CN208095724U - A kind of intensive culture pond combined using cement pre-fabricated panel - Google Patents
A kind of intensive culture pond combined using cement pre-fabricated panel Download PDFInfo
- Publication number
- CN208095724U CN208095724U CN201820187616.8U CN201820187616U CN208095724U CN 208095724 U CN208095724 U CN 208095724U CN 201820187616 U CN201820187616 U CN 201820187616U CN 208095724 U CN208095724 U CN 208095724U
- Authority
- CN
- China
- Prior art keywords
- side plate
- pier stud
- intensive culture
- culture pond
- cement pre
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses a kind of intensive culture ponds combined using cement pre-fabricated panel, it includes the polygon pond frame surrounded by several groups sole plate and several groups pier stud, side plate is additionally provided with every group of sole plate side, the side plate both ends respectively correspond one group of pier stud, and the pier stud shape is square cylinder;The notch for assigning side plate is provided on four faces of the pier stud at least two faces;The notch includes the locating slot for positioning to side plate and the grout groove for filling mortar.The utility model has the advantages that construction efficiency is high, saves labor cost.
Description
Technical field
The utility model belongs to technical field of aquaculture, and in particular to a kind of intensive culture combined using cement pre-fabricated panel
Pond.
Background technique
It is counted according to Fishery Bureau of the Ministry of Agriculture, CHINESE FRESHWATER total aquatic product production in 2014 is up to 3165.30 ten thousand tons, fresh water
Cultured output is 2935.76 ten thousand tons (account for about freshwater product total output 92.75%), and national freshwater cultured area is
2661.90 thousand hectares, pond culture is the main fresh water aquaculture mode of China.Existing aquatic products intensive culture pond mostly uses greatly brick
It builds or cast-in-place structural often has long in time limit, many defects of high cost when intensive culture pond is built.
Utility model content
The purpose of the utility model is to overcome above-mentioned the deficiencies in the prior art, provide a kind of concrete prefabricated board group of utilization
The intensive culture pond of conjunction.
A kind of intensive culture pond combined using cement pre-fabricated panel, it includes being surrounded by several groups sole plate and several groups pier stud
Polygon pond frame, be additionally provided with side plate every group of sole plate side, which respectively corresponds one group of pier stud.
Preferably, the pier stud shape is square cylinder.
Preferably, the notch for assigning side plate is provided on four faces of the pier stud at least two faces.
Preferably, the notch includes the locating slot for positioning to side plate and the grout groove for filling mortar.
Preferably, the width of the locating slot is slightly larger than the thickness of side plate.
Preferably, the width of the grout groove is greater than the width of locating slot.
Preferably, the pier stud, sole plate and side plate are all using construction material pouring molding.
Compared with prior art, the utility model has the beneficial effects that:
Intensive culture pond During Initial Stage Construction, first site operation sole plate and pier stud, side plate is prefabricated in factory's progress, and side plate passes through
After automobile roping to construction site, in the locating slot that side plate is inserted into, back-grouting finally is carried out to grout groove, prevents junction
Leakage.The utility model has the advantages that construction efficiency is high, speed is fast, saves labor cost.
Detailed description of the invention
Fig. 1 is the utility model pond mount structure schematic diagram;
Fig. 2 is the utility model structure diagram;
Fig. 3 is part A structure enlargement diagram in Fig. 2;
Fig. 4 is the utility model pillarwork schematic diagram;
Fig. 5 is the utility model embodiment structural schematic diagram;
Fig. 6 is the pillarwork schematic diagram in Fig. 5.
In figure, 1- pier stud, 2- sole plate, 3- side plate, 10- frame, 7- notch, 70- locating slot, 71- grout groove.
Specific embodiment
For convenient for those skilled in the art understand that technical solutions of the utility model, practical new to this now in conjunction with Figure of description
Type technical solution is described further.
As shown in Figure 1, Figure 2, Figure 3, Figure 4, a kind of intensive culture pond combined using cement pre-fabricated panel, it includes by several groups base
The polygon pond frame 10 that plinth bottom plate 2 and several groups pier stud 1 surround is additionally provided with side plate 3 every group of sole plate side, the side
3 both ends of plate respectively correspond one group of pier stud 1.
1 shape of pier stud is square cylinder.The slot for assigning side plate 3 is provided on 1 four faces of pier stud at least two faces
Mouth 7.Notch 7 includes the locating slot 70 for positioning to side plate 3 and the grout groove 71 for filling mortar.Locating slot 70
Width is slightly larger than the thickness of side plate 3.The width of grout groove 71 is greater than the width of locating slot 70.Pier stud 1, sole plate 2 and side plate
3 be all using construction material pouring molding.
Embodiment one
As shown in Figure 5, Figure 6, a kind of intensive culture pond combined using cement pre-fabricated panel, passes through several piers for having two groups of notches 7
Column 1, the pier stud 1 for being provided with three groups of notches 7 and the pier stud 1 for being provided with four groups of notches 7 and sole plate, that side plate can organize contract is multiple whole
Body formula intensive culture pond, to realize centralized management.
Technical solutions of the utility model are exemplarily described utility model above in conjunction with attached drawing, it is clear that this is practical
Novel specific implementation is not subject to the restrictions described above, as long as using the method concept and technical solution progress of the utility model
Various unsubstantialities improve, or it is not improved the conception and technical scheme of utility model are directly applied into other occasions,
It both is within the protection scope of the present invention.
Claims (7)
1. a kind of intensive culture pond combined using cement pre-fabricated panel, it is characterised in that:It include by several groups sole plate (2) and if
The polygon pond frame (10) that dry group pier stud (1) surrounds, is additionally provided with side plate (3) every group of sole plate side, the side plate (3) two
End respectively corresponds one group of pier stud (1).
2. a kind of intensive culture pond combined using cement pre-fabricated panel according to claim 1, it is characterised in that:The pier stud
(1) shape is square cylinder.
3. a kind of intensive culture pond combined using cement pre-fabricated panel according to claim 1, it is characterised in that:The pier stud
The notch (7) for assigning side plate (3) is provided on (1) four face at least two faces.
4. a kind of intensive culture pond combined using cement pre-fabricated panel according to claim 3, it is characterised in that:The notch
It (7) include the locating slot (70) for being positioned to side plate (3) and the grout groove (71) for filling mortar.
5. a kind of intensive culture pond combined using cement pre-fabricated panel according to claim 4, it is characterised in that:The locating slot
(70) width is slightly larger than the thickness of side plate (3).
6. a kind of intensive culture pond combined using cement pre-fabricated panel according to claim 4, it is characterised in that:The grout groove
(71) width is greater than the width of locating slot (70).
7. a kind of intensive culture pond combined using cement pre-fabricated panel according to claim 1, it is characterised in that:The pier stud
(1), sole plate (2) and side plate (3) are all using construction material pouring molding.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820187616.8U CN208095724U (en) | 2018-02-02 | 2018-02-02 | A kind of intensive culture pond combined using cement pre-fabricated panel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820187616.8U CN208095724U (en) | 2018-02-02 | 2018-02-02 | A kind of intensive culture pond combined using cement pre-fabricated panel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208095724U true CN208095724U (en) | 2018-11-16 |
Family
ID=64128256
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820187616.8U Expired - Fee Related CN208095724U (en) | 2018-02-02 | 2018-02-02 | A kind of intensive culture pond combined using cement pre-fabricated panel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208095724U (en) |
-
2018
- 2018-02-02 CN CN201820187616.8U patent/CN208095724U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109382908A (en) | The production method and its production mould of non-light tight concrete | |
CN208095724U (en) | A kind of intensive culture pond combined using cement pre-fabricated panel | |
CN106285001B (en) | A kind of facet integration segment quickly intersects flowing water construction method | |
CN106988509A (en) | A kind of wall plastering thickness controls device surely | |
CN209323574U (en) | Closed basement roof pouring after settlement structure in advance | |
CN204278207U (en) | Concrete tubular pile material filling system | |
CN208068520U (en) | A kind of septic tank mold | |
CN101560846B (en) | Water storage cellar wall antiseepage method | |
CN203848836U (en) | Column type marking pier | |
CN211389334U (en) | Long line platform of prestressed solid square pile die | |
CN203924694U (en) | Biogas charging and discharging pond die special for concrete | |
CN210263572U (en) | Concrete phosphogypsum composite floor | |
CN208290146U (en) | A kind of combined type GRC mold | |
CN203320484U (en) | Combined-type building template structural groove body | |
CN201554156U (en) | Building structural post | |
CN207620209U (en) | A kind of packet column building block group | |
CN106476139A (en) | Improved concrete mixer | |
CN206284143U (en) | The insulation crawl that a kind of use EPS modules are built | |
CN105130298A (en) | Artificial panel formula | |
CN204899034U (en) | Prefabricated wall post | |
CN204850481U (en) | Double -deck inside callipers formula template end -blocking device of case roof beam and T roof beam | |
CN215167117U (en) | Environment-friendly autoclaved aerated building block | |
CN205399830U (en) | Easy plane is plastics split heads for reinforcing bar | |
CN211616133U (en) | Recycled concrete raw material proportioning equipment | |
CN204876278U (en) | Hollow brick structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181116 Termination date: 20200202 |
|
CF01 | Termination of patent right due to non-payment of annual fee |