CN208121763U - A kind of piling bar Lift-on/Lift-off System and reversal hanger - Google Patents

A kind of piling bar Lift-on/Lift-off System and reversal hanger Download PDF

Info

Publication number
CN208121763U
CN208121763U CN201820097153.6U CN201820097153U CN208121763U CN 208121763 U CN208121763 U CN 208121763U CN 201820097153 U CN201820097153 U CN 201820097153U CN 208121763 U CN208121763 U CN 208121763U
Authority
CN
China
Prior art keywords
hoisting
steel
ear plate
pin shaft
overturning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820097153.6U
Other languages
Chinese (zh)
Inventor
幸思佳
毛炯程
黄剑锋
张瑞霞
李方峰
张克
万成钢
田继开
卢鹏
涂满明
潘军
余本俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Major Bridge Engineering Group Co Ltd
Original Assignee
China Railway Major Bridge Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Engineering Group Co Ltd filed Critical China Railway Major Bridge Engineering Group Co Ltd
Priority to CN201820097153.6U priority Critical patent/CN208121763U/en
Application granted granted Critical
Publication of CN208121763U publication Critical patent/CN208121763U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model discloses a kind of piling bar Lift-on/Lift-off System and reversal hangers, are related to piling bar lifting field, including a cabinet, tank ends are equipped with a component, and component includes:The otic placode group extended laterally by cabinet one end, otic placode group is used for and steel-pipe pile pin joint, and otic placode group includes two spaced first otic placodes to form the gap for steel-pipe pile insertion;The supporting structure upwardly extended by cabinet;Set on the first pin shaft of the cabinet other end;Piling bar lifting reversal hanger further includes shoulder pole girder, and shoulder pole girder both ends are pivotally connected with the first pin shaft of the component of tank ends respectively.The utility model structure novel is small and exquisite, uniform force, can be suitable for the lifting demand of Transmission of Super-Long Large Diameter piling bar different angle to avoid the large-tonnage steel stake destruction that suspension centre is generated by unbalance stress in hoisting process.

Description

一种钢桩吊装系统及翻转吊具A kind of steel pile hoisting system and flip sling

技术领域technical field

本实用新型涉及钢桩施工领域,具体涉及一种钢桩吊装系统及翻转吊具。The utility model relates to the field of steel pile construction, in particular to a steel pile hoisting system and an overturning sling.

背景技术Background technique

目前,常规预制桩及钢管桩的吊装方法为:在钢桩端头上设置吊耳,使用起吊设备通过吊耳直接吊起钢桩,吊装工作完成后解除钢桩与设备的连接,并切除吊耳。然而对于一些特定的如大直径大吨位的钢管桩而言,常规的吊装方式对吊耳和连接部位的结构受力要求高,需要在钢桩上设置数量较多的吊点并在吊装完成后割除,操作工序繁琐,费时废料。另外,采用常规的吊装方式容易使吊点在起吊的不同阶段不均匀受力,从而引起吊点的损坏。At present, the hoisting method of conventional prefabricated piles and steel pipe piles is as follows: set lifting lugs on the ends of the steel piles, use lifting equipment to directly lift the steel piles through the lifting lugs, release the connection between the steel piles and the equipment after the hoisting work is completed, and cut off the Lugs. However, for some specific steel pipe piles such as large diameter and large tonnage, the conventional hoisting method has high requirements on the structural stress of the lifting lugs and connecting parts, and it is necessary to set a large number of lifting points on the steel piles and complete the hoisting. After cutting, the operation process is cumbersome, time-consuming and waste. In addition, conventional hoisting methods are likely to cause uneven force on the hoisting point at different stages of hoisting, thus causing damage to the hoisting point.

实用新型内容Utility model content

针对现有技术中存在的缺陷,本实用新型的目的在于提供一种钢桩吊装系统及翻转吊具,可实现长大直径预制桩及钢桩的快速吊装成形。Aiming at the defects existing in the prior art, the purpose of this utility model is to provide a steel pile hoisting system and a flipping hoist, which can realize the rapid hoisting and forming of long-diameter prefabricated piles and steel piles.

为达到以上目的,本实用新型采取的技术方案是:For achieving above object, the technical scheme that the utility model takes is:

一种钢桩吊装翻转吊具,其包括一箱体,所述箱体两端均设有一组件,所述组件包括:A steel pile hoisting overturning spreader, which includes a box body, two ends of the box body are provided with an assembly, the assembly includes:

由所述箱体一端侧向延伸的耳板组,所述耳板组用于和钢桩销接,且所述耳板组包括两间隔设置的第一耳板以形成供钢桩插入的间隙;由所述箱体向上延伸的抵持结构;设于所述箱体另一端的第一销轴;A set of lugs extending laterally from one end of the box, the set of lugs is used for pin connection with steel piles, and the set of lugs includes two first lugs arranged at intervals to form a gap for the insertion of steel piles ; a resisting structure extending upward from the box; a first pin located at the other end of the box;

所述钢桩吊装翻转吊具还包括扁担梁,所述扁担梁两端分别与所述箱体两端的组件的第一销轴枢接。The hoisting and overturning sling for steel piles further includes a shoulder pole beam, and two ends of the shoulder pole beam are respectively pivotally connected to the first pin shafts of the components at both ends of the box body.

在上述技术方案的基础上,所述耳板组还包括设于所述箱体与第一耳板相对一侧的第二耳板,所述第一销轴设于第二耳板中。On the basis of the above technical solution, the ear plate set further includes a second ear plate arranged on the side of the box body opposite to the first ear plate, and the first pin shaft is arranged in the second ear plate.

在上述技术方案的基础上,所述扁担梁两端均设有向下延伸的第三耳板,所述第三耳板分别与所述箱体两端的组件的第一销轴枢接。On the basis of the above technical solution, both ends of the shoulder pole beam are provided with third lugs extending downward, and the third lugs are respectively pivotally connected to the first pins of the components at both ends of the box.

在上述技术方案的基础上,所述扁担梁长度方向垂直于所述第三耳板设置平面。On the basis of the above technical solution, the length direction of the shoulder pole beam is perpendicular to the installation plane of the third lug plate.

在上述技术方案的基础上,所述扁担梁两端均设置有两间隔设置的所述第三耳板,所述两间隔设置的所述第三耳板形成供所述第二耳板插入的间隙。On the basis of the above technical solution, the two ends of the pole beam are provided with the third lugs arranged at two intervals, and the third lugs arranged at two intervals form a hole for the insertion of the second lug. gap.

在上述技术方案的基础上,所述第一耳板、第二耳板和第三耳板处均设置有加强钢板。On the basis of the above technical solution, the first lug plate, the second lug plate and the third lug plate are all provided with reinforcing steel plates.

在上述技术方案的基础上,所述扁担梁还包括与所述第一销轴垂直设置的第二销轴。On the basis of the above technical solution, the shoulder pole beam further includes a second pin shaft perpendicular to the first pin shaft.

本实用新型还提供一种钢桩吊装系统,包括:The utility model also provides a steel pile hoisting system, including:

如前所述的钢桩吊装翻转吊具;The steel pile hoisting and overturning spreader as mentioned above;

起吊部件,包括吊索,所述吊索一端固定在吊车吊钩上,另一端与所述扁担梁可拆卸连接。The lifting part includes a sling, one end of the sling is fixed on the crane hook, and the other end is detachably connected to the shoulder beam.

在上述技术方案的基础上,所述扁担梁还包括与所述第一销轴垂直设置的第二销轴;所述吊索与所述吊车吊钩相对的一端设有卸扣,所述卸扣与第二销轴枢接。On the basis of the above technical solution, the shoulder pole beam also includes a second pin shaft perpendicular to the first pin shaft; the end of the sling opposite to the crane hook is provided with a shackle, and the shackle The buckle is pivotally connected to the second pin shaft.

与现有技术相比,本实用新型的优点在于:Compared with the prior art, the utility model has the advantages of:

(1)本实用新型的钢桩吊装翻转吊具减少了钢桩吊装过程中的吊耳数量,免去了切除吊耳的环节,减少了结构废料,节约了材料用量,降低了钢桩施工成本。(1) The steel pile hoisting and flipping hoist of the utility model reduces the number of lifting lugs in the steel pile hoisting process, eliminates the link of cutting the lifting lugs, reduces structural waste, saves material consumption, and reduces the construction cost of steel piles .

(2)本实用新型的钢桩吊装翻转吊具中箱体与扁担梁利用销轴连接成整体后再与钢桩销接,整个结构以销接为主,拆装方便,倒用性好。(2) In the steel pile hoisting overturning spreader of the utility model, the box body and the pole beam are connected into a whole by a pin shaft and then pinned to the steel pile.

(3)本实用新型的钢桩吊装翻转吊具将原始的焊接吊耳结构创新的转变为铰接形式,可使吊点在吊装的各个阶段受力均匀,结构灵活,安全可靠。(3) The steel pile hoisting flip sling of the utility model innovatively transforms the original welded lug structure into a articulated form, which can make the lifting points evenly stressed at each stage of hoisting, flexible in structure, safe and reliable.

附图说明Description of drawings

图1为本实用新型实施例中钢桩吊装翻转吊具的结构主视图;Fig. 1 is the front view of the structure of the steel pile hoisting and overturning spreader in the embodiment of the utility model;

图2为本实用新型实施例中钢桩吊装翻转吊具的侧视图;Fig. 2 is the side view of the steel pile hoisting turning over spreader in the utility model embodiment;

图3为本实用新型实施例中箱体的结构主视图;Fig. 3 is the structural front view of box body in the utility model embodiment;

图4为本实用新型实施例中箱体的侧视图;Fig. 4 is the side view of casing in the utility model embodiment;

图5为本实用新型实施例中扁担梁的结构主视图;Fig. 5 is the front view of the structure of the pole beam in the embodiment of the utility model;

图6为本实用新型实施例中扁担梁的侧视图;Fig. 6 is a side view of the pole beam in the embodiment of the utility model;

图中:1-箱体,2-耳板组,3-抵持结构,4-第一销轴,5-扁担梁, 6-第二销轴,7-加强钢板,8-吊索,9-吊车吊钩,10-卸扣,11-钢桩, 20-第一耳板,21-第二耳板,51-第三耳板。In the figure: 1-box body, 2-lug plate group, 3-resistance structure, 4-first pin shaft, 5-horse pole beam, 6-second pin shaft, 7-reinforced steel plate, 8-sling, 9 -crane hook, 10-shackle, 11-steel pile, 20-the first lug, 21-the second lug, 51-the third lug.

具体实施方式Detailed ways

以下结合附图及实施例对本实用新型作进一步详细说明。Below in conjunction with accompanying drawing and embodiment the utility model is described in further detail.

参见图1所示,本实用新型实施例提供一种钢桩吊装翻转吊具,包括:Referring to Fig. 1, the embodiment of the present invention provides a steel pile hoisting flipping sling, comprising:

箱体1,箱体1两端均设有一组件,所述组件包括:The box body 1 is provided with an assembly at both ends of the box body 1, and the assembly includes:

由所述箱体1一端侧向延伸的耳板组2,耳板组2用于和钢桩11 销接,且所述耳板组2包括两间隔设置的第一耳板20以形成供钢桩 11插入的间隙;The ear plate group 2 extending laterally from one end of the box body 1 is used for pin connection with the steel pile 11, and the ear plate group 2 includes two first ear plates 20 arranged at intervals to form a steel supply the gap into which the pile 11 is inserted;

由箱体1向上延伸的抵持结构3;A supporting structure 3 extending upward from the box body 1;

设于箱体1另一端的第一销轴4;The first pin shaft 4 arranged at the other end of the box body 1;

钢桩吊装翻转吊具还包括扁担梁5,扁担梁5两端分别与箱体1 两端的组件的第一销轴4枢接。The hoisting and overturning sling for the steel pile also includes a shoulder pole beam 5 , and the two ends of the shoulder pole beam 5 are respectively pivotally connected with the first pin shafts 4 of the components at both ends of the box body 1 .

在本实用新型的一个实施例中,耳板组2还包括设于箱体1与第一耳板20相对一侧的第二耳板21,第一销轴4设于第二耳板21中。In one embodiment of the present utility model, the ear plate group 2 further includes a second ear plate 21 arranged on the side opposite to the first ear plate 20 of the box body 1, and the first pin shaft 4 is arranged in the second ear plate 21 .

在本实用新型的一个实施例中,扁担梁5两端均设有向下延伸的第三耳板51,所述第三耳板51分别与所述箱体1两端的组件的第一销轴4枢接,扁担梁5长度方向垂直于所述第三耳板51设置平面;还可在扁担梁5两端均设置两个间隔设置的第三耳板51,这两个间隔设置的第三耳板51可形成供第二耳板21插入的间隙。In one embodiment of the present utility model, both ends of the shoulder pole beam 5 are provided with third lugs 51 extending downward, and the third lugs 51 are connected with the first pins of the components at both ends of the box body 1 respectively. 4 pivot connection, the length direction of the shoulder pole beam 5 is perpendicular to the plane where the third ear plate 51 is arranged; two third ear plates 51 arranged at intervals can also be arranged at both ends of the shoulder pole beam 5, and the third ear plates 51 arranged at intervals can be arranged at two intervals. The lug 51 may form a gap into which the second lug 21 is inserted.

在本实用新型的一个实施例中,第一耳板20、第二耳板21和第三耳板51处均设置有加强钢板7,保障各枢接或铰接部位的构件强度,提高吊具和吊装系统的稳定性In one embodiment of the present utility model, the first lug plate 20, the second lug plate 21 and the third lug plate 51 are provided with reinforcing steel plates 7 to ensure the component strength of each pivot joint or hinge joint and improve the strength of the hanger and The stability of the hoisting system

在本实用新型的一个实施例中,在扁担梁5上设置与第一销轴4 垂直设置的第二销轴6,便于本实用新型吊具与起吊部件的配合使用。In one embodiment of the present invention, the second pin shaft 6 perpendicular to the first pin shaft 4 is arranged on the shoulder pole beam 5, which facilitates the use of the utility model spreader and the hoisting parts.

本实用新型实施例还提供一种包括如前所述钢桩吊装翻转吊具的钢桩吊装系统,除钢桩吊装翻转吊具外还包括:The embodiment of the utility model also provides a steel pile hoisting system including the steel pile hoisting and turning sling as mentioned above, in addition to the steel pile hoisting and turning sling, it also includes:

起吊部件,包括吊索8,吊索8一端固定在所述吊车吊钩9上,另一端与扁担梁5可拆卸连接。The hoisting parts include a sling 8, one end of the sling 8 is fixed on the crane hook 9, and the other end is detachably connected with the shoulder beam 5.

在使用如上所述扁担梁5还设置有与所述第一销轴4垂直设置的第二销轴6的实施例的钢桩吊装翻转吊具的钢桩吊装系统内,具体的,吊索8与吊车吊钩9相对的一端可拆卸部件可设置为卸扣10,卸扣10与第二销轴6枢接。In the steel pile hoisting system using the steel pile hoisting turning tool of the embodiment in which the shoulder pole beam 5 is also provided with the second pin shaft 6 perpendicular to the first pin shaft 4 as described above, specifically, the sling 8 The detachable part at one end opposite to the crane hook 9 can be set as a shackle 10 , and the shackle 10 is pivotally connected with the second pin shaft 6 .

本实用新型说明书中记载的第一耳板20为设于箱体1上,与钢桩11的连接耳板;第二耳板21为设于箱体1上,与扁担梁5的连接耳板;第三耳板51为设于扁担梁5上,与箱体1的连接耳板。The first ear plate 20 recorded in the utility model description is located on the box body 1 and connects the ear plate with the steel pile 11; the second ear plate 21 is located on the box body 1 and connects the ear plate with the pole beam 5 ; The third ear plate 51 is located on the shoulder beam 5 and connects the ear plate with the box body 1 .

使用本实用新型钢桩翻转吊具的具体工序如下:The specific procedure of using the utility model steel pile overturning hanger is as follows:

首先进行钢桩翻转吊具的组装;将箱体1和扁担梁5通过销接第二耳板21与第三耳板51成整体,确保箱体1和扁担梁5可绕连接的第一销轴4旋转,钢桩翻转吊具安装完成后与钢桩11销接,确保二者能绕连接销轴旋转的同时保证箱体抵持结构3与钢桩11端部接触完好。第二步进行吊装系统的安装;翻转吊具组装完成之后,将箱体 1与钢桩11桩端通过第一耳板20销接,将扁担梁5与卸扣10销接,钢桩11及吊具整体通过卸扣10连接起吊设备。第三步进行大吨位钢桩的吊装;起吊过程中,通过抵持结构3控制钢桩11相对位置,钢桩11桩端以吊具为轴心由起吊设备牵引翻转向上提升,将置于存放场地上的水平钢桩11翻转提升至竖直状态并离开地面。First carry out the assembly of the steel pile turning hanger; the box body 1 and the pole beam 5 are integrated by pinning the second ear plate 21 and the third ear plate 51 to ensure that the box body 1 and the pole beam 5 can be connected around the first pin The shaft 4 rotates, and the steel pile overturning spreader is installed and pinned to the steel pile 11 to ensure that the two can rotate around the connecting pin shaft while ensuring that the box resisting structure 3 is in good contact with the end of the steel pile 11. The second step is to install the hoisting system; after the flipping sling is assembled, the box body 1 and the steel pile 11 pile ends are pinned through the first ear plate 20, and the shoulder beam 5 is pinned to the shackle 10, and the steel pile 11 and the shackle 10 are pinned together. The entire spreader is connected to the lifting device through the shackle 10. The third step is to hoist the large-tonnage steel pile; during the hoisting process, the relative position of the steel pile 11 is controlled by the support structure 3, and the pile end of the steel pile 11 is lifted by the hoisting equipment with the spreader as the axis, and will be placed in the storage The horizontal steel pile 11 on the ground is turned over and promoted to a vertical state and leaves the ground.

本实用新型不局限于上述实施方式,对于本技术领域的普通技术人员来说,在不脱离本实用新型原理的前提下,还可以做出若干改进和润饰,这些改进和润饰也视为本实用新型的保护范围之内。本说明书中未作详细描述的内容属于本领域专业技术人员公知的现有技术。The utility model is not limited to the above-mentioned embodiments. For those of ordinary skill in the art, without departing from the principle of the utility model, some improvements and modifications can also be made. within the scope of the new protection. The content not described in detail in this specification belongs to the prior art known to those skilled in the art.

Claims (9)

1.一种钢桩吊装翻转吊具,其特征在于:其包括一箱体(1),所述箱体(1)两端均设有一组件,所述组件包括:1. A steel pile hoisting overturning spreader is characterized in that: it comprises a casing (1), and an assembly is provided at both ends of the casing (1), and the assembly includes: 由所述箱体(1)一端侧向延伸的耳板组(2),所述耳板组(2)用于和钢桩(11)销接,且所述耳板组(2)包括两间隔设置的第一耳板(20)以形成供钢桩(11)插入的间隙;An ear plate group (2) extending laterally from one end of the box body (1), the ear plate group (2) is used for pin connection with the steel pile (11), and the ear plate group (2) includes two First lugs (20) arranged at intervals to form gaps for insertion of steel piles (11); 由所述箱体(1)向上延伸的抵持结构(3);a resisting structure (3) extending upward from the box (1); 设于所述箱体(1)另一端的第一销轴(4);a first pin shaft (4) arranged at the other end of the box body (1); 所述钢桩吊装翻转吊具还包括扁担梁(5),所述扁担梁(5)两端分别与所述箱体(1)两端的组件的第一销轴(4)枢接。The steel pile hoisting and overturning spreader also includes a shoulder pole beam (5), and the two ends of the shoulder pole beam (5) are respectively pivotally connected with the first pin shafts (4) of the components at the two ends of the box body (1). 2.如权利要求1所述的钢桩吊装翻转吊具,其特征在于:所述耳板组(2)还包括设于所述箱体(1)与第一耳板(20)相对一侧的第二耳板(21),所述第一销轴(4)设于第二耳板(21)中。2. The hoisting and overturning spreader for steel piles according to claim 1, characterized in that: the ear plate group (2) also includes a side of the box body (1) opposite to the first ear plate (20). The second ear plate (21), the first pin shaft (4) is arranged in the second ear plate (21). 3.如权利要求2所述的钢桩吊装翻转吊具,其特征在于:所述扁担梁(5)两端均设有向下延伸的第三耳板(51),所述第三耳板(51)分别与所述箱体(1)两端的组件的第一销轴(4)枢接。3. The hoisting and overturning spreader for steel piles as claimed in claim 2, characterized in that: both ends of the shoulder beam (5) are provided with a third ear plate (51) extending downward, and the third ear plate (51) are respectively pivotally connected to the first pin shafts (4) of the components at both ends of the box body (1). 4.如权利要求3所述的钢桩吊装翻转吊具,其特征在于:所述扁担梁(5)长度方向垂直于所述第三耳板(51)设置平面。4. The hoisting and overturning spreader for steel piles according to claim 3, characterized in that: the length direction of the shoulder pole beam (5) is perpendicular to the installation plane of the third ear plate (51). 5.如权利要求3所述的钢桩吊装翻转吊具,其特征在于:所述扁担梁(5)两端均设置有两间隔设置的所述第三耳板(51),所述两间隔设置的所述第三耳板(51)形成供所述第二耳板(21)插入的间隙。5. The hoisting and overturning spreader for steel piles as claimed in claim 3, characterized in that: the two ends of the shoulder beam (5) are provided with the third lugs (51) arranged at two intervals, and the two intervals The provided third ear plate (51) forms a gap for insertion of the second ear plate (21). 6.如权利要求5所述的钢桩吊装翻转吊具,其特征在于:所述第一耳板(20)、第二耳板(21)和第三耳板(51)处均设置有加强钢板(7)。6. The hoisting and overturning spreader for steel piles according to claim 5, characterized in that: the first lug (20), the second lug (21) and the third lug (51) are all provided with reinforcement steel plate (7). 7.如权利要求1所述的钢桩吊装翻转吊具,其特征在于:所述扁担梁(5)还包括与所述第一销轴(4)垂直设置的第二销轴(6)。7. The hoisting and overturning spreader for steel piles according to claim 1, characterized in that the shoulder beam (5) further comprises a second pin shaft (6) perpendicular to the first pin shaft (4). 8.一种钢桩吊装系统,其特征在于,包括:8. A steel pile hoisting system, characterized in that it comprises: 权利要求1所述的钢桩吊装翻转吊具;The steel pile hoisting and overturning spreader described in claim 1; 起吊部件,包括吊索(8),所述吊索(8)一端固定在吊车吊钩(9)上,另一端与所述扁担梁(5)可拆卸连接。The hoisting part includes a sling (8), one end of the sling (8) is fixed on the crane hook (9), and the other end is detachably connected to the shoulder beam (5). 9.如权利要求8所述的钢桩吊装系统,其特征在于:所述扁担梁(5)还包括与所述第一销轴(4)垂直设置的第二销轴(6);9. The steel pile hoisting system according to claim 8, characterized in that: the shoulder beam (5) further comprises a second pin shaft (6) arranged vertically to the first pin shaft (4); 所述吊索(8)与所述吊车吊钩(9)相对的一端设有卸扣(10),所述卸扣(10)与第二销轴(6)枢接。The end of the sling (8) opposite to the crane hook (9) is provided with a shackle (10), and the shackle (10) is pivotally connected to the second pin shaft (6).
CN201820097153.6U 2018-01-19 2018-01-19 A kind of piling bar Lift-on/Lift-off System and reversal hanger Expired - Fee Related CN208121763U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820097153.6U CN208121763U (en) 2018-01-19 2018-01-19 A kind of piling bar Lift-on/Lift-off System and reversal hanger

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820097153.6U CN208121763U (en) 2018-01-19 2018-01-19 A kind of piling bar Lift-on/Lift-off System and reversal hanger

Publications (1)

Publication Number Publication Date
CN208121763U true CN208121763U (en) 2018-11-20

Family

ID=64206105

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820097153.6U Expired - Fee Related CN208121763U (en) 2018-01-19 2018-01-19 A kind of piling bar Lift-on/Lift-off System and reversal hanger

Country Status (1)

Country Link
CN (1) CN208121763U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109626201A (en) * 2018-12-29 2019-04-16 武船重型工程股份有限公司 A kind of truss bridge piece purlin turnover hoisting suspender and its application method
CN109701786A (en) * 2018-12-25 2019-05-03 江苏谦益实业有限公司 A kind of spray painting overturning system of vehicle bearing plate of multi-storied garage
CN111994791A (en) * 2020-08-11 2020-11-27 山东中铁路桥工程有限公司 Special lifting appliance for large steel piles

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109701786A (en) * 2018-12-25 2019-05-03 江苏谦益实业有限公司 A kind of spray painting overturning system of vehicle bearing plate of multi-storied garage
CN109626201A (en) * 2018-12-29 2019-04-16 武船重型工程股份有限公司 A kind of truss bridge piece purlin turnover hoisting suspender and its application method
CN111994791A (en) * 2020-08-11 2020-11-27 山东中铁路桥工程有限公司 Special lifting appliance for large steel piles

Similar Documents

Publication Publication Date Title
CN201473227U (en) jib for cranes
CN108892060A (en) A kind of crane upper mechanism is from dismantling device, crane and tears method open certainly
CN206680096U (en) One kind is used for restricted clearance hanging apparatus
CN216377143U (en) Lifting appliance for preventing large-diameter pipeline from being lifted and deformed
CN204324760U (en) A kind of independent arm head and hoisting crane
CN204057766U (en) Mast hanging device
CN202245848U (en) Counterweight balance mechanism and double jib crane
CN102922280B (en) Tower crane jib installation method and its application auxiliary installation rod
CN102505852B (en) Pump truck
CN106715316B (en) Crane with a movable crane
CN104355245B (en) Independent arm head and crane
CN216336109U (en) Turn-over lifting lug
CN208980209U (en) The outer lifting device of transformer of household portable
CN108502701B (en) Single-side internally inserted safety lifting hook for rigid pipe
CN207599140U (en) A kind of descending pipelines into ditch device
CN110092284A (en) The suspender and operating method of stake and hoisting construction are turned over for offshore wind farm single-pile foundation steel-pipe pile
CN202248921U (en) pump truck
CN211366754U (en) A light and easy-to-install tower crane
CN202322108U (en) Arm head of crane truss arm and crane
CN103071989B (en) Sectional installation method of tower crane jib and its auxiliary installation struts
CN110821264A (en) A kind of holding pole lifting frame and its holding pole assembly method
CN202808222U (en) Goose head and engineering equipment
CN209554627U (en) Negative ring segment removal spreader
CN104045008B (en) Segmental Balance Boom and Tower Cranes
CN223737556U (en) A tower crane tie rod removal device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181120

CF01 Termination of patent right due to non-payment of annual fee