CN208090905U - A kind of plumbing installation suitable for wall-mounted new wind turbine - Google Patents

A kind of plumbing installation suitable for wall-mounted new wind turbine Download PDF

Info

Publication number
CN208090905U
CN208090905U CN201820260472.4U CN201820260472U CN208090905U CN 208090905 U CN208090905 U CN 208090905U CN 201820260472 U CN201820260472 U CN 201820260472U CN 208090905 U CN208090905 U CN 208090905U
Authority
CN
China
Prior art keywords
tube body
partition board
fresh air
wall
wind turbine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820260472.4U
Other languages
Chinese (zh)
Inventor
陶涛
伞文杰
吴伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Time Environment Technology Co Ltd
Original Assignee
Jiangsu Time Environment Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Time Environment Technology Co Ltd filed Critical Jiangsu Time Environment Technology Co Ltd
Priority to CN201820260472.4U priority Critical patent/CN208090905U/en
Application granted granted Critical
Publication of CN208090905U publication Critical patent/CN208090905U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ventilation (AREA)

Abstract

The utility model discloses a kind of plumbing installations suitable for wall-mounted new wind turbine, including tube body, tube body partition board is equipped in tube body, tube body is divided into fresh air channel and air exhaust passage by tube body partition board, the fresh air outlet of fresh air channel and the air draft entrance of air exhaust passage are located at the first end of tube body, the wind exhausting outlet of the air exhaust passage is located at the second end of the tube body, and the fresh air inlet of the fresh air channel is located at the side wall of the tube body.It is equipped with fresh air channel and air exhaust passage simultaneously in a tube body, it can ensure only to open a hole in wall while realizing air inlet and air-exhausting function, not only machine part quantity be reduced in this way, cost reduction, installation has been also convenient for very much, while appearance is also better able to receive;Tube body partition board stretches into the storage tank on end cap partition board, enhances the sealing performance between tube body and first end cover.

Description

A kind of plumbing installation suitable for wall-mounted new wind turbine
Technical field
The utility model belongs to technical field of air purification more particularly to a kind of pipeline suitable for wall-mounted new wind turbine fills It sets.
Background technology
With the improvement of living standards, requirement of the people to air quality is also higher and higher, wall-mounted new wind turbine can change Kind indoor air quality, ensures people's health.Traditional wall-mounted new wind turbine realizes air inlet and air draft using binary channels, It thus needs to open two holes in wall, causes house trepanning more, wall appearance is ugly, and user can also complain, influence outside wall Sight and user experience, while risk also is increased to sealing.And the part of complete machine also increases therewith, cost increase.
Utility model content
The purpose of this utility model is that in view of the above shortcomings of the prior art, providing a kind of suitable for wall-mounted new wind turbine Plumbing installation, can ensure realizing air inlet and only opening a hole in wall while air-exhausting function, so not only so that Machine part quantity is reduced, cost reduction, and installation has been also convenient for very much, while appearance is also better able to receive.
To solve the above problems, technical solution adopted in the utility model is:
A kind of plumbing installation suitable for wall-mounted new wind turbine, including tube body, the tube body is interior equipped with tube body partition board, described Tube body is divided into fresh air channel and air exhaust passage by tube body partition board, and the fresh air outlet and the air draft of air exhaust passage of the fresh air channel enter Mouth is located at the first end of the tube body, and the wind exhausting outlet of the air exhaust passage is located at the second end of the tube body, and the fresh air is logical The fresh air inlet in road is located at the side wall of the tube body.
Further, the tube body partition board be arc panel, make gas flow it is more smooth, one end of the tube body partition board with The side wall of tube body is tightly connected, the other end of the tube body partition board by the first end nozzle of the tube body be divided into fresh air outlet and Air draft entrance.
Further, it is equipped with grid at the fresh air inlet and at wind exhausting outlet.
Preferably, the wall-mounted new wind turbine ventilation duct further include be set to the tube body first end first end cover and It is set to the second end cover of the tube body second end, described first end cover one end is equipped with first convex for being clamped with the tube body Platform, the first end cover other end are equipped with several installation screws, end cap partition board, the end cap partition board are equipped in the first end cover The first end cover is divided into first through hole and the second through-hole, the first through hole is adapted with fresh air outlet, and described second is logical Hole is adapted with air draft entrance, and the end cap partition board is equipped with the storage tank for accommodating the tube body partition board, the second end cover one End is equipped with the second boss that be clamped with the tube body, and the second end cover other end is equipped with grid, fresh air on the tube wall Inlet also is provided with grid.
It is using advantageous effect caused by above-mentioned technical proposal:It is equipped with fresh air channel and row simultaneously in a tube body Wind channel a, it is ensured that only hole is opened in wall while realizing air inlet and air-exhausting function, so not only so that complete machine zero Number of packages amount is reduced, cost reduction, and installation has been also convenient for very much, while appearance is also better able to receive;Tube body partition board is arc panel, Gas is set to flow more smooth;First end cover and second end cover are clamped with tube body, and more convenient, tube body partition board is replaced in installation, maintenance It stretches into the storage tank on end cap partition board, enhances the sealing performance between tube body and first end cover.
Description of the drawings
Fig. 1 is a kind of structural representation of the first embodiment of plumbing installation suitable for wall-mounted new wind turbine of the utility model Figure;
Fig. 2 is a kind of sectional structure of the first embodiment of plumbing installation suitable for wall-mounted new wind turbine of the utility model Schematic diagram;
Fig. 3 is a kind of structural representation of the second embodiment of plumbing installation suitable for wall-mounted new wind turbine of the utility model Figure;
Fig. 4 is a kind of sectional structure of the second embodiment of plumbing installation suitable for wall-mounted new wind turbine of the utility model Schematic diagram;
Fig. 5 is a kind of first end cover of the second embodiment of plumbing installation suitable for wall-mounted new wind turbine of the utility model Structural schematic diagram;
Fig. 6 is a kind of first end cover of the second embodiment of plumbing installation suitable for wall-mounted new wind turbine of the utility model Another angle structural schematic diagram;
Fig. 7 is a kind of second end cover of the second embodiment of plumbing installation suitable for wall-mounted new wind turbine of the utility model Structural schematic diagram.
In figure:1, tube body;2, tube body partition board;3, air exhaust passage;4, fresh air channel;5, air duct switching mounting hole;6, lattice Grid;7, first end cover;8, second end cover;9, first boss;10, concave station;11, installation screw;12, end cap partition board;13, first is logical Hole;14, the second through-hole;15, storage tank;16, second boss.
Specific implementation mode
The embodiment of the utility model is described in further detail with reference to the accompanying drawings and examples.Following embodiment For illustrating the utility model, but cannot be used for limiting the scope of the utility model.
Embodiment one:As illustrated in fig. 1 and 2, a kind of plumbing installation suitable for wall-mounted new wind turbine, including tube body 1, it is described Tube body partition board 2 is equipped in tube body 1, tube body 1 is divided into fresh air channel 4 and air exhaust passage 3 by the tube body partition board 2, and the fresh air is logical The fresh air outlet in road 4 and the air draft entrance of air exhaust passage 3 are located at the first end of the tube body 1, and the air draft of the air exhaust passage 3 goes out Mouth is located at the second end of the tube body 1, and the fresh air inlet of the fresh air channel 4 is located at the side wall of the tube body 1.In a tube body It is interior while being equipped with fresh air channel 4 and air exhaust passage 3, it is ensured that realize air inlet and only opening one in wall while air-exhausting function A hole, so not only so that machine part quantity is reduced, cost reduction, installation has been also convenient for very much, while appearance also more can It is enough to receive.
The tube body partition board 2 is arc panel, so that gas is flowed more smooth, one end and the tube body 1 of the tube body partition board 2 Side wall be tightly connected, the first end nozzle of the tube body 1 is divided into fresh air outlet and row by the other end of the tube body partition board 2 Wind entrance.
Grid 6 is equipped at the fresh air inlet and at wind exhausting outlet.Prevent mosquito etc. from entering within doors.
Embodiment two:As shown in fig. 3 to 7, a kind of plumbing installation suitable for wall-mounted new wind turbine, including tube body 1, it is described Tube body partition board 2 is equipped in tube body 1, tube body 1 is divided into fresh air channel 4 and air exhaust passage 3 by the tube body partition board 2, and the fresh air is logical The fresh air outlet in road 4 and the air draft entrance of air exhaust passage 3 are located at the first end of the tube body 1, and the air draft of the air exhaust passage 3 goes out Mouth is located at the second end of the tube body 1, and the fresh air inlet of the fresh air channel 4 is located at the side wall of the tube body 1.It further include setting In the first end cover 7 and the second end cover 8 for being set to 1 second end of the tube body, the first end cover 7 of 1 first end of the tube body One end is equipped with the first boss 9 for being clamped with the tube body 1, and 7 other end of the first end cover is equipped with for being installed on wall On several installation screws 11, be equipped with end cap partition board 12 in the first end cover 7, the end cap partition board 12 is by the first end cover 7 are divided into first through hole 13 and the second through-hole 14, and the first through hole 13 is adapted with fresh air outlet, second through-hole 14 and row Wind entrance is adapted, and the end cap partition board 12 is equipped with the storage tank 15 for accommodating the tube body partition board 2, the second end cover 8 one End is equipped with the second boss 16 being clamped with the tube body 1, and 8 other end of the second end cover is equipped with grid 6,1 side wall of the tube body Grid 6 also is provided at upper fresh air inlet.
One end that the first end cover 7 is equipped with installation screw 11 is equipped with concave station 10, if the concave station 10 is equipped with dry-air blast Road is transferred mounting hole 5, for installation site is limited need to connect new wind turbine by bellows when, connect air duct connector, institute Air duct connector is stated for being connect with bellows, and then is connect with new wind turbine by bellows.
First end cover 7 and second end cover 8 are clamped with tube body 1, and more convenient, 2 inserting end of tube body partition board is replaced in installation, maintenance In storage tank 15 on lid partition board 12, the sealing performance between tube body 1 and first end cover 7 is enhanced;First end cover 7 is equipped with peace The one end for filling screw hole 11 is equipped with concave station 10, and the air duct switching mounting hole 5 being arranged on concave station 10 is described for connecting air duct connector Air duct connector is connect by bellows with new wind turbine for being connect with bellows.
Finally it should be noted that:Above example is only to illustrate the technical solution of the utility model, rather than its limitations; Although the utility model is described in detail with reference to the foregoing embodiments, it will be understood by those of ordinary skill in the art that: It can still modify to the technical solution recorded in previous embodiment, or be equal to which part technical characteristic It replaces;And these modifications or replacements, the utility model embodiment technical solution that it does not separate the essence of the corresponding technical solution Spirit and scope.

Claims (4)

1. a kind of plumbing installation suitable for wall-mounted new wind turbine, it is characterised in that:Including tube body(1), the tube body(1)Inside set There is tube body partition board(2), the tube body partition board(2)By tube body(1)It is divided into fresh air channel(4)And air exhaust passage(3), the fresh air is logical Road(4)Fresh air outlet and air exhaust passage(3)Air draft entrance be located at the tube body(1)First end, the air exhaust passage(3) Wind exhausting outlet be located at the tube body(1)Second end, the fresh air channel(4)Fresh air inlet be located at the tube body(1)'s Side wall.
2. a kind of plumbing installation suitable for wall-mounted new wind turbine according to claim 1, it is characterised in that:The tube body Partition board(2)For arc panel, the tube body partition board(2)One end and tube body(1)Side wall be tightly connected, the tube body partition board(2) The other end by the tube body(1)First end nozzle be divided into fresh air outlet and air draft entrance.
3. a kind of plumbing installation suitable for wall-mounted new wind turbine according to claim 2, it is characterised in that:The fresh air It is equipped with grid at inlet and wind exhausting outlet(6).
4. a kind of plumbing installation suitable for wall-mounted new wind turbine according to claim 1, it is characterised in that:Further include setting It is placed in the tube body(1)The first end cover of first end(7)Be set to the tube body(1)The second end cover of second end(8), described First end cover(7)One end be equipped with for the tube body(1)The first boss of clamping(9), the first end cover(7)The other end is set There are several installation screws(11), the first end cover(7)It is interior to be equipped with end cap partition board(12), the end cap partition board(12)By described One end cap(7)It is divided into first through hole(13)With the second through-hole(14), the first through hole(13)It is adapted with fresh air outlet, it is described Second through-hole(14)It is adapted with air draft entrance, the end cap partition board(12)It is equipped with and accommodates the tube body partition board(2)It is accommodating Slot(15), the second end cover(8)One end is equipped with and the tube body(1)The second boss of clamping(16), the second end cover(8) The other end is equipped with grid(6), the tube body(1)Grid also is provided on side wall at fresh air inlet(6).
CN201820260472.4U 2018-02-13 2018-02-13 A kind of plumbing installation suitable for wall-mounted new wind turbine Expired - Fee Related CN208090905U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820260472.4U CN208090905U (en) 2018-02-13 2018-02-13 A kind of plumbing installation suitable for wall-mounted new wind turbine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820260472.4U CN208090905U (en) 2018-02-13 2018-02-13 A kind of plumbing installation suitable for wall-mounted new wind turbine

Publications (1)

Publication Number Publication Date
CN208090905U true CN208090905U (en) 2018-11-13

Family

ID=64064584

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820260472.4U Expired - Fee Related CN208090905U (en) 2018-02-13 2018-02-13 A kind of plumbing installation suitable for wall-mounted new wind turbine

Country Status (1)

Country Link
CN (1) CN208090905U (en)

Similar Documents

Publication Publication Date Title
CN205690613U (en) A kind of pipeline for VMC (Ventilation Mechanical Control System)
CN208090905U (en) A kind of plumbing installation suitable for wall-mounted new wind turbine
CN208475600U (en) A kind of air duct noise-reducing structure of air purifier
CN207869588U (en) A kind of ventilating system of interchanger cabinet
CN201652698U (en) Uniform flow ventilating device
CN208566794U (en) A kind of smoke transfer for integrated kitchen range
CN208253798U (en) Outdoor joint pipe structure and air conditioner indoor unit with it
CN201569050U (en) Guiding device for lampblack exhaust and ventilation in kitchen
CN208735711U (en) A kind of streamlined smoke discharging structure and the integrated kitchen range including the structure
CN211038353U (en) Ventilation sound insulation window structure
CN209212132U (en) A kind of novel building energy saving door and window
CN208311640U (en) A kind of valve, kitchen ventilator special service valve and range hood for ventilation pipe
CN208687926U (en) Blast cap outside new blower intake stack room
CN203052796U (en) Washable supplementing blowing device for smoke exhaust ventilator
CN208480128U (en) A kind of waterproof type ship cast aluminium cabinet
CN209354007U (en) Aeration type sound arrester
CN206159731U (en) Sound absorption baffle
CN208579464U (en) A kind of wall embedded type ventilating system
CN206545465U (en) The window of convected air inside and outside a kind of clean room
CN206418575U (en) Double water seal floor drains
CN211526656U (en) Curtain wall ventilation device
CN205332386U (en) Fresh air purifier
CN205654262U (en) Type of making an uproar door and window ventilator is fallen
CN207865549U (en) A kind of home-use window haze purification device
CN220707432U (en) Air outlet of internal exhaust type range hood

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181113

Termination date: 20210213