CN208077895U - A kind of fuse downlead assembling device - Google Patents

A kind of fuse downlead assembling device Download PDF

Info

Publication number
CN208077895U
CN208077895U CN201820601362.XU CN201820601362U CN208077895U CN 208077895 U CN208077895 U CN 208077895U CN 201820601362 U CN201820601362 U CN 201820601362U CN 208077895 U CN208077895 U CN 208077895U
Authority
CN
China
Prior art keywords
assembly platform
conducting wire
telescopic rod
downlead
setting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820601362.XU
Other languages
Chinese (zh)
Inventor
赵红杰
刘永奇
张金涌
李琳
宋鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Electric Power Co Of Henan Province Shangshui County Power Supply Co
Zhoukou Power Supply Co of State Grid Henan Electric Power Co Ltd
Original Assignee
State Grid Electric Power Co Of Henan Province Shangshui County Power Supply Co
Zhoukou Power Supply Co of State Grid Henan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Electric Power Co Of Henan Province Shangshui County Power Supply Co, Zhoukou Power Supply Co of State Grid Henan Electric Power Co Ltd filed Critical State Grid Electric Power Co Of Henan Province Shangshui County Power Supply Co
Priority to CN201820601362.XU priority Critical patent/CN208077895U/en
Application granted granted Critical
Publication of CN208077895U publication Critical patent/CN208077895U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The utility model provides a kind of fuse downlead assembling device, including assembly platform, it is arranged on the assembly platform and positioned at the first insulating bottle clamping device of side, it is arranged on the assembly platform and positioned at the second insulating bottle clamping device of the other side, the first conductor clamping mechanism for the installation of the first downlead is set on the assembly platform, be arranged on the assembly platform for the banding mechanism tied up to more downleads, and be arranged on the assembly platform and with the matched auxiliary positioning mechanism of the banding mechanism;By the way of prefabrication, field erected mode is simulated, the stripping and installation of conducting wire is realized, and then completed belt to scene is installed, saves a large amount of time, also ensure the precision of installation.

Description

A kind of fuse downlead assembling device
Technical field
The utility model is related to power equipment technical field of processing equipment, and in particular to a kind of fuse downlead assembling dress It sets.
Background technology
Currently, the installation for lead under fuse, generally require operating personnel carry out wire stripping at the scene with shearing and by It is assembled successively according to the sequence of wiring, however due to needing to complete above-mentioned action in the air, often make operating personnel not only A large amount of muscle power is expended, and needs very high operation skill, just can guarantee the precision of installation;It is in Authorization Notice No. A kind of 330kV transformers leading-out wire structure is disclosed in CN206379253U, including:Transformer body and be set to transformer body On direct insertion raising seat;Transformer body is equipped with flange, and direct insertion raising seat is mounted on interface method by connecting bolt Lan Shang, and be connected to transformer body inside;It is equipped with transformer cable in transformer body, installs and becomes at the top of direct insertion raising seat Casing voltage equalizing ball is installed in depressor casing, bushing shell for transformer tail portion, and transformer cable stretches into inside casing voltage equalizing ball;Casing voltage equalizing ball Axle center with it is direct insertion increase seat axle center overlap;Although it describes a kind of wiring construction of transformer cable, it is simultaneously The problem of unresolved fuse installation.
Utility model content
In view of this, purpose provided by the utility model is in view of the deficiencies of the prior art, provide under a kind of fuse draws Line assembling device simulates field erected mode by the way of prefabrication, realizes the stripping and installation of conducting wire, and then will Completed belt to scene is installed, and a large amount of time is saved, and also ensures the precision of installation.
In order to solve the above technical problems, technical solution adopted in the utility model is:A kind of fuse downlead assembling Device, including assembly platform are arranged on the assembly platform and positioned at the first insulating bottle clamping device of side, are arranged in institute The second insulating bottle clamping device on assembly platform and positioned at the other side is stated, under setting is drawn on the assembly platform for first First conductor clamping mechanism of line installation, is arranged on the assembly platform strapper for being tied up to more downleads Structure, and be arranged on the assembly platform and with the matched auxiliary positioning mechanism of the banding mechanism;
The first insulating bottle clamping device includes the first Holding seat, and leading in first Holding seat both sides is arranged The first upper clamp in the two guide rod upper ends is arranged in bar, and the first lower clamp on two guide rods is arranged, and is arranged described For controlling the first retractable support arm that the first lower clamp is slided on guide rod, and setting in institute on first Holding seat State the first switch for controlling the first retractable support arm on assembly platform.
The second insulating bottle clamping device includes the second Holding seat, and it is vertical on second Holding seat to be arranged The mounting hole on the vertical substrate is arranged in substrate, and the lock for the second insulating bottle to be fixed is arranged in mounting hole Tight bolt.
First conductor clamping mechanism includes the first conducting wire grip block being arranged on the assembly platform, is arranged in institute State the first gripping block of the first conducting wire grip block side, be arranged on the first conducting wire grip block and with first gripping block Matched first conducting wire compresses telescopic rod, setting first conducting wire compress telescopic rod front end and with first gripping block Matched first compact heap, and be arranged on the assembly platform and opened for controlling the second of the first conducting wire compression telescopic rod It closes.
Setting and the matched limit card slot of the first compact heap in first gripping block.
The banding mechanism include be arranged on assembly platform tie up pedestal, be arranged and tie up tying up on pedestal described Locating slot, be arranged it is described tie up base side tie up telescopic rod, be arranged it is described tie up telescopic rod upper end tie up compression Plate, is arranged in the bridge joint hole tied up on pressure plate, and the bundle tied up on pressure plate is fixed on by bridging the bridging bar in hole Pressure body is arranged in the multiple through-holes tied up in laminate for being locked to the clamping body that multiple conducting wires are fixed, And it is arranged on the assembly platform for controlling the third switch for tying up telescopic rod.
The auxiliary positioning mechanism includes the second conducting wire grip block being arranged on the assembly platform, and setting is described the Second gripping block of two conducting wire grip block sides is arranged on the second conducting wire grip block and matches with second gripping block The second conducting wire closed compresses telescopic rod, and setting compresses telescopic rod front end in second conducting wire and matches with second gripping block The second compact heap closed, and the 4th switch that telescopic rod is compressed for controlling the second conducting wire is set on the assembly platform.
The utility model is directed to the installation for lead under fuse in the prior art, generally requires operating personnel at the scene It carries out wire stripping and shears and assembled successively according to the sequence of wiring, however due to needing to complete above-mentioned action in the air, it is past Toward making operating personnel not only expend a large amount of muscle power, but also the operation skill that needs are very high, the accurate of installation just can guarantee Degree;A kind of fuse downlead assembling device is provided, by the way of prefabrication, simulates field erected mode, realization is led The stripping and installation of line, and then completed belt to scene is installed, a large amount of time is saved, also ensures installation Precision.
In addition, the present apparatus uses assembly platform for matrix, the first insulating bottle clamping device is arranged in right side on it, on its left side The second porcelain vase clamping device is arranged in top, and on the right side of the second porcelain vase clamping device and on the left of the first insulating bottle clamping device First conductor clamping mechanism is set, strapper then is set in the second porcelain vase clamping device and the first conductor clamping mechanism lower part Then auxiliary positioning mechanism is arranged at banding mechanism rear portion, come conducting wire when ensuring to tie up will not there is a phenomenon where swing in structure.
In addition, the first insulating bottle clamping device used includes the first Holding seat, then guide rod is arranged in both sides on it, The first upper clamp is fixedly installed as the movable sliding rail of the first lower clamp, and in guide rod upper end, in order to realize the effect of clamping, The first retractable support arm is arranged in first lower clamp lower part, to ensure clamping effect of two clamps to insulating bottle, and in order to realize Dynamic, which is clamped on assembly platform, is arranged first switch near it, to be controlled.
In addition, the second insulating bottle clamping device used includes the second Holding seat, and it is arranged on the second Holding seat Then mounting hole, and the lock that setting is fixed with the second insulating bottle in mounting hole is arranged in vertical substrate on vertical substrate Tight bolt;In addition, the first conductor clamping mechanism used includes the first conducting wire grip block being arranged on assembly platform, it is water Then tablet is arranged the first gripping block in one side, and the first conducting wire is arranged in offside and compresses telescopic rod, then set in its end The first compact heap, and setting and limit card slot in the first gripping block are set, is clamped to ensure and conducting wire will not be caused to crush, It can realize limit, and second switch is set in the first conducting wire grip block side, can realize Quick-clamped and detach.
In addition, banding mechanism includes tying up pedestal, what is be arranged on tying up pedestal ties up locating slot, is used for carrying out conducting wire Limit, and in order to ensure the effect tied up, telescopic rod is tied up tying up base side setting, and compression is tied up in end setting on it Plate provides space to be tied up to conducting wire, bridging bar is arranged tying up pressure plate lower face, and setting is tied up in bridging bar lower end Then multiple through-holes are arranged in laminate on tying up laminate, for quickly locked to conductor clamping body, while for reality Now to tying up the compression of conducting wire, on assembly platform setting tie up the third of telescopic rod for control and switch, due to stretching for use Contracting bar is electric telescopic rod or startup telescopic rod so that clamps reaction speed quickly, it is ensured that the agility of operation.In addition, The auxiliary positioning mechanism of use is identical as the first conductor clamping mechanism structure, and only position is different.
Description of the drawings
Fig. 1 is the whole overlooking structure diagram of the utility model;
Fig. 2 is the structural schematic diagram at the utility model the first insulating bottle clamping device;
Fig. 3 is the overlooking structure diagram of the first lower clamp of the utility model;
Fig. 4 is the side structure schematic diagram of the utility model banding mechanism;
Fig. 5 is the side structure schematic diagram of the utility model the second insulating bottle clamping device;
Fig. 6 is the overlooking structure diagram of the first conductor clamping mechanism of the utility model;
Fig. 7 is the side structure schematic diagram of the first conductor clamping mechanism of the utility model;
Fig. 8 is the side structure schematic diagram of the utility model auxiliary positioning mechanism.
Specific implementation mode
It is new below in conjunction with this practicality to keep the purpose, technical scheme and advantage of the utility model embodiment clearer The attached drawing 1-8 of type embodiment, is clearly and completely described the technical solution of the utility model embodiment.Obviously, described Embodiment be the utility model a part of the embodiment, instead of all the embodiments.Based on described the utility model Embodiment, the every other embodiment that those of ordinary skill in the art are obtained shall fall within the protection scope of the present invention.
Embodiment one
A kind of fuse downlead assembling device, including assembly platform 1 are arranged on the assembly platform 1 and are located at one First insulating bottle clamping device 6 of side is arranged on the assembly platform 1 and positioned at the second insulating bottle clamping device of the other side 2, the first conductor clamping mechanism 3 for the installation of the first downlead is set on the assembly platform 1, and setting is flat in the assembling For the banding mechanism 7 tied up to more downleads on platform 1, and be arranged on the assembly platform 1 and with the bundle Prick 7 matched auxiliary positioning mechanism 8 of mechanism;
The first insulating bottle clamping device 6 includes the first Holding seat 61, and setting is in 61 liang of first Holding seat The first upper clamp 65 in two guide rods, 64 upper end is arranged in the guide rod 64 of side, is arranged under first on two guide rods 64 Clamp 63 is arranged on first Holding seat 61 for controlling the first lower clamp 63 is slided on guide rod 64 first Retractable support arm 62, and the first switch 5 for controlling the first retractable support arm 62 is set on the assembly platform 1.
Setting and the matched groove of the first insulating bottle 66 on first lower clamp 63.
The second insulating bottle clamping device 2 includes the second Holding seat 21, is arranged on second Holding seat 21 Vertical substrate 22, the mounting hole 23 on the vertical substrate 22 is set, and setting is in mounting hole 23 for insulating to second The clamping screw 24 that bottle is fixed.
First conductor clamping mechanism 3 includes the first conducting wire grip block 31 being arranged on the assembly platform 1, setting The first gripping block 34 in 31 side of the first conducting wire grip block, be arranged on the first conducting wire grip block 31 and with it is described Matched first conducting wire of first gripping block 34 compresses telescopic rod 32, setting first conducting wire compress 32 front end of telescopic rod and It is used to control first on the assembly platform 1 with first gripping block, 34 matched first compact heap 33, and setting Conducting wire compresses the second switch 4 of telescopic rod 32.
The banding mechanism 7 ties up pedestal 76 including what is be arranged on assembly platform, and setting is tied up described on pedestal 76 Tie up locating slot 77, be arranged it is described tie up 76 side of pedestal tie up telescopic rod 71, be arranged and tie up telescopic rod 71 described Pressure plate 72 is tied up in upper end, is arranged in the bridge joint hole tied up on pressure plate 72, solid by bridging the bridging bar 73 in hole It is scheduled on to tie up and ties up laminate 75 on pressure plate, be arranged in the folder tied up in laminate 75 for multiple conducting wires to be fixed Multiple through-holes 74 that tight body is locked, and be arranged on the assembly platform 1 for controlling the third for tying up telescopic rod 71 Switch 9.
The auxiliary positioning mechanism 8 includes the second conducting wire grip block 81 being arranged on the assembly platform 1, is arranged in institute It states the second gripping block 84 of 81 side of the second conducting wire grip block, is arranged on the second conducting wire grip block 81 and with described second 84 matched second conducting wire of gripping block compress telescopic rod 82, setting second conducting wire compress 82 front end of telescopic rod and with institute Matched second compact heap 83 of the second gripping block is stated, and is arranged on the assembly platform and is compressed for controlling the second conducting wire 4th switch 10 of telescopic rod.
Use assembly platform for matrix in the embodiment, the first insulating bottle clamping device is arranged in right side on it, on its left side The second porcelain vase clamping device is arranged in top, is arranged on the right side of the second porcelain vase clamping device and left positioned at the first insulating bottle clamping device First conductor clamping mechanism of side, and banding mechanism is set in the second porcelain vase clamping device and the first conductor clamping mechanism lower part, Then auxiliary positioning mechanism is set at banding mechanism rear portion, come conducting wire when ensuring to tie up will not there is a phenomenon where swing.
In addition, the first insulating bottle clamping device used includes the first Holding seat, then guide rod is arranged in both sides on it, The first upper clamp is fixedly installed as the movable sliding rail of the first lower clamp, and in guide rod upper end, in order to realize the effect of clamping, The first retractable support arm is arranged in first lower clamp lower part, to ensure clamping effect of two clamps to insulating bottle, and in order to realize Dynamic, which is clamped on assembly platform, is arranged first switch near it, to be controlled.
Embodiment two
Its with embodiment one difference lies in:
Setting and the matched limit card slot of first compact heap 35 in first gripping block 34.
Setting and the matched limiting slot of second compact heap 85 in second gripping block.
The banding mechanism used in the embodiment includes tying up pedestal, and what is be arranged on tying up pedestal ties up locating slot, uses Conducting wire is limited, and in order to ensure the effect tied up, tie up telescopic rod tying up base side setting, and hold on it Pressure plate is tied up in setting, and space is provided in order to be tied up to conducting wire, bridging bar is arranged tying up pressure plate lower face, and in bridging bar Laminate is tied up in lower end setting, multiple through-holes is then arranged on tying up laminate, for quickly locked to conductor clamping body Tightly, while in order to realize the compression to tying up conducting wire, it is arranged on assembly platform for controlling the third switch for tying up telescopic rod, Since the telescopic rod of use is electric telescopic rod or startup telescopic rod so that clamp reaction speed quickly, it is ensured that operation Agility.In addition, the auxiliary positioning mechanism used is identical as the first conductor clamping mechanism structure, only position is different.
The above is preferred embodiments of the present invention, it is noted that for the ordinary skill of the art For personnel, under the premise of not departing from principle described in the utility model, it can also make several improvements and retouch, these improvement The scope of protection of the utility model is also should be regarded as with retouching.

Claims (7)

1. a kind of fuse downlead assembling device, it is characterised in that:Including assembly platform, be arranged on the assembly platform and The first insulating bottle clamping device positioned at side is arranged on the assembly platform and is clamped positioned at the second insulating bottle of the other side The first conductor clamping mechanism for the installation of the first downlead is arranged on the assembly platform in mechanism, is arranged in the assembling Banding mechanism on platform for being tied up to more downleads, and be arranged on the assembly platform and tied up with described The matched auxiliary positioning mechanism of mechanism;
The first insulating bottle clamping device includes the first Holding seat, and the guide rod in first Holding seat both sides is arranged, The first upper clamp in the two guide rod upper ends is set, the first lower clamp on two guide rods is set, setting is described the For controlling the first retractable support arm that the first lower clamp is slided on guide rod, and setting described on one Holding seat First switch on assembly platform for controlling the first retractable support arm.
2. fuse downlead assembling device as described in claim 1, it is characterised in that:The second insulating bottle clamping device Including the second Holding seat, the vertical substrate on second Holding seat is set, consolidating on the vertical substrate is set Determine hole, the clamping screw for the second insulating bottle to be fixed is set in mounting hole.
3. fuse downlead assembling device as claimed in claim 2, it is characterised in that:The first conductor clamping mechanism packet The first conducting wire grip block being arranged on the assembly platform is included, is arranged and is clamped the first of the first conducting wire grip block side Block is arranged on the first conducting wire grip block and compresses telescopic rod with matched first conducting wire of first gripping block, if It sets and compresses telescopic rod front end in first conducting wire and exist with matched first compact heap of first gripping block, and setting The second switch of telescopic rod is compressed on the assembly platform for controlling the first conducting wire.
4. fuse downlead assembling device as claimed in claim 3, it is characterised in that:In first gripping block setting with The matched limit card slot of first compact heap.
5. fuse downlead assembling device as claimed in claim 4, it is characterised in that:The banding mechanism includes that setting exists Pedestal is tied up on assembly platform, is arranged in the locating slot of tying up tied up on pedestal, is arranged and ties up base side described Tie up telescopic rod, be arranged it is described tie up telescopic rod upper end tie up pressure plate, be arranged in the bridge tied up on pressure plate Hole is connect, is fixed on the laminate of tying up tied up on pressure plate by bridging the bridging bar in hole, setting is used in described tie up in laminate In the multiple through-holes locked to the clamping body that multiple conducting wires are fixed, and it is arranged on the assembly platform for controlling System ties up the third switch of telescopic rod.
6. fuse downlead assembling device as claimed in claim 5, it is characterised in that:The auxiliary positioning mechanism includes setting The second conducting wire grip block on the assembly platform is set, the second gripping block in the second conducting wire grip block side is set, It is arranged on the second conducting wire grip block and compresses telescopic rod with matched second conducting wire of second gripping block, setting exists Second conducting wire compress telescopic rod front end and with matched second compact heap of second gripping block, and be arranged described The 4th switch of telescopic rod is compressed on assembly platform for controlling the second conducting wire.
7. fuse downlead assembling device as claimed in claim 6, it is characterised in that:In second gripping block setting with The matched limiting slot of second compact heap.
CN201820601362.XU 2018-04-25 2018-04-25 A kind of fuse downlead assembling device Active CN208077895U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820601362.XU CN208077895U (en) 2018-04-25 2018-04-25 A kind of fuse downlead assembling device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820601362.XU CN208077895U (en) 2018-04-25 2018-04-25 A kind of fuse downlead assembling device

Publications (1)

Publication Number Publication Date
CN208077895U true CN208077895U (en) 2018-11-09

Family

ID=64044754

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820601362.XU Active CN208077895U (en) 2018-04-25 2018-04-25 A kind of fuse downlead assembling device

Country Status (1)

Country Link
CN (1) CN208077895U (en)

Similar Documents

Publication Publication Date Title
CN207181455U (en) A kind of high-tension transformer tests short jumper device
CN205996075U (en) A kind of electric wire cutting machine being easy to fixing cable
CN206332196U (en) Electric power overhaul termination
CN208077895U (en) A kind of fuse downlead assembling device
CN205429380U (en) Experimental short termination
CN205376812U (en) High voltage electricity joins in marriage electrified live wire device of taking of different current potential of net
CN209266601U (en) The fast wiring clip and insulation gripper clamp of low-voltage live line work
CN203672921U (en) End screen wiring device especially for transformer bushing dielectric loss testing
CN206811023U (en) A kind of power iron fitting punching stripper
CN207368245U (en) A kind of wiring units
CN215701173U (en) Wire harness positioning mechanism
CN206259668U (en) A kind of wire junction box
CN109524809A (en) The fast wiring clip and insulation gripper clamp and operating method of low-voltage live line work
CN205655079U (en) Electric power meter reading frame
CN213989583U (en) Female insulating guard plate of arranging convenient to installation
CN205790454U (en) Portable anchor support Special grounding wire
CN207082708U (en) DTU line loss terminal current automatic crimping structures
CN207165779U (en) A kind of 10KV is equipped with patch structure
CN207098483U (en) A kind of cord grip of electrically cabinet
CN2363409Y (en) Portable short grounding wire clamp
CN2317574Y (en) Insulating sealing lead wire device
CN206379495U (en) The firm overhead jointing clamp of clamping
CN207052928U (en) It is a kind of to divide core apparatus for the automatic of twin conductor
CN2371710Y (en) Portable short circuit grounding wire clamping device
CN203179329U (en) Tension-resistance-rod live working training apparatus

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant