CN208104289U - Refuse gasification boiler high temperature batcher - Google Patents

Refuse gasification boiler high temperature batcher Download PDF

Info

Publication number
CN208104289U
CN208104289U CN201820606922.0U CN201820606922U CN208104289U CN 208104289 U CN208104289 U CN 208104289U CN 201820606922 U CN201820606922 U CN 201820606922U CN 208104289 U CN208104289 U CN 208104289U
Authority
CN
China
Prior art keywords
circular arc
high temperature
semicanal
boiler high
refuse gasification
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820606922.0U
Other languages
Chinese (zh)
Inventor
钱尧翎
张国建
陈人民
邢云峰
章力夫
王金
施勇峰
许锡方
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG ZOKSEN ENVIRO-ENERGY EQUIPMENT Co Ltd
Original Assignee
ZHEJIANG ZOKSEN ENVIRO-ENERGY EQUIPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG ZOKSEN ENVIRO-ENERGY EQUIPMENT Co Ltd filed Critical ZHEJIANG ZOKSEN ENVIRO-ENERGY EQUIPMENT Co Ltd
Priority to CN201820606922.0U priority Critical patent/CN208104289U/en
Application granted granted Critical
Publication of CN208104289U publication Critical patent/CN208104289U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Processing Of Solid Wastes (AREA)

Abstract

This application discloses refuse gasification boiler high temperature batchers, including rack, transmission pipeline in the rack is set, spiral material conveying member in the transmission pipeline is set, and driving mechanism, the driving mechanism includes decelerating motor, the transmission shaft being connected by water-cooling bearing block with the decelerating motor, and make airtight and watertight padding seal box between the transmission shaft and the transmission pipeline, the transmission pipeline includes upper circular arc semicanal and lower circular arc semicanal, the upper circular arc semicanal and the lower circular arc semicanal are extended with mounting ear on the whole length direction of two arc end part, the upper circular arc semicanal and the lower circular arc semicanal are spirally connected installation by the mounting ear, and gasket seal is provided between both described mounting ear.Have the characteristics that reduce gasification process energy consumption.

Description

Refuse gasification boiler high temperature batcher
Technical field
This application involves garbage transfer equipment technical fields, and in particular to a kind of level-one gasification for refuse gasification processing Furnace is to the high temperature batcher between second level gasification furnace.
Background technique
Refuse pyrolysis gasification is in confined chamber to be heated at high temperature the synthesis gas converted garbage into as carbon monoxide and hydrogen. Then pass through and remove toxic granular and gas after filtering and chemical cleaning, and burned for energy or be converted into methane, ethyl alcohol or The fuel such as combined diesel oil.Refuse gasification processing quickly can convert energy for household refuse, and rubbish can become providing from debt It produces, the clean energy resource source that can be used on the spot is provided.
Currently, two-stage refuse gasification processing mode is, the rubbish to be processed in feed bin initially enters level-one gasification furnace, complete After level-one gasification process, second level gasification furnace is conveyed by screw(-type) feeder, since rubbish material is in screw(-type) feeder medium temperature Degree can be greatly reduced, thus rubbish material needs the gasification that heats up again in second level gasification furnace.Thus, in level-one gasification process and Between second level gasification process, rubbish is warmed, and-cooling-heats up again, thus there are energy loss, increase equipment energy consumption and The working efficiency of refuse gasification processing.
Summary of the invention
The goal of the invention of the utility model is to overcome above-mentioned technical problem, thus provide a kind of refuse gasification boiler high temperature to Material machine still keeps close after entering second level gasification furnace in the rubbish material in level-one gasification furnace with preferable airtightness Temperature when level-one gasification furnace is left, only less thermal losses, rubbish material is still in the condition of high temperature, without two Grade gasification furnace is heated again, and directly can be carried out gasification process in second level gasification furnace with the condition of high temperature, saved second level gasification The energy consumption of processing.
One embodiment of the utility model discloses refuse gasification boiler high temperature batcher, including rack, setting described Transmission pipeline in rack, the spiral material conveying member being arranged in the transmission pipeline and driving mechanism, the driving mechanism Including decelerating motor, the transmission shaft being connected by water-cooling bearing block with the decelerating motor and make the transmission shaft and the biography Airtight and watertight padding seal box between defeated pipeline, the transmission pipeline include upper circular arc semicanal and lower circular arc semicanal, the upper circular arc Semicanal and the lower circular arc semicanal are extended with mounting ear, the upper circular arc on the whole length direction of two arc end part Semicanal and the lower circular arc semicanal are spirally connected installation by the mounting ear, and are provided between both described mounting ear close Gasket.
By above structure, by the setting of filling sealing tank and gasket seal, the air-tightness in transmission pipeline is improved, The reduction of the rubbish material temperature in transmission pipeline is avoided, rubbish material is not necessarily to heat up again after entering second level gasification furnace, from And reduce the energy consumption of gasification process.On the other hand, by the setting of water-cooling bearing block, high temperature rubbish material is avoided by passing To the influence of drive mechanism when defeated pipeline, guarantee that equipment works normally in a high temperauture environment.
Further, silicon carbide liner plate is covered on the inner wall of the transmission pipeline.
In the technical scheme, carbofrax material has heat-resisting quantity, to avoid high temperature rubbish material to conveyance conduit The damage of inner wall.
Further, the silicon carbide liner plate is to pour silicon carbide plate.
Further, the silicon carbide liner plate is covered on the inner wall of the lower circular arc semicanal.
In the technical scheme, rubbish material under the effect of gravity, is more deposited on lower circular arc semicanal, as a result, by The conveying space medium temperature built up more heats in the conveying space that lower circular arc semicanal surrounds, and circular arc semicanal is descended to surround relatively Degree is more preferable, thus silicon carbide liner plate is arranged on the inner wall of lower circular arc semicanal to the protection that can not only realize to conveyance conduit, also Material utilization amount, save the cost can be reduced.In addition, having accumulated more rubbish objects in the conveying space that lower circular arc semicanal surrounds Material, and during transportation, machine drawing material mainly causes friction damage to the inner wall of lower circular arc semicanal, and carbofrax material has Better wear-resisting property, thus further protect conveyance conduit.
Further, the water-cooling bearing block is connected to by rotary joint with water source.
Further, the spiral material conveying member is shaftless screw conveying blade.
Further, circle is enclosed with heat preservation rock on the outer wall of the conveyance conduit.
Further, the gasket seal is soft graphite metal wound gasket.
To sum up, the refuse gasification high temperature batcher of the application at least has the advantages that energy saving, in level-one gasification furnace Rubbish material be directly entered in second level gasification furnace by the high temperature batcher of technical scheme, only less heat damage Consumption, rubbish material can be directly with the condition of high temperature two without being heated again in second level gasification furnace still in the condition of high temperature Gasification process is carried out in grade gasification furnace, has saved the energy consumption of second level gasification process.
The above description is merely an outline of the technical solution of the present invention, in order to better understand the skill of the utility model Art means, and can be implemented in accordance with the contents of the specification, with the preferred embodiment of the utility model, detailed description is as follows below.
Detailed description of the invention
Fig. 1 is a kind of schematic diagram of the refuse gasification boiler high temperature batcher of the utility model embodiment;
Fig. 2 is sectional view along A-A;
Fig. 3 is a kind of schematic diagram of the gasket seal of the utility model embodiment;
In attached drawing:
1, rack, 2, transmission pipeline, 3, spiral material conveying member, 4, water-cooling bearing block, 5, transmission shaft, 6, packing seal Case, 7, silicon carbide liner plate, 8, rotary joint, 21, upper circular arc semicanal, 22, lower circular arc semicanal, 23, mounting ear, 24, gasket seal, 241, shim body, 242, channel, 243, partition.
Specific embodiment
Below with reference to embodiment, specific embodiment of the present utility model is described in further detail.Following embodiment For illustrating the utility model, but it is not intended to limit the scope of the present invention.
Embodiment:Refuse gasification boiler high temperature batcher as illustrated in fig. 1 and 2, for will be handled in level-one refuse gasification boiler The rubbish material of completion is delivered to second level gasification furnace, is transmitting including rack 1, the transmission pipeline being arranged in rack 12, setting Spiral material conveying member 3 and driving mechanism in pipeline 2.In the present embodiment, spiral material conveying member 3 is that shaftless screw is defeated Blade is sent, and is cast by stainless steel 310S.
Driving mechanism includes decelerating motor, the transmission shaft being connected by water-cooling bearing block 4 with decelerating motor 5 and makes to be driven Airtight and watertight padding seal box 6 between axis 5 and transmission pipeline 2, water-cooling bearing block 4 are connected to by rotary joint 8 with water source.
Transmission pipeline 2 includes upper circular arc semicanal 21 and lower circular arc semicanal 22, and upper circular arc semicanal 21 and lower circular arc semicanal 22 are equal Mounting ear 23 is extended on the whole length direction of two arc end part, upper circular arc semicanal 21 and lower circular arc semicanal 22 pass through Mounting ear 23 is spirally connected installation, and gasket seal 24 is provided between the mounting ear 23 of the two.Offered on upper circular arc semicanal 21 with The feed inlet of the discharge port docking of level-one gasification furnace is offered on lower circular arc semicanal 22 and is docked with the feeding inlet of second level gasification furnace Discharge port, the end 500mm of the central axis Distance Transmission pipeline 2 of feed inlet, discharge port are located at the end of transmission pipeline 2.Rack 1, upper circular arc semicanal 21 and lower circular arc semicanal 22 are cast by stainless steel 310S.Gasket seal 24 is entire along mounting ear 23 Length direction arrangement is soft graphite metal wound gasket.
Turn to see Fig. 2, silicon carbide liner plate 7 is covered on the inner wall of transmission pipeline 2.Preferably, silicon carbide liner plate 7 is to pour carbon SiClx plate, and silicon carbide liner plate 7 is covered on the inner wall of lower circular arc semicanal 22.
In other implementations, circle is enclosed with heat preservation rock on the outer wall of conveyance conduit 2.
In other implementations, as shown in figure 3, gasket seal 24 includes shim body 241, along the length of ontology 241 Direction is spent through the plurality of passages 242 of setting, and 242 inner-use clapboard 243 of channel forms multiple compartments, swollen filled with heat in compartment Swollen particle.In the present embodiment, the cross section in channel 242 is triangular in shape.
The above is only the preferred embodiment of the utility model, is not intended to limit the utility model, it is noted that For those skilled in the art, without deviating from the technical principle of the utility model, it can also do Several improvements and modifications out, these improvements and modifications also should be regarded as the protection scope of the utility model.

Claims (8)

1. refuse gasification boiler high temperature batcher, it is characterised in that:Including rack(1), be arranged in the rack(1)On transfer tube Road(2), be arranged in the transmission pipeline(2)Interior spiral material conveying member(3)And driving mechanism, the driving mechanism include Decelerating motor passes through water-cooling bearing block(4)The transmission shaft being connected with the decelerating motor(5)And make the transmission shaft(5)With institute State transmission pipeline(2)Between airtight and watertight padding seal box(6), the transmission pipeline(2)Including upper circular arc semicanal(21)With lower circle Arc semicanal(22), the upper circular arc semicanal(21)With the lower circular arc semicanal(22)In the whole length of two arc end part Mounting ear is extended on direction(23), the upper circular arc semicanal(21)With the lower circular arc semicanal(22)Pass through the mounting ear (23)Be spirally connected installation, and both described mounting ear(23)Between be provided with gasket seal(24).
2. refuse gasification boiler high temperature batcher according to claim 1, it is characterised in that:The transmission pipeline(2)It is interior Silicon carbide liner plate is covered on wall(7).
3. refuse gasification boiler high temperature batcher according to claim 2, it is characterised in that:The silicon carbide liner plate(7)For Pour silicon carbide plate.
4. refuse gasification boiler high temperature batcher according to claim 2, it is characterised in that:The silicon carbide liner plate(7)It covers It covers in the lower circular arc semicanal(22)Inner wall on.
5. refuse gasification boiler high temperature batcher according to claim 1, it is characterised in that:The water-cooling bearing block(4)It is logical Cross rotary joint(8)It is connected to water source.
6. refuse gasification boiler high temperature batcher according to claim 1, it is characterised in that:The spiral material conveying member (3)For shaftless screw conveying blade.
7. refuse gasification boiler high temperature batcher according to claim 1, it is characterised in that:The conveyance conduit(2)It is outer Circle is enclosed with heat preservation rock on wall.
8. refuse gasification boiler high temperature batcher according to claim 1, it is characterised in that:The gasket seal(24)It is soft Property graphite metal wound gasket.
CN201820606922.0U 2018-04-26 2018-04-26 Refuse gasification boiler high temperature batcher Active CN208104289U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820606922.0U CN208104289U (en) 2018-04-26 2018-04-26 Refuse gasification boiler high temperature batcher

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820606922.0U CN208104289U (en) 2018-04-26 2018-04-26 Refuse gasification boiler high temperature batcher

Publications (1)

Publication Number Publication Date
CN208104289U true CN208104289U (en) 2018-11-16

Family

ID=64117084

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820606922.0U Active CN208104289U (en) 2018-04-26 2018-04-26 Refuse gasification boiler high temperature batcher

Country Status (1)

Country Link
CN (1) CN208104289U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111974480A (en) * 2020-09-02 2020-11-24 杭州潘达科技有限公司 Stabilize effectual constant temperature water bath with many interlayers

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111974480A (en) * 2020-09-02 2020-11-24 杭州潘达科技有限公司 Stabilize effectual constant temperature water bath with many interlayers

Similar Documents

Publication Publication Date Title
US5709779A (en) Device for conveying waste in a pyrolysis reactor
CN208104289U (en) Refuse gasification boiler high temperature batcher
CN101598334A (en) Bottom slag cooling method of circulating fluidized bed
CN101269744B (en) High-temperature water-cooling screw conveyor
CN202321536U (en) Self-sealing shaft-free spiral conveyor
CN209512032U (en) Spirally water cooling self-adapting seal discharging device
CN218520423U (en) Spiral conveying internal cooling device
CN114032110B (en) Pyrolysis material discharging device and discharging system of pyrolysis furnace
CN211060684U (en) Waste heat recovery device for cement rotary kiln
CN211261722U (en) Deoiling rotary kiln device
CN209783267U (en) Chemical converter
CN104851469B (en) Spirally whole bucket feeds processing system to one kind
CN103387842B (en) A kind of oil refining cracker with heat pipe
CN111960633A (en) Roller pyrolysis machine and pyrolysis method
CN217322511U (en) Novel pyrolysis oven feeding device
CN102012170B (en) High-temperature heat energy recycling converter
CN206709081U (en) Solid waste pyrolysis treatment systems
CN201819541U (en) Rotary cooling furnace used in coal-based activated carbon production process
CN218435589U (en) Waste rubber-plastic thermal cracking treatment equipment
CN109762605A (en) Circulating Fluidized Bed Gasifier For Biomass material returning device carbonizing device
CN207196509U (en) A kind of house refuse microwave cracking stove anoxybiotic discharge system
CN212320269U (en) Biomass fuel drying machine
CN201209061Y (en) High-temperature water-cooling screw conveyor
CN109761197A (en) Reacting furnace furnace tail gypsum slag-draining device and reacting furnace for Acid of Hydrofluoric Acid Production technique
CN214528856U (en) Continuous tube type pyrolysis furnace for finally disposing waste plastics

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant