CN208089323U CN201820559385.9U CN201820559385U CN208089323U CN 208089323 U CN208089323 U CN 208089323U CN 201820559385 U CN201820559385 U CN 201820559385U CN 208089323 U CN208089323 U CN 208089323U
Authority
CN
China
Prior art keywords
lanyard
bonding
ready
tunnel waterproofing
waterproofing construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820559385.9U
Other languages
Chinese (zh)
Inventor
王保良
渠红杰
鲍新艳
蒋红雷
岳保贵
赵晨姗
王浩
刘春迎
詹明
梁国军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HENGSHUI XINLU TRAFFIC EQUIPMENT CO Ltd
Original Assignee
HENGSHUI XINLU TRAFFIC EQUIPMENT CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HENGSHUI XINLU TRAFFIC EQUIPMENT CO Ltd filed Critical HENGSHUI XINLU TRAFFIC EQUIPMENT CO Ltd
Priority to CN201820559385.9U priority Critical patent/CN208089323U/en
Application granted granted Critical
Publication of CN208089323U publication Critical patent/CN208089323U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a kind of ready-package tunnel waterproofing constructions, it is related to tunnel water proofing technology, includes the second bonding lanyard for being connected to form loop fastener structures by nailing and gasket with the first Nian Jie lanyard, waterproof roll and the lanyard Nian Jie with first that base is connected and being fixed on the waterproof roll.The utility model has the beneficial effects that:Constructing operation is simple, quick, and time saving and energy saving, high degree of automation, waterproof roll is laid with closely connected, no-welding, avoids the weldering leakage drawback easily occurred in gasket welding process, substantially increases waterproof effect.

Description

Ready-package tunnel waterproofing construction
Technical field
The utility model patent is related to tunnel water proofing technology, especially a kind of ready-package tunnel waterproofing construction.
Background technology
Needed in constructing tunnel, before Tunnel Second Lining Construction to after preliminary bracing tunnel side wall and arch prevent Drainage construction, to prevent tunnel from percolating water phenomenon occur during operation.Current waterproof construction includes by spraying coagulation The base of soil or cement sand plaster, sets gradually geotextiles in base and splash guard realizes waterproof.
The installation of splash guard is laid with the installation of generally use gallus-type in existing tunnel, hot melt washer is laid with, adhesive type waterproof The paving modes such as plate.Gallus-type splash guard is to produce upper suspender belt in the one side of splash guard according to constant spacing in production, in work In journey construction, hook being squeezed on rock mass in tunnel, then the suspender belt of splash guard is tied on hook, splash guard and knot are installed in this way Structure object is not closely connected, and especially in construction tunnel arch ring concrete, the dead weight of concrete is easy splash guard to pull off, and rises not To waterproof action.The splash guard that washer is laid with is heated, is the first installation infiltration geotextiles on scar, is then laid with hot melt washer, Splash guard and hot melt washer are welded together the two using heat melting device again, this waterproof plate temperature is not easy to control and is easy weldering Splash guard is worn, and solder joint fastness is poor, it is same to generate gallus-type splash guard not since hot melt washer is laid with there are larger spacing Sharp effect.Adhesive type splash guard is laid with, is to have been coated with viscose glue in waterproof plate face in plant produced, in construction, is torn Viscose glue protective film is removed, splash guard is adhered on tunnel scar, this requires scar clean, smooth, but can not in actual tunnel Accomplish, this causes to bond shakiness, does not have waterproof action.
Invention content
Problem to be solved in the utility model is to provide a kind of ready-package tunnel waterproofing construction, is realized by loop fastener structures anti- Connection between water coiled material and base, quick construction is time saving and energy saving, reduces construction cost, while no-welding, highly dense note, can The drawbacks of evading well during existing waterproof coiled material construction, waterproof quality is effectively guaranteed.
In order to solve the above technical problems, the technical solution adopted in the utility model is:A kind of ready-package tunnel waterproofing construction, It is characterized in that:Include being glued by nailing and the gasket first Nian Jie lanyard connected with base, waterproof roll and with first Connect the second bonding lanyard that lanyard is connected to form loop fastener structures and is fixed on the waterproof roll.
Further, geotextiles are equipped in the base.
Further, the width of the first bonding lanyard is 15-40cm.
Further, the first bonding lanyard is uniformly arranged multigroup along the horizontal direction of the base, and adjacent first is viscous The spacing for connecing lanyard is 70-120cm.
Further, the second bonding lanyard is uniformly arranged multigroup along the vertical direction of the waterproof roll, and adjacent the The spacing of two bonding lanyards is 70-120cm.
Further, the gasket is square or round.The gasket includes shim body and is arranged in the gasket Body central position with the matched ladder connecting hole of the nailing.
Further, it is placed with iron plate in the ladder connecting hole, is equipped on the iron plate and coordinates with the nailing Connecting hole.
Further, it is evenly equipped with through-hole in the shim body, bonded adhesives is equipped in the through-hole.
Further, it is equipped with cavity in the engaging portion of shim body lanyard Nian Jie with first, the is equipped in cavity Three bonding lanyards.
The utility model has the beneficial effects that:Constructing operation is simple, quick, time saving and energy saving, high degree of automation, waterproof volume Material is laid with closely connected, no-welding, avoids the weldering leakage drawback easily occurred in gasket welding process, substantially increases waterproof effect.
The utility model is described in detail below in conjunction with the accompanying drawings.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model ready-package tunnel waterproofing construction embodiment one;
Fig. 2 is the structural schematic diagram of the utility model ready-package tunnel waterproofing construction embodiment one;
Fig. 3 is the structural schematic diagram of gasket in the utility model ready-package tunnel waterproofing construction;
Fig. 4 is another structural schematic diagram of gasket in the utility model ready-package tunnel waterproofing construction;
Fig. 5 is the construction schematic diagram of the utility model ready-package tunnel waterproofing construction in the specific implementation;
Fig. 6 is that the utility model ready-package tunnel waterproofing construction the first bonding lanyard and second bonding after the completion of construction are hung The connection diagram of band.
In the accompanying drawings:1 is base, and 2 be nailing, and 3 be waterproof roll, and 4 be the first bonding lanyard, and 5 be the second bonding lanyard, 6 be geotextiles, and 7 be shim body, and 7-1 is ladder connecting hole, and 7-2 is through-hole, and 7-3 is cavity, and 8 be iron plate, and 9 be third bonding Lanyard, 10 be gravity drop hammer.
Specific implementation mode
Embodiment one:Referring to attached drawing 1, the utility model provides a kind of ready-package tunnel waterproofing construction, including by penetrating Nail 2 and gasket are connected to form viscous with the first Nian Jie lanyard 4, waterproof roll 3 and the lanyard Nian Jie with first 4 that base 1 is connected Buckle structure and the second bonding lanyard 5 being fixed on waterproof roll 3.
It is equipped with sticking button hook surface layer on the first bonding lanyard 4, mating thread gluing flocked layer is equipped on the second bonding lanyard 5, Or it is equipped with thread gluing flocked layer on the first bonding lanyard 4, it is equipped with mating sticking button hook surface layer on the second bonding lanyard 5.
Second bonding lanyard 5 is bonded in by heating combined producing tech on waterproof roll 3.
Referring to attached drawing 3 and 4, above-mentioned gasket is square or circle.Gasket includes shim body 7 and is arranged in gasket sheet 7 center of body with 2 matched ladder connecting hole 7-1 of nailing.It is placed with iron plate 8 in ladder connecting hole 7-1, in iron plate 8 are equipped with the connecting hole coordinated with nailing 2.
The ready-package tunnel waterproofing construction of the utility model is in the specific implementation:Referring to attached Figures 5 and 6, it is being fixed with geotechnique In the base 1 of cloth 6, gasket and the first bonding lanyard 4 are fixed in base 1 first with nailing gun nailing 2.Repeat above-mentioned behaviour Make the laterally homogeneous multigroup first bonding lanyard 4 of setting in base 1, lanyard length is less than waterproof roll width 50-100cm, and two Side reserves the overlap edge between two width coiled materials of welding, adjacent two automatic adhesives lanyard spacing 70-120cm.
It is automatic upwards since bottom surface base 1 will to be tightly attached to the waterproof roll 3 of the second bonding lanyard 5 with deployment equipment Laying is rewinded, it is viscous by the second bonding 5 firm physics of lanyard being arranged on the first bonding lanyard 4 in base 1 and waterproof roll 3 It connects and realizes that the construction of waterproof roll is fixed.Gravity drop hammer 10 is equipped in deployment equipment, waterproof is rolled up under the pressure effect of gravity drop hammer 10 Material can be more convenient, more efficiently be fixed in base 1, be allowed to more closely connected, secured.
Finally the overlap edge between two width waterproof rolls 3 is welded and is completed.
Embodiment two:Referring to attached drawing 2, unlike embodiment one shim body 7 and first it is Nian Jie lanyard 4 combination Portion is equipped with cavity 7-3, and third bonding lanyard 9 is equipped in cavity 7-3.Third bonding lanyard 9 is bonded in cavity 7-3, is had Lanyard Nian Jie with first 4 forms the sticking button hook surface layer or thread gluing flocked layer of loop fastener structures.Pad is may make by third bonding lanyard 9 Piece is firmly bonded on the first bonding lanyard 4, realizes secondary fixation.
Embodiment three:Unlike embodiment two, it is evenly equipped with through-hole 7-2 in shim body 7, is set in through-hole 7-2 Have bonded adhesives so that gasket be bonded on the first bonding lanyard 4 and make gasket it is Nian Jie with second be linked with it is 5 glued together, Realize multiple connection.
In above example, the width of the first bonding lanyard 4 is 15-40cm.First bonding lanyard 4 be vertically disposed and Be uniformly arranged along the horizontal direction of base 1 it is multigroup, while second bonding lanyard 5 horizontal directions setting and along the waterproof roll 3 Vertical direction is uniformly arranged multigroup or the first bonding 4 horizontal directions of lanyard and is arranged and is uniformly arranged along the vertical direction of base 1 It is multigroup, at the same second bonding lanyard 5 be vertically disposed and be uniformly arranged along the horizontal direction of the waterproof roll 3 it is multigroup, in this way Design convenient for waterproof roll 3 be connected with base 1 without consider first it is Nian Jie lanyard 4 and second bonding lanyard 5 together Position relationship between when setting.The spacing of adjacent first bonding lanyard 4 is preferably 70-120cm, adjacent second bonding lanyard 5 spacing is preferably 70-120cm.
Finally it should be noted that:The above embodiments are merely illustrative of the technical scheme of the present invention and are not intended to be limiting thereof;To the greatest extent The present invention is described in detail with reference to preferred embodiments for pipe, those of ordinary skills in the art should understand that:Still It can modify to the specific implementation mode of the present invention or equivalent replacement is carried out to some technical characteristics;Without departing from this hair The spirit of bright technical solution should all cover within the scope of the technical scheme claimed by the invention.

Claims (10)

1. a kind of ready-package tunnel waterproofing construction, it is characterised in that:Including by nailing(2)And gasket and base(1)It is connected First bonding lanyard(4), waterproof roll(3)And lanyard Nian Jie with first(4)It is connected to form loop fastener structures and is fixed on institute State waterproof roll(3)On second bonding lanyard(5).
2. ready-package tunnel waterproofing construction according to claim 1, it is characterised in that:In the base(1)It is equipped with soil Work cloth(6).
3. ready-package tunnel waterproofing construction according to claim 1, it is characterised in that:The first bonding lanyard(4)'s Width is 15-40cm.
4. ready-package tunnel waterproofing construction according to claim 1, it is characterised in that:The first bonding lanyard(4)Edge The base(1)Horizontal direction be uniformly arranged it is multigroup, it is adjacent first bonding lanyard(4)Spacing be 70-120cm.
5. ready-package tunnel waterproofing construction according to claim 1, it is characterised in that:The second bonding lanyard(5)Edge The waterproof roll(3)Vertical direction be uniformly arranged it is multigroup, it is adjacent second bonding lanyard(5)Spacing be 70-120cm.
6. according to claim 1-5 any one of them ready-package tunnel waterproofing constructions, it is characterised in that:The gasket is square Or it is round.
7. ready-package tunnel waterproofing construction according to claim 6, it is characterised in that:The gasket includes shim body (7)And it is arranged in the shim body(7)Center with the nailing(2)Matched ladder connecting hole(7-1).
8. ready-package tunnel waterproofing construction according to claim 7, it is characterised in that:In the ladder connecting hole(7-1) Inside it is placed with iron plate(8), in the iron plate(8)It is equipped with and the nailing(2)The connecting hole of cooperation.
9. ready-package tunnel waterproofing construction according to claim 7, it is characterised in that:In the shim body(7)It is upper equal It is furnished with through-hole(7-2), in the through-hole(7-2)It is interior to be equipped with bonded adhesives.
10. ready-package tunnel waterproofing construction according to claim 7 or 8, it is characterised in that:In the shim body(7) Lanyard Nian Jie with first(4)Engaging portion be equipped with cavity(7-3), in cavity(7-3)It is interior to be equipped with third bonding lanyard(9).
CN201820559385.9U 2018-04-19 2018-04-19 Ready-package tunnel waterproofing construction Active CN208089323U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820559385.9U CN208089323U (en) 2018-04-19 2018-04-19 Ready-package tunnel waterproofing construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820559385.9U CN208089323U (en) 2018-04-19 2018-04-19 Ready-package tunnel waterproofing construction

Publications (1)

Publication Number Publication Date
CN208089323U true CN208089323U (en) 2018-11-13

Family

ID=64056404

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820559385.9U Active CN208089323U (en) 2018-04-19 2018-04-19 Ready-package tunnel waterproofing construction

Country Status (1)

Country Link
CN (1) CN208089323U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110453795A (en) * 2019-09-06 2019-11-15 四川省飞翎防水工程有限公司 Wall facade Macromolecular self-adhesive membrane overlays the lossless fixed structure and construction method of waterproof roll

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110453795A (en) * 2019-09-06 2019-11-15 四川省飞翎防水工程有限公司 Wall facade Macromolecular self-adhesive membrane overlays the lossless fixed structure and construction method of waterproof roll

Similar Documents

Publication Publication Date Title
CN208089323U (en) Ready-package tunnel waterproofing construction
CN206942791U (en) Tunnel waterproofing construction
CN105840215A (en) Tunnel waterproof board bonding and laying process
CN108222304A (en) Block of glass wool heat insulating and sound insulating system and its construction method
CN109441491A (en) A kind of railway tunnel self-adhesive waterproof material and its construction method
CN108286447A (en) A kind of self-adhesive pad formula waterproof roll paving hanging method
CN105257320A (en) Tunnel waterproof structure and construction method
CN106759955A (en) The construction method of waterproof system is laid in a kind of toilet and toilet with waterproof system
CN206129299U (en) Prevent drain bar combined system
CN205936663U (en) Undercut tunnel waterproof construction
CN209040863U (en) A kind of tunnel waterproofing construction
CN205101003U (en) Tunnel water proofing structure
KR101029976B1 (en) Water tank and method for constructing the same
CN104234249B (en) The external heat insulating wall engineering method of application hard polyurethane foam composite plates
CN205976015U (en) Waterproof construction of basement outer wall
CN203913659U (en) Height adheres to magic tape and penetrates hook basal body structure
WO2008144954A1 (en) Adhering method of wide breadth wall cloth
CN214834127U (en) Roof waterproof insulation structure
CN214784236U (en) Anti-leakage node structure between pre-laid anti-adhesion waterproof and anti-floating anchor rods
CN208982070U (en) A kind of tunnel coiled material
CN110714791A (en) Method for shallow-buried and underground-excavated two-lining waterproof rapid construction in comprehensive pipe gallery engineering
JP2007270531A (en) Plate-like laminate for covering structure and method of mounting it
CN207277737U (en) A kind of tack ceramic tile being easily installed
CN202370546U (en) Composite waterproof plate
CN107060842B (en) Construction method for paving and hanging tunnel with non-transparent waterproof structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Quickly installed tunnel waterproof structure

Effective date of registration: 20230314

Granted publication date: 20181113

Pledgee: China Construction Bank Corporation Hengshui Housing and Urban Construction Sub-branch

Pledgor: HENGSHUI XINLU TRAFFIC EQUIPMENT Co.,Ltd.

Registration number: Y2023980034827