CN208107377U - Novel municipal works Environment Protection and Drainage of Pulled Water device - Google Patents
Novel municipal works Environment Protection and Drainage of Pulled Water device Download PDFInfo
- Publication number
- CN208107377U CN208107377U CN201820577241.6U CN201820577241U CN208107377U CN 208107377 U CN208107377 U CN 208107377U CN 201820577241 U CN201820577241 U CN 201820577241U CN 208107377 U CN208107377 U CN 208107377U
- Authority
- CN
- China
- Prior art keywords
- cooperation
- sewage pipe
- seal ring
- fixed plate
- positioning seal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Sink And Installation For Waste Water (AREA)
Abstract
Novel municipal works Environment Protection and Drainage of Pulled Water device, including sewage pipe, cooperate sewage pipe, positioning seal ring, cooperate positioning seal ring, fit sealing circle, cooperate fit sealing circle, cooperate fixed plate, fixed plate, reinforcement flange, cooperate reinforcement flange, the sewage pipe and cooperation sewage pipe are adapted, the cooperation sewage pipe connects sewage pipe, there is installation projecting slot on the right side of the sewage pipe, there is installation protrusion on the left of the cooperation sewage pipe, the installation protrusion is adapted with installation projecting slot, the installation projecting slot connection installation protrusion, installation protrusion outside connection cooperation positioning seal ring, positioning seal ring is connected on the inside of the installation projecting slot, it is adapted inside the positioning seal ring with cooperation positioning seal ring, the cooperation positioning seal ring left end connects positioning seal ring, the fit sealing circle connects sewage pipe.
Description
Technical field
The utility model relates to sewage pipe field more particularly to a kind of novel municipal works Environment Protection and Drainage of Pulled Water devices.
Background technique
The construction of municipal works drainage and people's normal work and the normal operation of life are closely bound up, however existing
Municipal works Environment Protection and Drainage of Pulled Water pipe installation connection it is not close, reduce the leakproofness of pipeline junction.
Utility model content
The utility model In view of the above shortcomings of the prior art, provides a kind of structurally reasonable novel municipal works ring
Protect blowdown apparatus.
The purpose of this utility model is to be achieved through the following technical solutions:
A kind of novel municipal works Environment Protection and Drainage of Pulled Water device, including sewage pipe, cooperation sewage pipe, positioning seal ring, cooperation are calmly
Position sealing ring, fit sealing circle, cooperation fit sealing circle, cooperation fixed plate, fixed plate, reinforcement flange, cooperation reinforcement flange, institute
It states sewage pipe and sewage pipe is cooperated to be adapted, the cooperation sewage pipe connects sewage pipe, has installation convex on the right side of the sewage pipe
Grooving, the cooperation sewage pipe left side have installation protrusion, and the installation protrusion and installation projecting slot are adapted, and the installation is convex
Grooving connection installation is raised, installation protrusion outside connection cooperation positioning seal ring, and installation projecting slot inside connection is fixed
Position sealing ring, the positioning seal ring inside are adapted with cooperation positioning seal ring, the cooperation positioning seal ring left end connection
Positioning seal ring, the fit sealing circle connect sewage pipe, have fastening projecting slot, the cooperation on the inside of the fit sealing circle
The connection of fit sealing circle cooperates sewage pipe, and the cooperation fit sealing circle has fastening protrusion, and the fastening protrusion and fastening are convex
Grooving is adapted, the fastening projecting slot connection fastening protrusion, is connected and fixed plate by fastening nail on the outside of the sewage pipe, described
Cooperate sewage pipe by cooperation fastening nail outside connection cooperation fixed plate, the cooperation fixed plate is connected and fixed plate, the fixation
Plate outer end connects fastening bolt, and the fastening bolt is sequentially connected fixed plate, cooperation fixed plate.
Connection cooperation sewage pipe on the inside of the cooperation reinforcement flange, the cooperation reinforcement flange are sliding on cooperation sewage pipe
It is dynamic, sewage pipe is connected on the inside of the reinforcement flange, the reinforcement flange is slided on sewage pipe, and the reinforcement flange right end has
Reinforcing bar, the reinforcing bar are sequentially connected cooperation reinforcement flange, reinforce nut.
Beneficial effect:
Cooperation positioning seal ring left end is caught in positioning seal ring, keeps sewage pipe and the sealing of cooperation sewage pipe junction good
It is good, it fastens raised mouth and enters to fasten in projecting slot, increase the leakproofness of sewage pipe connection cooperation sewage pipe, cooperation fastening nail will match
It closes fixed plate to be fixed on cooperation sewage pipe, make to cooperate sewage pipe and cooperates fixed plate stable connection, fastening nail consolidates fixed plate
It is scheduled on sewage pipe, sewage pipe is enabled to be connected firmly with fixed plate, fastening bolt is sequentially connected fixed plate, cooperation fixed plate, makes to arrange
Dirt pipe is stablized with cooperation sewage pipe opposed configuration, and reinforcing bar reinforcement by connection nut is opposite with cooperation reinforcement flange by reinforcement flange
It is fixed, and then make between sewage pipe, cooperation sewage pipe, cooperation fixed plate, fixed plate that structure is more stable, enable sewage pipe and cooperation arrange
Dirty pipe is completely embedded.This novel municipal works Environment Protection and Drainage of Pulled Water device is completely embedded, and improves the leakproofness of pipeline junction.
Detailed description of the invention
Fig. 1 is novel municipal works Environment Protection and Drainage of Pulled Water apparatus structure schematic diagram described in the utility model.
Fig. 2 is novel municipal works Environment Protection and Drainage of Pulled Water device partial enlarged view described in the utility model.
Specific embodiment
The utility model is described in further detail below according to drawings and examples:
A kind of novel municipal works Environment Protection and Drainage of Pulled Water device, including sewage pipe 1, cooperation sewage pipe 2, positioning seal ring 5, cooperation
Positioning seal ring 6, cooperation fit sealing circle 10, cooperation fixed plate 11, fixed plate 12, reinforcement flange 14, is matched at fit sealing circle 7
Reinforcement flange 17 is closed, the sewage pipe 1 is adapted with cooperation sewage pipe 2, and the cooperation sewage pipe 2 connects sewage pipe 1, the row
There is installation projecting slot 3 on the right side of dirty pipe 1, there is installation protrusion 4, the installation protrusion 4 and installation on the left of the cooperation sewage pipe 2
Projecting slot 3 is adapted, the connection of the installation projecting slot 3 installation protrusion 4, the 4 outside connection cooperation location sealing of installation protrusion
6 are enclosed, positioning seal ring 5,5 inside of positioning seal ring and cooperation 6 phase of positioning seal ring are connected on the inside of the installation projecting slot 3
It adapts to, 6 left end of cooperation positioning seal ring connects positioning seal ring 5, and the fit sealing circle 7 connects sewage pipe 1, described tight
Gu there is fastening projecting slot 8 on the inside of sealing ring 7, the connection of the cooperation fit sealing circle 10 cooperation sewage pipe 2, the cooperation fastening
Sealing ring 10 has fastening protrusion 9, and the fastening protrusion 9 is adapted with fastening projecting slot 8, and the fastening projecting slot 8 connects tightly
Gu protrusion 9, is connected and fixed plate 12 by fastening nail 19 on the outside of the sewage pipe 1, the cooperation sewage pipe 2 is followed closely by cooperation fastening
18 outside connection cooperation fixed plates 11, the cooperation fixed plate 11 are connected and fixed plate 12,12 outer end of the fixed plate connection fastening
Bolt 13, the fastening bolt 13 are sequentially connected fixed plate 12, cooperation fixed plate 11.
Connection cooperation sewage pipe 2 on the inside of the cooperation reinforcement flange 17, the cooperation reinforcement flange 17 is in cooperation sewage pipe 2
Upper sliding connects sewage pipe 1 on the inside of the reinforcement flange 14, and the reinforcement flange 14 is slided on sewage pipe 1, the method for strengthening
Blue 14 right ends have reinforcing bar 15, and the reinforcing bar 15 is sequentially connected cooperation reinforcement flange 17, reinforces nut 16.
Cooperation 6 left end of positioning seal ring is caught in positioning seal ring 5, makes sewage pipe 1 and the sealing of cooperation 2 junction of sewage pipe
Well, enter to fasten to increase the leakproofness that the connection of sewage pipe 1 cooperates sewage pipe 2, cooperation fastening in projecting slot 8 for 9 mouthfuls of fastening protrusion
Cooperation fixed plate 11 is fixed on cooperation sewage pipe 2 by nail 18, is made to cooperate sewage pipe 2 and is cooperated 11 stable connection of fixed plate, tightly
Admittedly fixed plate 12 is fixed on sewage pipe 1 by nail 19, sewage pipe 1 is enabled to be connected firmly with fixed plate 12, fastening bolt 13 successively connects
Fixed plate 12, cooperation fixed plate 11 are connect, stablizes sewage pipe 1 and cooperation 2 opposed configuration of sewage pipe, 15 reinforcement by connection spiral shell of reinforcing bar
Mother 16, reinforcement flange 14 and cooperation reinforcement flange 17 is relatively fixed, and then fix sewage pipe 1, cooperation sewage pipe 2, cooperation
12 plate 11, fixed plate structures are more stable, and sewage pipe 1 is enabled to be completely embedded with cooperation sewage pipe 2.This novel municipal works ring
It protects blowdown apparatus to be completely embedded, improves the leakproofness of pipeline junction.
Claims (2)
1. a kind of novel municipal works Environment Protection and Drainage of Pulled Water device, it is characterized in that:Including sewage pipe, cooperation sewage pipe, positioning seal ring,
Positioning seal ring, fit sealing circle, cooperation fit sealing circle, cooperation fixed plate, fixed plate, reinforcement flange, cooperation is cooperated to reinforce
Flange, the sewage pipe and cooperation sewage pipe are adapted, and the cooperation sewage pipe connects sewage pipe, are had on the right side of the sewage pipe
Projecting slot is installed, there is installation protrusion, the installation protrusion is adapted with installation projecting slot, described on the left of the cooperation sewage pipe
It is raised that projecting slot connection installation is installed, installation protrusion outside connection cooperation positioning seal ring, the installation projecting slot inside
Positioning seal ring is connected, is adapted inside the positioning seal ring with cooperation positioning seal ring, the cooperation positioning seal ring is left
End connection positioning seal ring, the fit sealing circle connect sewage pipe, have fastening projecting slot, institute on the inside of the fit sealing circle
State cooperation fit sealing circle connection cooperation sewage pipe, the cooperation fit sealing circle has a fastening protrusion, the fastening it is raised and
It fastens projecting slot to be adapted, the fastening projecting slot connection fastening protrusion, be connected and fixed on the outside of the sewage pipe by fastening nail
Plate, the cooperation sewage pipe are connected and fixed plate by cooperation fastening nail outside connection cooperation fixed plate, the cooperation fixed plate, institute
Fixed plate outer end connection fastening bolt is stated, the fastening bolt is sequentially connected fixed plate, cooperation fixed plate.
2. novel municipal works Environment Protection and Drainage of Pulled Water device according to claim 1, it is characterized in that:In the cooperation reinforcement flange
Side connection cooperation sewage pipe, the cooperation reinforcement flange are slided on cooperation sewage pipe, and blowdown is connected on the inside of the reinforcement flange
Pipe, the reinforcement flange are slided on sewage pipe, and the reinforcement flange right end has reinforcing bar, and the reinforcing bar, which is sequentially connected, matches
It closes reinforcement flange, reinforce nut.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820577241.6U CN208107377U (en) | 2018-04-23 | 2018-04-23 | Novel municipal works Environment Protection and Drainage of Pulled Water device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820577241.6U CN208107377U (en) | 2018-04-23 | 2018-04-23 | Novel municipal works Environment Protection and Drainage of Pulled Water device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208107377U true CN208107377U (en) | 2018-11-16 |
Family
ID=64115738
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820577241.6U Expired - Fee Related CN208107377U (en) | 2018-04-23 | 2018-04-23 | Novel municipal works Environment Protection and Drainage of Pulled Water device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208107377U (en) |
-
2018
- 2018-04-23 CN CN201820577241.6U patent/CN208107377U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204225261U (en) | One is buried sewage lifting pump station integrally | |
CN205116383U (en) | Prefabricated pump station of integration with bobbin base is from cleaning device | |
CN206721978U (en) | A kind of Intelligent house that rainwater-collecting can be preserved | |
CN105201070A (en) | Intelligent integrated prefabrication pump station | |
CN208107377U (en) | Novel municipal works Environment Protection and Drainage of Pulled Water device | |
CN205116384U (en) | Prefabricated pump station of intelligence integration | |
CN210640604U (en) | Foundation structure of box-type substation | |
CN203007830U (en) | Split draining device for bridge | |
CN205116381U (en) | Prefabricated pump station of integration with antiskid top cap | |
CN201627224U (en) | Rain water pipe rain water leading-out structure | |
CN210687069U (en) | Be used for sewage treatment to use drainage valve | |
CN207109924U (en) | A kind of garden landscape rainwater-collecting cyclic utilization system | |
CN207295936U (en) | A kind of Novel drain discharge structure | |
CN201990999U (en) | Drain board and filter tube connecting piece | |
CN206758984U (en) | A kind of power cable protecting pipe | |
CN206157782U (en) | Use manhole cover between underground communication equipment | |
CN206145332U (en) | Drainage pipe's crooked transform structure | |
CN201214798Y (en) | Tubular and annular water tower for buildings | |
CN205116382U (en) | Prefabricated pump station of integration with deodorizing device | |
CN210421380U (en) | Environment-friendly new energy building | |
CN214282565U (en) | Water-saving drip irrigation device for landscaping | |
CN201599503U (en) | Multifunctional water discharging joint | |
CN203296121U (en) | Building water collection system | |
CN219471383U (en) | Leakage-proof plugging device for roofing PVC ventilation pipeline | |
CN202273283U (en) | Air pressure adjusting drainage device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181116 Termination date: 20190423 |