CN208097438U - A kind of methanol destilling tower gas phase potential, tower bottom waste water condensing gas heat utilization system - Google Patents

A kind of methanol destilling tower gas phase potential, tower bottom waste water condensing gas heat utilization system Download PDF

Info

Publication number
CN208097438U
CN208097438U CN201820245623.9U CN201820245623U CN208097438U CN 208097438 U CN208097438 U CN 208097438U CN 201820245623 U CN201820245623 U CN 201820245623U CN 208097438 U CN208097438 U CN 208097438U
Authority
CN
China
Prior art keywords
methanol
tower
destilling tower
gas
methanol destilling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820245623.9U
Other languages
Chinese (zh)
Inventor
叶剑
陈晓星
吴徐元
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Double Key Chemical (taixing) Co Ltd
Original Assignee
Double Key Chemical (taixing) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Double Key Chemical (taixing) Co Ltd filed Critical Double Key Chemical (taixing) Co Ltd
Priority to CN201820245623.9U priority Critical patent/CN208097438U/en
Application granted granted Critical
Publication of CN208097438U publication Critical patent/CN208097438U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Vaporization, Distillation, Condensation, Sublimation, And Cold Traps (AREA)

Abstract

The utility model relates to a kind of methanol destilling tower gas phase potential,Tower bottom waste water condensing gas heat utilization system,Including methanol destilling tower,Condensing tower,Gas-liquid separator,Collecting tank,Reflux pump,Reboiler,Condenser,Feed inlet is into methanol-water in the middle part of methanol destilling tower,Methanol destilling tower bottom sidewall is equipped with wastewater outlet from the bottom to top and boils again and answers back,Wastewater outlet and boiling again answer back be separately connected reboiler into,Outlet,Leakage fluid dram is arranged in reboiler bottom,A hot journey of the leakage fluid dram through positive displacement pump connection condenser,Condensing tower is sequentially connected through collecting pipe at the top of methanol destilling tower,Gas-liquid separator,Collecting tank connects methanol destilling tower top through reflux pump again,Heat exchange sleeve is socketed on collecting pipe,Methanol destilling tower upper portion side wall connects gas phase heat exchanger tube,Another hot journey of condenser, which is connected to, after gas phase heat exchanger tube connection heat exchange sleeve is followed by feed inlet in the middle part of methanol destilling tower.

Description

A kind of methanol destilling tower gas phase potential, tower bottom waste water condensing gas heat utilization system
Technical field
The utility model relates to a kind of heat utilization system, specifically a kind of methanol destilling tower gas phase potential, tower bottom are useless Water condensation gas heat utilization system.
Background technique
When prepared by conventional methanol, need the methanol-water of 30% concentration carrying out purifying, collecting, wherein amount of heat is distilling It is wasted in tower, condensing tower, causes serious thermal energy waste, resource utilization is low.
Summary of the invention
In view of the above-mentioned problems, to provide a kind of structure simple for the utility model, methanol-water effectively can be distilled into condensation and collected Middle thermal energy makes full use of, the high methanol destilling tower gas phase potential of heat resource utilization rate, tower bottom waste water condensing gas heat utilization system System.
The technical solution adopted in the utility model is:A kind of methanol destilling tower gas phase potential, tower bottom waste water condensing gas heat Utilize system, it is characterised in that:Including methanol destilling tower, condensing tower, gas-liquid separator, collecting tank, reflux pump, reboiler, cold Condenser, for feed inlet into methanol-water, methanol destilling tower bottom sidewall is equipped with wastewater outlet and again from the bottom to top in the middle part of methanol destilling tower Boiling is answered back, and wastewater outlet and is boiled to answer back again and is separately connected the import and export of reboiler, and leakage fluid dram, leakage fluid dram is arranged in reboiler bottom A hot journey through positive displacement pump connection condenser, methanol destilling tower top are sequentially connected condensing tower, gas-liquid separator, receipts through collecting pipe Collect tank and connect methanol destilling tower top through reflux pump again, is socketed heat exchange sleeve on collecting pipe, methanol destilling tower upper portion side wall connects gas Phase heat exchanger tube is connected to another hot journey of condenser after gas phase heat exchanger tube connection heat exchange sleeve and is followed by charging in the middle part of methanol destilling tower Mouthful.
Tail gas discharging pipe is connect at the top of the gas-liquid separator.
The utility model methanol-water distills in a distillation column, and part methanol-water falls into tower bottom through wastewater outlet and again when starting Boiling, which is answered back, is separately connected the import and export of reboiler, the gasification of methanol in reboiler, and waste water is arranged by the leakage fluid dram of reboiler bottom Out, after gasification methanol enter methanol distillation the subsequent charging of column distillation methanol-water distilled, methanol steam through collecting pipe successively It send condensing tower, gas-liquid separator, collecting tank to be condensed, gas-liquid separation and collect, in collecting pipe conveying, exchanged heat by gas phase Part methanol steam is reduced the delivery temperature of methanol steam by pipe in Heat exchange jacekt intraductal heat exchange, and the methanol steam after heat absorption is through exchanging heat Pipe absorbs reboiler leakage fluid dram by condenser and waste water heat is discharged, and returns again to methanol destilling tower and improves temperature in tower, absorption portion Divide gas phase thermal energy and waste water thermal energy, improving heat resource utilization rate will be in collecting tank in order to improve methanol concentration in collecting tank Methanol is through reflux pump methanol at reflux destilling tower, for improving successive concentrations, can effectively improve methanol preparation concentration.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model.
In figure:Methanol destilling tower 1, wastewater outlet 2, boil again 3, reboiler 4 of answering back, leakage fluid dram 5, positive displacement pump 6, condenser 7, Collecting pipe 8, condensing tower 9, gas-liquid separator 10, collecting tank 11, reflux pump 12, heat exchange sleeve 13, gas phase heat exchanger tube 14.
Specific embodiment
It is described further below in conjunction with drawings and examples.
Shown in Fig. 1:A kind of methanol destilling tower gas phase potential, tower bottom waste water condensing gas heat utilization system include methanol distillation Tower 1, positive displacement pump 6, condenser 7, collecting pipe 8, condensing tower 9, gas-liquid separator 10, collecting tank 11, reflux pump 12, changes reboiler 4 Thermal sleeve 13, gas phase heat exchanger tube 14.1 middle part feed inlet of methanol destilling tower into methanol-water, 1 bottom sidewall of methanol destilling tower by down toward It is equipped with wastewater outlet 2 and boiling again and answers back 3, wastewater outlet and boil to answer back again and be separately connected the import and export of reboiler 4, reboiler 4 Leakage fluid dram 5 is arranged in bottom, and leakage fluid dram 5 connects a hot journey of condenser 7 through positive displacement pump 6, and 1 top of methanol destilling tower is through collecting pipe 8 It is sequentially connected condensing tower 9, gas-liquid separator 10, collecting tank 11 and connects methanol destilling tower top through reflux pump 12 again, on collecting pipe 8 It is socketed heat exchange sleeve 13, methanol destilling tower upper portion side wall connects gas phase heat exchanger tube 14, after gas phase heat exchanger tube 14 is connected to heat exchange sleeve 13 It is connected to another hot journey of condenser 7 and is followed by 1 middle part feed inlet of methanol destilling tower.

Claims (2)

1. a kind of methanol destilling tower gas phase potential, tower bottom waste water condensing gas heat utilization system, it is characterised in that:It is steamed including methanol Evaporate tower, condensing tower, gas-liquid separator, collecting tank, reflux pump, reboiler, condenser, feed inlet is into methanol in the middle part of methanol destilling tower Water, methanol destilling tower bottom sidewall are equipped with wastewater outlet from the bottom to top and boil again and answer back, and wastewater outlet and boil to answer back again and connect respectively The import and export of reboiler is connect, leakage fluid dram, a hot journey of the leakage fluid dram through positive displacement pump connection condenser, methanol is arranged in reboiler bottom Condensing tower, gas-liquid separator, collecting tank are sequentially connected again through on reflux pump connection methanol destilling tower through collecting pipe at the top of destilling tower Portion is socketed heat exchange sleeve on collecting pipe, and methanol destilling tower upper portion side wall connects gas phase heat exchanger tube, and gas phase heat exchanger tube is connected to heat exchange sleeve After be connected to another hot journey of condenser and be followed by feed inlet in the middle part of methanol destilling tower.
2. a kind of methanol destilling tower gas phase potential according to claim 1, tower bottom waste water condensing gas heat utilization system, It is characterized in:Tail gas discharging pipe is connect at the top of the gas-liquid separator.
CN201820245623.9U 2018-02-11 2018-02-11 A kind of methanol destilling tower gas phase potential, tower bottom waste water condensing gas heat utilization system Expired - Fee Related CN208097438U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820245623.9U CN208097438U (en) 2018-02-11 2018-02-11 A kind of methanol destilling tower gas phase potential, tower bottom waste water condensing gas heat utilization system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820245623.9U CN208097438U (en) 2018-02-11 2018-02-11 A kind of methanol destilling tower gas phase potential, tower bottom waste water condensing gas heat utilization system

Publications (1)

Publication Number Publication Date
CN208097438U true CN208097438U (en) 2018-11-16

Family

ID=64124263

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820245623.9U Expired - Fee Related CN208097438U (en) 2018-02-11 2018-02-11 A kind of methanol destilling tower gas phase potential, tower bottom waste water condensing gas heat utilization system

Country Status (1)

Country Link
CN (1) CN208097438U (en)

Similar Documents

Publication Publication Date Title
CN109908616A (en) The energy-saving distillation system and its distillating method of carbon monoxide ethyl alcohol
CN208911492U (en) A kind of kettle material purification system again
CN102430254A (en) Rectification technology and apparatus of aqueous solution of methanol or ethanol
CN209500800U (en) A kind of forced circulation MVR evaporator
CN201094869Y (en) Multipurpose internal reflux distillation device
CN208097438U (en) A kind of methanol destilling tower gas phase potential, tower bottom waste water condensing gas heat utilization system
CN108325229A (en) A kind of methanol destilling tower gas phase potential, bottom of tower waste water condensing gas heat utilization system
CN203196362U (en) High-efficient alcohol recovery tower
CN102417266B (en) Climbing film type multi-effect water distillator
CN206027123U (en) Waste solvent recoverer suitable for coating processing
CN208641815U (en) A kind of acetone, methanol extraction rectifier unit
CN102020327B (en) Ammonia nitrogen waste water treatment equipment
CN110260694A (en) Plate journey shunt plate heat exchanger
CN207307226U (en) A kind of methanol rectification recovery system
CN201668968U (en) Energy-saving system for five-tower three-stage differential-pressure distilling production of edible alcohol
CN214861267U (en) Rectifying tower
CN205965067U (en) Two thick tower differential pressure distillation alcohol economizer system
CN213202997U (en) White spirit production distillation plant
CN212585515U (en) Shell and tube type high-efficiency condenser with jacket
CN101143807A (en) Method for producing dimethyl ether by separating heat tube type reactor
CN211521661U (en) Surplus ammonia water distillation plant that heat energy cyclic utilization
CN209378483U (en) A kind of energy-saving rectifying tower
CN208990790U (en) A kind of epoxide resin reactive diluent distillation system
CN206152382U (en) High energy utilization's rectification tower system
CN208302238U (en) A kind of recyclable device of chondroitin sulfate extract liquor

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181116

CF01 Termination of patent right due to non-payment of annual fee