CN208072688U - A kind of novel earthquake-proof steel construction - Google Patents

A kind of novel earthquake-proof steel construction Download PDF

Info

Publication number
CN208072688U
CN208072688U CN201820542188.6U CN201820542188U CN208072688U CN 208072688 U CN208072688 U CN 208072688U CN 201820542188 U CN201820542188 U CN 201820542188U CN 208072688 U CN208072688 U CN 208072688U
Authority
CN
China
Prior art keywords
plate body
shock structure
steel construction
proof steel
telescopic mast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820542188.6U
Other languages
Chinese (zh)
Inventor
杨正迎
刘德安
唐斌
朱跃军
喻钻科
周立军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Shengshi Suntech Construction Engineering Co Ltd
Original Assignee
Hunan Shengshi Suntech Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Shengshi Suntech Construction Engineering Co Ltd filed Critical Hunan Shengshi Suntech Construction Engineering Co Ltd
Priority to CN201820542188.6U priority Critical patent/CN208072688U/en
Application granted granted Critical
Publication of CN208072688U publication Critical patent/CN208072688U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of novel earthquake-proof steel constructions, including shock structure, the surface of the shock structure offers card hole, shock absorption buffering mechanism is both provided in shock structure at the top and bottom of card hole, shock absorption buffering mechanism includes the first plate body, first plate body is fixedly connected with shock structure, the both ends of the upper surface of first plate body are symmetrically arranged with telescopic mast, the second plate body is installed at the top of telescopic mast, the outside of telescopic mast is socketed with compressed spring, and the upper surface of the first plate body is symmetrical arranged that there are two blocks.The novel earthquake-proof steel construction, play the role of antidetonation, the setting of telescopic mast plays the role of flexible limit, and the setting of compressed spring plays the role of buffering, the setting of connector sleeve, connecting rod and extruding spring plays the role of flexible and limits, play the role of buffering and antidetonation, the setting of screw facilitates the connection of the first plate body and shock structure, the novel earthquake-proof steel construction, good damping effect, shock resistance is good, and reasonable design is highly practical.

Description

A kind of novel earthquake-proof steel construction
Technical field
The utility model is related to steel structure technology field, specially a kind of novel earthquake-proof steel construction.
Background technology
The structure that steel construction is made of steel material is one of main building construction types.Structure is mainly by shaped steel With the components such as girder steel, steel column, steel truss composition made of steel plate etc., and using silanization, pure manganese phosphatization, washing drying, zinc-plated Equal derusting rust-proofings technique.Generally use weld seam, bolt or rivet interlacement between each component or component.Because its dead weight is lighter, and apply Work is easy, is widely used in the fields such as large-sized workshop, venue, Super High.
The damping effect of present steel construction is bad, and abundant excavation, shock resistance is not yet received in the potentiality of steel structure system Difference, therefore, it is divination by means of the milfoil technical problem to be solved to work out a kind of new steel structure system that shock resistance is high.
Utility model content
(1) the technical issues of solving
In view of the deficiencies of the prior art, the utility model provides a kind of novel earthquake-proof steel construction, solves above-mentioned background The problem of proposed in technology.
(2) technical solution
To achieve the above object, the utility model provides the following technical solutions:A kind of novel earthquake-proof steel construction, including damping Column, the surface of the shock structure offer card hole, and damping, buffering dress is both provided at the top and bottom of card hole in the shock structure Set, the shock absorption buffering mechanism includes the first plate body, and first plate body is fixedly connected with shock structure, first plate body it is upper The both ends on surface are symmetrically arranged with telescopic mast, and the second plate body is installed at the top of the telescopic mast, the telescopic mast Outside is socketed with compressed spring, and the upper surface of first plate body is symmetrical arranged that there are two block, the tops of two blocks It is connected with connector sleeve, the connector sleeve is internally provided with connecting rod, consolidates at the center of second plate body lower surface Dingan County is equipped with connecting pole, and one end of the connecting rod passes through connector sleeve and extends to the outside of connector sleeve and the side of connecting pole and lives Dynamic connection, the connector sleeve are internally provided with extruding spring, and described one end for squeezing spring is located at connecting rod in connector sleeve The end thereof contacts in portion.
Preferably, the both ends of second plate body are installed with connecting plate, and the outside of described connecting plate one end is socketed with set Tin, it is installed with buffer spring, one end of the buffer spring and the end thereof contacts of connecting plate on the side wall of the barrel bore.
Preferably, the side of the sleeve is connected with pulley, and the pulley is contacted with the inner wall of shock structure.
Preferably, the both ends of first plate body are fixedly connected by screw with shock structure.
Preferably, the telescopic mast includes the first tube body and the second tube body, one end of the first tube body pass through the second tube body and The inside of the second tube body is extended to, the first tube body is flexibly connected with the second tube body.
(3) advantageous effect
The utility model provides a kind of novel earthquake-proof steel construction.Has following advantageous effect:
The novel earthquake-proof steel construction passes through shock absorption buffering mechanism, the first plate body, telescopic mast, compressed spring, block, connection The setting of set, connecting rod, extruding spring, connecting pole, the second plate body, connecting plate, sleeve, buffer spring, pulley and screw reaches The effect of bumper and absorbing shock plays the role of antidetonation, and the setting of telescopic mast plays the role of flexible limit, and compressed spring is set It sets and plays the role of buffering, the setting of connector sleeve, connecting rod and extruding spring plays the role of flexible and limits, and plays The effect of buffering and antidetonation, the setting of screw facilitate the connection of the first plate body and shock structure, the novel earthquake-proof steel construction, damping Effect is good, and shock resistance is good, and reasonable design is highly practical.
Description of the drawings
Fig. 1 is the utility model structure front view;
Fig. 2 is the front view of the utility model structural damping buffer unit;
Fig. 3 is partial enlarged view at the A of the utility model structure chart 2.
In figure:1 shock structure, 2 card holes, 3 shock absorption buffering mechanisms, 301 first plate bodys, 302 telescopic masts, 303 compressed springs, 304 blocks, 305 connector sleeves, 306 connecting rods, 307 squeeze springs, 308 connecting poles, 309 second plate bodys, 310 connecting plates, 311 sets Cylinder, 312 buffer springs, 313 pulleys, 4 screws.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work The every other embodiment obtained, shall fall within the protection scope of the present invention.
As shown in Figs. 1-3, the utility model provides a kind of technical solution:A kind of novel earthquake-proof steel construction, including shock structure 1, the surface of the shock structure 1 offers card hole 2, and the top and bottom of card hole 2 are both provided with damping, buffering in the shock structure 1 Device 3, the shock absorption buffering mechanism 3 include the first plate body 301, and first plate body 301 is fixedly connected with shock structure 1, described The both ends of the upper surface of first plate body 301 are symmetrically arranged with telescopic mast 302, and the setting of telescopic mast 302 plays flexible and limit The effect of position, the top of the telescopic mast 302 are installed with the second plate body 309, and the outside of the telescopic mast 302 is socketed with pressure Contracting spring 303, compressed spring 303 have compressibility, compressed spring 303 have the function of reset, first plate body 301 it is upper Surface is arranged symmetrically, and there are two blocks 304, and the top of two blocks 304 is connected with connector sleeve 305, the connection Set 305 is internally provided with connecting rod 306, and connecting pole 308 is installed at the center of 309 lower surface of the second plate body, One end of the connecting rod 306 passes through connector sleeve 305 and extends to the outside of connector sleeve 305 and the side activity of connecting pole 308 Connection, being internally provided with for the connector sleeve 305 squeeze spring 307, described one end for squeezing spring 307 and connecting rod 306 End thereof contacts inside connector sleeve 305, squeezing spring 307 has compressibility, and squeezing spring 307 has the function of resetting.
Specifically, the both ends of second plate body 309 are installed with connecting plate 310,310 one end of the connecting plate it is outer Portion is socketed with sleeve 311, and buffer spring 312, the buffer spring 312 are installed on the side wall of 311 inner cavity of the sleeve One end and connecting plate 310 end thereof contacts, buffer spring 312 has the function of compressibility and reset.
Specifically, the side of the sleeve 311 is connected with pulley 313, the pulley 313 is interior with shock structure 1 Wall contacts, and the setting of pulley 313 facilitates the second plate body 309 and moved on shock structure 1.
Specifically, the both ends of first plate body 301 are fixedly connected by screw 4 with shock structure 1, screw 4 is set Set the installation and removal for facilitating the first plate body 301.
Specifically, the telescopic mast 302 includes the first tube body and the second tube body, one end of the first tube body passes through the second pipe Body and the inside for extending to the second tube body, the first tube body are flexibly connected with the second tube body, the setting of the first tube body and the second tube body Play the role of flexible and limits.
It can to sum up obtain, the novel earthquake-proof steel construction, pass through shock absorption buffering mechanism 3, the first plate body 301, telescopic mast 302, pressure Contracting spring 303, connector sleeve 305, connecting rod 306, squeezes spring 307, connecting pole 308, the second plate body 309, connecting plate at block 304 310, the setting of sleeve 311, buffer spring 312, pulley 313 and screw 4 has achieved the effect that bumper and absorbing shock, plays antidetonation The setting of effect, telescopic mast 302 plays the role of flexible limit, and the setting of compressed spring 303 plays the role of buffering, even It female connector 305, connecting rod 306 and squeezes the setting of spring 307 and plays the role of flexible and limit, play buffering and antidetonation Effect, the setting of screw 4 facilitate the connection of the first plate body 301 and shock structure 1, the novel earthquake-proof steel construction, good damping effect, Shock resistance is good, and reasonable design is highly practical.
It should be noted that herein, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also include other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that There is also other identical elements in process, method, article or equipment including the element.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is appreciated that can these embodiments be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof, it should be noted that this article The electric elements of middle appearance are electrically connected with extraneous main controller and 220V alternating currents, and main controller can be that computer etc. plays control The conventionally known equipment of system.

Claims (5)

1. a kind of novel earthquake-proof steel construction, including shock structure (1), it is characterised in that:The surface of the shock structure (1) offers card Hole (2) is both provided with shock absorption buffering mechanism (3), the damping, buffering at the top and bottom of the interior card hole of the shock structure (1) (2) Device (3) includes the first plate body (301), and first plate body (301) is fixedly connected with shock structure (1), first plate body (301) both ends of upper surface are symmetrically arranged with telescopic mast (302), and is installed at the top of the telescopic mast (302) The outside of two plate bodys (309), the telescopic mast (302) is socketed with compressed spring (303), the upper table of first plate body (301) Face is symmetrically arranged with two blocks (304), and the top of two blocks (304) is connected with connector sleeve (305), described Connector sleeve (305) is internally provided with connecting rod (306), is installed at the center of the second plate body (309) lower surface One end of connecting pole (308), the connecting rod (306) passes through connector sleeve (305) and extends to outside and the company of connector sleeve (305) The side flexible connection of column (308) is connect, being internally provided with for the connector sleeve (305) squeezes spring (307), the extruding spring (307) one end is located at the internal end thereof contacts of connector sleeve (305) with connecting rod (306).
2. a kind of novel earthquake-proof steel construction according to claim 1, it is characterised in that:The two of second plate body (309) End is installed with connecting plate (310), and the outside of described connecting plate (310) one end is socketed with sleeve (311), the sleeve (311) Buffer spring (312), one end of one end and connecting plate (310) of the buffer spring (312) are installed on the side wall of inner cavity Contact.
3. a kind of novel earthquake-proof steel construction according to claim 2, it is characterised in that:It lives the side of the sleeve (311) Dynamic to be connected with pulley (313), the pulley (313) contacts with the inner wall of shock structure (1).
4. a kind of novel earthquake-proof steel construction according to claim 1, it is characterised in that:The two of first plate body (301) End is fixedly connected by screw (4) with shock structure (1).
5. a kind of novel earthquake-proof steel construction according to claim 1, it is characterised in that:The telescopic mast (302) includes the One tube body and the second tube body, one end of the first tube body pass through the second tube body and extend to the inside of the second tube body, the first tube body with Second tube body is flexibly connected.
CN201820542188.6U 2018-04-17 2018-04-17 A kind of novel earthquake-proof steel construction Expired - Fee Related CN208072688U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820542188.6U CN208072688U (en) 2018-04-17 2018-04-17 A kind of novel earthquake-proof steel construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820542188.6U CN208072688U (en) 2018-04-17 2018-04-17 A kind of novel earthquake-proof steel construction

Publications (1)

Publication Number Publication Date
CN208072688U true CN208072688U (en) 2018-11-09

Family

ID=64041987

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820542188.6U Expired - Fee Related CN208072688U (en) 2018-04-17 2018-04-17 A kind of novel earthquake-proof steel construction

Country Status (1)

Country Link
CN (1) CN208072688U (en)

Similar Documents

Publication Publication Date Title
CN206545167U (en) A kind of expansion joint device for steel plate built-up bridge
CN209555759U (en) A kind of shock mount of road and bridge good damping effect
CN208072688U (en) A kind of novel earthquake-proof steel construction
CN207960131U (en) A kind of cylindrical column Quick installation equipment
CN207381223U (en) A kind of dry type amorphous transformer being easily installed
CN206457955U (en) A kind of oblique close rib composite wall board structure
CN210507796U (en) Convenient connecting piece of beam body
CN203487632U (en) Multipurpose frame component
CN208396009U (en) A kind of steel structure connection component being easily installed connection
CN109218569A (en) A kind of intelligent video camera head being easily installed
CN207838074U (en) A kind of hand propelled fire extinguisher
CN208012963U (en) A kind of steel construction resistance to compression detection device
CN207620112U (en) A kind of mounting structure of U-shaped glass architecture body
CN209384693U (en) A kind of structure node reinforced for solder sphere rod member for grid
CN207609966U (en) A kind of construction tripod being easily installed
CN207425478U (en) A kind of copper wire reducing mechanism of waste and old cable
CN205928542U (en) Insulating glass steel strutting arrangement of high strength
CN207334167U (en) A kind of communication engineering fixed support device
CN208309868U (en) A kind of buckling restrained brace device
CN207453111U (en) A kind of function with the support of Self-resetting armpit can recover steel-frame structure
CN208455856U (en) A kind of steel construction damping device
CN206090825U (en) Steel construction girder steel connection structure
CN209508806U (en) A kind of anchor of bridge expanssion joint
CN205655092U (en) High strength steel board
CN215519887U (en) Novel folding high strength scaffold

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181109

Termination date: 20210417

CF01 Termination of patent right due to non-payment of annual fee