CN208075101U - Changed into switchhouse heating radiator pipeline and valve - Google Patents
Changed into switchhouse heating radiator pipeline and valve Download PDFInfo
- Publication number
- CN208075101U CN208075101U CN201820292640.8U CN201820292640U CN208075101U CN 208075101 U CN208075101 U CN 208075101U CN 201820292640 U CN201820292640 U CN 201820292640U CN 208075101 U CN208075101 U CN 208075101U
- Authority
- CN
- China
- Prior art keywords
- valve
- radiator
- steel pipe
- steel
- pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Steam Or Hot-Water Central Heating Systems (AREA)
Abstract
The utility model provides a kind of changed into switchhouse heating radiator pipeline and valve, it includes radiator, water supply steel pipe and return water steel pipe are connected on the radiator, the steel pipe extends to outside electrical house, and it is equipped with shut-off valve on the steel pipe outside electrical house and steel moulds crossover sub, steel modeling crossover sub continues connection PPR pipe and extends to below flooring.The utility model heating system uses Lower Pleistocene series, and most of pipeline buried-pipe laying, the influence to indoor environment is small.Steel modeling conversion connects, various valve members are both placed in non-electrical room, prevents influence of the pipe fitting junction drainage to electric room.Air bleeding valve is arranged on standpipe can save the tubing that radiator exhaust is connected to adjacent room's setting air bleeding valve prolongation.
Description
Technical field
The utility model is related to design of heating system field, specifically a kind of changed into switchhouse heating radiator pipeline and
Valve.
Background technology
Nowadays along with the rapid development of capital construction industry and the progress of science and technology, intelligent building is gradually general
And.At the same time, the electric room in building is also more and more.Once electric room, which is damaged, to work, gently then influence
People normally live, order of handling official business.It is heavy then huge economic asset is caused to lose, or even if fire protection control room is damaged
Evil, the life security of possible entail dangers to personnel.Hot water system has operational management simple, and maintenance cost is low, and heating effect is good
The advantages that become current most important heating system, but also generally existing the phenomenon that hot water system run, drip, leak.How
Hot water system is used in electric room, and is prevented the phenomenon that there are hot water system run, drip, leak for electric room,
It is the main problem needed to pay attention to when system designs.
Invention content
The utility model in order to make up for the deficiencies of the prior art, provides a kind of changed into switchhouse heating radiator pipeline and valve
Door to solve to use hot water system in electric room, and prevent in electric room there are hot water systems to run, emit, drip,
The problem of leakage.
The technical solution of the utility model is:It includes radiator, and water supply steel pipe and return water are connected on the radiator
Steel pipe, the steel pipe extend to outside electrical house, and shut-off valve and steel modeling crossover sub, steel are equipped on the steel pipe outside electrical house
Modeling crossover sub continues connection PPR pipe and extends to below flooring.It is additionally provided with air bleeding valve on the steel pipe.The radiator with
Steel pipe is connected using welding manner.The radiator is light calandria heat radiator.
The utility model has the advantage of:The utility model heating system uses Lower Pleistocene series, and most of pipeline is buried to be applied
If the influence to indoor environment is small.Steel modeling conversion connects, various valve members are both placed in non-electrical room, prevents pipe fitting junction
Influence of the drainage to electric room.Pipeline in electric room uses welding connecting mode, prevents silk and connect easily leak occur
Phenomenon.Air bleeding valve is arranged on standpipe can save the tubing that radiator exhaust is connected to adjacent room's setting air bleeding valve prolongation.
Description of the drawings
FIG. 1 is a schematic structural view of the utility model.
1 is radiator in figure, and 2 be water supply steel pipe, and 3 be return water steel pipe, and 4 be air bleeding valve, and 5 be shut-off valve, and 6 be steel modeling conversion
Connector, 7 be PPR pipe.
Specific implementation mode
As shown in Figure 1, the utility model provides a kind of changed into switchhouse heating radiator pipeline and valve, it includes heat dissipation
Device (1) is connected with water supply steel pipe (2) and return water steel pipe (3) on the radiator (1), and the steel pipe (2,3) extends to electrical house
Outside, shut-off valve (5) and steel modeling crossover sub (6) are equipped on the steel pipe (2,3) and outside electrical house, steel moulds crossover sub (6)
Continue connection PPR pipe (7) to extend to below flooring.It is additionally provided with air bleeding valve (4) on the steel pipe (2,3).The radiator
(1) it is connect using welding manner with steel pipe (2,3).The radiator (1) is light calandria heat radiator.
In actual use, the utility model moves to steel modeling crossover sub in the non-electrical room of electric room adjacent room.It adopts
Heating system is exhausted using standpipe, and air bleeding valve and shut-off valve are likewise provided in the non-electrical room of electric room adjacent room, meanwhile,
Buried pipeline uses plastic tube, bright pipe to can be used welded still pipe, and radiator model selects light calandria heat radiator, in electric room
All pipeline connection types should be used and are welded to connect, and any valve must not be arranged in electric room.The prior art compares this practicality
Novel advantageous effect is, heating system uses Lower Pleistocene series, most of pipeline buried-pipe laying, and the influence to indoor environment is small.
Steel modeling conversion connects, various valve members are both placed in non-electrical room, prevents run, drip, leak phenomenon in pipe fitting junction to electrical house
Between influence.Pipeline in electric room uses welding connecting mode, prevents silk and connect easily drainage occur.It is arranged on standpipe
Air bleeding valve can be saved is connected to the tubing that air bleeding valve prolongation is arranged in adjacent room by radiator exhaust.
Claims (4)
1. a kind of changed into switchhouse heating radiator pipeline and valve, it includes radiator, it is characterised in that:Connect on the radiator
It is connected to water supply steel pipe and return water steel pipe, the steel pipe extends to outside electrical house, and cut-off is equipped on the steel pipe outside electrical house
Valve and steel mould crossover sub, and steel modeling crossover sub continues connection PPR pipe and extends to below flooring.
2. changed into switchhouse heating radiator pipeline according to claim 1 and valve, it is characterised in that:On the steel pipe also
Equipped with air bleeding valve.
3. changed into switchhouse heating radiator pipeline according to claim 1 and valve, it is characterised in that:The radiator with
Steel pipe is connected using welding manner.
4. changed into switchhouse heating radiator pipeline according to claim 1 and valve, it is characterised in that:The radiator is
Light calandria heat radiator.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820292640.8U CN208075101U (en) | 2018-03-02 | 2018-03-02 | Changed into switchhouse heating radiator pipeline and valve |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820292640.8U CN208075101U (en) | 2018-03-02 | 2018-03-02 | Changed into switchhouse heating radiator pipeline and valve |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208075101U true CN208075101U (en) | 2018-11-09 |
Family
ID=64039716
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820292640.8U Active CN208075101U (en) | 2018-03-02 | 2018-03-02 | Changed into switchhouse heating radiator pipeline and valve |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208075101U (en) |
-
2018
- 2018-03-02 CN CN201820292640.8U patent/CN208075101U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103216879B (en) | A kind of tunnel heat supply winterization system | |
CN208075101U (en) | Changed into switchhouse heating radiator pipeline and valve | |
CN211881590U (en) | Intelligent childbirth house temperature control system | |
CN103272351B (en) | Interim fire-fighting system in building a building | |
CN204593568U (en) | A kind of transformer station's house heating system based on power transformer loss | |
CN203291426U (en) | Temporary fire extinguishing system for buildings | |
CN104180416A (en) | Winter heating system for temporary buildings of living quarters | |
CN202511358U (en) | High direct connection heating unit for heating | |
CN201884860U (en) | Air surface heat tracing type freeze-proof device | |
CN205014636U (en) | Glass vacuum tube heat collector of can reporting to police | |
CN203989627U (en) | Boiler heating and anti-freezing system for tunnel fire-fighting | |
CN104315582A (en) | Floor-heating floor board system | |
CN208152147U (en) | A kind of municipal works irrigation system constant-pressure water feeding system device | |
CN207382612U (en) | A kind of tunnel in cold area cable duct Heat preservation system | |
CN205897902U (en) | Municipal water supply and industrial waste water heat exchange system based on city utility tunnel | |
CN201795557U (en) | Solar hot water centralized supply system | |
CN204491725U (en) | The non-current water service pipe of a kind of severe cold area roofing antifreeze protection insulation ditch | |
CN206572616U (en) | Heat metering and energy conserving system at times | |
CN205300034U (en) | Horizontal pipe network of single tube hot -well based on shallow geothermal energy can heat pump system | |
CN211290230U (en) | Heating system individual transmission and distribution pipeline component in pipe well and pipe well heating pipeline | |
CN105588177A (en) | Intelligent heat supply monitoring application system based on environment of Internet of Things | |
CN202561874U (en) | Full-automatic dual-channel water heating constant-temperature geothermal system for culturing farm | |
CN203533667U (en) | Comprehensive utilization system having steam heat-preserving and heat-tracing and steam fire protection functions in chemical device | |
CN209978138U (en) | Heat supply system for district central heat supply secondary pipe network | |
CN219208792U (en) | Tunnel water fire-fighting intelligent anti-freezing system based on micro-pressure self-circulation and fixed-point heat supply |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |