CN208119869U - A kind of four-way pipe support frame downstream - Google Patents

A kind of four-way pipe support frame downstream Download PDF

Info

Publication number
CN208119869U
CN208119869U CN201820592102.0U CN201820592102U CN208119869U CN 208119869 U CN208119869 U CN 208119869U CN 201820592102 U CN201820592102 U CN 201820592102U CN 208119869 U CN208119869 U CN 208119869U
Authority
CN
China
Prior art keywords
fixed
way pipe
fixed frame
dust
top cover
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820592102.0U
Other languages
Chinese (zh)
Inventor
石国彩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201820592102.0U priority Critical patent/CN208119869U/en
Application granted granted Critical
Publication of CN208119869U publication Critical patent/CN208119869U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Specific Sealing Or Ventilating Devices For Doors And Windows (AREA)

Abstract

The utility model discloses a kind of four-way pipe support frames downstream, including bracket, the first fixed frame is fixed on the bracket, second fixed frame and third fixed frame, first fixed frame, linear guide there are two being respectively mounted on the inner wall of second fixed frame and third fixed frame, there are four fixed long slabs for setting between two linear guides, the both ends of the fixed long slab are respectively and fixedly provided with sliding block, the sliding block is connected with linear guide, the top of the bracket is equipped with support column, one end of the support column is equipped with dust-proof top cover, and dust-proof top cover is rectangular parallelepiped structure, the side of the bracket is equipped with push rod.Four-way pipe downstream can be stuck on adjacent fixation long slab by the utility model, and isolation board can carry out isolation processing to different types of four-way pipe downstream, avoid the occurrence of aliasing, the spacing of adjacent fixed long slab is adjusted, four-way pipe can will be fixedly clamped downstream, the stability of four-way pipe downstream is improved.

Description

A kind of four-way pipe support frame downstream
Technical field
The utility model relates to tube storage techniques field, specifically a kind of four-way pipe support frame downstream.
Background technique
Pipeline is connected into pipe, pipe connector and valve etc. for conveying gas, liquid or with solid particle Fluid device.In general, fluid flows to low pressure from the high pressure of pipeline after the pressurization such as air blower, compressor, pump and boiler The pressure or gravity conveying of fluid itself can also be used in place.Having many uses for pipeline is general, be used primarily in water supply, draining, heat supply, It gives gas, in long distance delivery oil and natural gas, agricultural irrigation, hydraulic engineering and various commercial plants.And four-way pipe downstream It is one of pipeline type, support frame is needed to store four-way pipe downstream, but traditional four-way pipe downstream supports holder function It is more single, it is to be improved to four-way pipe stability downstream.
Utility model content
The purpose of this utility model is to provide a kind of four-way pipe support frame downstream, to solve in the prior art downstream four The problem that siphunculus supports holder function more single, to be improved to four-way pipe stability downstream.
To achieve the above object, the utility model provides the following technical solutions:A kind of four-way pipe support frame downstream, including branch Frame is fixed with the first fixed frame, the second fixed frame and third fixed frame on the bracket, and first fixed frame and third are fixed Frame is located at the upper and lower of the second fixed frame, on the inner wall of first fixed frame, the second fixed frame and third fixed frame Installation is there are two linear guide, and there are four fixed long slab, the both ends of the fixed long slab for setting between two linear guides It is respectively and fixedly provided with sliding block, the sliding block is connected with linear guide, and limited block is equipped on sliding block, is fixed on the fixed long slab The spacing of four isolation boards, the adjacent isolation board is equal, and the two sides of isolation board are respectively and fixedly provided with buffer rubber gasket, the branch The top of frame is equipped with support column, and one end of the support column is equipped with dust-proof top cover, and dust-proof top cover is rectangular parallelepiped structure, institute The side for stating bracket is equipped with push rod, and one end of push rod is equipped with rubber handle, and the surface of the rubber handle is uniformly distributed There is anti-skid bulge.
Preferably, the bottom end of the bracket is equipped with firm banking, and the corner of the bottom end of firm banking four is respectively mounted There is movable castor.
Preferably, criss-crossing reinforcing ribs are installed in the dust-proof top cover.
Preferably, the both ends of the support column are connected with being fastened by bolts between dust-proof top cover and bracket, and support The height of column is 0.2 times of dust-proof top cover length.
Preferably, the surface of the dust-proof top cover is provided with wear-resistant coating and PVC waterproof membrane.
Compared with prior art, the utility model has the beneficial effects that:The utility model is scientific and reasonable for structure, easy to use Efficiently;Since there are four fixed long slabs for setting between adjacent linear guide, and the both ends of fixed long slab are led by sliding block and straight line What rail was connected, while uniformly there are four isolation boards for fixation on each fixed long slab, and four-way pipe downstream can be stuck in adjacent fixation On long slab, isolation board can carry out isolation processing to different types of four-way pipe downstream, avoid the occurrence of aliasing, adjust adjacent solid The spacing of fixed length plate four-way pipe can will be fixedly clamped downstream, improve the stability of four-way pipe downstream;Pass through the two sides of isolation board It is mounted on buffer rubber gasket, buffer rubber gasket can cause to wear to avoid isolation board to four-way pipe downstream, guarantee four-way downstream Pipe integrality;Dust-proof top cover is installed by one end of support column, while being fixed with criss-crossing reinforcing ribs in dust-proof top cover, it is dust-proof Anti- bar grid gear effect may be implemented in top cover, guarantees that four-way pipe spatter property, criss-crossing reinforcing ribs keep dust-proof top cover structure tighter downstream It gathers solid, is hardly damaged.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the supporting structure schematic diagram of the utility model;
Fig. 3 is the dust-proof top cover structural schematic diagram of the utility model.
In figure:1, the first fixed frame;2, fixed long slab;3, isolation board;4, buffer rubber gasket;5, linear guide;6, push rod; 7, rubber handle;8, sliding block;9, limited block;10, dust-proof top cover;11, support column;12, bracket;13, the second fixed frame;14, Three fixed frames;15, movable castor;16, firm banking;17, criss-crossing reinforcing ribs.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Please refer to Fig. 1-3, in the utility model embodiment, a kind of four-way pipe support frame, including bracket 12 downstream, bracket 12 On be fixed with the first fixed frame 1, the second fixed frame 13 and third fixed frame 14, the first fixed frame 1 and third fixed frame 14 are distinguished Positioned at the upper and lower of the second fixed frame 13, it is respectively mounted on the inner wall of the first fixed frame 1, the second fixed frame 13 and third fixed frame 14 There are two linear guide 5, there are four fixed long slabs 2, the both ends of fixed long slab 2 to be respectively and fixedly provided with for setting between two linear guides 5 Sliding block 8, sliding block 8 are connected with linear guide 5, and limited block 9 is equipped on sliding block 8, and fixed on fixed long slab 2 there are four isolation boards 3, the spacing of adjacent separator plates 3 is equal, since there are four fixed long slabs 2 for setting between adjacent linear guide 5, and fixes long slab 2 Both ends be connected by sliding block 8 with linear guide 5, while uniformly isolation board 3 there are four fixations on each fixed long slab 2 can Four-way pipe downstream is stuck on adjacent fixation long slab 2, isolation board 3 can carry out at isolation different types of four-way pipe downstream Reason, avoids the occurrence of aliasing, adjusts the spacing of adjacent fixed long slab 2, four-way pipe can will be fixedly clamped downstream, improves downstream four The stability of siphunculus, and the two sides of isolation board 3 are respectively and fixedly provided with buffer rubber gasket 4, are mounted on by the two sides of isolation board 3 Buffer rubber gasket 4, buffer rubber gasket 4 can cause to wear to avoid isolation board 3 to four-way pipe downstream, guarantee that four-way pipe is complete downstream Property, the top of bracket 12 is equipped with support column 11, and one end of support column 11 is equipped with dust-proof top cover 10, and dust-proof top cover 10 is length Cube structure, the side of bracket 12 is equipped with push rod 6, and one end of push rod 6 is equipped with rubber handle 7, the surface of rubber handle 7 It is evenly distributed with anti-skid bulge, the bottom end of bracket 12 is equipped with firm banking 16, and the corner of the bottom end of firm banking 16 four It is mounted on movable castor 15, criss-crossing reinforcing ribs 17 are installed in dust-proof top cover 10, is equipped with by one end of support column 11 Dust-proof top cover 10, while criss-crossing reinforcing ribs 17 are fixed in dust-proof top cover 10, dust-proof top cover 10 may be implemented anti-bar grid gear and make With four-way pipe spatter property, criss-crossing reinforcing ribs 17 keep 10 more compact structure of dust-proof top cover solid, are hardly damaged downstream for guarantee, prop up It is fastened by bolts and is connected between the both ends of dagger 11 and dust-proof top cover 10 and bracket 12, and the height of support column 11 is dust-proof 0.2 times of 10 length of top cover, the surface of dust-proof top cover 10 is provided with wear-resistant coating and PVC waterproof membrane.
The working principle of the utility model is:Four-way pipe downstream is stuck between adjacent fixation long slab 2 first, fixed length Isolation board 3 on plate 2 carries out isolation processing to four-way pipe downstream, and the two sides of isolation board 3 are provided with buffer rubber gasket 4, delays Rushing rubber pad 4 can cause to wear to avoid isolation board 3 to four-way pipe downstream, since fixed 2 both ends of long slab pass through sliding block 8 and straight line What guide rail 5 was connected, the spacing of adjacent fixed long slab 2 is manually adjusted, then sliding block 8 is fixed in limited block 9, makes fixed long slab 2 are less prone to sideslip, realize the clamping to four-way pipe downstream, and 12 top of bracket is provided with dust-proof top cover 10, dust-proof top cover 10 Have effects that it is dust-proof, improve downstream four-way pipe spatter property and firm banking 16 bottom end four corner is mounted on movable castor 15, rubber handle 7 is then held, four-way pipe support frame is moved to specified position downstream for promotion.
It is obvious to a person skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and And without departing substantially from the spirit or essential attributes of the utility model, it can realize that this is practical new in other specific forms Type.Therefore, in all respects, the present embodiments are to be considered as illustrative and not restrictive, this is practical new The range of type is indicated by the appended claims rather than the foregoing description, it is intended that containing for the equivalent requirements of the claims will be fallen in All changes in justice and range are embraced therein.It should not treat any reference in the claims as limiting Related claim.

Claims (5)

1. a kind of four-way pipe support frame, including bracket (12) downstream, it is characterised in that:It is solid that first is fixed on the bracket (12) Determine frame (1), the second fixed frame (13) and third fixed frame (14), first fixed frame (1) and third fixed frame (14) are respectively Upper and lower positioned at the second fixed frame (13), first fixed frame (1), the second fixed frame (13) and third fixed frame (14) There are two being respectively mounted on inner wall linear guide (5), there are four fixed long slab (2), institutes for setting between two linear guides (5) The both ends for stating fixed long slab (2) are respectively and fixedly provided with sliding block (8), and the sliding block (8) is connected with linear guide (5), and pacifies on sliding block (8) Equipped with limited block (9), fixed on the fixed long slab (2) there are four isolation board (3), the spacing phases of the adjacent isolation board (3) Deng, and the two sides of isolation board (3) are respectively and fixedly provided with buffer rubber gasket (4), the top of the bracket (12) is equipped with support column (11), one end of the support column (11) is equipped with dust-proof top cover (10), and dust-proof top cover (10) is rectangular parallelepiped structure, the branch The side of frame (12) is equipped with push rod (6), and one end of push rod (6) is equipped with rubber handle (7), the rubber handle (7) Surface is evenly distributed with anti-skid bulge.
2. a kind of four-way pipe support frame downstream according to claim 1, it is characterised in that:Pacify the bottom end of the bracket (12) Equipped with firm banking (16), and the corner of the bottom end of firm banking (16) four is mounted on movable castor (15).
3. a kind of four-way pipe support frame downstream according to claim 1, it is characterised in that:Peace in the dust-proof top cover (10) Equipped with criss-crossing reinforcing ribs (17).
4. a kind of four-way pipe support frame downstream according to claim 1, it is characterised in that:The both ends of the support column (11) It is fastened by bolts and is connected between dust-proof top cover (10) and bracket (12), and the height of support column (11) is dust-proof top cover (10) 0.2 times of length.
5. a kind of four-way pipe support frame downstream according to claim 1, it is characterised in that:The table of the dust-proof top cover (10) Face is provided with wear-resistant coating and PVC waterproof membrane.
CN201820592102.0U 2018-04-24 2018-04-24 A kind of four-way pipe support frame downstream Expired - Fee Related CN208119869U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820592102.0U CN208119869U (en) 2018-04-24 2018-04-24 A kind of four-way pipe support frame downstream

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820592102.0U CN208119869U (en) 2018-04-24 2018-04-24 A kind of four-way pipe support frame downstream

Publications (1)

Publication Number Publication Date
CN208119869U true CN208119869U (en) 2018-11-20

Family

ID=64186198

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820592102.0U Expired - Fee Related CN208119869U (en) 2018-04-24 2018-04-24 A kind of four-way pipe support frame downstream

Country Status (1)

Country Link
CN (1) CN208119869U (en)

Similar Documents

Publication Publication Date Title
CN108971570A (en) A kind of waterproof pipe drilling device with cooling effect
CN107830260B (en) A kind of fixing device for pipe fitting
CN207740554U (en) A kind of enhanced high top safety supports system
CN107489819B (en) A kind of outdoor air purge pipe mounting device
CN107855829A (en) A kind of metal hose cutter device for being easy to regulation
CN208119869U (en) A kind of four-way pipe support frame downstream
CN205766653U (en) A kind of stable floor lath cutter
CN206678034U (en) A kind of pipe cutting machine
CN107775473A (en) A kind of pipeline sanding apparatus
CN108557279A (en) A kind of four-way pipe supporting rack downstream
CN204328224U (en) A kind of novel pipeline scaffold
CN208123622U (en) A kind of rubber concrete antidetonation buttress
CN208619065U (en) A kind of novel metal pipe setback
CN204328225U (en) A kind of pipeline installation rack
CN207750589U (en) A kind of buried jet chimney fixing device of steel sleeve steel
CN208871159U (en) A kind of fixed device of water pipeline
CN207656813U (en) Pipe cutting equipment
CN207823445U (en) A kind of power cable cleaning plant
CN207452826U (en) A kind of avenue flood fighting flood control plate
CN208629560U (en) A kind of hydraulic engineering pipe cutting bracket
CN209130300U (en) A kind of hydraulic engineering tube support arrangement
CN206440553U (en) A kind of pipeline pressure testing device
CN204684769U (en) A kind of novel anti-cyclone filter
CN213745274U (en) Support arrangement for pipeline installation
CN207614231U (en) A kind of multi-functional fire plant

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181120

Termination date: 20190424

CF01 Termination of patent right due to non-payment of annual fee