CN208082502U - A kind of low temperature water bath of outer water receiving cycle - Google Patents

A kind of low temperature water bath of outer water receiving cycle Download PDF

Info

Publication number
CN208082502U
CN208082502U CN201820280160.XU CN201820280160U CN208082502U CN 208082502 U CN208082502 U CN 208082502U CN 201820280160 U CN201820280160 U CN 201820280160U CN 208082502 U CN208082502 U CN 208082502U
Authority
CN
China
Prior art keywords
penetration test
test cylinder
copper pipe
water bath
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820280160.XU
Other languages
Chinese (zh)
Inventor
杨云龙
杨代宪
谭开欣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Ruixin Supply Chain Management Co., Ltd
Original Assignee
Chengdu Ruixin Asphalt Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Ruixin Asphalt Technology Co Ltd filed Critical Chengdu Ruixin Asphalt Technology Co Ltd
Priority to CN201820280160.XU priority Critical patent/CN208082502U/en
Application granted granted Critical
Publication of CN208082502U publication Critical patent/CN208082502U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Details Of Fluid Heaters (AREA)

Abstract

The utility model discloses a kind of low temperature water baths of outer water receiving cycle, including babinet, it is provided with case lid at the top of the babinet, the inner cavity of the babinet is provided with electric hot plate, the electric hot plate is internally provided with interlayer, the interlayer is specially heat conduction oil reservoir, it is injected with conduction oil in the heat conduction oil reservoir, the top of the electric hot plate offers oil filler point, the inner wall of the electric hot plate has been fitted and connected water bath, the surface of the water bath and babinet symmetrically offers jack, two jacks are fixedly connected by copper pipe, the outer wall of the copper pipe is provided with penetration test cylinder, the copper pipe is penetrated by the top of penetration test cylinder, then it is pierced by from bottom end, the inner cavity of the penetration test cylinder is provided with inner wall, interlayer is formed between the inner cavity and inner wall of penetration test cylinder, the copper pipe arranges in the shape of a spiral in interlayer.The utility model has the beneficial effects that:Have the characteristics that the experiment suitable for all size and the efficiency of heating surface is more preferable.

Description

A kind of low temperature water bath of outer water receiving cycle
Technical field
The utility model is related to low temperature water bath technical field, specially a kind of low temperature water bath of outer water receiving cycle.
Background technology
Currently, water bath is by heating or freezing and temperature control equipment provides one kind of constant bath temperature Device can provide the bath temperature of different temperatures.Water bath is mainly used for distilling in laboratory, dry, concentration, and warm stain Learn drug or biological products, it can also be used to which heated at constant temperature and other humid tests are the religions such as biology, heredity, laboratory, analysis room Educate the indispensable tool of scientific research.The water bath or low temperature water bath for being traditionally used for heating water bath of laboratory configuration, there is one A apparent feature:Small volume, water-bath area is small, is less than 0.1m2, wherein the water-bath area smaller of low temperature water bath.And When carrying out penetration test, smaller low temperature water bath can not just use, and traditional water bath is in terms of the efficiency of heating surface Effect is undesirable.
Utility model content
The technical issues of the utility model solves be to overcome defect of the existing technology, provides a kind of outer water receiving cycle Low temperature water bath.The low temperature water bath of the outer water receiving cycle has the experiment suitable for all size and the efficiency of heating surface is more preferable The characteristics of.
To achieve the above object, the utility model provides the following technical solutions:A kind of low temperature water bath of outer water receiving cycle, Including babinet, case lid is provided at the top of the babinet, the inner cavity of the babinet is provided with electric hot plate, is set inside the electric hot plate It is equipped with interlayer, the interlayer is specially heat conduction oil reservoir, and conduction oil is injected in the heat conduction oil reservoir, and the top of the electric hot plate is opened Equipped with oil filler point, the inner wall of the electric hot plate has been fitted and connected water bath, and the surface of the water bath and babinet symmetrically opens up There is jack, two jacks to be fixedly connected by copper pipe, the outer wall of the copper pipe is provided with penetration test cylinder, the copper pipe by The top of penetration test cylinder penetrates, and is then pierced by from bottom end, and the inner cavity of the penetration test cylinder is provided with inner wall, needle penetration Interlayer is formed between the inner cavity and inner wall of test cylinder, the copper pipe arranges in the shape of a spiral in interlayer, the interlayer and the needle The inner cavity bottom end of penetration test cylinder is connected to.
Preferably, the copper pipe is fixedly connected with the bottom of penetration test cylinder, a diameter of ten millimeters of the copper pipe, Thickness is one millimeter.
Preferably, the inner cavity of the penetration test cylinder is equipped with penetration test liquid, the outer wall of the penetration test cylinder Fixing sleeve is connected to insulating.
Compared with prior art, the utility model has the beneficial effects that:It can be with by the heat conduction oil reservoir that is opened up in electric hot plate More quickly realize the effect of heating so that the water temperature inside water bath can more quickly reach the required temperature of experiment Degree;Secondly, experimental liquid in external penetration test cylinder can be heated using copper pipe, the copper pipe being arranged by helical form The contact area of copper pipe and experimental liquid can be increased, increase the efficiency of heating surface, can prevent from rushing copper pipe shadow in experiment process by interlayer Ring test result.
Description of the drawings
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the utility model body structure sectional view.
Figure label:1 babinet, 2 case lids, 3 electric hot plates, 4 heat conduction oil reservoirs, 5 water baths.6 jacks, 7 copper pipes, the examination of 8 needle penetrations Test cylinder, 9 interlayers.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work The every other embodiment obtained, shall fall within the protection scope of the present invention.
- 2 are please referred to Fig.1, the utility model provides a kind of technical solution:A kind of low temperature water bath of outer water receiving cycle, packet Include babinet 1, the top of the babinet 1 is provided with case lid 2, and the inner cavity of the babinet 1 is provided with electric hot plate 3, in the electric hot plate 3 Portion is provided with interlayer, and the interlayer is specially heat conduction oil reservoir 4, and conduction oil, the electric hot plate 4 are injected in the heat conduction oil reservoir 4 Top offer oil filler point, the inner wall of the electric hot plate 3 has been fitted and connected water bath 5, the table of the water bath 5 and babinet 1 Face symmetrically offers jack 6, and two jacks 6 are fixedly connected by copper pipe 7, and the outer wall of the copper pipe 7 is provided with needle penetration Test cylinder 8, the copper pipe 7 are fixedly connected with the bottom of penetration test cylinder 8, a diameter of ten millimeters of the copper pipe 7, thickness It it is one millimeter, the copper pipe 7 is penetrated by the top of penetration test cylinder 8, is then pierced by from bottom end, the penetration test cylinder 8 Inner cavity be provided with inner wall, between the inner cavity and inner wall of penetration test cylinder 8 formed interlayer 9, the penetration test cylinder 8 it is interior Chamber is equipped with penetration test liquid, and the outer wall fixing sleeve of the penetration test cylinder 8 is connected to insulating, the copper pipe 7 every It is arranged in the shape of a spiral in layer 9, the interlayer 9 is connected to the inner cavity bottom end of the penetration test cylinder 8.
Operation principle
The effect of heating can be more quickly realized by the heat conduction oil reservoir 4 opened up in electric hot plate 3 so that water bath 5 Internal water temperature can more quickly reach the required temperature of experiment;It secondly, can be by external needle penetration using copper pipe 7 Experimental liquid is heated in test cylinder 8, and the copper pipe 7 being arranged by helical form can increase the contact area of copper pipe 7 and experimental liquid, is increased Add the efficiency of heating surface, can prevent from rushing the influence test result of copper pipe 7 in experiment process by interlayer 9.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is appreciated that can these embodiments be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (3)

1. a kind of low temperature water bath of outer water receiving cycle, including babinet(1), it is characterised in that:The babinet(1)Top setting There is case lid(2), the babinet(1)Inner cavity be provided with electric hot plate(3), the electric hot plate(3)It is internally provided with interlayer, the folder Layer is specially heat conduction oil reservoir(4), the heat conduction oil reservoir(4)Inside it is injected with conduction oil, the electric hot plate(3)Top offer note Oilhole, the electric hot plate(3)Inner wall be fitted and connected water bath(5), the water bath(5)And babinet(1)Surface it is right Title offers jack(6), two jacks(6)Pass through copper pipe(7)It is fixedly connected, the copper pipe(7)Outer wall be provided with needle and enter Spend test cylinder(8), the copper pipe(7)By penetration test cylinder(8)Top penetrate, be then pierced by from bottom end, the needle penetration Test cylinder(8)Inner cavity be provided with inner wall, penetration test cylinder(8)Inner cavity and inner wall between form interlayer(9), the copper pipe (7)In interlayer(9)It inside arranges in the shape of a spiral, the interlayer(9)With the penetration test cylinder(8)Inner cavity bottom end connection.
2. a kind of low temperature water bath of outer water receiving cycle according to claim 1, it is characterised in that:The copper pipe(7)With Penetration test cylinder(8)Bottom be fixedly connected, the copper pipe(7)A diameter of ten millimeters, thickness be one millimeter.
3. a kind of low temperature water bath of outer water receiving cycle according to claim 1, it is characterised in that:The penetration test Cylinder(8)Inner cavity be equipped with penetration test liquid, the penetration test cylinder(8)Outer wall fixing sleeve be connected to insulating.
CN201820280160.XU 2018-02-28 2018-02-28 A kind of low temperature water bath of outer water receiving cycle Active CN208082502U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820280160.XU CN208082502U (en) 2018-02-28 2018-02-28 A kind of low temperature water bath of outer water receiving cycle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820280160.XU CN208082502U (en) 2018-02-28 2018-02-28 A kind of low temperature water bath of outer water receiving cycle

Publications (1)

Publication Number Publication Date
CN208082502U true CN208082502U (en) 2018-11-13

Family

ID=64060929

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820280160.XU Active CN208082502U (en) 2018-02-28 2018-02-28 A kind of low temperature water bath of outer water receiving cycle

Country Status (1)

Country Link
CN (1) CN208082502U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109842965A (en) * 2019-03-25 2019-06-04 芜湖艾尔达科技有限责任公司 A kind of temperature control accurately speed heat plate electric heater unit

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109842965A (en) * 2019-03-25 2019-06-04 芜湖艾尔达科技有限责任公司 A kind of temperature control accurately speed heat plate electric heater unit

Similar Documents

Publication Publication Date Title
CN208082502U (en) A kind of low temperature water bath of outer water receiving cycle
CN204841769U (en) Test tube clamp for chemistry experiments
CN207756170U (en) Metal detection thermostat water bath
CN205404460U (en) Gel time measurement device
CN207085956U (en) A kind of Multifunctional water bath kettle
CN216799897U (en) Electric heating constant-temperature water bath kettle
CN110605151A (en) Test tube heating heat preservation device for biotechnology
CN206008778U (en) New test tube seat
CN207562950U (en) A kind of medical test tubes frame with heating function
CN203737278U (en) Reagent heating device
CN206146723U (en) Electric heat graphite digestion device
CN204678876U (en) A kind of muffle furnace
CN205850894U (en) Density bottle heater
CN206094757U (en) A dewatering equipment for lithium ion cell
CN207913964U (en) One kind can heat serifuge
CN204806850U (en) Wall -hanging sampling tube drying process device
CN104313860A (en) Dry ceramic iron
CN203440503U (en) Seal box for real silk soaking separation
CN104001565A (en) Reagent heating device
CN108361985A (en) A kind of glue heating and heat-insulating device
CN208742614U (en) A kind of biotechnology test tube heating and heat-insulating device
CN207908407U (en) Chinese medicine water tries method discriminating insulating box
CN102963634A (en) Heating and preservation device for asphalt
CN108080049A (en) A kind of solid-state is with type energy transmission device
CN102671731B (en) Test tube capable of preserving heat

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Ruixin (Chengdu) Asphalt Material Co., Ltd.

Assignor: Chengdu Ruixin Asphalt Technology Co. Ltd.

Contract record no.: 2019510000002

Denomination of utility model: Low temperature water bath of external hydrologic cycle

Granted publication date: 20181113

License type: Common License

Record date: 20190226

EE01 Entry into force of recordation of patent licensing contract
TR01 Transfer of patent right

Effective date of registration: 20201211

Address after: 610000 6 / F, building 11, 267-8, wainan street, Xindu street, Xindu District, Chengdu, Sichuan Province

Patentee after: Sichuan Ruixin Supply Chain Management Co., Ltd

Address before: Qingbai Jie Cun, Xinfan Town, Xindu District, Chengdu City, Sichuan Province 610501

Patentee before: CHENGDU RUIXIN ASPHALT TECHNOLOGY Co.,Ltd.

TR01 Transfer of patent right