturing and embedding method
CN105136072B (en) A kind of Tunnel Lining Cracks depth measurement method and measurement apparatus
CN108086355A (en) Pre-buried channel flow installing and fixing method under cast-in-place piping lane traditional handicraft
CN208136889U (en) A kind of soil pressure cell fixed installation structure
CN109281250A (en) Deck type external tendon multiple-arch bridge arch ring linearly with prestress control construction method
CN106644930A (en) Device and method for bonding slippage testing inside reinforced concrete
CN103728146A (en) Method for simulation foundation pit excavation inner supporting experiments on basis of simple soil engineering centrifugal machine and special clamp thereof
CN103323156B (en) Dangerous rock masses stress pick-up transducers and installation method thereof
CN102854302A (en) Testing device and method for real-time measurement of cracking time and crack width of concrete at early age
CN110359485A (en) A kind of pre-buried trough fixation device of steel form and its construction method
CN203908928U (en) Reinforced concrete bond stress and slippage measuring device
CN109211464B (en) Osmometer embedding device and method
CN105735228A (en) Construction method and installation accuracy control method of rack systems of high-lift rack climbing type ship lift
CN205000639U (en) Modular wear floor cover
CN105625721B (en) The boring and coring method and its servicing unit in concrete lamp hole
CN103940914B (en) Method for manufacturing calibration model of pipeline grouting quality detection instrument and calibration model
CN107366313B (en) Burying method of inclinometer pipe
CN210507563U (en) Miniature steel-pipe pile body soil pressure sensor lays device

Legal Events

Date Code Title Description
GR01 Patent grant