CN208089264U - A kind of gas production, fracture well head coiled tubing six lead to fracturing device - Google Patents

A kind of gas production, fracture well head coiled tubing six lead to fracturing device Download PDF

Info

Publication number
CN208089264U
CN208089264U CN201721755356.1U CN201721755356U CN208089264U CN 208089264 U CN208089264 U CN 208089264U CN 201721755356 U CN201721755356 U CN 201721755356U CN 208089264 U CN208089264 U CN 208089264U
Authority
CN
China
Prior art keywords
main pipeline
fracturing
lead
gas production
coiled tubing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721755356.1U
Other languages
Chinese (zh)
Inventor
陆军
侯传干
吕可鉴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANJING WEIYE MECHINE CO Ltd
Original Assignee
NANJING WEIYE MECHINE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANJING WEIYE MECHINE CO Ltd filed Critical NANJING WEIYE MECHINE CO Ltd
Priority to CN201721755356.1U priority Critical patent/CN208089264U/en
Application granted granted Critical
Publication of CN208089264U publication Critical patent/CN208089264U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model discloses a kind of gas production, fracture well head coiled tubings six to lead to fracturing device, characterized in that including fracturing head body, protective case, sealing ring and pressure ring;The fracturing head body uses six logical structures, including main pipeline and four secondary ducts;The secondary duct is evenly distributed on the surrounding of main pipeline;The protection is set on main pipeline inner wall;The pressure ring is arranged at the both ends of protective case;The pressure ring is bolted with main pipeline both ends.The advantageous effect that the utility model is reached:Inclination angle is formed between secondary duct and main pipeline, and fracturing sand clogging will not be caused in operation;Sealing ring makes to form sealing between main pipeline, secondary duct and protective case, prevents from down splitting and goes here and there phenomenon on sand.

Description

A kind of gas production, fracture well head coiled tubing six lead to fracturing device
Technical field
The utility model is related to a kind of gas production, fracture well head coiled tubings six to lead to fracturing device, belong to oil field equipment skill Art field.
Background technology
Currently, existing fracturing device, with long-time service, coiled tubing is very easy to be damaged in operation process The phenomenon that, in use, due to the abrasion of sand, but also the service life of its internal sand control protective case drops significantly It is low.In addition, sand is easily altered there is a phenomenon where on when fracturing work, also it is very easy to block main pipeline.
Invention content
To solve the deficiencies in the prior art, the purpose of this utility model is to provide a kind of gas production, fracture well heads with continuously The phenomenon that oil pipe six leads to fracturing device, greatly reduces channel jam, and the rub proofness inside whole equipment is improved, it improves Durability degree.
In order to realize above-mentioned target, the utility model adopts the following technical scheme:
A kind of gas production, fracture well head coiled tubing six lead to fracturing device, characterized in that including fracturing head body, protective case, Sealing ring and pressure ring;The fracturing head body uses six logical structures, including main pipeline and four secondary ducts;The secondary duct is uniformly divided Cloth is in the surrounding of main pipeline, and each secondary duct is consistent with the corner dimension of main pipeline;
The protection is set on main pipeline inner wall;The pressure ring is arranged at the both ends of protective case;The pressure ring and master Pipe ends are bolted;
It is also embedded with ring type seal on the main pipeline inner wall;It is bonded between the ring type seal and protective case.
Further, each angle between the secondary duct and main pipeline is acute angle, and angle direction is upward.
Further, each angle between the secondary duct and main pipeline is 45 degree.
Further, the outlet end of the secondary duct is both provided with flanged joint portion;The flanged joint portion passes through bolt It is fixed on the outlet end of secondary duct.
Further, it is provided with gasket ring between the flanged joint portion and the outlet end of secondary duct.
Further, it is both provided with groove on the face of the upper and lower ends of the main pipeline;The groove is placed with gasket ring.
Further, the side of the fracturing head body is provided with rotating hoisting ring;The rotating hoisting ring use L-type, one end with Fracturing head body is threadedly coupled.
Further, further include lifting tool;The lifting tool is for lifting by crane protective case.
The advantageous effect that the utility model is reached:1, inclination angle is formed between secondary duct and main pipeline, it will not in operation Cause fracturing sand clogging;2, sealing ring makes to form sealing between main pipeline, secondary duct and protective case, prevents from down splitting on sand and go here and there Phenomenon occurs;3, the lifting tool of configuration lifting sand control protective case when lifting by crane sand control protective case, back-outs sand control protection set upper side Bolt takes out pressure ring, and lifting tool screw is twisted and wants the upper surface of sand control protective case and tightens, the steel wire hooked with suspension hook Rope, you can sand control protective case is hung out, it is quick and convenient.
Description of the drawings
Fig. 1 is the structural schematic diagram of the present apparatus.
The meaning of reference numeral in figure:
1- protective cases, 2- fracturing head bodies, 3- sealing rings, 4,7- gasket rings, 5,8,9- bolts, 6- pressure rings, 10- valves, 11- rotations Turn hanging ring.
Specific implementation mode
The utility model is further described below in conjunction with the accompanying drawings.Following embodiment is only used for clearly illustrating this The technical solution of utility model, and the scope of protection of the utility model cannot be limited with this.
The present apparatus is related to a kind of gas production, fracture well head coiled tubing six leads to fracturing device, as shown in Figure 1, including pressure break Head body 2, protective case 1, sealing ring 3 and pressure ring 6.
Wherein fracturing head body 2 uses six logical structures, including main pipeline and four secondary ducts.Secondary duct is evenly distributed on supervisor The surrounding in road, and each secondary duct is consistent with the corner dimension of main pipeline, is acute angle, and direction is upward, in this way in operation Cheng Zhong, would not there is a phenomenon where fracturing sands to block.Angle is used as best angle using 45 degree in the present embodiment.
Protective case 1 is arranged on main pipeline inner wall, and pressure ring 6 is arranged at the both ends of protective case 1, pressure ring 6 and main pipeline both ends It is bolted by second.It is also embedded with ring type seal 3 on main pipeline inner wall, is pasted between ring type seal 3 and protective case 1 It closes, such structure so that gap is not present between secondary duct and protective case, and preventing from down splitting and go here and there phenomenon on sand, reduction is responsible for Wear phenomenon in road.
The outer meta design of protective case is 45 ° of mistakes at stage structure, between 134 outer circle of 140 outer circles of Φ and Φ in the present embodiment It crosses, is used for the axially position of sand control protective case, and support the important of sand control protective case, the lower part outer circle surfacing of sand control protective case is hard Matter alloy forms protection structure, makes erosion resistance in sand control protective case operation, extend its service life, sand control protective case endoporus lower part is fallen 30 °, axial dimension 7mm of angle, for facilitating taking-up power tool.
In addition, the outlet end of secondary duct is both provided with flanged joint portion.Flanged joint portion is bolted on secondary duct Outlet end.It is provided with gasket ring between flanged joint portion and the outlet end of secondary duct.Such structure can be conveniently replaceable and not Abrasion can be generated to the end of secondary duct, improve durability degree.
Groove is both provided on the face of the upper and lower ends of main pipeline, groove is placed with gasket ring, and a part for gasket ring is beyond master Plane where the upper and lower ends of pipeline.Such structure can reduce when being connect with other external component, to main pipeline both ends Abrasion improves durability degree.
In addition, the side of fracturing head body is provided with rotating hoisting ring, when needing to turn the present apparatus, hung as external equipment hook Component.
The present apparatus is also equipped with lifting tool, for lifting by crane protective case.When lifting by crane protective case, back-out the spiral shell of protection set upper side Bolt takes out pressure ring, and lifting tool screw is twisted and wants the upper surface of sand control protective case and tightens, the steel wire hooked with suspension hook Rope, you can hang out sand control protective case.
The above is only the preferred embodiment of the utility model, it is noted that for the common skill of the art For art personnel, without deviating from the technical principle of the utility model, several improvement and deformations can also be made, these change The scope of protection of the utility model is also should be regarded as into deformation.

Claims (8)

1. a kind of gas production, fracture well head coiled tubing six lead to fracturing device, characterized in that including fracturing head body, protective case, close Seal and pressure ring;The fracturing head body uses six logical structures, including main pipeline and four secondary ducts;The secondary duct is uniformly distributed In the surrounding of main pipeline, and each secondary duct is consistent with the corner dimension of main pipeline;
The protection is set on main pipeline inner wall;The pressure ring is arranged at the both ends of protective case;The pressure ring and main pipeline Both ends are bolted;
It is also embedded with ring type seal on the main pipeline inner wall;It is bonded between the ring type seal and protective case.
2. a kind of gas production according to claim 1, fracture well head coiled tubing six lead to fracturing device, characterized in that every Angle between a secondary duct and main pipeline is acute angle, and angle direction is upward.
3. a kind of gas production according to claim 2, fracture well head coiled tubing six lead to fracturing device, characterized in that every Angle between a secondary duct and main pipeline is 45 degree.
4. a kind of gas production according to claim 1, fracture well head coiled tubing six lead to fracturing device, characterized in that institute The outlet end for stating secondary duct is both provided with flanged joint portion;The flanged joint portion is bolted on the outlet of secondary duct End.
5. a kind of gas production according to claim 4, fracture well head coiled tubing six lead to fracturing device, characterized in that institute It states and is provided with gasket ring between flanged joint portion and the outlet end of secondary duct.
6. a kind of gas production according to claim 1, fracture well head coiled tubing six lead to fracturing device, characterized in that institute It states and is both provided with groove on the face of the upper and lower ends of main pipeline;The groove is placed with gasket ring.
7. a kind of gas production according to claim 1, fracture well head coiled tubing six lead to fracturing device, characterized in that institute The side for stating fracturing head body is provided with rotating hoisting ring;The rotating hoisting ring uses L-type, and one end is threadedly coupled with fracturing head body.
8. a kind of gas production according to claim 1, fracture well head coiled tubing six lead to fracturing device, characterized in that also Including lifting tool;The lifting tool is for lifting by crane protective case.
CN201721755356.1U 2017-12-15 2017-12-15 A kind of gas production, fracture well head coiled tubing six lead to fracturing device Active CN208089264U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721755356.1U CN208089264U (en) 2017-12-15 2017-12-15 A kind of gas production, fracture well head coiled tubing six lead to fracturing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721755356.1U CN208089264U (en) 2017-12-15 2017-12-15 A kind of gas production, fracture well head coiled tubing six lead to fracturing device

Publications (1)

Publication Number Publication Date
CN208089264U true CN208089264U (en) 2018-11-13

Family

ID=64068108

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721755356.1U Active CN208089264U (en) 2017-12-15 2017-12-15 A kind of gas production, fracture well head coiled tubing six lead to fracturing device

Country Status (1)

Country Link
CN (1) CN208089264U (en)

Similar Documents

Publication Publication Date Title
CN202991461U (en) Fluid end assembly of plunger pump
CN104775760A (en) Multi-hydraulic-cylinder driving type top-drive casing pipe feeding tool
CN208089264U (en) A kind of gas production, fracture well head coiled tubing six lead to fracturing device
WO2007051366A1 (en) Suspending hydraulic pillar
CN201090402Y (en) Corrosion protection anti-obstruction air valve of compressor
CN203925394U (en) Not kill-job of gas well fluid-tight gas well mouth spraying-preventing system
CN201666245U (en) Anti-fouling and sand-proof oil pump
CN207315318U (en) A kind of cock-type natural gas wellhead pipeline throttling arrangement
CN206053897U (en) Polish rod sealing device
CN201496025U (en) Hydraulic rotary well plugging device
CN212642623U (en) Oil pumping rod with good anti-corrosion sealing effect for pumping well head
CN108709026A (en) A kind of pipe flange top opening
CN202992193U (en) Special full lining chlor-alkali valve
CN211314151U (en) Wear-resistant sleeve for casing head
CN207155683U (en) A kind of double cylinder double acting membrane pump top cover provision for disengagement
CN105370235B (en) A kind of well top sealing device
CN215169930U (en) Novel fracturing injection device
CN205297461U (en) A fixed glib sub -assembly that is used for gas production well head, fixed choke valve of ground manifold
CN205745274U (en) A kind of high-temperature resistant seal ring
CN204754893U (en) Compound perforation rifle
CN217681609U (en) Spray welding polished rod adaptable to large-caliber high-corrosion oil well
CN217130644U (en) Wear-resistant concentric reducing pipe for ore pulp conveying device
CN203230355U (en) Supporting plate for pumping unit horsehead beam hanger
CN204457564U (en) The spiral apparatus for assembling packings of a kind of oil pumper
CN204099259U (en) A kind of wear resistant corrosion resistant double casing volute pump

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant