CN208073517U - A kind of twisted steel positioning reinforcing device - Google Patents

A kind of twisted steel positioning reinforcing device Download PDF

Info

Publication number
CN208073517U
CN208073517U CN201820186288.XU CN201820186288U CN208073517U CN 208073517 U CN208073517 U CN 208073517U CN 201820186288 U CN201820186288 U CN 201820186288U CN 208073517 U CN208073517 U CN 208073517U
Authority
CN
China
Prior art keywords
steel plate
fixing steel
steelframe
fixing
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820186288.XU
Other languages
Chinese (zh)
Inventor
黄童
李龙喜
姜灵程
白鹏鹏
杨峰
林若晨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC THIRD HARBOR ENGINEERING Co Ltd NANJING BRANCH
CHINA COMMUNICATIONS THIRD NAVIGATIONAL BUREAU 2ND ENGINEERING Co Ltd
Original Assignee
CCCC THIRD HARBOR ENGINEERING Co Ltd NANJING BRANCH
CHINA COMMUNICATIONS THIRD NAVIGATIONAL BUREAU 2ND ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC THIRD HARBOR ENGINEERING Co Ltd NANJING BRANCH, CHINA COMMUNICATIONS THIRD NAVIGATIONAL BUREAU 2ND ENGINEERING Co Ltd filed Critical CCCC THIRD HARBOR ENGINEERING Co Ltd NANJING BRANCH
Priority to CN201820186288.XU priority Critical patent/CN208073517U/en
Application granted granted Critical
Publication of CN208073517U publication Critical patent/CN208073517U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a kind of twisted steel positioning reinforcing devices, and wherein device includes steelframe, fixing steel plate one, fixing steel plate two, fixing steel plate three.Steelframe is in " U-shaped " that side is put;The fixing steel plate one, fixing steel plate two and fixing steel plate three are rectangular slab, two round preformed holes are arranged thereon, fixing steel plate one, fixing steel plate two and fixing steel plate three are sleeved on by round preformed hole on two supporting legs of steelframe.It is completely enclosed that row hole preliminary bracing after leading hole steel arch rack position ensures is accurately positioned when row hole sets up steel arch-shelf after the utility model enables;The utility model convenient material drawing, mounting process is simple, can effectively simplify constructing tunnel difficulty.

Description

A kind of twisted steel positioning reinforcing device
Technical field
The utility model belongs to constructing tunnel apparatus field, and in particular to a kind of twisted steel positioning reinforcing device.
Background technology
In the construction of the multiple-arch tunnel of no mid-board, as shown in Figure 1, the left and right hole supporting construction back of the body patch back of the body, right hole 1(First Row hole)Construction in advance, preliminary bracing steel arch-shelf is closed, and left hole 2(Row hole afterwards)Preliminary bracing steel arch-shelf is not closed, one side Arch springing is welded on right hole preliminary bracing steel arch-shelf, and structure stress is complicated, and Construction control difficulty is big.When construction, rear row hole steel arch Frame needs accurately to be overlapped on leading hole steel arch-shelf, but since Hou Hangdong all takes three benching tunnelling methods to excavate, therefore the row after excavation When the top bar of hole, leading hole steel arch rack position can not be accurately positioned, so in practice of construction, row hole preliminary bracing steel one after another Frame is difficult accurately to connect, and the dislocation of row hole major part arch is more one after another at node, can not be connected by design, after may causing The preliminary bracing of row hole is not closed or false closing, and is only welded in lap-joint between two hole arches, is unable to fully ensure two hole arches Between the reliability that connects, thus row hole stability brings high security risk after giving.
Utility model content
In order to solve the problems, such as that the prior art exists, the main purpose of the utility model is that:A kind of positioning of utility model adds Be fixedly mounted with set enable after row hole set up steel arch-shelf when leading hole steel arch rack position is accurately positioned, make one after another row hole arch according to design Connection, the preliminary bracing of row hole is completely enclosed after guarantee, while enhancing the connection between leading hole and rear row hole steel arch-shelf, improves branch Protection structure stress, the stability in row hole after raising.
To achieve the goals above, the utility model proposes a kind of twisted steel positioning reinforcing devices, including steelframe, positioning steel Plate one, fixing steel plate two, fixing steel plate three;The steelframe is in " U-shaped " that side is put;The fixing steel plate one, two and of fixing steel plate Fixing steel plate three is rectangular slab, and two round preformed holes, fixing steel plate one, fixing steel plate two and fixing steel plate three are arranged thereon It is sleeved on two supporting legs of steelframe by round preformed hole.
Further, the steelframe is welded after being docked by the spiral that two tail portions are right angle bending.
Further, the sealing side of the fixing steel plate one and steelframe is welded and fixed,
Further, it is bending head that the steelframe, which passes through the end of fixing steel plate three,.
Further, the preformed hole inner wall of the fixing steel plate one, fixing steel plate two and fixing steel plate three is welded with steelframe Connect fixation.
A kind of installation method of twisted steel positioning reinforcing device, includes the following steps:
The first step, in Construction in Preparatory Stage, according to the construction location and angle of positioning threads muscle, the steel arch in leading hole Fixing steel plate one and fixing steel plate two is respectively welded in the both sides of frame one;
Second step after the completion of steel arch-shelf one is set up, utilizes the fixing steel plate one and positioning being welded on leading hole steel arch-shelf Preformed hole on steel plate two carries out drill precise holes;
Third walks, and in the upper casing of spiral end point set of composition steelframe, and spiral is squeezed into along drilling, is covered The gap of pipe end and spiral is filled with hot melt adhesive, and steelframe is welded together to form after spiral tail portion is docked;
4th step, heating muff end and the hot melt adhesive in screw-thread steel gap, the casing on twisted steel are removed, leading hole The spiral in Hou Hangdong top bar outline excavations is extended to, steel arch-shelf two is erected in Hou Hangdong;
5th step is arranged fixing steel plate three in side of the steel arch-shelf two far from country rock, spiral is packed into fixing steel plate It is welded and fixed in preformed hole on three, and end is bent.
The utility model has the beneficial effects that:
1, row hole after leading hole steel arch rack position ensures is accurately positioned when row hole sets up steel arch-shelf after the utility model enables Preliminary bracing is completely enclosed;
2, the utility model can enhance the connection between leading hole and rear row hole steel arch-shelf, improve supporting construction stress, The stability in row hole after raising;
3, the utility model convenient material drawing, mounting process is simple, can effectively simplify constructing tunnel difficulty.
Description of the drawings
Fig. 1 is multiple-arch tunnel structural schematic diagram;
Fig. 2 is a kind of twisted steel positioning reinforcing device structural schematic diagram;
Fig. 3 fixing steel plate structural schematic diagrams;
Fig. 4 twisted steels tail portion bent jointing schematic diagram;
Twisted steel bending sketch map at Fig. 5 fixing steel plates three;
Structural schematic diagram when a kind of twisted steel positioning reinforcing devices of Fig. 6 are installed
A kind of twisted steel positioning reinforcing device mounted configuration schematic diagrames of Fig. 7.
In figure:1, leading hole;2, Hou Hangdong;3, steelframe;4, fixing steel plate one;5, fixing steel plate two;6, fixing steel plate three; 7, preformed hole;8, spiral;9, bending head;10, steel arch-shelf one;11, casing;12, steel arch-shelf two;13, country rock.
Specific implementation mode
In order to clearly illustrate the above objects, features, and advantages of the utility model, below in conjunction with the accompanying drawings and specifically Technical solution provided by the utility model is described in detail in embodiment.Other than each embodiment described in this part, this reality It can also be implemented by other different modes with novel, those skilled in the art can be correspondingly improved, deform and replace It changes, therefore the utility model is not limited by specific embodiment disclosed in the part.The scope of protection of the utility model Ying Yiquan Subject to power claim.
As shown in Fig. 2, a kind of twisted steel positioning reinforcing device, including it is steelframe 3, fixing steel plate 1, fixing steel plate 25, fixed Position steel plate 36;Steelframe 3 is in " U-shaped " that side is put.As shown in figure 3, fixing steel plate 1, fixing steel plate 25 and fixing steel plate 36 are equal For rectangular slab, two round preformed holes 7 are set thereon, and fixing steel plate 1, fixing steel plate 25 and fixing steel plate 36 pass through circle Preformed hole 7 is sleeved on two supporting legs of steelframe 3.As shown in figure 4, steelframe 3 is that the spiral 8 that right angle is bent is right by two tail portions It is welded after connecing.As shown in figure 5, the sealing side of fixing steel plate 1 and steelframe 3 is welded and fixed, steelframe 3 passes through fixing steel plate three 6 end is bending head 9.The preformed hole inner wall of fixing steel plate 1, fixing steel plate 25 and fixing steel plate 36 is welded with steelframe 3 Connect fixation.
A kind of installation method of twisted steel positioning reinforcing device, includes the following steps:
The first step, in Construction in Preparatory Stage, according to the construction location and angle of positioning threads muscle, the steel in leading hole 1 The both sides of arch 1 are respectively welded fixing steel plate 1 and fixing steel plate 25, fixing steel plate size be 170mm × 50mm × 10mm's, there are the preformed holes 7 of a diameter of 31mm for the left and right sides.
Second step utilizes one 4 He of fixing steel plate being welded on 1 steel arch-shelf of leading hole after the completion of steel arch-shelf 1 is set up Preformed hole 7 on fixing steel plate 25 carries out drill precise holes to country rock 13.
Third walks, as shown in fig. 6, in the upper casing 11 of 8 end point of spiral set of composition steelframe 3, the outer diameter of casing 11 For 29mm, wall thickness 2mm, and spiral 8 is squeezed into country rock 13, the gap of casing 11 end and spiral 8 along drilling It is filled with hot melt adhesive, screw-thread steel is contaminated when preventing slip casting.It is welded together to form steel after 8 tail portion of spiral is docked Frame 3.
4th step, 11 end of heating muff and the hot melt adhesive in screw-thread steel gap, the casing 11 on twisted steel are removed, first Row hole 1 extends to the spiral 8 in 2 top bar outline excavations of Hou Hangdong, and steel arch-shelf 2 12 is erected in Hou Hangdong 2.
Fixing steel plate 36 is arranged in side of the steel arch-shelf 2 12 far from country rock 13 in 5th step, and it is fixed that spiral 8 is packed into In preformed hole 7 on the steel plate 36 of position, and end is bent, ensures the suitable length of vertical bending part.This practicality after installing It is novel as shown in Figure 7.
The operation principle of the utility model is:The principle for determining straight line using 2 points, it is true by two pieces of fixing steel plates The angle of steel arch-shelf, after extending to the straight line of steel arch-shelf in leading hole using steelframe in row hole, then uses third in fixed leading hole Block fixing steel plate positions, after being eventually found in row hole steel arch-shelf installation site, to standard when row hole sets up steel arch-shelf after enabling Determine the leading hole steel arch rack position in position.

Claims (5)

1. a kind of twisted steel positioning reinforcing device, which is characterized in that including steelframe, fixing steel plate one, fixing steel plate two, positioning steel Plate three;The steelframe is in " U-shaped " that side is put;The fixing steel plate one, fixing steel plate two and fixing steel plate three are rectangular slab, The round preformed hole of upper setting two, fixing steel plate one, fixing steel plate two and fixing steel plate three are sleeved on steelframe by round preformed hole Two supporting legs on.
2. a kind of twisted steel positioning reinforcing device as described in claim 1, which is characterized in that the steelframe is by two tail portions It is welded after the spiral docking of right angle bending.
3. a kind of twisted steel positioning reinforcing device as described in claim 1, which is characterized in that the fixing steel plate one and steelframe Sealing side be welded and fixed.
4. a kind of twisted steel positioning reinforcing device as described in claim 1, which is characterized in that the steelframe passes through fixing steel plate Three end is bending head.
5. a kind of twisted steel positioning reinforcing device as described in claim 1, which is characterized in that the fixing steel plate one, positioning The preformed hole inner wall of steel plate two and fixing steel plate three is welded and fixed with steelframe.
CN201820186288.XU 2018-02-02 2018-02-02 A kind of twisted steel positioning reinforcing device Active CN208073517U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820186288.XU CN208073517U (en) 2018-02-02 2018-02-02 A kind of twisted steel positioning reinforcing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820186288.XU CN208073517U (en) 2018-02-02 2018-02-02 A kind of twisted steel positioning reinforcing device

Publications (1)

Publication Number Publication Date
CN208073517U true CN208073517U (en) 2018-11-09

Family

ID=64036817

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820186288.XU Active CN208073517U (en) 2018-02-02 2018-02-02 A kind of twisted steel positioning reinforcing device

Country Status (1)

Country Link
CN (1) CN208073517U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108222977A (en) * 2018-02-02 2018-06-29 中交三航局第三工程有限公司 A kind of twisted steel positioning reinforcing device and its installation method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108222977A (en) * 2018-02-02 2018-06-29 中交三航局第三工程有限公司 A kind of twisted steel positioning reinforcing device and its installation method
CN108222977B (en) * 2018-02-02 2024-03-22 中交三航局第三工程有限公司 Screw thread rib positioning and reinforcing device and installation method thereof

Similar Documents

Publication Publication Date Title
CN105952474B (en) A kind of large cross-section tunnel confined concrete preliminary bracing rapid constructing method
CN101864963B (en) Large-section loess tunnel construction method
CN103046933B (en) Shield station-crossing tunneling and station parallel construction method
CN104533433B (en) Starting method of small-radius curve tunnel
CN101775988A (en) Construction method for inclined shaft to main tunnel of weak surrounding rock
CN104453930B (en) Tunnel initial lining construction device and method
CN103061771B (en) Second mining mine fully mechanized coal face cuts eye driving and supporting method thereof
CN104389610A (en) Construction method of ultrashort steps crossing operational expressway tunnel
CN109184704B (en) Small clear distance tunnel excavation and middle rock clamping reinforcement technology
CN107013033A (en) A kind of concrete side wall formwork for placing and its construction method
CN103615254B (en) A kind of method that sharp radius curve articulated shield machine starts
CN107575237A (en) A kind of subsurface excavation method is combined the construction method of construction subway station with shield method
CN208073517U (en) A kind of twisted steel positioning reinforcing device
CN205689216U (en) A kind of reinforced combined retaining structure of pipe-plate lining
CN107313787A (en) A kind of tunnel lining trolley end mould and construction method
CN207569332U (en) Mud tube take over auxiliary device after a kind of slurry shield trolley
CN104047607A (en) Construction method for lifting out shield tunneling machine under condition of envelop enclosure
CN108222977A (en) A kind of twisted steel positioning reinforcing device and its installation method
CN108979663A (en) A kind of main structure of subway station construction method using interim middle spacer post support
CN208734343U (en) A kind of station tunnel excavation structure with interim middle spacer post support
CN107387131A (en) A kind of asymmetric trouble hole supporting construction and its construction method
CN107269283A (en) A kind of big cross section tunneling subway station and running tunnel insertion construction method
CN210317313U (en) Split-type spliced model structure for pouring inverted arch and filling of highway tunnel
CN107419720B (en) A kind of construction method for assisting the decentralization of taper pile steel reinforcement cage transverse steel and preparing positioning
CN206071598U (en) Self-propelled for tunnel excavation supporting bores quick-fried chassis

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant