It is a kind of for producing the prior-warning device of the gas pressure sintering furnace of special cermacis
Technical field
The utility model relates to the gas pressure sintering furnace technical fields of special cermacis, specially a kind of for producing special cermacis
Gas pressure sintering furnace prior-warning device.
Background technique
Special cermacis refers to special mechanics, the ceramics of physically or chemically performance, is applied to various modern industries and point
End science and technology, raw material used and required production technology have had biggish different and development from conventional ceramic, extraordinary
Ceramics can be subdivided into structural ceramics, function ceramics and tool ceramics, Special clay according to its performance characteristics and the difference of purposes
Porcelain, also known as fine ceramics are classified by its application function, can substantially be divided into high-intensitive, high temperature resistant and composite structural ceramic and electrician
The inorganic material being especially formulated is added in electric function ceramic two major classes in ceramic batch, by 1360 degree or so high temperature sinterings
Molding becomes a kind of new special ceramics, usually has one or more function to obtain reliable and stable antistatic performance
Can, such as:The functions such as electricity, magnetic, light, heat, sound, chemistry and biology and coupling function, such as piezoelectricity, thermoelectricity, electric light, acousto-optic and magnetic
The functions such as light.
It needs to use gas pressure sintering furnace during special cermacis is fired, reaches 800 in gas pressure sintering furnace interior temperature
When spending, needing to carry out the inside of gas pressure sintering furnace aerating, the mode of existing gas pressure sintering furnace interior temperature is artificial observation,
Not only working efficiency is lower, waste of manpower, and work quality cannot be guaranteed.
Utility model content
(One)The technical issues of solution
In view of the deficiencies of the prior art, the utility model provides a kind of for producing the gas pressure sintering furnace of special cermacis
Prior-warning device, the mode for solving existing gas pressure sintering furnace interior temperature is artificial observation, and not only working efficiency is lower, waste
Manpower, and the problem of work quality cannot be guaranteed.
(Two)Technical solution
To achieve the above object, the utility model provides the following technical solutions:It is a kind of for producing the air pressure of special cermacis
The prior-warning device of sintering furnace, including furnace body, the side of the furnace body are fixedly connected with ventilation duct, and the ventilation duct is far from furnace body
One end is fixedly connected with pressure fan, and the top fixation of the furnace body side is communicated with air guiding chamber, and the top of the air guiding chamber is fixed
It is communicated with conduction pipe, the inside of the conduction pipe is plugged with measurement needle, and the conducting tube cavity is fixed with the junction for measuring needle
It is connected with heat-resistant sealing ring.
The top of the measurement needle is flexibly connected through the bottom for controlling box and with control box, the side weldering of the control box
It connects in the side of furnace body, one end that the measurement needle is located at control box inner cavity is fixedly connected with temperature inductor, the temperature sense
The output end of device is answered to be electrically connected with the input terminal of data-analyzing machine, the output end of the data-analyzing machine and the input terminal of controller
Electrical connection, the first output end of the controller are electrically connected with the input terminal of buzzer, the side of the buzzer and control box
Side far from furnace body is fixedly connected, and the second output terminal of the controller is electrically connected with the input terminal of warning lamp, the warning
The side of lamp is fixedly connected with control box far from the side of furnace body.
The control box is fixedly connected with the first protective frame far from the side of furnace body, and the warning lamp is located at the first protective frame
Inside, first protective frame has been connected through hinge activity the second protective frame far from the bottom of control box side, described the
Side far from control box at the top of one protective frame is fixedly connected with the first thread bush, close first spiral shell at the top of second protective frame
The side of line set is fixedly connected with the second thread bush, and the flank threads of second thread bush are connected with threaded rod, the screw thread
The one end of bar far from the second thread bush is threadedly coupled with the first thread bush.
Preferably, the outer surface of the measurement needle is fixedly connected with limit plate, and the limit plate is located at the top of conduction pipe.
Preferably, the outer surface of the temperature inductor is socketed with the first fixing sleeve, the bottom of first fixing sleeve with
The bottom of control box inner cavity is fixedly connected.
Preferably, the outer surface of the data-analyzing machine is socketed with the second fixing sleeve, the side of second fixing sleeve with
Control box inner cavity is fixedly connected close to the side of furnace body.
Preferably, the furnace body is fixedly connected with baffle at the top of control box side, and the baffle is located at control box
Top.
Preferably, the threaded rod is fixedly connected with switch block far from one end of the first thread bush, and the shape of the switch block is
Rectangle.
(Three)Beneficial effect
The utility model provides a kind of for producing the prior-warning device of the gas pressure sintering furnace of special cermacis, and having following has
Beneficial effect:
(1), this be used to produce the prior-warning device of the gas pressure sintering furnace of special cermacis, when measuring furnace by temperature inductor
When the temperature in internal portion reaches 750 degree, the temperature data that temperature inductor will test is transferred on data-analyzing machine, through data
Analyzer analysis comparison, when meeting the amount value of data-analyzing machine inner setting, transfers data on controller, controller
Control buzzer works to warn staff, and controller control warning lamp works to indicate the position of staff's furnace body, tool
It is standby to be not necessarily to the intracorporal temperature of artificial observation furnace, save manpower, the advantage of high-precision operation.
(2), this be used to produce the prior-warning device of the gas pressure sintering furnace of special cermacis, led by measurement needle through conduction pipe
The inside of air compartment, it is convenient that the temperature of furnace interior is measured, it manually blows, passes through to furnace body by the way that pressure fan is convenient
First protective frame and the second protective frame are facilitated and are protected warning lamp, make threaded rod and the first thread bush by rotating switch block
Separation separates the top of the first protective frame and the second protective frame, convenient to repair to warning lamp, prevents high-altitude by baffle
Pendant object damages warning lamp and control box.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the structural schematic diagram in the portion A in the utility model Fig. 1.
In figure:1 furnace body, 2 ventilation ducts, 3 pressure fan, 4 air guiding chamber, 5 baffles, 6 conduction pipes, 7 measurement needles, 8 heat-resistant sealing rings,
9 limit plates, 10 temperature inductors, 11 first fixing sleeves, 12 control boxes, 13 data-analyzing machines, 14 second fixing sleeves, 15 controls
Device, 16 buzzers, 17 warning lamps, 18 first protective frames, 19 second protective frames, 20 hinges, 21 first thread bush, 22 second screw threads
Set, 23 threaded rods, 24 switch blocks.
Specific embodiment
As shown in Figs. 1-2, the utility model provides a kind of technical solution:It is a kind of for producing the gas pressure sintering of special cermacis
The prior-warning device of furnace, including furnace body 1, the side of furnace body 1 are fixedly connected with ventilation duct 2, and the one end of ventilation duct 2 far from furnace body 1 is solid
Surely it is connected with pressure fan 3, is manually blown to furnace body 1 by the way that pressure fan 3 is convenient, the top fixation of 1 side of furnace body is communicated with
Air guiding chamber 4, the top of air guiding chamber 4 is fixed to be communicated with conduction pipe 6, and the inside of conduction pipe 6 is plugged with measurement needle 7, measures the outer of needle 7
Surface is fixedly connected with limit plate 9, and limit plate 9 is located at the top of conduction pipe 6, and 6 inner cavity of conduction pipe and the junction for measuring needle 7 are solid
Surely it is connected with heat-resistant sealing ring 8.
The top of measurement needle 7 is flexibly connected through the bottom for controlling box 12 and with control box 12, the side weldering of control box 12
It connects in the side of furnace body 1, furnace body 1 is fixedly connected with baffle 5 at the top of control 12 side of box, and baffle 5 is located at control box 12
Top, by baffle 5 prevent falling object from high altitude to warning lamp 17 and control box 12 damage, measurement needle 7 be located at control box 12
One end of inner cavity is fixedly connected with temperature inductor 10, the inside by measurement needle 7 through the importing of conduction pipe 6 air guiding chamber 4, and convenient pair
Temperature inside furnace body 1 measures, and the outer surface of temperature inductor 10 is socketed with the first fixing sleeve 11, the first fixing sleeve 11
Bottom is fixedly connected with the bottom of control 12 inner cavity of box, and limit is fixed to temperature inductor 10 by the way that the first fixing sleeve 11 is convenient
Position, convenient to fix to position of the measurement needle 7 in air guiding chamber 4, the output end of temperature inductor 10 is defeated with data-analyzing machine 13
Enter end electrical connection, the rated value of data-analyzing machine 13 is 750 degree to 800 degree, when detecting that temperature reaches in temperature inductor 10
750 degree of data-analyzing machines 13 just transfer data on controller 15, and buzzer 16 is made to alarm, convenient to buffer preparation to worker
Time, the outer surface of data-analyzing machine 13 are socketed with the second fixing sleeve 14, the side and control 12 inner cavity of box of the second fixing sleeve 14
Side close to furnace body 1 is fixedly connected, and is facilitated by the second fixing sleeve 14 and data-analyzing machine 13 is fixed, data analysis
The output end of device 13 is electrically connected with the input terminal of controller 15, and controller 15, temperature inductor 10 and data-analyzing machine 13 can roots
Model available for purchase in the market is selected according to actual demand, increases the alternative of construction personnel, the first output of controller 15
End is electrically connected with the input terminal of buzzer 16, and the side of buzzer 16 is fixedly connected with control box 12 far from the side of furnace body 1, is controlled
The second output terminal of device 15 processed is electrically connected with the input terminal of warning lamp 17, and the side of warning lamp 17 and control box 12 are far from furnace body 1
Side be fixedly connected, when measuring the temperature inside furnace body 1 by temperature inductor 10 and reaching 750 degree, temperature inductor
10 temperature datas that will test are transferred on data-analyzing machine 13, are analyzed and are compared through data-analyzing machine 13, are divided when meeting data
It when the amount value of 13 inner setting of parser, transfers data on controller 15, controller 15 controls the work of buzzer 16 to warn
Show staff, controller 15 controls the work of warning lamp 17 to indicate the position of staff's furnace body 1, has without artificial observation
Temperature in furnace body 1 saves manpower, the advantage of high-precision operation.
It controls box 12 and is fixedly connected with the first protective frame 18 far from the side of furnace body 1, warning lamp 17 is located at the first protective frame
18 inside, the first protective frame 18 are connected with the second protective frame 19 by hinge 20 far from the bottom of control 12 side of box,
It facilitates and warning lamp 17 is protected by the first protective frame 18 and the second protective frame 19,18 top of the first protective frame is far from control
The side of box 12 processed is fixedly connected with the first thread bush 21, and 19 top of the second protective frame is fixed close to the side of the first thread bush 21
It is connected with the second thread bush 22, the flank threads of the second thread bush 22 are connected with threaded rod 23, and threaded rod 23 is far from the second screw thread
One end of set 22 is threadedly coupled with the first thread bush 21, and threaded rod 23 is fixedly connected with switch block far from one end of the first thread bush 21
24, the shape of switch block 24 is rectangle, separates threaded rod 23 with the first thread bush 21 by rotating switch block 24, makes the first protection
The separation of the top of frame 18 and the second protective frame 19, it is convenient that warning lamp 17 is repaired.
The electric elements occurred in this article are electrically connected with extraneous main controller and 220V alternating current, and main controller can be meter
Calculation machine etc. plays the conventionally known equipment of control.
Working principle:When measuring the temperature inside furnace body 1 by temperature inductor 10 and reaching 750 degree, temperature sense
The temperature data that device 10 will test is transferred on data-analyzing machine 13, is analyzed and is compared through data-analyzing machine 13, when meeting data
It when the amount value of 13 inner setting of analyzer, transfers data on controller 15, controller 15, which controls the work of buzzer 16, to be come
Staff is warned, controller 15 controls the work of warning lamp 17 to indicate the position of staff's furnace body 1, has and see without artificial
The temperature in furnace body 1 is examined, manpower, the advantage of high-precision operation are saved.