CN208073425U - A kind of setting cementing unit of casing head - Google Patents
A kind of setting cementing unit of casing head Download PDFInfo
- Publication number
- CN208073425U CN208073425U CN201820545711.0U CN201820545711U CN208073425U CN 208073425 U CN208073425 U CN 208073425U CN 201820545711 U CN201820545711 U CN 201820545711U CN 208073425 U CN208073425 U CN 208073425U
- Authority
- CN
- China
- Prior art keywords
- circulation pipeline
- threeway
- valve
- casing head
- cycle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model is related to a kind of setting cementing units of casing head, including casing head, drilling spool, preventer and the slurry conduit being once connected to from bottom to up, and the both sides of drilling spool are connected to kill manifold and choke manifold by the second valve respectively, it is characterised in that:It further include cycle four-way, first circulation pipeline and second circulation pipeline, cycle four-way is connected to two valves up and down of casing head, first circulation pipeline is connected to by the first valve in the left and right sides of cycle four-way respectively with second circulation pipeline, first circulation pipeline and second circulation pipeline are connected to by the first threeway with well cementation valve, it is connected to by the second threeway between kill manifold and the second valve, well cementation valve is connected to the second threeway, first threeway is reducing tee, the large flange port of first threeway is connected to well cementation valve, the small flange port of first threeway is connected to first circulation pipeline and second circulation pipeline respectively.It can solve the problems, such as that pipeloop builds the pressure, suppresses leakage stratum or overflow dangerous situation occurs.
Description
Technical field
The utility model is related to the technical field of casing head well cementation, especially a kind of setting cementing units of casing head.
Background technology
Normal sleeve head needs to implement seat extension before well cementation, in fact by casing head to ensure that smooth seat hangs reliable sealing
Existing annular space sealing.In general, this casing head design side, which is instrument flange, connects pressure gauge, the other side is valve, as water conservancy diversion
Outlet connects pipeloop, since discharge capacity is larger when well cementation, if only lean on a pipeloop can not smooth drain, be also easy to produce well cementation
Back pressure causes to suppress leakage stratum or overflow dangerous situation occurs.
Utility model content
The purpose of this utility model is to provide a kind of overcome the deficiencies in the prior art, one kind simple in structure, easy to use
It can solve the problems, such as that pipeloop builds the pressure, suppresses leakage stratum or occur the setting cementing unit of casing head of overflow dangerous situation.
To achieve the goals above, the technological means that the utility model is taken is:
A kind of setting cementing unit of casing head, including be once connected to from bottom to up casing head, drilling spool, preventer and
The both sides of slurry conduit, drilling spool are connected to kill manifold by the second valve respectively and choke manifold, key are:Further include
Four-way, first circulation pipeline and second circulation pipeline are recycled, cycle four-way is connected to two valves up and down of casing head, and first follows
Endless tube line and second circulation pipeline are connected to by the first valve in the left and right sides of cycle four-way respectively, first circulation pipeline and the
Two pipeloops are connected to by the first threeway with well cementation valve, are led to by the two or three between kill manifold and the second valve
Logical, well cementation valve is connected to the second threeway, and the first threeway is reducing tee, and large flange port and the well cementation valve of the first threeway connect
Logical, the small flange port of the first threeway is connected to first circulation pipeline and second circulation pipeline respectively.
It is both provided with union in the junction of first circulation pipeline, second circulation pipeline and the first threeway.
It is both provided with union flange in first circulation pipeline, second circulation pipeline and the junction of cycle four-way.
The internal diameter of first circulation pipeline and second circulation pipeline is 75mm, and the large flange internal diameter of the first threeway is 103mm, small
Flange inner diameter is 65mm, and 65mm is 2 9/16 inches of conversions as a result, meeting GB/T22513-2013 standards;75mm is 3 inches
Conversion as a result, meeting GB/T22513-2013 standards.
Second valve and the latus rectum of the second threeway are 103mm, and 103mm is 4 inches of conversions as a result, meeting GB/T22513-
2013 standards.
The utility model has the beneficial effects that:Pipeloop can be solved to build the pressure, suppress leakage stratum or overflow dangerous situation occurs and ask
The generation of topic.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model.
Specific implementation mode
The utility model is described further in the following with reference to the drawings and specific embodiments.
Specific embodiment, as shown in Figure 1, a kind of setting cementing unit of casing head, including the set that is once connected to from bottom to up
The both sides of tube head 10, drilling spool 2, preventer 1 and slurry conduit 11, drilling spool 2 are connected to kill-job by the second valve 3 respectively
Manifold 5 and choke manifold 12 further include cycle four-way, first circulation pipeline 9 and second circulation pipeline 13, first circulation pipeline 9
It is made of flexible rubber hose with second circulation pipeline 13, cycle four-way is connected to two valves up and down of casing head 10, first circulation
Pipeline 9 is connected to by the first valve 15 in the left and right sides of cycle four-way, first circulation pipeline 9 respectively with second circulation pipeline 13
It is connected to well cementation valve 6 by the first threeway 7 with second circulation pipeline 13, by the between kill manifold 5 and the second valve 3
Two threeways 4 are connected to, and well cementation valve 6 is connected to the second threeway 4, and the first threeway 7 is reducing tee, the large flange end of the first threeway 7
Mouth is connected to well cementation valve 6, and the small flange port of the first threeway 7 connects with first circulation pipeline 9 and second circulation pipeline 13 respectively
It is logical.
It is both provided with union 8 in the junction of first circulation pipeline 9, second circulation pipeline 13 and the first threeway 7, first
Pipeloop 9, second circulation pipeline 13 and the junction of cycle four-way are both provided with union flange 14,9 He of first circulation pipeline
The internal diameter of second circulation pipeline 13 is 75mm, and the large flange internal diameter of the first threeway 7 is 103mm, and small flange inner diameter is 65mm, second
Valve 3 and the latus rectum of the second threeway 4 are 103mm, and the small flange port for the first threeway 7 that two latus rectums are 65mm converges to latus rectum
The large flange port of 103mm, increased flow capacity can mitigate the pressure of pipeline, avoid building the pressure, and accelerate the speed of mud cycle.
When the utility model is used, first by drilling company drilling well, in kill manifold 5, the second threeway 4 and well cementation valve
After 6 connections, well cementation valve 6 reconnects the first threeway 7, and the first 7 liang of threeway outlet is connected to union flange;The valve of casing head 10 goes out
Mouth is equally connected to union flange, first circulation pipeline 9 and second circulation pipeline 13 will cycle by 8 connecting rod flange 14 of union
Four-way is connected with the valve of casing head 10, and the latus rectum of the second threeway 4 is 103mm, and well cementation valve 6 and the second threeway 4 should be with well heads
Well control device same level same specification.First circulation pipeline 9 and oil resistant, fire resisting, resistance to height that 13 internal diameter of second circulation pipeline is 75mm
Moulding pipe, both sides union 8 match with casing head 10 and 7 union of the first threeway, pressure rank and well control equipment pressure rank
It is same or higher.
Pipeline focuses on the side of kill manifold 5, is grasped to throttling, open flow when avoiding again occurring in wellbore construction overflow dangerous situation
It interferes, shortens the closed-in time, valve 6 of cementing the well in the case of normal drilling well is in long off state, meets overflow dangerous situation and needs to close
It is operated by the closing well program and operating process of each operating mode when well, casing headstock is hung into rear when well cementation, opens well cementation
The cycle four way valve of 10 both sides of valve 6 and casing head can normal circulation well cementation, drilling fluid is via 5 side blowout prevention of kill manifold
1 pipeline of device enters in well head, is returned into cycle filling by mud ditch, once when overflow dangerous situation occurring when well cementation, is grasped by well cementation well control
Make flow i.e. closing well program closing well, if cement mortar returns to ground, cementing truck can be connect in the ball-and-seat of 5 side of kill manifold
Well head is rinsed, first circulation pipeline 9 and second circulation pipeline 13 can together be installed when installing wellhead blowout preventor 1,
It can be installed before well cementation, the clean and tidy of well head can be kept in this way, union connection is very simple and efficient, which does not violate well control
Rule and well control operating process, side valve can be unloaded, load onto instrument flange, pressure gauge after the completion of well cementation.
Claims (5)
1. a kind of setting cementing unit of casing head, including the casing head (10), drilling spool (2), anti-that is once connected to from bottom to up
The both sides of spray apparatus (1) and slurry conduit (11), drilling spool (2) are connected to kill manifold (5) and section by the second valve (3) respectively
Flow tube is converged (12), it is characterised in that:Further include cycle four-way, first circulation pipeline (9) and second circulation pipeline (13), cycle four
Logical to be connected to two valves up and down of casing head (10), first circulation pipeline (9) and second circulation pipeline (13) are respectively by the
In the left and right sides of cycle four-way, first circulation pipeline (9) and second circulation pipeline (13) pass through first for one valve (15) connection
Threeway (7) is connected to well cementation valve (6), is connected to by the second threeway (4) between kill manifold (5) and the second valve (3), Gu
Well valve (6) is connected to the second threeway (4), and the first threeway (7) is reducing tee, the large flange port of the first threeway (7) with it is solid
Well valve (6) is connected to, the small flange port of the first threeway (7) respectively with first circulation pipeline (9) and second circulation pipeline (13)
Connection.
2. the setting cementing unit of a kind of casing head according to claim 1, it is characterised in that:First circulation pipeline (9),
Second circulation pipeline (13) and the junction of the first threeway (7) are both provided with union (8).
3. the setting cementing unit of a kind of casing head according to claim 1, it is characterised in that:First circulation pipeline (9),
Second circulation pipeline (13) and the junction of cycle four-way are both provided with union flange (14).
4. the setting cementing unit of a kind of casing head according to claim 1, it is characterised in that:First circulation pipeline (9) and
The internal diameter of second circulation pipeline (13) is 75mm, and the large flange internal diameter of the first threeway (7) is 103mm, and small flange inner diameter is 65mm.
5. the setting cementing unit of a kind of casing head according to claim 1, it is characterised in that:Second valve (3) and second
The latus rectum of threeway (4) is 103mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820545711.0U CN208073425U (en) | 2018-04-17 | 2018-04-17 | A kind of setting cementing unit of casing head |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820545711.0U CN208073425U (en) | 2018-04-17 | 2018-04-17 | A kind of setting cementing unit of casing head |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208073425U true CN208073425U (en) | 2018-11-09 |
Family
ID=64041714
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820545711.0U Active CN208073425U (en) | 2018-04-17 | 2018-04-17 | A kind of setting cementing unit of casing head |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208073425U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113107472A (en) * | 2021-05-11 | 2021-07-13 | 京鸿石油钻采工程技术有限公司 | Active magnetic distance measuring device and method suitable for well drilling collision prevention |
-
2018
- 2018-04-17 CN CN201820545711.0U patent/CN208073425U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113107472A (en) * | 2021-05-11 | 2021-07-13 | 京鸿石油钻采工程技术有限公司 | Active magnetic distance measuring device and method suitable for well drilling collision prevention |
CN113107472B (en) * | 2021-05-11 | 2022-12-20 | 京鸿石油钻采工程技术有限公司 | Active magnetic distance measuring device and method suitable for well drilling collision prevention |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103352673B (en) | Monocular twin-well surface layer well cementation technology | |
RU2014152035A (en) | METHODS AND SYSTEMS FOR PERFORMING UNDERGROUND WORKS USING THE DOUBLE DRILL PIPE PIPES | |
CN205606060U (en) | With single riser water -drainage tube part of layer installation | |
CN208073425U (en) | A kind of setting cementing unit of casing head | |
CN104963634B (en) | A kind of actuating oil-pumping unit method | |
CN112917660B (en) | Efficient anti-blocking backflow grouting pipe and method | |
CN2893131Y (en) | Sand flushing packer | |
CN209603919U (en) | Not termination of pumping negative pressure sand washing auto Isolator Well Head | |
CN104564105B (en) | A kind of apparatus and method of two grades of sleeve pipes of seat earth grouting and reinforcing | |
CN201068748Y (en) | Horizontal well continue sand-flushing device | |
CN207332828U (en) | A kind of wellhead assembly for shale gas well hydraulic jet pump mining | |
CN205369303U (en) | Prefabricated formula valve well | |
CN211951557U (en) | Low-resistance backflow preventer | |
CN204899977U (en) | A automatic sand removal device of pipeline that is used for tailings to fill thick liquid system that makes | |
CN203716897U (en) | Double-flow mud purification system | |
CN208966223U (en) | A kind of not termination of pumping negative pressure sand washing lost circulation prevention tubing string | |
CN207229045U (en) | A kind of continuous reverse sand flushing device of oil well | |
CN208966733U (en) | A kind of siphon pumping equipment | |
CN208981989U (en) | Gas-lift reverses circulation device | |
CN207017367U (en) | A kind of Homofloor drainage system | |
CN102287157A (en) | Multifunctional well-killing open flow manifold | |
CN206157851U (en) | Toilet bowl water conservation siphon | |
CN207348840U (en) | A kind of fast-connecting type thick oil well controls device of air automatically | |
CN205954816U (en) | Integral type sewage lifting mechanism | |
CN206635894U (en) | A kind of hydraulic type sewer dredging device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |