CN208112336U - A kind of intelligent substation bay device cluster measure and control device - Google Patents

A kind of intelligent substation bay device cluster measure and control device Download PDF

Info

Publication number
CN208112336U
CN208112336U CN201820672481.4U CN201820672481U CN208112336U CN 208112336 U CN208112336 U CN 208112336U CN 201820672481 U CN201820672481 U CN 201820672481U CN 208112336 U CN208112336 U CN 208112336U
Authority
CN
China
Prior art keywords
control device
equipment
interface
controlling
observing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820672481.4U
Other languages
Chinese (zh)
Inventor
许洪强
王永福
赵硕
潘向华
耿晓辉
白英伟
王亚飞
常乃超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Shandong Electric Power Co Ltd
Zibo Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Shandong Electric Power Co Ltd
Zibo Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Shandong Electric Power Co Ltd, Zibo Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201820672481.4U priority Critical patent/CN208112336U/en
Application granted granted Critical
Publication of CN208112336U publication Critical patent/CN208112336U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The utility model relates to a kind of intelligent substation bay device cluster measure and control devices, including:Two sets of boards configure exactly the same, mutual backup the sub- equipment of observing and controlling, and the board configuration of every sub- equipment of set observing and controlling includes:Power panel, the process layer interface board for having SV/GOOSE receiving interface and GOOSE transmission interface are opened into plate, Main Processing Unit, and the power panel of every sub- equipment of set observing and controlling, process layer interface board are opened and be electrically connected respectively with Main Processing Unit into plate.After the utility model replaces existing measure and control device with cluster measure and control device, the quantity of wall measure and control device, the installation and debugging for reducing monitoring system and operation expense is greatly reduced, solves the outstanding problem without independent spare measure and control device in existing monitoring system.

Description

A kind of intelligent substation bay device cluster measure and control device
Technical field
The utility model belongs to power system automation technology field, sets more particularly to a kind of intelligent substation wall Standby cluster measure and control device.
Background technique
Currently, intelligent substation construction generallys use the mode of " three-layer equipment, two-tier network ", i.e., process layer devices, Interlayer equipment, station level equipment and process-level network, station level network.Although the intelligent substation built up equipment, Greater advance is achieved in terms of construction and operation management, but since monitoring system function is dispersed, internal information network of standing is more complicated, Not only it had increased equipment investment but also had reduced the reliability of substation.Intelligent substation builds theory, technological innovation, specialized management Etc. there are still problems, up for further solving.
Intelligent substation monitoring at this stage uses the configuration mode towards wall;Station level device category is more, function Setting dispersion, information exchange is complicated, functional application low efficiency, and operational reliability is low;Bay device quantity is more, has a single function, Irredundant spare, the equipment information collection disabler once broken down causes real time data incomplete;Whole station lacks effective Operation monitoring and maintenance tool, live operation and maintenance inadequate to supports such as substation equipment patrol, execute-in-place, maintenance services Personnel can not monitor and solve in time failure.Technical problem underlying present in automatic system of intelligent transformer station is at present:It presses The scheme of wall configuration measure and control device leads to required measure and control device substantial amounts, high construction cost, and maintenance is big;Measure and control device Without spare, once measure and control device damages, electric substation automation system will be unable to work normally.
Summary of the invention
In order to solve the above technical problems, the utility model proposes a kind of surveys of Novel intelligent substation bay device cluster Device is controlled, using two layers of equipment (station level equipment and bay device, eliminate process layer devices), primary network station (by before Process-level network and station level network be combined into one) architecture, achieve the purpose that simplified network and convenient for function integration. Two levels are integrated from equipment arrangement and function to optimize intelligent substation, are reached and are simplified bay device measure and control device and match The purpose set, so that bay device is in higher level upper realization information sharing, fusion and interaction.On the one hand pass through monitoring system Function optimization integration, simplifies the configuration of bay device, clears function crossing interface between profession, grasp existing various standards, The accordance of specification, convenient for preferably carrying out operation maintenance management;On the other hand, secondary system of intelligent substation information is sorted out The interaction main line of stream realizes shared network information, fusion and interaction etc. on this basis.The technical side that the utility model uses Case is as follows:
A kind of intelligent substation bay device cluster measure and control device, including:Two sets of boards configure exactly the same, standby each other The sub- equipment of observing and controlling, every sub- equipment of set observing and controlling can independent operatings, the complete bay device cluster observing and controlling function of realization;Often The board of the set equipment of observing and controlling, which configures, includes:Power panel, the process for having SV/GOOSE receiving interface and GOOSE transmission interface Layer interface plate is opened into plate, Main Processing Unit, the power panel of every sub- equipment of set observing and controlling, process layer interface board, open into plate respectively with main place It manages plate electrical connection, realize data interaction and TT&C Management.It opens into plate access binary switch amount input signal, pass to main process task Plate, and by Main Processing Unit be converted into GOOSE (Generic Object Oriented Substation Event, towards The transformer substation case of general object) information, into substation, other intelligent electronic devices are forwarded.
After the utility model replaces existing measure and control device with cluster measure and control device, wall measure and control device is greatly reduced Quantity, reduce monitoring system installation and debugging and operation expense, solve in existing monitoring system without individually it is spare The outstanding problem of measure and control device.
Preferably, the processor that the Main Processing Unit uses 36 core 64, can run built-in Linux operating system, On each core can complete independently monospace observing and controlling function, Main Processing Unit internally receive from process layer interface board transmission come SV (Sampled Values, sampled value), GOOSE information, and the corresponding kernel in each interval is distributed to, complete the measurement at corresponding interval And control function.Main Processing Unit also has MMS Ethernet interface, GPS clock synchronization interface, by MMS interface, cluster measure and control device with The interaction of substation's station level equipment, is sent to control centre by station level equipment for wall observing and controlling information, and receive scheduling The remote control order that center is sent;GPS clock synchronization interface can receive IRIG-B code or pulse per second (PPS) clock synchronization signal, pass through GPS pairs The processing capacity of measuring and control data of the Shi Shixian with absolute time mark.
Preferably, the power panel, process layer interface board of every sub- equipment of set observing and controlling, open and pass through one piece of connection motherboard point into plate It is not electrically connected with Main Processing Unit, the connection motherboard provides data line, control line between each board and connects with power supply line.Using Connection motherboard realizes that electrical connection can shorten power supply and signal link length, increases the anti-interference ability of measuring and controlling equipment.
Preferably, the SV/GOOSE receiving interface and GOOSE transmission interface are Ethernet interface.Process layer interface The SV information that plate is acquired and is sent on process-level network by being respectively spaced combining unit in this substation of SV interface;Pass through All intelligent terminals and other intelligent electronic devices are sent on process-level network in this substation of GOOSE interface GOOSE information;Remote control command is also sent to corresponding intelligent terminal by GOOSE transmission interface.Process layer interface board also passes through SV and GOOSE information is forwarded to Main Processing Unit by the internal bus on motherboard.
Preferably, two sets of boards configure the sub- integration of equipments of exactly the same observing and controlling and are mounted in a cabinet.Collection Independent redundancy backup may be implemented in two sets of sub- equipment of observing and controlling in Cheng Yi cabinet, and hardware fault occurs in a set of equipment, can be by The seamless switching of other set equipment realization observing and controlling function;Compared to being distributed in the redundancy alternative scheme realized in more cabinets, It can reduce equipment volume and screen cabinet occupied area, facilitate operational management.
The beneficial effects of the utility model:
(1) it will be replaced originally by the measure and control device of each interval separate configurations by 1 cluster measure and control device in intelligent substation, 1 identical redundancy backup apparatus is separately configured to improve reliability, the quantity of wall measure and control device is greatly reduced;
(2) externally use completely and meet SV the and GOOSE interface of IEC61850 standard, improve measure and control device input, The interoperability of output can access the equipment such as combining unit, the intelligent terminal of different manufacturers;
(3) debugging in project implementing process is greatly decreased using after cluster measure and control device in intelligent substation monitoring system Workload and later maintenance workload reduce construction, the maintenance cost of automatic system of intelligent transformer station;
(4) from substation's overall situation angle, the integration and optimization of software and hardware are carried out to monitoring system, to system secondary in substation System carries out planning as a whole to distribute rationally, reduces the repetition in equipment and function, effectively reduces bay device quantity and equipment arrangement Required construction area simplifies substation's internal structure, provides operational efficiency;
(5) the networking acquisition mode for optimizing data, simplifies network structure, interchanger usage quantity is effectively reduced;Pass through Standardized designs realize the reasonable link of equipment, network and system according to business and regulatory requirement, reach total in long life cycle Body cost performance is optimal, sufficiently meets the requirement of big construction, big operation, general overhaul.
Detailed description of the invention
Fig. 1 is the board layout drawing of the utility model;
Fig. 2 is the hardware configuration schematic block diagram of the utility model.
Specific embodiment
With reference to the accompanying drawing, the embodiments of the present invention is illustrated.
As shown in Figure 1, being the board layout drawing of the utility model.In a cabinet, two sets of boards of integrated installation are matched The sub- equipment of identical observing and controlling is set, forms mutually spare technical solution between two sets of sub- equipment of observing and controlling.Every set observing and controlling is set Standby board configures:Power panel, having SV/GOOSE receiving interface and GOOSE transmission interface, (above-mentioned interface is Ethernet interface) process layer interface board, open into plate, Main Processing Unit, power panel, the process layer interface of every sub- equipment of set observing and controlling Plate is opened and passes through one piece of connection motherboard into plate and be electrically connected respectively with Main Processing Unit.Empty position can also be reserved in board arrangement With extension spare space, empty position therein gives over to the space of Main Processing Unit heat dissipation, and extension spare space, which gives over to, is opening into more Application increase open into plate.
As shown in Fig. 2, being the hardware configuration schematic block diagram of the utility model.Main Processing Unit is the core of cluster measure and control device The heart, in the present embodiment, Main Processing Unit use 64 many-core processor TILE-Gx 8036 of Tilera64 company, the processing Device has 36 cores, processing capacity with super strength, using built-in Linux as operating system, complete independently list on each core The observing and controlling function at interval, entire Main Processing Unit can satisfy the observing and controlling functional requirement of intelligent substation whole station completely.Main Processing Unit SV, GOOSE information come from the transmission of process layer interface board are internally received by connection motherboard, and it is corresponding interior to distribute to each interval Core completes the measurement and control function at corresponding interval.Main Processing Unit also has 4 MMS Ethernet interfaces, passes through MMS interface, collection Group's measure and control device is interacted with substation's station level equipment, and wall observing and controlling information is sent in scheduling by station level equipment The heart, and receive the remote control order sent control centre.Main Processing Unit has GPS clock synchronization interface, can receive IRIG-B code Or pulse per second (PPS) clock synchronization signal realizes the measuring and control data processing capacity with absolute time mark by GPS clock synchronization.At TILE-Gx 8036 The FLASH for managing device is used as program storage and observing and controlling parameter storage;DDR is used as program running memory;FPGA is used as piece choosing and patrols It collects and the miscellaneous functions such as timer, timer.
The power module of power panel provides power supply for the sub- equipment of observing and controlling, inputs as external 220V direct current or alternating current Source exports as 24V, 15V and 5V DC power supply, and each road DC power supply is connected to other each plates by connecting the power supply line of motherboard Card.It opens and accesses binary switch amount input signal into module into opening for plate, passes to Main Processing Unit, and be converted by Main Processing Unit For GOOSE information, into substation, other intelligent electronic devices are forwarded.The ethernet switching module of process layer interface board passes through SV Interface/GOOSE interface realizes information exchange.

Claims (6)

1. a kind of intelligent substation bay device cluster measure and control device, which is characterized in that including:Two sets of boards configure full phase Same, mutual backup the sub- equipment of observing and controlling, the board of every sub- equipment of set observing and controlling, which configures, includes:Power panel has SV/GOOSE and connects It receives the process layer interface board of interface and GOOSE transmission interface, open into plate, Main Processing Unit, the power panel of every sub- equipment of set observing and controlling, mistake Journey layer interface plate is opened and is electrically connected respectively with Main Processing Unit into plate.
2. a kind of intelligent substation bay device cluster measure and control device according to claim 1, which is characterized in that described Main Processing Unit using 36 core 64, the processor of built-in Linux operating system can be run.
3. a kind of intelligent substation bay device cluster measure and control device according to claim 2, which is characterized in that described Main Processing Unit also there is MMS Ethernet interface, GPS clock synchronization interface.
4. a kind of intelligent substation bay device cluster measure and control device according to claim 3, which is characterized in that every set The power panel of the sub- equipment of observing and controlling, process layer interface board are opened and pass through one piece of connection motherboard into plate and be electrically connected respectively with Main Processing Unit, The connection motherboard provides data line, control line between each board and connects with power supply line.
5. a kind of intelligent substation bay device cluster measure and control device according to claim 4, which is characterized in that described SV/GOOSE receiving interface and GOOSE transmission interface be Ethernet interface.
6. a kind of intelligent substation bay device cluster measure and control device according to claim 1-5, feature It is, two sets of boards configure the sub- integration of equipments of exactly the same observing and controlling and are mounted in a cabinet.
CN201820672481.4U 2018-05-07 2018-05-07 A kind of intelligent substation bay device cluster measure and control device Expired - Fee Related CN208112336U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820672481.4U CN208112336U (en) 2018-05-07 2018-05-07 A kind of intelligent substation bay device cluster measure and control device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820672481.4U CN208112336U (en) 2018-05-07 2018-05-07 A kind of intelligent substation bay device cluster measure and control device

Publications (1)

Publication Number Publication Date
CN208112336U true CN208112336U (en) 2018-11-16

Family

ID=64114885

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820672481.4U Expired - Fee Related CN208112336U (en) 2018-05-07 2018-05-07 A kind of intelligent substation bay device cluster measure and control device

Country Status (1)

Country Link
CN (1) CN208112336U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108512311A (en) * 2018-05-07 2018-09-07 国家电网公司 A kind of intelligent substation bay device cluster measure and control device
CN110347140A (en) * 2019-05-30 2019-10-18 南京国电南自电网自动化有限公司 Judgment method and system are moved back in main measure and control device method for monitoring operation states, system and standby observing and controlling throwing

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108512311A (en) * 2018-05-07 2018-09-07 国家电网公司 A kind of intelligent substation bay device cluster measure and control device
CN110347140A (en) * 2019-05-30 2019-10-18 南京国电南自电网自动化有限公司 Judgment method and system are moved back in main measure and control device method for monitoring operation states, system and standby observing and controlling throwing

Similar Documents

Publication Publication Date Title
CN202351347U (en) Monitoring terminal device for distribution transformer
CN106826825B (en) A kind of more mechanical arm wireless control cabinets and more mechanical arm control systems
CN108512311A (en) A kind of intelligent substation bay device cluster measure and control device
CN208112336U (en) A kind of intelligent substation bay device cluster measure and control device
CN113098001A (en) Docker container-based intelligent distribution transformer terminal system
CN101800443B (en) Electric power on-site monitoring equipment
CN103308762A (en) Intensive energy consumption subentry measurement warning system and implementation method
CN204649927U (en) A kind of primary cut-out state monitoring device
CN201477418U (en) Microcomputer protection measuring and controlling device
CN110277832A (en) A kind of intelligent substation is grouped centralized TT&C system and its construction method
CN105226961B (en) A kind of three level energy accumulation current converter of modularization
CN101311959A (en) Preposing subsystem of electric power scheduling automatization system
CN202034825U (en) Intelligent comprehensive device of medium-voltage switch
CN204882838U (en) Direct current 240 or 336V distribution equipment electric quantity and load condition monitor cell
CN202978406U (en) AC-DC integrated power supply system
CN103364668B (en) A kind of DC distribution equipment intelligent monitoring and energy-consumption monitoring system
CN109256865A (en) A kind of distribution network automated terminal with self-checking function
CN104253487A (en) Integrated intelligent electronic device of transition layer of intelligent substation
CN213602450U (en) Monitoring device and monitoring system
CN208158231U (en) A kind of intelligent substation station domain reserve protection
CN206293978U (en) A kind of distribution power automation terminal
CN203339807U (en) Lithium iron phosphate battery based substation direct-current power supply integrated monitoring system
CN206340984U (en) A kind of integrated AC/DC integrated power-supply system of multicompartment
CN204407997U (en) The energy-conservation uninterruptible power system of high voltage direct current
CN209298985U (en) A kind of Intelligent distribution station institute automatization terminal

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181116

Termination date: 20190507

CF01 Termination of patent right due to non-payment of annual fee