CN208104510U - A kind of hot galvanizing reverberatory furnace - Google Patents
A kind of hot galvanizing reverberatory furnace Download PDFInfo
- Publication number
- CN208104510U CN208104510U CN201820420218.6U CN201820420218U CN208104510U CN 208104510 U CN208104510 U CN 208104510U CN 201820420218 U CN201820420218 U CN 201820420218U CN 208104510 U CN208104510 U CN 208104510U
- Authority
- CN
- China
- Prior art keywords
- storehouse
- zinc
- plated
- melt
- furnace body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Vertical, Hearth, Or Arc Furnaces (AREA)
- Coating With Molten Metal (AREA)
- Manufacture And Refinement Of Metals (AREA)
Abstract
The utility model discloses a kind of hot galvanizing reverberatory furnaces, including fixing seat, middle position at the top of the fixing seat is provided with furnace body, and the bottom of furnace body side is provided with air pump, the furnace body is provided with Bunker at the top of air pump side, and furnace body is provided with melt storehouse far from absorber is provided at the top of air pump side above the furnace interior, and melt the top of the warehouse is provided with charging door close to the side of air pump, the top on the outside of the melt storehouse is provided with annular fixed block.The utility model is equipped with melt storehouse, and outlet flue is provided at the top of melt storehouse, it is connected to using communicating pipe cooperation absorber with zinc-plated storehouse, so that the heat that outlet flue can not only be discharged in device cleans, while heat can be recycled, save production cost, and the setting of melt storehouse inside multiple groups burner, the active area that can be improved flame Yu zinc raw material accelerates the melting of zinc, improves production efficiency.
Description
Technical field
The utility model relates to technical field of galvanizing equipment, specially a kind of hot galvanizing reverberatory furnace.
Background technique
Reverberatory furnace is also known as flame reverberatory furnace, is that one kind by flame directly heats material, with the metallurgical furnace of smelting metal, by
Burn three Zhun, working chamber and exhaust uptake (chimney) major part compositions, and entire burner hearth is exactly one and uses refractory liner
Rectangle working chamber, reverberatory furnace structure is simple, investment is small, the fuel type that uses is relatively wide (such as coal, coal gas, heavy oil), is
The important smelting equipment of the non-ferrous metals such as copper, nickel, tin, in the production process of malleable cast iron pipe fitting, need to pipe fitting carry out it is zinc-plated, with
Ensure the quality of product, and present hot galvanizing reverberatory furnace conductivity of heat is poor, zinc thawing efficiency is slower, meanwhile, heat loss is high, can not
To the utilization that heat is recycled, production cost is increased, moreover, the component content in bottom solution can become a little by operation
Change, conventional apparatus can not handle the impurity in bottom solution, influence product it is zinc-plated after quality.
Utility model content
The purpose of this utility model is to provide a kind of hot galvanizing reverberatory furnaces, to solve mentioned above in the background art ask
Topic.
To achieve the above object, the utility model provides the following technical solutions:A kind of hot galvanizing reverberatory furnace, including fixation
, the middle position at the top of the fixing seat is provided with furnace body, and the bottom of furnace body side is provided with air pump, and the furnace body leans on
Bunker is provided at the top of nearly air pump side, and furnace body is far from being provided with absorber at the top of air pump side, in the furnace body
Melt storehouse is provided with above portion, and melt the top of the warehouse is provided with charging door close to the side of air pump, on the outside of the melt storehouse
Top is provided with annular fixed block, and annular fixed block is internally provided with ring pipe, the input terminal and annular of the Bunker
Pipe connection, the middle position of the melt the top of the warehouse is provided with venthole, and venthole is connected to by appendix with absorber,
The top of melt storehouse inner sidewall is evenly arranged with burner, and burner all passes through appendix and is connected to ring pipe, the melt
Lower section inside storehouse is provided with strainer, and the middle position of molten bin bottom is provided with taphole, described furnace body one end
Top is provided with slag-drip opening, and slag-drip opening is connected to melt storehouse, and zinc-plated storehouse, the solution are provided with below the furnace interior
The bottom of outlet is provided with switch valve, and the output end of switch valve is connected to zinc-plated storehouse, the output end of the air pump and zinc-plated storehouse
Connection, the output end of the absorber are connected to zinc-plated storehouse, and the top inside the zinc-plated storehouse is provided with through-hole, and the bottom of through-hole
Portion is evenly arranged with fixed plate, and the lower section inside the zinc-plated storehouse is provided with placement plate, and the middle position in zinc-plated orlop portion
Be provided with permanent magnet, the zinc-plated storehouse is provided with diversion pipe close to the bottom of air pump side, and diversion pipe far from zinc-plated storehouse one
End is connected to melt storehouse, and middle position of the zinc-plated storehouse close to slag-drip opening one end is provided with door.
Preferably, bearing block is all provided at the corner location of the fixing seat bottom.
Preferably, the burner is provided with eight groups, and the angle between adjacent burner is 30 °.
Preferably, it is provided with fixture block on the door, is provided with the card slot matched with fixture block on the zinc-plated storehouse.
Preferably, sealing cover is all provided on the charging door and slag-drip opening.
Preferably, the through-hole is provided with ten groups, and the distance between adjacent through-holes are identical.
Compared with prior art, the utility model has the beneficial effects that:The hot galvanizing reverberatory furnace is equipped with melt storehouse, and
Melt is provided with outlet flue at the top of storehouse, is connected to using communicating pipe cooperation absorber with zinc-plated storehouse, so that device can not only be right
The heat of outlet flue discharge cleans, while can recycle to heat, saves production cost, and in melt storehouse
The setting of portion's multiple groups burner, can be improved the active area of flame Yu zinc raw material, accelerates the melting of zinc, improves production efficiency,
The setting of fixed plate and through-hole, enables zinc solution uniformly to fall in the surface of plating piece inside zinc-plated storehouse, is convenient for plating piece table
The iron filings punching in face is fallen, and is used cooperatively with permanent magnet, convenient for being collected to iron filings, is improved zinc-plated quality, furnace body side gas
The setting of pump can be improved the pressure inside zinc-plated storehouse, is connected to using perfusion tube with melt storehouse, convenient for carrying out to zinc solution
Circulation, so that the cleaning inside zinc-plated storehouse is more convenient, improves the practicability of device.
Detailed description of the invention
Fig. 1 is the main view schematic cross-sectional view of the utility model;
Fig. 2 is the schematic front view of the utility model.
In figure:1, fixing seat;2, furnace body;3, air pump;4, zinc-plated storehouse;5, through-hole;6, Bunker;7, strainer;8, ring pipe;
9, annular fixed block;10, charging door;11, venthole;12, burner;13, absorber;14, taphole;15, switch valve;16,
Fixed plate;17, placement plate;18, permanent magnet;19, door;20, slag-drip opening;21, melt storehouse;22, diversion pipe.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
Embodiment provided by the utility model referring to FIG. 1-2,:A kind of hot galvanizing reverberatory furnace, including fixing seat 1, it is fixed
The middle position at 1 top of seat is provided with furnace body 2, and the bottom of 2 side of furnace body is provided with air pump 3, and furnace body 2 is close to air pump 3 one
It is provided with Bunker 6 at the top of side, and furnace body 2 is far from being provided with absorber 13 at the top of 3 side of air pump, it is upper inside furnace body 2
Side is provided with melt storehouse 21, and 21 top of melt storehouse is provided with charging door 10, the top in 21 outside of melt storehouse close to the side of air pump 3
Portion is provided with annular fixed block 9, and annular fixed block 9 is internally provided with ring pipe 8, the input terminal and ring pipe 8 of Bunker 6
The middle position of connection, 21 top of melt storehouse is provided with venthole 11, and venthole 11 is connected by appendix and absorber 13
Logical, the top of 21 inner sidewall of melt storehouse is evenly arranged with burner 12, and burner 12 is all connected to by appendix with ring pipe 8, melts
Lower section inside feed bin 21 is provided with strainer 7, and the middle position of 21 bottom of melt storehouse is provided with taphole 14, furnace body 2
Slag-drip opening 20 is provided at the top of one end, and slag-drip opening 20 is connected to melt storehouse 21, the lower section inside furnace body 2 is provided with zinc-plated storehouse
4, the bottom of taphole 14 is provided with switch valve 15, and the output end of switch valve 15 is connected to zinc-plated storehouse 4, the output of air pump 3
End is connected to zinc-plated storehouse 4, and the output end of absorber 13 is connected to zinc-plated storehouse 4, and the top inside zinc-plated storehouse 4 is provided with through-hole 5, and
The bottom of through-hole 5 is evenly arranged with fixed plate 16, and the lower section inside zinc-plated storehouse 4 is provided with placement plate 17, and 4 bottom of zinc-plated storehouse
Middle position is provided with permanent magnet 18, and zinc-plated storehouse 4 is provided with diversion pipe 22, and diversion pipe 22 close to the bottom of 3 side of air pump
One end far from zinc-plated storehouse 4 is connected to melt storehouse 21, and middle position of the zinc-plated storehouse 4 close to 20 one end of slag-drip opening is provided with door
19。
In this embodiment:It is all provided with bearing block at the corner location of 1 bottom of fixing seat, improves the stability of device,
Burner 12 is provided with eight groups, and the angle between adjacent burner 12 is 30 °, improves the contact area between flame and spelter,
Accelerate the thawing of spelter, is provided with fixture block on door 19, the card slot matched with fixture block is provided on furnace body 2, improves door
It is all provided with sealing cover on sealing effect between 19 and zinc-plated storehouse 4, charging door 10 and slag-drip opening 20, improves the sealing of device
Effect, through-hole 5 is provided with ten groups, and the distance between adjacent through-holes 5 are identical, and zinc solution is enabled uniformly to be sprayed at plating piece
Surface, improve impurity-eliminating effect.
Working principle:Before use, powering on, in use, opening door 19, pipe fitting is put into the top of placement plate 17
Portion, is then shut off door 19, pipe fitting is placed complete after, strainer Zinc material is put into from charging door 10 inside melt storehouse 21
On 7, burner 12 is opened, melting is carried out to zinc raw material raw material, the material residue after melt is discharged from slag-drip opening 20, and flue gas is from venthole
11 discharges, clean through absorber 13, by the heat transfer in flue gas to the inside in zinc-plated storehouse 4, improve the temperature inside zinc-plated storehouse 4
Degree, then, turns on the switch valve 15, and zinc liquid flows out inside through-hole 5, falls in the top of plating piece, is rinsed to plating piece, removes de-iron
Bits, iron filings are adsorbed on the bottom in zinc-plated storehouse 4 through permanent magnet 18, and zinc solution floods plating piece, and completion is zinc-plated, then opens air pump 3, increase
Zinc solution is transmitted to the inside in melt storehouse 21, is recycled, so by the pressure inside big zinc-plated storehouse 4 by diversion pipe 22
Afterwards, pipe fitting is taken out, meanwhile, the iron filings of 21 bottom of melt storehouse are cleared up, when reusing, valve 15 is turned on the switch, solution is conveyed
To inside melt storehouse 21, zinc-plated, zinc-plated completion and then secondary opening air pump 3, by zinc solution out of zinc-plated storehouse 4 are carried out to pipe fitting
Portion is drawn into the inside in melt storehouse 21, and clears up zinc-plated storehouse 4.
It is obvious to a person skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and
And without departing substantially from the spirit or essential attributes of the utility model, it can realize that this is practical new in other specific forms
Type.Therefore, in all respects, the present embodiments are to be considered as illustrative and not restrictive, this is practical new
The range of type is indicated by the appended claims rather than the foregoing description, it is intended that containing for the equivalent requirements of the claims will be fallen in
All changes in justice and range are embraced therein.It should not treat any reference in the claims as limiting
Related claim.
Claims (6)
1. a kind of hot galvanizing reverberatory furnace, including fixing seat (1), it is characterised in that:Middle position at the top of the fixing seat (1)
It is provided with furnace body (2), and the bottom of furnace body (2) side is provided with air pump (3), top of the furnace body (2) close to air pump (3) side
Portion is provided with Bunker (6), and is provided with absorber (13) at the top of separate air pump (3) side of furnace body (2), the furnace body (2)
Internal top is provided with melt storehouse (21), and the side at the top of melt storehouse (21) close to air pump (3) is provided with charging door (10),
Top on the outside of the melt storehouse (21) is provided with annular fixed block (9), and annular fixed block (9) is internally provided with ring pipe
(8), the input terminal of the Bunker (6) is connected to ring pipe (8), and the middle position at the top of the melt storehouse (21) is provided with
Venthole (11), and venthole (11) is connected to by appendix with absorber (13), the top of melt storehouse (21) inner sidewall
It is evenly arranged with burner (12), and burner (12) is all connected to by appendix with ring pipe (8), melt storehouse (21) inside
Lower section is provided with strainer (7), and the middle position of melt storehouse (21) bottom is provided with taphole (14), the furnace body (2)
It is provided at the top of one end slag-drip opening (20), and slag-drip opening (20) is connected to melt storehouse (21), the internal lower section of the furnace body (2)
Be provided with zinc-plated storehouse (4), the bottom of the taphole (14) is provided with switch valve (15), and the output end of switch valve (15) with
The connection of zinc-plated storehouse (4), the output end of the air pump (3) are connected to zinc-plated storehouse (4), the output end of the absorber (13) with it is zinc-plated
Storehouse (4) connection, the internal top of the zinc-plated storehouse (4) is provided with through-hole (5), and the bottom of through-hole (5) is evenly arranged with fixation
Plate (16), the internal lower section of the zinc-plated storehouse (4) is provided with placement plate (17), and the middle position of zinc-plated storehouse (4) bottom is set
It is equipped with permanent magnet (18), the zinc-plated storehouse (4) is provided with diversion pipe (22) close to the bottom of air pump (3) side, and diversion pipe
(22) one end far from zinc-plated storehouse (4) is connected to melt storehouse (21), centre of the zinc-plated storehouse (4) close to slag-drip opening (20) one end
Door (19) are provided at position.
2. a kind of hot galvanizing reverberatory furnace according to claim 1, it is characterised in that:The quadrangle of fixing seat (1) bottom
Bearing block is all provided at position.
3. a kind of hot galvanizing reverberatory furnace according to claim 1, it is characterised in that:The burner (12) is provided with eight groups,
And the angle between adjacent burner (12) is 30 °.
4. a kind of hot galvanizing reverberatory furnace according to claim 1, it is characterised in that:Card is provided on the door (19)
Block is provided with the card slot matched with fixture block on the zinc-plated storehouse (4).
5. a kind of hot galvanizing reverberatory furnace according to claim 1, it is characterised in that:The charging door (10) and slag-drip opening
(20) sealing cover is all provided on.
6. a kind of hot galvanizing reverberatory furnace according to claim 1, it is characterised in that:The through-hole (5) is provided with ten groups, and
The distance between adjacent through-holes (5) are identical.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820420218.6U CN208104510U (en) | 2018-03-27 | 2018-03-27 | A kind of hot galvanizing reverberatory furnace |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820420218.6U CN208104510U (en) | 2018-03-27 | 2018-03-27 | A kind of hot galvanizing reverberatory furnace |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208104510U true CN208104510U (en) | 2018-11-16 |
Family
ID=64123092
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820420218.6U Expired - Fee Related CN208104510U (en) | 2018-03-27 | 2018-03-27 | A kind of hot galvanizing reverberatory furnace |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208104510U (en) |
-
2018
- 2018-03-27 CN CN201820420218.6U patent/CN208104510U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206755875U (en) | A kind of metallurgy smelting furnace | |
CN201273767Y (en) | Multifunctional industrial furnace and continuous smelting system comprising the industrial furnace | |
CN201449136U (en) | Device for zinc metallurgy of electric-heating rotary kiln | |
CN202254865U (en) | On-line alloy baking device for steel making | |
CN102899497A (en) | Zinc leaching slag treatment device and treatment process | |
CN103468955B (en) | A kind of copper scap smelting process | |
CN208104510U (en) | A kind of hot galvanizing reverberatory furnace | |
CN105506299A (en) | Low-grade secondary lead smelting slag fuming furnace treatment system and method | |
CN208860123U (en) | Smelting furnace is used in a kind of production of copper products | |
CN109974449B (en) | Novel smelting device | |
CN106635167A (en) | Submerged arc furnace capable of preventing charging material from spattering, and rotary kiln combined smelting system | |
CN208012366U (en) | A kind of feed device for Regenerated aluminium smelter hearth | |
CN207087091U (en) | Continuous mesh belt type soldering oven | |
CN212533052U (en) | Scrap steel continuous charging electric arc furnace with double preheating channels | |
CN204514031U (en) | A kind of high-temperature smelting equipment | |
CN209989442U (en) | Waste pop can recovery system | |
CN204301491U (en) | For the feeding device of smelting furnace | |
CN210122577U (en) | Smelting system of iron-based multi-metal mineral aggregate | |
CN208139819U (en) | A kind of environment-protecting type horizontal holding furnace | |
CN209116749U (en) | A kind of efficient smelting equipment of metallurgy | |
CN208346238U (en) | A kind of anode furnace equipped with refining hole | |
CN207335419U (en) | A kind of side blowing smelting furnace | |
CN206266645U (en) | The system of middle low-order coal sub-prime cascade utilization | |
CN215808501U (en) | Discharge port device applied to melting furnace | |
CN217131861U (en) | Furnace charge preheating device for submerged arc furnace |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181116 Termination date: 20210327 |