CN208085937U - Marine boiler top braces device - Google Patents
Marine boiler top braces device Download PDFInfo
- Publication number
- CN208085937U CN208085937U CN201820574983.3U CN201820574983U CN208085937U CN 208085937 U CN208085937 U CN 208085937U CN 201820574983 U CN201820574983 U CN 201820574983U CN 208085937 U CN208085937 U CN 208085937U
- Authority
- CN
- China
- Prior art keywords
- eye plate
- web
- steel pipe
- cushion block
- eye
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
The utility model discloses a kind of marine boiler top braces devices, are set between bulkhead and boiler eye plate;Marine boiler top braces device includes the first web for being fixed in bulkhead, and the first eye plate is connected on the first web, and the both sides of the first eye plate are respectively provided with second eye plate, and the first eye plate and the second eye plate are bolted by first;It is installed with the second web on second eye plate, the first steel pipe is connected on the second web;It is arranged with the second steel pipe on first steel pipe, is connected with third web on the second steel pipe, affixed there are two third eye plate on third web, two third eye plates are respectively arranged on the both sides of boiler eye plate;It is bolted by second between third eye plate and boiler eye plate;By being welded to connect between first steel pipe and the second steel pipe.The marine boiler top braces device of the utility model may insure once mounting success, avoids the waste of part, ensure that the construction time.
Description
Technical field
The utility model is related to technical field of ships, more particularly to a kind of marine boiler top braces device.
Background technology
Since ship hull vibration is larger, when marine boiler is installed, need to be fixedly connected with hull securely.Boiler on ship at present
Installation mostly use boiler pedestal greatly and be directly welded on hull platform, be then by channel steel support rod piece and eye plate etc. at the top of boiler
Attachment is fixed in Ship Structure.Deformation control and channel steel eye plate of this installation method for the Ship Structure of eye plate installation place
The machining accuracy of equal attachmentes has high requirement.Often occur according to calculated value design and the channel steel processed and eye plate etc.
Attachment, when mounted, due to the shadow of the deformation of hull and craftsmanship's level and installation tool caused by the factors such as temperature difference
The case where ringing, causing scene that can not install.Have no alternative but that attachment can only be re-worked, reinstall, causes the waste of material, and shadow
Ring shipbuilding progress.
Utility model content
The technical problems to be solved in the utility model is to provide a kind of ship to overcome drawbacks described above of the existing technology
With boiler top braces device.
The utility model is to solve above-mentioned technical problem by following technical proposals:
A kind of marine boiler top braces device is set between bulkhead and boiler eye plate;Marine boiler top braces fill
The first web including being fixed in bulkhead is set, the first eye plate is connected on the first web, the both sides of the first eye plate are respectively provided with one
Second eye plate, the first eye plate and the second eye plate are bolted by first;The second web, the second web are installed on second eye plate
On be connected with the first steel pipe;It is arranged with the second steel pipe on first steel pipe, is connected with third web on the second steel pipe, on third web
Third eye plate there are two affixed, two third eye plates are respectively arranged on the both sides of boiler eye plate;Lead between third eye plate and boiler eye plate
Second is crossed to be bolted;By being welded to connect between first steel pipe and the second steel pipe.
The both sides of first eye plate are each affixed there are one the first cushion block, and the second cushion block, the first bolt are connected on the second eye plate
It is arranged in the first cushion block and the second cushion block simultaneously.
The first gasket is equipped between second eye plate and the first cushion block.
It is connected with third cushion block on third eye plate, the both sides of boiler eye plate are each, and affixed there are one the 4th cushion block, the second bolts
It is arranged in third cushion block and the 4th cushion block simultaneously.
The second gasket is equipped between third eye plate and the 4th cushion block.
Between first web and bulkhead, between the first eye plate and the first web, between the second eye plate and the second web, second
It is to be welded to connect between web and the first steel pipe.
Between second steel pipe and third web, between third web and third eye plate, between third cushion block and third web
It is to be welded to connect.
The positive effect of the utility model is:The marine boiler top braces device of the utility model uses first
Steel pipe and the second steel pipe socket after be welded with the mode connect, at the scene according to actual deformation of hull amount, attachment machining accuracy etc. because
Element welding efficiently solves the case where factors such as installation attachment machining accuracy, the deformation of hull cause scene that can not install;This practicality
Novel marine boiler top braces device may insure once mounting success, the waste of part be avoided, when ensure that construction
Between.
Description of the drawings
Fig. 1 is the usage state diagram schematic diagram of the utility model preferred embodiment.
Fig. 2 is the structural schematic diagram of the utility model preferred embodiment.
Specific implementation mode
A preferred embodiment is named, and completely illustrates the utility model in conjunction with attached drawing to become apparent from.
As shown in Figure 1, a kind of marine boiler top braces device 100, is set to the boiler eye plate of bulkhead 10 and boiler 200
Between 20.
As shown in Fig. 2, marine boiler top braces device includes the first web 11 for being fixed in bulkhead 10, the first web 11
On be connected with the first eye plate 21, the both sides of the first eye plate 21 are respectively provided with second eye plate 22, the first eye plate 21 and the second eye plate
22 are connected by the first bolt 31.
It is installed with the second web 12 on second eye plate 22, the first steel pipe 51 is connected on the second web 12.
The second steel pipe 52 is arranged on first steel pipe 51.By being welded to connect between first steel pipe 51 and the second steel pipe 52.
It is connected with third web 13 on second steel pipe 52, affixed on third web 13 there are two third eye plate 23, two thirds
Eye plate 23 is respectively arranged on the both sides of boiler eye plate 20;It is connected by the second bolt 32 between third eye plate 23 and boiler eye plate 20.
To improve the stability of structure, the both sides of the first eye plate 21 are each, and affixed there are one the first cushion block 61, the second eye plates 22
On be connected with the second cushion block 62, the first bolt 31 is arranged in the first cushion block 61 and the second cushion block 62 simultaneously.
The first gasket 71 is equipped between second eye plate 22 and the first cushion block 61.
It is connected with third cushion block 63 on third eye plate 23, the both sides of boiler eye plate 20 are each affixed there are one the 4th cushion block 64,
Second bolt 32 is arranged in third cushion block 63 and the 4th cushion block 64 simultaneously.
The second gasket 72 is equipped between third eye plate 23 and the 4th cushion block 64.
Between first web 11 and bulkhead 10, between the first eye plate 21 and the first web 11, the second eye plate 22 and the second abdomen
Between plate 12, between the second web 12 and the first steel pipe 51 be to be welded to connect.
Between second steel pipe 52 and third web 13, between third web 13 and third eye plate 23, third cushion block 63 and
It is to be welded to connect between three webs 13.
When manufacturing the marine boiler top braces device of the present embodiment, without solid between the first steel pipe and the second steel pipe
Fixed connection.When the marine boiler top braces device of the present embodiment to be mounted between boiler and bulkhead, the first steel pipe is inserted into
Then first steel pipe and the second steel pipe are welded to connect by the second steel pipe.
When being installed on ship, the first steel pipe is inserted into the second steel pipe, and the insertion depth of the first steel pipe is according to the deformation of Ship Structure
It is determined with the machining accuracy of the attachmentes such as eye plate.
The depth that first steel pipe is inserted into the second steel pipe is flexibly adjusted, in this way, it is extremely low to the processing request of the attachmentes such as eye plate,
Also the influence that the factors such as the deformation of hull are brought is adapted to;Existing connection type is avoided for installation attachment processing request and ship
The high requirement of the factors such as body deformation.
The marine boiler top braces device of the present embodiment may insure once mounting success, avoid the waste of part,
It ensure that the construction time.
The marine boiler top braces device of the present embodiment is welded with the side connect after being socketed using the first steel pipe and the second steel pipe
Formula.It is welded at the scene according to factors such as actual deformation of hull amount, attachment machining accuracies, efficiently solves installation attachment processing essence
The case where factors such as degree, the deformation of hull cause scene that can not install.
In actual use, the marine boiler top braces of multiple the present embodiment are usually installed at the top of boiler between bulkhead
Device, in this manner it is ensured that the firmness of boiler.
Although the foregoing describe specific embodiment of the present utility model, it will be appreciated by those of skill in the art that
This is merely illustrative of, and the scope of protection of the utility model is defined by the appended claims.Those skilled in the art
Under the premise of without departing substantially from the principles of the present invention and essence, many changes and modifications may be made,
But these change and modification each fall within the scope of protection of the utility model.
Claims (7)
1. a kind of marine boiler top braces device is set between bulkhead and boiler eye plate;It is characterized in that, marine boiler top
Portion's support device includes being fixed in the first web of bulkhead, the first eye plate is connected on the first web, the both sides of the first eye plate are each
If there are one the second eye plates, the first eye plate and the second eye plate are bolted by first;The second web is installed on second eye plate,
The first steel pipe is connected on second web;It is arranged with the second steel pipe on first steel pipe, third web is connected on the second steel pipe, the
Affixed there are two third eye plate on three webs, two third eye plates are respectively arranged on the both sides of boiler eye plate;Third eye plate and boiler eye
It is bolted by second between plate;By being welded to connect between first steel pipe and the second steel pipe.
2. marine boiler top braces device as described in claim 1, which is characterized in that the both sides of the first eye plate are respectively connected with
One the first cushion block is connected with the second cushion block on the second eye plate, and the first bolt is arranged in the first cushion block and the second cushion block simultaneously.
3. marine boiler top braces device as claimed in claim 2, which is characterized in that between the second eye plate and the first cushion block
Equipped with the first gasket.
4. marine boiler top braces device as described in claim 1, which is characterized in that be connected with third pad on third eye plate
The both sides of block, boiler eye plate are each affixed there are one the 4th cushion block, and the second bolt is arranged in third cushion block and the 4th cushion block simultaneously.
5. marine boiler top braces device as claimed in claim 4, which is characterized in that between third eye plate and the 4th cushion block
Equipped with the second gasket.
6. marine boiler top braces device as described in claim 1, which is characterized in that between the first web and bulkhead,
It is that welding connects between one eye plate and the first web, between the second eye plate and the second web, between the second web and the first steel pipe
It connects.
7. marine boiler top braces device as described in claim 1, which is characterized in that the second steel pipe and third web it
Between, between third web and third eye plate, between third cushion block and third web be to be welded to connect.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820574983.3U CN208085937U (en) | 2018-04-20 | 2018-04-20 | Marine boiler top braces device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820574983.3U CN208085937U (en) | 2018-04-20 | 2018-04-20 | Marine boiler top braces device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208085937U true CN208085937U (en) | 2018-11-13 |
Family
ID=64056896
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820574983.3U Active CN208085937U (en) | 2018-04-20 | 2018-04-20 | Marine boiler top braces device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208085937U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113551218A (en) * | 2021-08-10 | 2021-10-26 | 西安热工研究院有限公司 | Adjustable rigid beam corner connecting device for boiler water wall |
-
2018
- 2018-04-20 CN CN201820574983.3U patent/CN208085937U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113551218A (en) * | 2021-08-10 | 2021-10-26 | 西安热工研究院有限公司 | Adjustable rigid beam corner connecting device for boiler water wall |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201856883U (en) | Ship pipe system unit produced in internal field of workshop | |
CN208085937U (en) | Marine boiler top braces device | |
CN109911127A (en) | A kind of primary-auxiliary type installation ship and its application of assembling at sea | |
CN206646691U (en) | Special-shaped curtain wall hitching component | |
CN203062189U (en) | Adjusting device for butting installation of oxygen pipeline | |
CN105836091A (en) | Shock-absorbing and rainproof device for exhaust pipe | |
CN206263522U (en) | A kind of pipe fitting spot welding fixture (SWFX) | |
CN203131230U (en) | Adjustable hanger for marine PE (polyethylene) pipes | |
CN201027745Y (en) | Expanding pipe sleeve connector and multifunctional expanding pipe connected by the same | |
CN204623765U (en) | A kind of chimney peculiar to vessel | |
CN205589414U (en) | Embedded equipment base structure of boats and ships | |
CN209398928U (en) | A kind of fixed bracket of pump line attached wall | |
CN205712038U (en) | Jack-up unit and jetting pipeline support thereof | |
CN205020298U (en) | Adjustable anchor chain water flooding nozzle | |
CN211446994U (en) | Fixing device for integrated type cage sacrificial anode assembly | |
CN203923994U (en) | Removable steel work berthing member | |
CN207241979U (en) | A kind of marine radar cable hose end positioning tool | |
CN106976532A (en) | Netted infundibulate mini underwater vehicle retracting device | |
CN205938173U (en) | Protection device of submarine pipeline flange | |
CN206274094U (en) | A kind of reserved riser clip pedestal protector of offshore platform | |
CN207405876U (en) | A kind of firm banking for column component | |
CN202001727U (en) | Anchor device for deep water double-layer submarine pipeline | |
CN205036959U (en) | Valve strutting arrangement of marine LNG fuel jar | |
CN207864040U (en) | Boat diesel engine exhaust pipe mounting structure | |
CN210232220U (en) | Water leakage prevention structure for steel pipe welding lathe bed installation dovetail groove workbench |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |