CN208121871U CN201820521736.7U CN201820521736U CN208121871U CN 208121871 U CN208121871 U CN 208121871U CN 201820521736 U CN201820521736 U CN 201820521736U CN 208121871 U CN208121871 U CN 208121871U
Authority
CN
China
Prior art keywords
water
switching valve
electric switching
water supply
inlet manifold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820521736.7U
Other languages
Chinese (zh)
Inventor
李静
李明忠
闫文峰
李伟伟
胡明
许海洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Wujiang Hydropower Development Co Ltd Shatuo Power Plant
Original Assignee
Guizhou Wujiang Hydropower Development Co Ltd Shatuo Power Plant
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Wujiang Hydropower Development Co Ltd Shatuo Power Plant filed Critical Guizhou Wujiang Hydropower Development Co Ltd Shatuo Power Plant
Priority to CN201820521736.7U priority Critical patent/CN208121871U/en
Application granted granted Critical
Publication of CN208121871U publication Critical patent/CN208121871U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Hydraulic Turbines (AREA)
  • Control Of Water Turbines (AREA)

Abstract

The utility model discloses a kind of large and medium-sized hydroelectric power plant's technical water supply dual redundant constructions of switch, including:Water main,The first electric switching valve on water main is set,Water inlet manifold for supplying water to power generation machine part,And the controller for controlling the opening and closing of the first electric switching valve,Water main is connect by the first electric switching valve with water inlet manifold,The water supply branch in parallel with the first electric switching valve is equipped between the water main and water inlet manifold,The water supply branch road is equipped with the second electric switching valve,The control terminal of second electric switching valve and the output port conducting wire of controller connect,Pressure-detecting device is equipped in the water inlet manifold inner cavity,The signal output end of pressure-detecting device and the input port conducting wire of controller connect,The utility model can guarantee unit under operation in normally-pressured neighbor of the technical water supply reliably uninterruptedly to supply and maintain permission,Guarantee turbine-generator units reliability of operation,Safety.

Description

Large and medium-sized hydroelectric power plant's technical water supply dual redundant construction of switch
Technical field
The utility model relates to a kind of large and medium-sized hydroelectric power plant's technical water supply dual redundant constructions of switch, belong to hydroelectric power plant and control safely Field processed.
Background technique
Technical water supply is also known as production water supply, and main object is various electromechanical running equipments, there is air cooler of generator, hair Each guide bearing cooling of motor and lubrication etc.;Effect is cooled down to running equipment, is also used to be lubricated sometimes(Such as the hydraulic turbine Rubber tile guide bearing).
With the development and extensive use of hydroelectric power plant of China control system, establishing robust techniques water system is hydroelectric power plant One of important topic, without preventing technical water supply general pipeline electric switching valve from smuggling program in original design, generator normal operating condition If lower electric switching valve situations such as there are mechanical breakdowns, infiltration, it will lead to electric switching valve and smuggle and hydraulic pressure subnormal pressure Value will be unable to meet each guide bearing of generating set, aerial cooler cooling and the cooling requirement of other electromechanical equipments, and then can cause It is reliable for operation also to will seriously affect hydrogenerator under " remote control, few man on duty " mode for hydrogenerator non-programmed halt Property.
Utility model content
The technical problems to be solved in the utility model is:A kind of large and medium-sized hydroelectric power plant's technical water supply dual redundant switch knot is provided Structure guarantees the reliability of technical water supply, with overcome the deficiencies in the prior art.
The technical solution of the utility model is:A kind of large and medium-sized hydroelectric power plant's technical water supply dual redundant construction of switch, including:For Supply mains, the first electric switching valve being arranged on water main, the water inlet manifold for supplying water to power generation machine part, Yi Jiyong In the controller for controlling the opening and closing of the first electric switching valve, water main is connect by the first electric switching valve with water inlet manifold, The water supply branch in parallel with the first electric switching valve is equipped between the water main and water inlet manifold, the water supply branch road is set There is the second electric switching valve, the control terminal of the second electric switching valve and the output port conducting wire of controller connect, in the water inlet Pressure-detecting device is equipped in total tube cavity, the signal output end of pressure-detecting device and the input port conducting wire of controller connect It connects.
The pressure-detecting device includes pressure switch and pressure transmitter.
The utility model has the beneficial effects that:The utility model passes through double in every generating set technical water supply general pipeline configuration Redundancy electric switching valve is normal lower than preset when unit Programmable detection to technology water inlet manifold pressure in generator operation When hydraulic pressure value, program, which will execute this section, prevents electric switching valve(First electric switching valve)Smuggle program, open another group it is spare Electric switching valve(Second electric switching valve)Technology water inlet manifold water pressure is set to rise to normal hydraulic pressure value, reaching technical water supply can By the purpose of property.The utility model can guarantee unit under operation technical water supply reliably uninterruptedly to supply and maintain fair Perhaps in normally-pressured neighbor, guarantee turbine-generator units reliability of operation, safety.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the System Control Figure of the utility model;
Description of symbols:1, water main, 2, water inlet manifold, the 3, first electric switching valve, the 4, second electric switching valve, 5, pressure transmitter, 6, pressure switch, 7, water supply branch.
Specific embodiment
With reference to the accompanying drawing and utility model is described further in specific embodiment:
With reference to Fig. 1 and Fig. 2, according to a kind of large and medium-sized hydroelectric power plant's technical water supply dual redundant construction of switch of the utility model, packet It includes:Water main 1, the first electric switching valve 3 being arranged on water main 1, the water inlet for supplying water to power generation machine part are total Pipe 2, and the controller for controlling the opening and closing of the first electric switching valve 3, water main 1 by the first electric switching valve 3 with into Supply mains 2 connects, and the above structure is the technical water supply structure in existing power plant, if the electric switching valve under operation state of generator There are mechanical breakdown, infiltrations etc., and electric switching valve to be caused to be smuggled, and pressure of supply water is lower than 0.2MPa, will be unable to meet generating set each Guide bearing, aerial cooler are cooling and the cooling of other electromechanical equipments requires, it will cause hydrogenerator water dispenser accidental shutdown, It will seriously affect hydrogenerator operational reliability under " remote control, few man on duty " mode.
The water supply branch 7 in parallel with the first electric switching valve 3, the water supply are equipped between water main 1 and water inlet manifold 2 Second electric switching valve 4 is installed, the control terminal of the second electric switching valve 4 and the output port conducting wire of controller connect on branch 7 It connects, pressure-detecting device, the input of the signal output end and controller of pressure-detecting device is installed in 2 inner cavity of water inlet manifold The connection of port conducting wire, when hydraulic pressure deficiency setting value in this way in water inlet manifold 2, controller controls the second electric switching valve 4 and opens Dynamic, water supply branch 7 also supplies water at this time, so that the hydraulic pressure in water inlet manifold 2 rises to predetermined value, this kind of mode can be solved effectively Electric switching valve is smuggled caused by the reasons such as there was a mechanical failure because of the first electric switching valve 3, infiltration, makes 2 internal pressure of water inlet manifold Power is lower than normal value, thus the problem of causing generator water dispenser accidental shutdown.
Preferably, the pressure-detecting device includes pressure switch 6 and pressure transmitter 5, is detected due to pressure switch 6 It is discontinuous point value, and what pressure transmitter 5 detected is continuous point value, such pressure-detecting device can be detected more accurate Hydraulic pressure value, improve the judgement reliability of controller.In practice, such as by pressure switch 6 and pressure transmitter 5 it is respectively provided with just Ordinary water pressure is 0.2MPa, in real time send pressure signal to unit monitoring system local control device, if receiving machine in unit program Group is in operating state signal(Locking is extracted and generating unit speed is not less than 0.2%), 1 pressure of water main(Analog quantity)It is lower than It is good that 0.2MPa and data acquire quality;1 pressure switch 6 of water main(Switching value)Issue hydraulic pressure spectral artifacts.Unit program Comprehensive descision is that the electronic pass valve of technical water supply is smuggled, and opens another group of spare electric switching valve(That is the second electric switching valve 4)Make Hydraulic pressure maintains in normal range hydraulic pressure.
It, cannot the above content is specific preferred embodiment further detailed description of the utility model is combined Assert that the specific implementation of the utility model is only limited to these instructions.For the ordinary skill of the utility model technical field For personnel, without departing from the concept of the premise utility, a number of simple deductions or replacements can also be made, should all regard To belong to the protection scope of the utility model.

Claims (2)

1. a kind of large and medium-sized hydroelectric power plant's technical water supply dual redundant construction of switch, including:Water main(1), be arranged in water main (1)On the first electric switching valve(3), for power generation machine part supply water water inlet manifold(2), and for controlling the first electricity Dynamic switch valve(3)The controller of opening and closing, water main(1)Pass through the first electric switching valve(3)With water inlet manifold(2)Connection, It is characterized in that:In the water main(1)With water inlet manifold(2)Between be equipped with and the first electric switching valve(3)Water supply in parallel Branch(7), the water supply branch(7)It is equipped with the second electric switching valve(4), the second electric switching valve(4)Control terminal and control The output port conducting wire of device processed connects, in the water inlet manifold(2)Pressure-detecting device is equipped in inner cavity, pressure-detecting device The connection of the input port conducting wire of signal output end and controller.
2. large and medium-sized hydroelectric power plant's technical water supply dual redundant construction of switch according to claim 1, it is characterised in that:The pressure Force checking device includes pressure switch(6)And pressure transmitter(5).
CN201820521736.7U 2018-04-13 2018-04-13 Large and medium-sized hydroelectric power plant's technical water supply dual redundant construction of switch Active CN208121871U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820521736.7U CN208121871U (en) 2018-04-13 2018-04-13 Large and medium-sized hydroelectric power plant's technical water supply dual redundant construction of switch

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820521736.7U CN208121871U (en) 2018-04-13 2018-04-13 Large and medium-sized hydroelectric power plant's technical water supply dual redundant construction of switch

Publications (1)

Publication Number Publication Date
CN208121871U true CN208121871U (en) 2018-11-20

Family

ID=64191460

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820521736.7U Active CN208121871U (en) 2018-04-13 2018-04-13 Large and medium-sized hydroelectric power plant's technical water supply dual redundant construction of switch

Country Status (1)

Country Link
CN (1) CN208121871U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114635926A (en) * 2022-02-17 2022-06-17 贵州乌江水电开发有限责任公司 Cooling protection device for hydropower station water turbine

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114635926A (en) * 2022-02-17 2022-06-17 贵州乌江水电开发有限责任公司 Cooling protection device for hydropower station water turbine
CN114635926B (en) * 2022-02-17 2023-09-22 贵州乌江水电开发有限责任公司 Cooling protection device for hydropower station water turbine

Similar Documents

Publication Publication Date Title
CN106437912B (en) A kind of natural gas pressure difference generating system and its control method
CN103104532B (en) A kind of mining intelligent ventilator controller
CN104913179B (en) A kind of automatic lubricating system
CN208121871U (en) Large and medium-sized hydroelectric power plant's technical water supply dual redundant construction of switch
CN206397647U (en) Oil pressure numerical value harvester and hydraulic oil jack-up pressure monitoring system
CN103398291B (en) A kind of thermal power plant compressed air system and pressure classification supplying method thereof
CN206313698U (en) A kind of frequency conversion and power frequency switching circuit air-cooler
CN112196783A (en) Automatic control starting method for pump set of long-distance large-pipe-diameter water delivery and transfer pump station
CN205302580U (en) Leak water alarming system based on reactive power compensator
CN204553319U (en) A kind of blower fan oil pump interlock circuit
CN207703481U (en) Gas electricity unit centralized monitoring system
CN106286254A (en) A kind of air compressor machine of full-automatic unmanned supervision
CN203445507U (en) Brush generator set integrated intelligent control screen
CN204962245U (en) Online automatic switching control equipment of double pump
CN205644256U (en) Property equipment is concentrated and distribution control management system
CN205821366U (en) A kind of blast furnace cold cut water supply system
CN213656286U (en) Novel connecting pipeline, pipeline device and fan lubricating system
CN205638880U (en) Closed level four connection in series -parallel pump station system
CN206190342U (en) Natural atmospheric pressure difference power generation system
CN208885927U (en) A kind of control device of speed reducer cooling water
CN102183971B (en) Automatic water-replenishing device for gas producer
CN203201842U (en) Mining intelligent ventilator controller
CN209282813U (en) Monitor the safety relay of safety return circuit output
CN206189506U (en) Redundant measure and control's intelligent constant pressure water supply control system of residential building
CN208501637U (en) A kind of hydrogenerator tail water door infiltration monitoring device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant