CN208105780U - A kind of building materials and ornaments flat grey device of floor tile - Google Patents

A kind of building materials and ornaments flat grey device of floor tile Download PDF

Info

Publication number
CN208105780U
CN208105780U CN201820438924.3U CN201820438924U CN208105780U CN 208105780 U CN208105780 U CN 208105780U CN 201820438924 U CN201820438924 U CN 201820438924U CN 208105780 U CN208105780 U CN 208105780U
Authority
CN
China
Prior art keywords
sleeve
strut
slide bar
fixedly connected
floor tile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820438924.3U
Other languages
Chinese (zh)
Inventor
白文化
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Original Assignee
Shanghai Baoye Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Group Corp Ltd filed Critical Shanghai Baoye Group Corp Ltd
Priority to CN201820438924.3U priority Critical patent/CN208105780U/en
Application granted granted Critical
Publication of CN208105780U publication Critical patent/CN208105780U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a kind of building materials and ornaments flat grey devices of floor tile; including fixed device, carriage and apparatus of plastering; the fixed device includes longitudinally fixed axis, clamping screw, sleeve and neonychium; the bottom end of the longitudinally fixed axis is equipped with the sleeve; the clamping screw runs through the sleeve; and be fixedly connected with the sleeve, the neonychium is located at the top of the clamping screw;Two longitudinally fixed axis are set, bottom end is installed by stationary fixture, slide bar is installed on longitudinally fixed axis, plaster trowel is installed on slide bar, and strut is auxiliarily fixed in the installation of the other end of slide bar, when in use, it according to the size of floor tile, is adjusted, then plaster trowel is enabled to slidably reciprocate on slide bar, plaster on floor tile is smeared uniform, the thickness that plaster on floor tile can in this way smeared is more uniform consistent, and does not need professional's operation, for a wider population, effect of plastering is good, conducive to the horizontality of ground tile paving.

Description

A kind of building materials and ornaments flat grey device of floor tile
Technical field
The utility model belongs to finishing technical field of tools, and in particular to a kind of building materials and ornaments flat grey device of floor tile.
Background technique
With the development of society, especially scientific and technical progress, people's lives are greatly improved and improve; Especially in economically developed area, no matter from hardware resource to software resource and resources of human talents, all converges together, make Economically developed city or area are obtained, needs to carry the population of super number on limited soil.
In existing building decoration, it is laid with floor tile, is a very universal building decoration.Floor tile is a kind of ground dress Exterior material is also floor tile, is fired with clay, and specification is a variety of, and matter is hard, pressure resistance is wear-resisting, can be moisture-proof, some through glazing at Reason has decoration function, is chiefly used in the ground and floor of public building and civil buildings, and floor tile needs overleaf to apply when being laid with Laying if cement in homogeneous thickness, for floor tile.
Original floor tile is that staff is plastered using hand-held plaster trowel at the back side of floor tile, smears in process of deployment Ash thickness by staff grasp, subjective factor gap is larger, and can not coating thickness uniformity, to the water of floor tile Tiling setting tool has certain influence.
Therefore it provides a kind of laying utensil that can improve existing building materials and ornaments floor tile, being one is worth asking for research Topic.
Summary of the invention
It is that staff is carried out using hand-held plaster trowel at the back side of floor tile to overcome original floor tile in process of deployment Plastering, by staff's grasp, subjective factor gap is larger for the thickness of plastering, and can not coating thickness uniformity, it is right Horizontal be laid with of floor tile has certain the problem of influencing, and the utility model provides a kind of flat grey device of building materials and ornaments floor tile.
What the purpose of this utility model was realized in:
A kind of building materials and ornaments flat grey device of floor tile, including fixed device, are arranged carriage on the securing means, and The apparatus of plastering being connect with carriage.
The fixed device includes longitudinally fixed axis, clamping screw, sleeve and neonychium, the bottom end of the longitudinally fixed axis Equipped with the sleeve, the clamping screw runs through the sleeve, and is fixedly connected with the sleeve, and the neonychium is located at described The top of clamping screw, and be fixedly connected with the longitudinally fixed axis.
The carriage includes sliding rack sleeve and slide bar, and the sliding rack sleeve is set in the longitudinally fixed axis Appearance wall, and being fixedly connected with the longitudinally fixed axis, the slide bar are located at the appearance wall of the sliding rack sleeve, and with it is described The rotation connection of sliding rack sleeve, the slide bar are cylindrical body.
The apparatus of plastering includes plaster trowel sleeve, plaster trowel and plaster trowel carrier, and the plaster trowel sleeve is set in institute State on slide bar, and be fixedly connected with the slide bar, the plaster trowel carrier is located at the lower section of the plaster trowel sleeve, and with it is described Plaster trowel sleeve is structure as a whole, and the bottom end of the plaster trowel carrier offers strip fault trough, the top installation of the plaster trowel It is fixedly connected in the strip fault trough, and with the plaster trowel, the fixed device further includes that strut is auxiliarily fixed, described auxiliary Fixed strut is helped to be located at one end on the slide bar far from the sliding rack sleeve, the strut that is auxiliarily fixed includes strut set Cylinder, the first strut, the second strut and fixing clamp, the strut sleeve are set on the appearance wall of the slide bar, and with the cunning Bar is fixedly connected, and first strut is located at the lower section of the strut sleeve, and fixes with the strut sleeve weld, and described One strut is hollow tubular, and second strut is mounted in first strut, and is fixedly connected with first strut, institute The bottom end for stating the second strut is equipped with the fixing clamp, and the fixing clamp is structure as a whole with second strut.
The carriage further includes connecting rod, and the longitudinally fixed number of axle is two, and two described longitudinally fixed Axis is fixedly connected by the connecting rod, and two longitudinally fixed axis are installed in parallel.
The connecting rod is made of loop bar and sleeve, and adjusting handle, and the set are equipped on the appearance wall of the sleeve The outer wall for being set in the loop bar of cylinder, the loop bar are fixedly connected with sleeve by the adjusting handle.
The appearance wall of the strut sleeve is equipped with spirit bubble, and the appearance wall of second strut is equipped with graduated scale, institute It states the second strut and is fixedly connected with first strut by handwheel.
The bottom end of the plaster trowel is equipped with sawtooth, and the sawtooth quantity is nine, and is evenly distributed on the plaster trowel Bottom end
Positive beneficial effect:The utility model is by two longitudinally fixed axis of setting, and stationary fixture is installed in bottom end, in longitudinal direction Slide bar is installed in fixing axle, plaster trowel is installed, and strut is auxiliarily fixed in the installation of the other end of slide bar on slide bar, is using When, it according to the size of floor tile, is adjusted, then plaster trowel is enabled to slidably reciprocate on slide bar, the plaster on floor tile is smeared equal Even, the thickness that the plaster on floor tile can in this way smeared is more uniform consistent, and does not need professional's operation, target user Wider, plastering effect is good, conducive to the horizontality of ground tile paving.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the right side structure schematic view of the utility model;
Fig. 3 is the structural schematic diagram of plaster trowel in the utility model;
In figure:10- fixes device, the longitudinally fixed axis of 11-, 12- clamping screw, 13- sleeve, 14- neonychium, 15- auxiliary Fixed strut, 151- strut sleeve, the first strut of 152-, the second strut of 153-, 154- fixing clamp, 20- carriage, 21- are sliding Moving frame sleeve, 22- slide bar, 23- connecting rod, 30- apparatus of plastering, 31- plaster trowel sleeve, 32- plaster trowel, 33- plaster trowel carrier.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1-3 is please referred to, the utility model provides a kind of technical solution:A kind of building materials and ornaments flat grey device of floor tile, including Fixed device 10, carriage 20 and apparatus of plastering 30, fixed device 10 include longitudinally fixed axis 11, clamping screw 12, sleeve 13 and neonychium 14, the bottom end of longitudinally fixed axis 11 is equipped with sleeve 13, and clamping screw 12 runs through sleeve 13, and fixed with sleeve 13 Connection, neonychium 14 is located at the top of clamping screw 12, and is fixedly connected with longitudinally fixed axis 11, and carriage 20 includes sliding Frame sleeve 21 and slide bar 22, sliding rack sleeve 21 are set in the appearance wall of longitudinally fixed axis 11, and fixed with longitudinally fixed axis 11 Connection, slide bar 22 is located at the appearance wall of sliding rack sleeve 21, and is rotatablely connected with sliding rack sleeve 21, and slide bar 22 is cylindrical body, Apparatus of plastering 30 includes plaster trowel sleeve 31, plaster trowel 32 and plaster trowel carrier 33, and plaster trowel sleeve 31 is set on slide bar 22, And be fixedly connected with slide bar 22, plaster trowel carrier 33 is located at the lower section of plaster trowel sleeve 31, and is integrated with plaster trowel sleeve 31 Structure, the bottom end of plaster trowel carrier 33 offer strip fault trough, and the top of plaster trowel 32 is mounted in strip fault trough, and with plastering Knife 32 is fixedly connected, and fixed device 10 further includes that strut 15 is auxiliarily fixed, and strut 15 is auxiliarily fixed and is located on slide bar 22 far from sliding One end of moving frame sleeve 21 is auxiliarily fixed strut 15 and includes strut sleeve 151, the first strut 152, the second strut 153 and fix Folder 154, strut sleeve 151 is set on the appearance wall of slide bar 22, and is fixedly connected with slide bar 22, and the first strut 152 is located at support The lower section of rod sleeve 151, and be welded and fixed with strut sleeve 151, the first strut 152 is hollow tubular, the installation of the second strut 153 It is fixedly connected in the first strut 152, and with the first strut 152, the bottom end of the second strut 153 is equipped with fixing clamp 154, fixing clamp 154 are structure as a whole with the second strut 153.
In the present embodiment, two longitudinally fixed axis 11 are set, in the installation stationary fixture of longitudinally fixed axis 11, two longitudinal directions Fixing axle 11 is arranged side by side, intermediate fixed by connecting rod 23, and slide bar 22, slide bar 22 and longitudinal direction are installed on longitudinally fixed axis 11 Fixing axle 11 is rotatablely connected, and plaster trowel 32 is installed on slide bar 22, and strut 15 is auxiliarily fixed in the installation of the other end of slide bar 22, When in use, according to the size of floor tile, the distance between two longitudinally fixed axis 11 are adjusted, suitable position is arrived, then passes through The telescopic rod on strut 15 is auxiliarily fixed, adjusts and arrives proper height, and judge whether the position of slide bar 22 is horizontal by spirit bubble, Then it enables plaster trowel 32 slidably reciprocate on slide bar 22, the plaster on floor tile is smeared uniformly, and be same thickness, it in this way can be with The thickness for smearing the plaster on floor tile is more uniform consistent, and does not need professional's operation, for a wider population, plastering effect Fruit is good, conducive to the horizontality of ground tile paving.
Further, carriage 20 further includes connecting rod 23, and longitudinally fixed 11 quantity of axis is two, and two longitudinal directions are solid Dead axle 11 is fixedly connected by connecting rod 23, two longitudinally fixed installations in parallel of axis 11.
In the present embodiment, carriage 20 further includes connecting rod 23, and longitudinally fixed 11 quantity of axis is two, and two longitudinal directions Fixing axle 11 is fixedly connected by connecting rod 23, two longitudinally fixed installations in parallel of axis 11, can be to the plaster trowel on slide bar 22 32 form support, enable the horizontal sliding that plaster trowel 32 can be stable.
Further, connecting rod 23 is made of loop bar and sleeve, is equipped with adjusting handle, and sleeve on the appearance wall of sleeve The outer wall for being set in loop bar, loop bar is fixedly connected with sleeve by adjusting handle.
In the present embodiment, connecting rod 23 is made of loop bar and sleeve, adjusting handle is equipped on the appearance wall of sleeve, and cover The outer wall for being set in loop bar of cylinder, loop bar is fixedly connected with sleeve by adjusting handle, can by adjust loop bar and sleeve it Between distance, to change the length of connecting rod 23, to be applicable in various sizes of floor tile.
Further, the appearance wall of strut sleeve 151 is equipped with spirit bubble, and the appearance wall of the second strut 153, which is equipped with, to be carved Ruler is spent, the second strut 153 is fixedly connected with the first strut 152 by handwheel.
In the present embodiment, the appearance wall of strut sleeve 151 is equipped with spirit bubble, and the appearance wall of the second strut 153 is equipped with Graduated scale, the second strut 153 are fixedly connected with the first strut 152 by handwheel, can be when strut 15 is auxiliarily fixed in placement, side Just staff judges whether slide bar 22 is in a horizontal position.
Further, the bottom end of plaster trowel 32 is equipped with sawtooth, and sawtooth quantity is nine, and is evenly distributed on plaster trowel 32 Bottom end.
In the present embodiment, the bottom end of plaster trowel 32 is equipped with sawtooth, and sawtooth quantity is nine, and is evenly distributed on plaster trowel 32 Bottom end, groove can be left on plaster in smearing process, it is convenient that floor tile outflow gap is squeezed when being laid with floor tile.
The working principle and process for using of the utility model:After the utility model installs, when in use, according to floor tile Size, adjust the distance between two longitudinally fixed axis 11, arrive suitable position, tighten clamping screw 12 and be fixed, so It afterwards by the telescopic rod being auxiliarily fixed on strut 15, adjusts and arrives proper height, and judge that the position of slide bar 22 is by spirit bubble No level is fixed by fixing clamp 154, by then plaster trowel 32 being enabled to slidably reciprocate on slide bar 22, on floor tile Plaster is smeared uniform.
The utility model is installed stationary fixture, is installed on longitudinally fixed axis by two longitudinally fixed axis of setting, bottom end Slide bar installs plaster trowel on slide bar, and strut is auxiliarily fixed in the installation of the other end of slide bar, when in use, according to floor tile Size is adjusted, and then plaster trowel is enabled to slidably reciprocate on slide bar, and the plaster on floor tile is smeared uniformly, can be made in this way The thickness that plaster on floor tile is smeared is more uniform consistent, and does not need professional's operation, for a wider population, effect of plastering It is good, conducive to the horizontality of ground tile paving.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (4)

1. a kind of building materials and ornaments flat grey device of floor tile, it is characterised in that:Including fixed device(10), setting is in fixed device(10) On carriage(20), and and carriage(20)The apparatus of plastering of connection(30);The fixed device(10)Including vertical To fixing axle(11), clamping screw(12), sleeve(13)And neonychium(14), the longitudinally fixed axis(11)Bottom end be equipped with institute State sleeve(13), the clamping screw(12)Through the sleeve(13), and with the sleeve(13)It is fixedly connected, the protection Pad(14)Positioned at the clamping screw(12)Top, and with the longitudinally fixed axis(11)It is fixedly connected;The carriage (20)Including sliding rack sleeve(21)And slide bar(22), the sliding rack sleeve(21)It is set in longitudinally fixed axis(11)Appearance Wall, and with the longitudinally fixed axis(11)It is fixedly connected, the slide bar(22)Positioned at the sliding rack sleeve(21)Appearance wall, And with the sliding rack sleeve(21)Rotation connection, the slide bar(22)For cylindrical body, the apparatus of plastering(30)Including plastering Broach shell cylinder(31), plaster trowel(32)With plaster trowel carrier(33), the plaster trowel sleeve(31)It is set in the slide bar(22)On, And with the slide bar(22)It is fixedly connected, the plaster trowel carrier(33)Positioned at the plaster trowel sleeve(31)Lower section, and with The plaster trowel sleeve(31)It is structure as a whole, the plaster trowel carrier(33)Bottom end offer strip fault trough, the plastering Knife(32)Top be mounted in the strip fault trough, and with the plaster trowel(32)It is fixedly connected;The fixed device(10) It further include that strut is auxiliarily fixed(15), described that strut is auxiliarily fixed(15)Positioned at slide bar(22)Upper separate sliding rack sleeve(21)'s One end, it is described that strut is auxiliarily fixed(15)Including strut sleeve(151), the first strut(152), the second strut(153)And fixation Folder(154), the strut sleeve(151)It is set in the slide bar(22)Appearance wall on, and with the slide bar(22)It is fixed to connect It connects, first strut(152)Positioned at the strut sleeve(151)Lower section, and with the strut sleeve(151)Welding is solid It is fixed, first strut(152)For hollow tubular, second strut(153)It is mounted on first strut(152)It is interior, and With first strut(152)It is fixedly connected, second strut(153)Bottom end be equipped with the fixing clamp(154), described solid Clamp(154)With second strut(153)It is structure as a whole;The plaster trowel(32)Bottom end be equipped with sawtooth, the sawtooth Quantity is nine, and is evenly distributed on the plaster trowel(32)Bottom end.
2. a kind of building materials and ornaments according to claim 1 flat grey device of floor tile, it is characterised in that:The carriage(20) It further include connecting rod(23), the longitudinally fixed axis(11)Quantity is two, and two longitudinally fixed axis(11)Pass through institute State connecting rod(23)It is fixedly connected, two longitudinally fixed axis(11)Parallel installation.
3. a kind of building materials and ornaments according to claim 2 flat grey device of floor tile, it is characterised in that:The connecting rod(23)By Loop bar and sleeve composition, be equipped with adjusting handle on the appearance wall of the sleeve, and the sleeve is set in the loop bar Outer wall, the loop bar and sleeve are fixedly connected by the adjusting handle.
4. a kind of building materials and ornaments according to claim 1 flat grey device of floor tile, it is characterised in that:The strut sleeve (151)Appearance wall be equipped with spirit bubble, second strut(153)Appearance wall be equipped with graduated scale, second strut (153)With first strut(152)It is fixedly connected by handwheel.
CN201820438924.3U 2018-03-29 2018-03-29 A kind of building materials and ornaments flat grey device of floor tile Expired - Fee Related CN208105780U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820438924.3U CN208105780U (en) 2018-03-29 2018-03-29 A kind of building materials and ornaments flat grey device of floor tile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820438924.3U CN208105780U (en) 2018-03-29 2018-03-29 A kind of building materials and ornaments flat grey device of floor tile

Publications (1)

Publication Number Publication Date
CN208105780U true CN208105780U (en) 2018-11-16

Family

ID=64123186

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820438924.3U Expired - Fee Related CN208105780U (en) 2018-03-29 2018-03-29 A kind of building materials and ornaments flat grey device of floor tile

Country Status (1)

Country Link
CN (1) CN208105780U (en)

Similar Documents

Publication Publication Date Title
CN106121205B (en) Paste wall, floor tile and levelling multiple purpose aeroplane
CN103352557B (en) Drone version full-automatic multi-functional wall surface mortar strikes off trowelling machine
CN208105780U (en) A kind of building materials and ornaments flat grey device of floor tile
CN106525537B (en) Concrete core sample end face filling-in device and its application method
CN114635542A (en) Light partition plate perps processing frock and system
CN110565905A (en) multifunctional skirting line upper edge surface folding moving device and using method
CN111749441A (en) A exterior wall ceramic brick laying device for individual layer building
CN210256614U (en) Slant control guide rail for concrete vibrating rod
CN210049537U (en) Ceramic tile soaking frame
CN217232568U (en) Light partition plate perps processing frock and system
CN107081987A (en) A kind of working eminence line orientation device of construction and decoration
CN211949445U (en) Plastering device for building decorative plate
CN105672629B (en) A kind of mechanical float and its operating method
CN205637501U (en) Can carry out plastering unit that plasters with wall keeping parallelism
CN210508290U (en) Slide rail formula ceramic tile ash smoothing device with handle
CN211974847U (en) Ladder for electric power engineering construction
CN208039761U (en) A kind of wall blank scraper plate
CN206189879U (en) Plaster and get rid of thick liquid device
CN214574690U (en) Building connecting bridge
CN205822733U (en) A kind of wall-surface screeding robot
CN213742123U (en) Coating whitewashes device that architectural decoration was used
CN104742259B (en) Ceramic tile cutter
CN216142350U (en) Plastering device for building external wall
CN216446447U (en) Strickle device with direction function
CN109914255A (en) Construction roof beam structure device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181116