CN208114418U - Cable cantilever - Google Patents

Cable cantilever Download PDF

Info

Publication number
CN208114418U
CN208114418U CN201721739847.7U CN201721739847U CN208114418U CN 208114418 U CN208114418 U CN 208114418U CN 201721739847 U CN201721739847 U CN 201721739847U CN 208114418 U CN208114418 U CN 208114418U
Authority
CN
China
Prior art keywords
support plate
cable
block
carrier block
carrier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721739847.7U
Other languages
Chinese (zh)
Inventor
张永杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Haode Storage Equipment Manufacturing Co Ltd
Original Assignee
Nanjing Haode Storage Equipment Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Haode Storage Equipment Manufacturing Co Ltd filed Critical Nanjing Haode Storage Equipment Manufacturing Co Ltd
Priority to CN201721739847.7U priority Critical patent/CN208114418U/en
Application granted granted Critical
Publication of CN208114418U publication Critical patent/CN208114418U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Unwinding Of Filamentary Materials (AREA)

Abstract

The utility model discloses a kind of cable cantilevers, belong to cable trough field, it is desirable to provide a kind of cable cantilever, its key points of the technical solution are that:Including two pedestals and the support plate for being connected to base upper surface and being arranged along the vertical direction, the side of support plate is equipped with several carrier blocks, the side of carrier block towards support plate offers sliding groove along the vertical direction, carrier block is connected on the supporting plate by sliding groove sliding, support plate is equipped with the fixed fixing piece on the supporting plate of carrier block, and carrier block offers the arc notch of current supply cable placement away from the side on ground;The utility model has the advantages that:Support plate is equipped with multiple carrier blocks for being used to carry cable, therefore energy folding and unfolding multi-layer cable, improves the utilization rate of cable cantilever.

Description

Cable cantilever
Technical field
The utility model relates to cable trough field, in particular to a kind of cable cantilever.
Background technique
Cable is that cable is usually placed on cable trough when not needing using cable by common tool in engineer operation On be collected.Traditional cable trough includes the cross bar of two brackets and installation between two supports, and cable is placed on cross bar.
With increasing for cable, limited area of storing in a warehouse, and cable can be installed by only having on cross bar on traditional cable frame, so that The number of cables that cable trough can be installed is less, and the utilization rate of cable trough is lower.
It includes support frame, bottom gag lever post that the patent of Chinese patent notification number CN204714234U, which discloses a kind of cable trough, And it is used to support the cable cantilever of cable, bottom gag lever post is mounted on support frame bottom end, and cable cantilever is mounted on top of support frame, Bottom gag lever post is multiple, multiple bottom gag lever posts shape between support frame length direction distribution, two neighboring bottom gag lever post At cable limiting slot.But this cable trough can only at most put two layers of cable, the utilization rate of cable trough is lower.
Utility model content
The purpose of the utility model is to provide a kind of cable cantilevers, the advantage is that:Support plate is equipped with multiple for holding The carrier block of download cable, therefore energy folding and unfolding multi-layer cable, improve the utilization rate of cable cantilever.
The above-mentioned technical purpose of the utility model technical scheme is that:A kind of cable cantilever, packet The support plate for including two pedestals and being connected to base upper surface and being arranged along the vertical direction, if the side of the support plate is equipped with Dry carrier block, the side of the carrier block towards support plate offer sliding groove along the vertical direction, and the carrier block passes through sliding On the supporting plate, the support plate is equipped with the fixed fixing piece on the supporting plate of carrier block, the carrying for slot sliding connection Block offers the arc notch of current supply cable placement away from the side on ground.
Through the above scheme, when needing to place cable, operator can several carrier blocks on first sliding support plate so that Several carrier blocks are arranged along the vertical direction of support plate, and by fixing piece that carrier block is fixed on the supporting plate, so that two Carrier block in a support plate corresponds, and the both ends of cable are individually positioned in corresponding two in two support plates again at this time On a carrier block, and cable is fallen into arc notch notch.Due to carrier block can on the supporting plate be equipped with it is multiple, It can according to need on one cable cantilever and place multiple cables, improve the utilization rate of cable cantilever.
Further, the fixing piece includes several connection through-holes being provided on the cell wall of sliding groove two sides, the support Plate offers several perforatings along the vertical direction, is equipped with threaded rod in the perforating, the both ends of the threaded rod each extend over Through-hole is connected out, and the both ends of the threaded rod are threaded with locking nut, the opposite side of two locking nuts respectively It is inconsistent with the two sides of carrier block respectively.
Through the above scheme, when carrier block is slid onto specified altitude assignment by operator, threaded rod can be fed through simultaneously and is worn Then two locking nuts are screwed in the both ends of threaded rod, and tighten so that locking nut is opposite by apertured and connection through-hole respectively Side it is inconsistent with the two sides of carrier block respectively, thus quickly and easily that carrier block is fixed on the supporting plate.
Further, the fixing piece includes being rotatably connected on support plate along the rotating block of carrier block glide direction two sides, The rotating block along support plate vertical direction be equipped with it is multiple, the support plate is additionally provided with along the two sides of carrier block glide direction and leads To slot, the guide pad extended in guide groove is connected on the carrier block, when the rotating block when in the horizontal position, it is described The limited block that restricted rotating block rotates down is connected in support plate;When the carrier block is mobile away from the direction of pedestal When, the upper surface of the carrier block and the lower surface of rotating block contradict and rotating block are rotated to the direction far from limited block.
Through the above scheme, guide pad limits the movement of carrier block in the horizontal direction, so that carrier block can only edge The vertical direction of support plate is mobile.When needing to place cable, carrier block on operator's sliding support plate, the upper surface of carrier block It is contradicted with the lower surface of rotating block and rotating block is rotated to the direction far from limited block, so that carrier block can be continuous It moves up on the supporting plate, when carrier block is moved to specified altitude assignment, operator's slide downward carrier block, until carrier block Lower surface and a rotating block upper surface below carrier block are inconsistent, due to rotating block at this time is limited block limit and without normal direction Lower rotation is placed on rotating block so that carrier block is stable, then the both ends of cable is placed on to the arc of carrier block In notch, cable carrying is got up so that carrier block is stable.
Further, the support plate is equipped with fixed pulley far from one end of pedestal, is arranged with rope on the fixed pulley, One end of the rope is equipped with suspension hook, and the carrier block is connected with the hanging ring hung for suspension hook away from the side on ground.
Through the above scheme, carrier block can first be slid onto the lower end of support plate by operator, then by the both ends of cable It is placed in the notch of carrier block, suspension hook is hung in hanging ring at this time, then pull the one end of rope far from suspension hook, thus The carrier block for carrying cable is conveniently pulled to specified altitude assignment, due to not needing to load cable in the air, The erection step for enormously simplifying cable improves the erection efficiency of cable.
Further, if the support plate is equipped with dry finishing block away from the side of carrier block, the arrangement block is along vertical side To through-hole is offered, the one end of the rope far from suspension hook is successively fed through the through-hole on each arrangement block from top to bottom.
Through the above scheme, rope is fed through the through-hole on each arrangement block far from one end of suspension hook, so that rope The upper end of orderly slave support plate is hung down, and the possibility of rope winding on the supporting plate is reduced, and pulls lifting convenient for operator Rope.
Further, there are two the support plate is set along the length direction of support, and carrier block sliding is connected to two branch The opposite side of fagging.
Through the above scheme, set on a pedestal there are two support plate so that the utilization rate of individual cable cantilever improve to Twice, and since carrier block sliding is connected to two opposite sides of support plate, it will not be generated when placing cable mutually dry It disturbs.
Further, the opposite side of two support plates passes through several the first horizontally disposed reinforcing rod phases Even.
Through the above scheme, the first reinforcing rod strengthens the structural strength of two support plates, exists to reduce support plate The possibility of deformation is generated under the pressure of cable and carrier block.
Further, the opposite side of two pedestals is connected by the second reinforcing rod, two on one of them described pedestal The first reinforcing rod between support plate by third reinforcing rod be connected between two support plates of another pedestal first plus On strong bar.
Through the above scheme, two pedestals are connected by the second reinforcing rod, and operator is allowed to move two pedestals simultaneously, Also the distance between two pedestals are secured, eliminate operator adjust two pedestals between apart from the step of, simplify installation Process.Third reinforcing rod then by two pedestals support plate and the first reinforcing rod connect, improve on two pedestals Structural strength between each support plate.
To sum up, the utility model has the advantages that:
1, carrier block can be equipped with multiple on the supporting plate, therefore it is multiple to can according to need placement on a cable cantilever Cable improves the utilization rate of cable cantilever;
2, the carrier block for carrying cable can be pulled to specified altitude assignment by fixed pulley on the ground by operator, be not required to Cable is loaded in the air, therefore enormously simplifies the erection step of cable, improve the erection efficiency of cable.
Detailed description of the invention
Fig. 1 is the overall structure diagram of embodiment 1;
Fig. 2 is in embodiment 1 for embodying the structural schematic diagram of carrier block;
Fig. 3 is the overall structure diagram of embodiment 2;
Fig. 4 is in embodiment 2 for embodying the structural schematic diagram of carrier block;
Fig. 5 is the partial enlargement diagram in the portion A in Fig. 4.
In figure, 1, pedestal;2, support plate;21, perforating;22, guide groove;3, carrier block;31, sliding groove;311, it connects Through-hole;32, arc notch;33, guide pad;34, hanging ring;4, threaded rod;41, locking nut;5, rotating block;6, limited block;7, Fixed pulley;71, rope;72, suspension hook;8, block is arranged;81, through-hole;9, the first reinforcing rod;91, the second reinforcing rod;92, third Reinforcing rod;10, cable.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.
Wherein identical components are presented with like reference characters.It should be noted that word used in the following description Language "front", "rear", "left", "right", "up" and "down" refer to the direction in attached drawing, word " bottom surface " and " top surface ", "inner" and "outside" refers respectively to the direction towards or away from geometric center of specific component.
Embodiment 1:A kind of cable cantilever, such as Fig. 1, including two pedestals 1 and it is connected to 1 upper surface of pedestal and along vertical The support plate 2 of direction setting, there are two support plate 2 is set along the length direction of support, the side of support plate 2 sets that there are three carrier blocks 3, carrier block 3 offers sliding groove 31 towards the side of support plate 2 along the vertical direction(Such as Fig. 2), carrier block 3 pass through sliding groove 31 Sliding is connected to two opposite sides of support plate 2, and carrier block 3 offers the arc of the placement of current supply cable 10 away from the side on ground Notch 32(Such as Fig. 2), support plate 2 is equipped with the fixing piece being fixed on carrier block 3 in support plate 2.
Such as Fig. 2, fixing piece includes several connection through-holes 311 being provided on 31 two sides cell wall of sliding groove, and support plate 2 is along perpendicular Histogram is equipped with threaded rod 4, it is logical that the both ends of threaded rod 4 each extend over out connection to several perforatings 21 are offered in perforating 21 Hole 311 is simultaneously threaded with locking nut 41.
Such as Fig. 1, in order to reinforce the structural stability of 10 cantilever of cable, the opposite side of two support plates 2 passes through several edges The first horizontally arranged reinforcing rod 9 is connected, and the first reinforcing rod 9 strengthens the structural strength of two support plates 2, to reduce Support plate 2 generates under the pressure of cable 10 and carrier block 3 possibility of deformation.The opposite side of two pedestals 1 passes through second Reinforcing rod 91 is connected, and allows operator to move two pedestals 1 simultaneously, also secures the distance between two pedestals 1, removes Operator adjust between two pedestals 1 apart from the step of, simplify installation process.Two support plates 2 on one of pedestal 1 Between the first reinforcing rod 9 by third reinforcing rod 92 be connected between two support plates 2 of another pedestal 1 first reinforce On bar 9, to improve the structural strength on two pedestals 1 between each support plate 2.
Operating process:When needing to place cable 10, operator can three carrier blocks 3 on first sliding support plate 2 make it Equidistant is distributed in support plate 2, then tightens the locking nut 41 at 4 both ends of threaded rod respectively, so that locking nut 41 is opposite Side it is inconsistent with the two sides of carrier block 3 respectively, so that stable be limited in carrier block 3 in support plate 2, repeat this operation So that the carrier block 3 in two support plates 2 corresponds respectively, multiple cables 10 are then individually positioned in two support plates 2 On the notch of corresponding two carrier blocks 3, the storage of multiple cables 10 is completed, the utilization rate in space is improved.
Embodiment 2:A kind of cable cantilever, such as Fig. 5, difference from example 1 is that, fixing piece includes rotation connection In support plate 2 along the rotating block 5 of 3 glide direction two sides of carrier block, rotating block 5 is equipped with multiple, branch along the vertical direction of support plate 2 Fagging 2 is additionally provided with guide groove 22 along the two sides of 3 glide direction of carrier block, is connected with and is extended in guide groove 22 on carrier block 3 Guide pad 33, guide pad 33 limit the movement of carrier block 3 in the horizontal direction, so that carrier block 3 can only be along the vertical of support plate 2 Direction is mobile.Limited block 6 is connected in the lower section of rotating block 5 in support plate 2.Carrier block 3 in upward sliding in support plate 2, The upper surface of carrier block 3 and the lower surface of rotating block 5 contradict and rotating block 5 are rotated to the direction far from limited block 6, thus Carrier block 3 is constantly moved up in support plate 2, when carrier block 3 is moved to specified altitude assignment, operator is to downslide Dynamic carrier block 3, until the lower surface of carrier block 3 and 5 upper surface of rotating block of 3 lower section of carrier block are inconsistent, due at this time Rotating block 5 is limited the limit of block 6 and can not rotate down, and is placed on rotating block 5 so that carrier block 3 is stable.
Such as Fig. 4, carrier block 3 is promoted for ease of operation, support plate 2 is equipped with fixed pulley 7 far from one end of pedestal 1, fixed Rope 71 is arranged on pulley 7, one end of rope 71 is equipped with suspension hook 72(Such as Fig. 5), side company of the carrier block 3 away from ground It is connected to the hanging ring 34 hung for suspension hook 72(Such as Fig. 5)If support plate 2 is equipped with dry finishing block 8 away from the side of carrier block 3, arrange Block 8 offers through-hole 81 along the vertical direction(Such as Fig. 5), the one end of rope 71 far from suspension hook 72 is successively fed through respectively from top to bottom A through-hole 81 arranged on block 8, to reduce the possibility that rope 71 is wrapped in support plate 2.Cable 10 is installed(Such as Fig. 3) When, carrier block 3 can first be slid onto the lower end of support plate 2 by operator, and the both ends of cable 10 are then placed on carrier block 3 In notch, suspension hook 72 is hung in hanging ring 34 at this time, then pulls the one end of rope 71 far from suspension hook 72, thus convenient fast Prompt is pulled to specified altitude assignment for the carrier block 3 for carrying cable 10, big due to not needing to load cable 10 in the air The erection step for simplifying cable 10 greatly, improves the erection efficiency of cable 10.
This specific embodiment is only the explanation to the utility model, is not limitations of the present invention, ability Field technique personnel can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but As long as all by the protection of Patent Law in the scope of the claims of the utility model.

Claims (8)

1. a kind of cable cantilever, it is characterized in that:Including two pedestals(1)And it is connected to pedestal(1)Upper surface and along vertical side To the support plate of setting(2), the support plate(2)Side be equipped with several carrier blocks(3), the carrier block(3)Towards support Plate(2)Side offer sliding groove along the vertical direction(31), the carrier block(3)Pass through sliding groove(31)Sliding is connected to branch Fagging(2)On, the support plate(2)It is equipped with carrier block(3)It is fixed on support plate(2)On fixing piece, the carrier block (3)Side away from ground offers current supply cable(10)The arc notch of placement(32).
2. cable cantilever according to claim 1, it is characterized in that:The fixing piece includes being provided with sliding groove(31)Two sides Several connection through-holes on cell wall(311), the support plate(2)Several perforatings are offered along the vertical direction(21), described to wear Apertured(21)It is interior to be equipped with threaded rod(4), the threaded rod(4)Both ends each extend over out and connect through-hole(311), the threaded rod (4)Both ends be threaded with locking nut respectively(41), two locking nuts(41)Opposite side respectively with carrying Block(3)Two sides it is inconsistent.
3. cable cantilever according to claim 1, it is characterized in that:The fixing piece includes being rotatably connected on support plate(2) Along carrier block(3)The rotating block of glide direction two sides(5), the rotating block(5)Along support plate(2)Vertical direction be equipped with it is more It is a, the support plate(2)Along carrier block(3)The two sides of glide direction are additionally provided with guide groove(22), the carrier block(3)Upper connection Extend to guide groove(22)Interior guide pad(33), when the rotating block(5)When in the horizontal position, the support plate(2) The upper restricted rotating block of connection(5)The limited block rotated down(6);When the carrier block(3)Away from pedestal(1)Direction When mobile, the carrier block(3)Upper surface and rotating block(5)Lower surface contradict and make rotating block(5)To far from limit Block(6)Direction rotation.
4. cable cantilever according to claim 3, it is characterized in that:The support plate(2)Far from pedestal(1)One end be equipped with Fixed pulley(7), the fixed pulley(7)On be arranged with rope(71), the rope(71)One end be equipped with suspension hook(72), institute State carrier block(3)Side away from ground is connected with for suspension hook(72)The hanging ring hung(34).
5. cable cantilever according to claim 4, it is characterized in that:The support plate(2)Away from carrier block(3)Side set If there is dry finishing block(8), the arrangement block(8)Through-hole is offered along the vertical direction(81), the rope(71)Far from suspension hook (72)One end be successively fed through each arrangement block from top to bottom(8)On through-hole(81).
6. cable cantilever according to claim 1, it is characterized in that:The support plate(2)Length direction along support is equipped with Two, and carrier block(3)Sliding is connected to two support plates(2)Opposite side.
7. cable cantilever according to claim 6, it is characterized in that:Two support plates(2)If opposite side passes through Do the first horizontally disposed reinforcing rod(9)It is connected.
8. cable cantilever according to claim 7, it is characterized in that:Two pedestals(1)Reinforce by second opposite side Bar(91)It is connected, one of them described pedestal(1)Upper two support plates(2)Between the first reinforcing rod(9)Reinforced by third Bar(92)It is connected to another pedestal(1)Two support plates(2)Between the first reinforcing rod(9)On.
CN201721739847.7U 2017-12-13 2017-12-13 Cable cantilever Expired - Fee Related CN208114418U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721739847.7U CN208114418U (en) 2017-12-13 2017-12-13 Cable cantilever

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721739847.7U CN208114418U (en) 2017-12-13 2017-12-13 Cable cantilever

Publications (1)

Publication Number Publication Date
CN208114418U true CN208114418U (en) 2018-11-20

Family

ID=64209739

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721739847.7U Expired - Fee Related CN208114418U (en) 2017-12-13 2017-12-13 Cable cantilever

Country Status (1)

Country Link
CN (1) CN208114418U (en)

Similar Documents

Publication Publication Date Title
CN206126677U (en) Can dismantle regulation formula portal crane shelves
CN208422589U (en) A kind of transformer mounting rack of efficient stable
CN206288883U (en) A kind of eminence folds up device
CN208114418U (en) Cable cantilever
CN204607463U (en) Building operation material handling lifting auxiliary device
CN202323481U (en) Foldable clothes hanger with sliding rail guiding function and automatic clamping function
CN109119561B (en) Battery rack with lifting function and lifting method thereof
CN204776640U (en) Roller support
CN208200150U (en) A kind of crane support that load-bearing property is good
CN205186870U (en) Sign indicating number frame is folded in tubular product turnover
CN205035001U (en) Generator handling device
CN212815100U (en) Foldable goods shelf
CN210748125U (en) Adjustable sling frame
CN210783885U (en) Hanging rack capable of hanging multiple round basins
CN210858716U (en) Supporting platform for coal mine machinery
CN211162717U (en) Fan blade supporting device
CN207853325U (en) A kind of six or three hanging point strain insulator-string operating platform of ± 800 kV UHVDC Transmission Lines
CN202827672U (en) Hanging type wire harness moving car
CN207609188U (en) A kind of dust-proof curtain device
CN207719623U (en) A kind of novel distribution cabinet of mounting plate easy disassembly
CN206665992U (en) A kind of plant equipment mast-up
CN217867752U (en) Portable solar cell panel disassembly and assembly equipment
CN110729666A (en) Top-loading type overhead ground wire mounting and paying-off device
CN204273086U (en) A kind of large white goose goose-claw nails hanger bracket
CN216034510U (en) Plastic trolley with foldable frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181120

CF01 Termination of patent right due to non-payment of annual fee