CN208072326U - A kind of pressure free current is to pressure flow fluidised form conversion facility - Google Patents

A kind of pressure free current is to pressure flow fluidised form conversion facility Download PDF

Info

Publication number
CN208072326U
CN208072326U CN201820351412.3U CN201820351412U CN208072326U CN 208072326 U CN208072326 U CN 208072326U CN 201820351412 U CN201820351412 U CN 201820351412U CN 208072326 U CN208072326 U CN 208072326U
Authority
CN
China
Prior art keywords
pond
section
diffuser
pressure
flow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820351412.3U
Other languages
Chinese (zh)
Inventor
吴换营
董立红
宁金钢
刘际军
穆迅
韩县刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Water Planning Survey and Design Co., Ltd
Original Assignee
TIANJIN WATER RESOURCES SURVEY AND DESIGN INSTITUTE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN WATER RESOURCES SURVEY AND DESIGN INSTITUTE filed Critical TIANJIN WATER RESOURCES SURVEY AND DESIGN INSTITUTE
Priority to CN201820351412.3U priority Critical patent/CN208072326U/en
Application granted granted Critical
Publication of CN208072326U publication Critical patent/CN208072326U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of pressure free current to pressure flow fluidised form conversion facility, including is sequentially connected upstream linkage section, diffuser, slope section, pond figure and the downstream connection section of setting;Diffuser includes preceding diffuser and rear diffuser, has overflow ducts on preceding diffuser side wall;Afterwards diversion pier is provided in diffuser, there is middle dividing pier respectively in slope section and pond figure, diversion pier, the arrangement connection of middle dividing pier linear state make to enter water in rear diffuser and are flowed into slope section from three water stream channels and have entered pressure pipe culvert after entering downstream connection section after the figure of pond;Wave absorption beam is arranged in the rear slopes section of slope section and the pond body leading portion of pond figure;Equal discharge orifice is arranged at the lower part of the Dun Bi of the middle dividing pier in the body leading portion of pond;Wave absorption breastwork is arranged at intersegmental top behind for pond body leading portion and pond.The utility model realizes the automatic equalization of flow between each hole of smooth transition and downstream under the different operating modes such as normal operation in water delivery engineering, engineering maintenance, wrong hole operation between two kinds of fluidised forms of pressure free current and pressure flow.

Description

A kind of pressure free current is to pressure flow fluidised form conversion facility
Technical field
The utility model is specifically related to a kind of pressure free current to pressure flow fluidised form conversion facility.
Background technology
With industrialization, the quickening of urbanization process, water resource has become North China, the Northwest's economic development, city are built If important conditionality factor.To solve the problems, such as urban water supply, long distance water transfer project is increasing, the diversion works master of early stage Will with using natural river course or excavate the special channel of water delivery free flow water delivery based on, as Diversion Project from Luanhe to Tianjin, WTYQ project, Tianjin is emergent to draw yellow water diversion project etc..With China's expanding economy, problem of environmental pollution is very prominent, therefore to prevent water Matter pollution, guarantee, urban water supply engineering gradually develop into based on long range pipe culvert, and such as Dong-Shen water supply project draws Huang Ji too engineering, closed conduit engineering etc. of diverting Luanhe water to Tianjin, water-carriage mode includes no ballast power water delivery, have the water delivery of ballast power, pressurization water delivery, Gravity and pressurization combination water delivery etc..
The change for situations such as general long distance water transfer is with terrain, frictional head loss, shunting, water-carriage mode can be sent out Changing, pipe culvert caliber and hole count are also required to accordingly adjust.Water delivery pattern is also managed by water delivery flow, terrain feature, operation The influence of reason and construction investment is few frequently with hole count, area of passage is small in the location that topography is steep, drop is big, head is abundant Free flow water conveyer mode;Topography is flat, drop is small, pressure flow water delivery is generally adopted in the limited location of head, commonly use that hole count is more, mistake The patterns such as the big box culvert of flow area or pipeline.Therefore, it needs that pressure free current and pressure flow is arranged between pressure free current and pressure flow Conversion, transition facility, to realize that the smooth-going of two kinds of fluidised forms is connected;While in order to ensure the safety guarantee rate of water delivery engineering, water delivery Pipe culvert hole count is generally no less than holes, the equilibrium of flow, stream between thus needing conversion facility that can realize different hole count lower opening The smooth transition of state, it is particularly problematic in engineering maintenance, wrong hole operating condition, it should more be protected.
Utility model content
The purpose of this utility model is to be directed to technological deficiency existing in the prior art, and provide a kind of pressure free current to there is pressure Flow fluidised form conversion facility.
Technical solution is used by realize the purpose of this utility model:
A kind of pressure free current is to pressure flow fluidised form conversion facility, including is sequentially connected the upstream linkage section of setting, diffuser, tiltedly Slope section, pond figure and downstream connection section;
The upstream linkage section is two pore structures, includes for connecting the upstream transition and be located at upstream that non pressure pipe is contained The maintenance lockage chamber in transition downstream;The maintenance lockage chamber connects diffuser;
The diffuser includes preceding diffuser and rear diffuser, has overflow ducts on the side wall of the preceding diffuser;
Multiple diversion piers are provided in diffuser after described, are respectively arranged in slope section in the slope section and pond figure Dividing pier in dividing pier, pond figure, dividing pier is sequentially connected and linear state cloth in dividing pier, pond figure in the diversion pier, slope section Set, multiple diversion piers along water (flow) direction straight line arrangement will be divided into three water stream channels in rear diffuser, make enter it is described after Water in diffuser is flowed into slope section from three water stream channels and enters downstream connection section after flowing through pond figure, and described in passing through Downstream connection section has entered pressure pipe culvert;
The slope section includes preceding slope section, middle slope section and rear slopes section;The pond figure include pond body leading portion and Pond section behind;The lower part of the Dun Bi of dividing pier, which is formed with, in pond figure in the pond body leading portion multiple has homogenizing traffic engineering capability Equal discharge orifice;Top is provided with stationary flow fluidised form and eliminates the work(of flow aeration between section behind for the pond body leading portion and pond The wave absorption breastwork of energy;
It is respectively arranged in the rear slopes section and pond body leading portion multiple spaced horizontally disposed with elimination face The top of the dividing pier in corresponding is arranged in the wave absorption beam of wave energy, the wave absorption beam.
The upstream gradual change segment length 11.5m of the upstream linkage section is 4.4m × 4.5m cast-in-place concrete casees of two pore structures Contain, bottom plate crest level 23.54m;The maintenance lockage chamber long 15m of the upstream linkage section, wide 11.7m, two pore structure of open type, single hole Clear span 4.4m.
The diffuser overall length 35m, import overall width 9.7m, export overall width 17.2m, and angle of flare is 6.11 degree;Wherein, Preceding diffusion segment length 15m is single hole rectangular channel, and the outlet clear span of preceding diffuser is 12.92m;Segment length 20m is spread afterwards, passes through setting Multiple diversion pier formation widths be 5.0m three hole rectangular channels.
The slope segment length 55.93m is three pore structures, and single hole clear span 5.0m, slope slope ratio is 1:7, bottom plate crest level by 23.54m gradual changes are to pond body bottom plate crest level 15.55m.
The long 40.0m of pond figure, wherein segment length 22.0m before the body of pond, segment length 18.0m, three pore structures, single hole are net behind in pond Wide 5.0m.
The equal discharge orifice is three, the single hole wide 1.5m, high 4.5m of equal discharge orifice.
The pond body leading portion downstream is equipped with down-the-hole type and overhauls lock, has pressure box culvert to overhaul downstream.
The downstream connection segment length 18.0m is three hole concrete box culverts, and box culvert aperture is along water (flow) direction from 5.0m × 4.4m Gradual change has the pressure pipe to contain drop-over to 4.4m × 4.4m, with downstream.
The utility model realizes under the different operating modes such as normal operation in water delivery engineering, engineering maintenance, wrong hole operation without pressure The automatic equalization of flow, greatlies simplify the tune of engineering between each hole of smooth transition and downstream between stream and two kinds of fluidised forms of pressure flow Degree operation, reduces construction investment.
Description of the drawings
Fig. 1 is planar structure schematic diagram of the pressure free current to pressure flow fluidised form conversion facility;
Fig. 2 is cross-sectional view of the pressure free current to pressure flow fluidised form conversion facility;
Fig. 3 is fluidised form floor map of the pressure free current under big flow to pressure flow fluidised form conversion facility;
Fig. 4 is fluidised form diagrammatic cross-section of the pressure free current under big flow to pressure flow fluidised form conversion facility;
Fig. 5 is fluidised form floor map of the pressure free current under small flow to pressure flow fluidised form conversion facility;
Fig. 6 is fluidised form diagrammatic cross-section of the pressure free current under small flow to pressure flow fluidised form conversion facility;
Fig. 7 is fluidised form floor map of the pressure free current under the small flow in wrong hole to pressure flow fluidised form conversion facility;
Fig. 8 is fluidised form diagrammatic cross-section of the pressure free current under the small flow in wrong hole to pressure flow fluidised form conversion facility;
Fig. 9 is the arrangement schematic diagram of equal discharge orifice;
Figure 10 is the structural schematic diagram of the pier nose of diversion pier.
Specific implementation mode
The utility model is described in further detail below in conjunction with the drawings and specific embodiments.It should be appreciated that this place The specific embodiment of description is only used to explain the utility model, is not used to limit the utility model.
Referring to shown in Fig. 1-10, a kind of pressure free current is to pressure flow fluidised form conversion facility, including is sequentially connected the upstream of setting Linkage section 1, diffuser 2, slope section 3, pond figure 4 and downstream connection section 5;
The upstream linkage section 1 is two pore structures, includes for connecting the upstream transition 11 and be located at that non pressure pipe is contained The maintenance lockage chamber 12 in upstream transition downstream;The maintenance lockage chamber connects diffuser;
Wherein, it is equipped with maintenance lock 13 in the maintenance lockage chamber, dividing pier 14 is formed in the upstream linkage section 1, it will be described Form holes structure to 1 inner homogeneous of upstream linkage section;
The diffuser includes preceding diffuser 21 and rear diffuser 22, has overflow logical on the side wall of the preceding diffuser respectively Road 23;
The diversion pier 24 that multiple ends form cusp-shaped, the slope section and pond figure are provided with after described in diffuser 22 Inside it is respectively arranged with dividing pier 35 in slope section, dividing pier 44 in the figure of pond, dividing pier, pond figure interval in the diversion pier, slope section Pier is sequentially connected and linear state arrangement, and multiple diversion piers will be divided into three along water (flow) direction straight line arrangement in rear diffuser A water stream channel or duct make to enter water body in the rear diffuser and are flowed into slope section from three water stream channels and flow through pond Enter downstream connection section after figure, and pressure pipe culvert has been entered through the downstream connection section, there is pressure pipe to contain and the downstream connection The outlet of section is connected;
The slope section includes preceding slope section 31, middle slope section 32 and rear slopes section 33;The pond figure includes Chi Shenqian Section 41 and pond section 42 behind;The lower part of the Dun Bi of dividing pier is formed with multiple with homogenizing in pond figure in the pond body leading portion The equal discharge orifice 46 of traffic engineering capability;Top is provided with stationary flow fluidised form and elimination between section behind for the pond body leading portion and pond The wave absorption breastwork 45 of the function of flow aeration;
It is respectively arranged in the rear slopes section and pond body leading portion multiple spaced horizontally disposed with elimination face The wave absorption beam of wave energy, includes the wave absorption beam 47 of the wave absorption beam 34 of rear slopes section and pond body leading portion, and the rear slopes section disappears The top of the dividing pier in corresponding is arranged in the wave absorption beam 47 of wave beam 34 and pond body leading portion.
In the utility model, diffuser is that the plane between upstream and fluidised form conversion facility is connected, slope section be upstream with Vertical linking between fluidised form conversion facility, pond figure are the main bodys of fluidised form conversion facility.With the variation of water delivery flow, upstream Water in conversion facility by the form of submerged hydraulic jump eliminate it is extra can be connected with downstream water surface curve after head, realize pressure free current and The transition of pressure flow.Pond figure is equipped with breastwork formula pressure pipe culvert import and overhauls lock, and is set in slope section and pond figure suitable height There is wave absorption beam, can not only be used for structural support improves structure stress condition, can also jointly be played with breastwork and eliminate surface wave, stationary flow State prevents from taking the effect that air water stream enters downstream pressure pipe culvert.For the globality and rigidity of enhancing structure, structure wall thickness is reduced, Diffuser back segment, slope section and pond figure are equipped with middle dividing pier;To realize uniform fluid flow under different operating modes, stably entering downstream pressure Solenoid is contained, and diffuser diversion pier takes the set-up mode of certain angle to play guide functions, while dividing pier is equipped in the figure of pond The flow equalization that downstream water-supply-pipe is contained when equal discharge orifice is to realize asymmetric water delivery.To prevent caused by downstream happens suddenly water hammer Having pressure pipe to contain, internal water pressure drastically increases and upstream non pressure pipe is contained free pressure flow and alternately occurred, logical provided with overflow in diffuser Road.
In the utility model, by the way that wave absorption beam and wave absorption breastwork is arranged, flow disorder caused by capable of accelerating elimination hydraulic jump, The bubble escaped in water level fluctuation and water body is brought to downstream pressure pipe to obtain the flow-shape stablized in pond and reduce gas To contain, in the utility model, wave absorber includes two parts, when the crossbeam of the elimination hydraulic jump surface wave along water (flow) direction arrangement, It arranges in order to which the supporting beam set by enhancing structure overall stiffness, reduction structure section size is combined and is designed.Due to being When system big flow water delivery, water levels of upstream and downstream difference is smaller, and water surface curve is steadily connected, and water level fluctuation is smaller;And when medium-small flow water delivery, Head is smaller needed for pressure water conveyer section, causes conversion facility upstream and downstream Fall head of water surface larger, and energy dissipating will be carried out in the form of hydraulic jump, from And downstream is caused to have water level fluctuation in pressure pipe culvert forebay figure violent, and generated with a large amount of bubbles, therefore, the elevation of wave absorption beam It should be using the level of tail water under medium-small flow operating mode as control condition, when bottom elevation should be slightly below water level fluctuation maximum duty pair The pond body water level answered.The cross dimensions of wave absorption beam needs to consider water level fluctuation characteristic, hydraulic jump feature and Structure Calculation etc. Factor is determined.It, can be according to practical wave dissipation effect, by wave absorption beam staggered floor interval cloth in the case of level of tail water luffing is larger It sets, to meet the requirement for eliminating surface wave under the conditions of different water levels.
Second is that intercept gas after jump in water body, accelerating its dissipation, the vertical wave absorption breastwork of Transverse to the flow direction arrangement, It overhauls the breastwork of lock with pond figure and is combined arrangement.To minimize the head loss of pond figure, keep conversion facility overcurrent smooth, Wave absorption breastwork bottom end should be not less than the height that downstream has pressure pipe to contain away from bottom of pond distance.
Due to eliminating surface wave and accelerating the theory that gas escapes in water still incomplete, effect is mainly through hydraulic model It is verified, due to being provided with surface wave eliminations and accelerating bubble loss facility after jumping, the flow in pond body is occurring strongly Hydraulic jump after hit with crossbeam, energy is cut down;Later flow again through vertical wave absorption breastwork reflect flow back, again with It collides, rub with crossbeam, to further cut down water body kinetic energy, final pool inner water face is maintained stable state, Pool inner water face does not have phenomena such as apparent surface vortex, violent disturbance;Take barrier of the air water body through vertical wave absorption breastwork, flow Direction and flow velocity change, and most gases escape water in the form of bubble along wall and the preceding waters of wall in water body Face, only small portion of gas enter pond section behind in the form of minor diameter bubble along underflow.Adjustment again through pond section behind, the water surface More steady, the substantially all effusion water surface of bubble, it is ensured that downstream has pressure pipe to contain the good hydraulics before import.
In the utility model, the diversion pier important technological parameters in the diffuser include cutwater degree, start position and pier nose Type shape.Cutwater degree and diversion pier start position should be to ensure that it is logical to diffuse into each water delivery in downstream for uniform fluid flow under each water delivery flow Subject to road, it is distributed according to diffuser water flow field, is determined according to the principle of flow equalization.When due to medium-small flow water delivery, Diffuser category torrent fluidised form blocks water to reduce diversion pier pier nose, through the pier type to diversified forms such as triangle, circle, fish tail types It carries out than selecting verification, the finally determining point circle fish tail diving pier using after improveing.The pier nose shape of diversion pier is as shown in Figure 10. The position of diversion pier is determined according to numerical simulation, and is verified by model test.D-diversion pier is thick;R-pier nose circular arc half Diameter;O1, O2-pier nose circular arc center of circle.
Wherein, the slope section uses 1:7 slope connects diffuser, and backfill ground can be located to avoid upstream structure On base, while also functioning to the effect of enhancing gas effusion length.
Preferably, the wave absorption beam 47 of the wave absorption beam 34 of the rear slopes section and pond body leading portion is distinguished multiple, spaced Certain distance is arranged, and is located at sustained height position.The equal discharge orifice 46 is located under the wave absorption beam 47 of the pond body leading portion Side, and positioned at the upstream side of the wave absorption breastwork 45.
Wherein, the bottom of the pond figure, upstream linkage section, diffuser and downstream connection section is plane, the slope The bottom of section is the monoblock type ramp structure tilted down along water (flow) direction.
Preferably, the upstream gradual change segment length 11.5m of the upstream linkage section is that 4.4m × 4.5m of two pore structures is cast-in-place mixed Solidifying soil box culvert, bottom plate crest level 23.54m;Maintenance lockage chamber long 15m, the wide 11.7m of the upstream linkage section are open type holes Structure, single hole clear span 4.4m.
The diffuser overall length 35m, import overall width 9.7m, export overall width 17.2m, and angle of flare is 6.11 degree;Wherein, Preceding diffusion segment length 15m is single hole rectangular channel, and the outlet clear span of preceding diffuser is 12.92m;Segment length 20m is spread afterwards, passes through setting Multiple diversion pier formation widths be 5.0m three hole rectangular channels.The diffuser overflow ducts bottom elevation should meet generation water When hammer, flow smoothly can excrete conversion facility by overflow ducts in time, and the raising of diffuser water level is avoided to cause non pressure pipe There is free pressure flow Alternate Phenomenon in culvert, while can stablize the internal water pressure for having pressure pipe to contain.And in normal operation, bottom elevation There should be certain superelevation, extra overflow is avoided to cause water resource waste.The overflow ducts are designed by free weir flow.Choose diffusion When angle, it should be ensured that disengaging side does not occur under different operating modes and water delivery flow when dispersion of flow (mainly with medium water delivery flow control) The phenomenon that wall, causes fluidised form disorder, structure quake, and then influence in order to avoid because shear action generates lateral current, reflux, vortex Conveyance capacity, pool inner water position and structure safety.
The slope segment length 55.93m is three pore structures, and single hole clear span 5.0m, slope slope ratio is 1:7, bottom plate crest level by 23.54m gradual changes are to pond body bottom plate crest level 15.55m.
The long 40.0m of pond figure, wherein segment length 22.0m before the body of pond, segment length 18.0m, three pore structures, single hole are net behind in pond Wide 5.0m.
As shown in figure 9, the equal discharge orifice is three rectangular-shaped holes, and setting spaced apart, the single hole of equal discharge orifice 46 Width (b4) 1.5m, height (h1) 4.5m.It is divided into 3m between the wave absorption beam 34 of the rear slopes section and the wave absorption beam 47 of pond body leading portion, The section of the wave absorption beam is the rectangle of 1.0m × 0.8m.The equal discharge orifice is away from pond figure initial section distance L1 so that flow Subject to capable of fully spreading;Away from wave absorption breastwork distance L2 can then ensure pressure pipe culvert inlet flow state is steady, subject to flow equalization.
It, can be when conversion facility upstream and downstream hole count be inconsistent or the hole water delivery of upstream and downstream mistake is outstanding by the way that equal discharge orifice is arranged When it is the hole water delivery of single hole mistake, efficiently solve flow in pond body inevitably repulse or subdue the enemy, bias current, cause pool inner water stream it is disorderly, under Play pipe contains the problem of mass flow discrepancy, can preferably be homogenized flow, eliminate the adverse effect generated when asymmetric water delivery, keep in pond Water flow stationary transition.
The pond body leading portion downstream is equipped with down-the-hole type and overhauls lock 43, has pressure box culvert to overhaul downstream, is located at the wave absorption In breastwork 45.
The downstream connection segment length 18.0m is three hole concrete box culverts, and box culvert aperture is along water (flow) direction from 5.0m × 4.4m Gradual change has the pressure pipe to contain drop-over to 4.4m × 4.4m, with downstream.Three pore structures are formed by dividing pier 50 in the downstream connection section, Side is formed with the corresponding gas vent 51 for leading to earth's surface above, and exhaust is mutually passed to the water stream channel of downstream connection intersegmental part. The major function of downstream connection section is to realize that pond body has steady being connected of pressure pipe culvert with downstream, and ensure have pressure pipe to contain import flow With good fluidised form, and be conducive to be vented.For this purpose, downstream connection section takes tapered, counter-slope arrangement, and exhaust is set in end Hole.The import of linkage section beginning should meet certain depth of immersion requirement, and crest level should meet rich requirement more than pressure in the pipe culvert of end.Gradually Contracting angle is generally 5 °~7 °, counter-slope slope ratio iInsteadGenerally 1:10~1:15.
The overflow ducts 23 are rectangular groove structure, are formed in the top of the side wall of diffuser, a length of 3m of rectangular channel.
The utility model is not only applicable to big flow water delivery, is also applied for small flow water delivery.
1) big flow water delivery
When system is in design discharge water delivery, fluidised form conversion facility is in normal operating condition, water levels of upstream and downstream drop Only reserved design head value, water surface curve can smooth out linking, fluid stable in pond.Water body is through diffuser under the action of diversion pier Evenly into downstream passage, then the homogenization through equal discharge orifice, water flow, which balancedly enters downstream, pressure pipe culvert.Model tries It tests under the conditions of showing such water delivery, flow-shape is stablized in diffuser, and velocity flow profile is uniform, angle of flare angle and diffusion segment length It is reasonable to spend value, flow does not occur and takes off wall phenomenon;Diversion pier pier type is reasonable, and position is suitable, each water of entrance that flow can be balanced Circulation road, pier nose shape can effectively avoid the sputtering of flow;The Dam Configuration Design of conversion facility can be good at meeting design requirement. Verified fluidised form conversion facility design build and size are reasonable, and disclosure satisfy that functional requirement.Refer to Fig. 3-4.
2) small flow water delivery
When the small flow transfer water project of system, head is smaller needed for pressure water conveyer section, and downstream water surface curve reduces larger, conversion Upstream and downstream water body forms larger drop in facility, and upstream and downstream water surface curve is connected in the form of hydraulic jump.At this point, when water delivery flow is by big Become hour, hydraulic jump is gradually rear into pond body from diffuser to move, and due to there being thicker water cushion in pond, can form submerged water Jump, water body by rolling in water cushion, friction is automatic eliminates excess energy, according to the variation that water delivery flow is descending, on Swimming body gross energy also changes therewith, and water cushion thickness occurs by thick to thin variation, and pool inner water pad is thick under different water delivery flows Degree can meet the requirement for eliminating energy;When water delivery flow changes from small to big, hydraulic jump is gradually moved from pond body to diffuser, water cushion Thickness is thickend by thin, and pool inner water mat thickness can also meet the requirement for eliminating energy under different water delivery flows.By wave absorption beam and The effect of vertical wave absorption breastwork, further eliminates surface layer residual amount of energy, to realize water body steadily after equal discharge orifice homogenizing Weighing apparatus ground enters downstream.Model test the result shows that, under the conditions of such water delivery, the Dam Configuration Design of conversion facility is also reasonable, It disclosure satisfy that design requirement.Refer to Fig. 5-6.
When flow water delivery small using wrong hole (operation of one hole of upstream), flow enters pond after being spread in diffuser It is interior, then steadily enter downstream pipe culvert after equal discharge orifice homogenizing.Model test shows that under such operating status, flow is being spread Uneven diffusion occurs in section, after diversion pier adjusts for the first time, sectional velocity distribution uniformity coefficient makes moderate progress, into oblique Hydraulic jump occurs in the section of slope and eliminates excess energy automatically, after second of the flow homogenizing adjustment of equal discharge orifice, each hole water body is more uniform Ground, which enters downstream, has pressure pipe to contain each hole.The size and layout reasonable of conversion facility, do not generate bad hydraulic phenomenon, see figure Shown in 7-8.
The utility model has the following advantages and feature:
(1) under different water delivery flows, can realize automatic steady transition of the pressure free current to pressure flow, make pressure free current section with Pressure flow section is clearly demarcated, and ensures that respective fluidised form is stablized relatively.
(2) when upstream and downstream use different hole count water deliverys, it can be homogenized flow automatically, keep downstream pressure pipe culvert flow equal Weighing apparatus, Current connectin are steady.
(3) it under various operating conditions, prevents from that free pressure flow alternately bad hydraulic phenomenon occurs without pressure section pipe culvert, under control Trip has the internal water pressure that pressure pipe is contained, and ensures engineering safety operation.
(4) pressure pipe contains in roughness variation range in downstream, it is ensured that engineering has the ability of safe transport design discharge.
(5) automatic to consume part surplus water head when small flow, while can prevent the bubble generated in energy dissipating from entering downstream Have in pressure pipe culvert, ensures system conveyance power of water and engineering safety.
The utility model is verified through hydraulic model test, and Current connectin is good between two kinds of different fluidised forms, water under different operating modes Middle gas does not enter downstream substantially pressure pipe culvert, and the fluctuation of pressure pipe culvert Inlet water position is smaller, and downstream pipe culvert flow equalization meets work The safe and reliable service requirement of journey.
The above is only the preferred embodiment of the utility model, it is noted that for the general of the art For logical technical staff, without departing from the principle of this utility model, several improvements and modifications can also be made, these change The scope of protection of the utility model is also should be regarded as into retouching.

Claims (8)

1. a kind of pressure free current is to pressure flow fluidised form conversion facility, which is characterized in that including be sequentially connected setting upstream linkage section, Diffuser, slope section, pond figure and downstream connection section;
The upstream linkage section is two pore structures, includes for connecting the upstream transition and be located at upstream gradual change that non pressure pipe is contained The maintenance lockage chamber in section downstream;The maintenance lockage chamber connects diffuser;
The diffuser includes preceding diffuser and rear diffuser, has overflow ducts on the side wall of the preceding diffuser;
Multiple diversion piers are provided in diffuser after described, slope section interval is respectively arranged in the slope section and pond figure Dividing pier in pier, pond figure, dividing pier is sequentially connected in dividing pier, pond figure in the diversion pier, slope section, and linear state cloth Set, multiple diversion piers along water (flow) direction straight line arrangement will be divided into three water stream channels in rear diffuser, make enter it is described after Water in diffuser is flowed into slope section from three water stream channels and enters downstream connection section after flowing through pond figure, and described in passing through Downstream connection section has entered pressure pipe culvert;
The slope section includes preceding slope section, middle slope section and rear slopes section;The pond figure includes pond body leading portion and pond body Back segment;The lower part of the Dun Bi of dividing pier is formed with multiple streams with homogenizing traffic engineering capability in pond figure in the pond body leading portion Hole;Top is provided with and has the function of stationary flow fluidised form and eliminate flow aeration between section behind for the pond body leading portion and pond Wave absorption breastwork;
It is respectively arranged in the rear slopes section and pond body leading portion multiple spaced horizontally disposed with elimination surface wave work( The top of the dividing pier in corresponding is arranged in the wave absorption beam of energy, the wave absorption beam.
2. pressure free current is to pressure flow fluidised form conversion facility according to claim 1, which is characterized in that the upstream linkage section Gradual change segment length 11.5m in upstream is 4.4m × 4.5m cast-in-place concrete box culverts of two pore structures, bottom plate crest level 23.54m;It is described The maintenance lockage chamber long 15m of upstream linkage section, wide 11.7m, two pore structure of open type, single hole clear span 4.4m.
3. pressure free current is to pressure flow fluidised form conversion facility according to claim 1, which is characterized in that the diffuser overall length 35m, import overall width 9.7m, export overall width 17.2m, and angle of flare is 6.11 degree;Wherein, preceding diffusion segment length 15m is single hole square The outlet clear span of shape slot, preceding diffuser is 12.92m;Segment length 20m is spread afterwards, is by multiple diversion pier formation widths of setting The three hole rectangular channels of 5.0m.
4. pressure free current is to pressure flow fluidised form conversion facility according to claim 1, which is characterized in that the slope segment length 55.93m is three pore structures, and single hole clear span 5.0m, slope slope ratio is 1:7, bottom plate crest level is by 23.54m gradual changes to pond body bottom plate Crest level 15.55m.
5. pressure free current is to pressure flow fluidised form conversion facility according to claim 1, which is characterized in that the pond figure is long 40.0m, wherein segment length 22.0m before the body of pond, pond segment length 18.0m behind, three pore structures, single hole clear span 5.0m.
6. pressure free current is to pressure flow fluidised form conversion facility according to claim 1, which is characterized in that the equal discharge orifice is three It is a, the single hole wide 1.5m, high 4.5m of equal discharge orifice.
7. pressure free current is to pressure flow fluidised form conversion facility according to claim 1, which is characterized in that the pond body leading portion downstream Lock is overhauled equipped with down-the-hole type, has pressure box culvert to overhaul downstream.
8. pressure free current is to pressure flow fluidised form conversion facility according to claim 1, which is characterized in that the downstream connection segment length 18.0m, be three hole concrete box culverts, box culvert aperture along water (flow) direction from 5.0m × 4.4m gradual changes to 4.4m × 4.4m, with downstream Have pressure pipe contain drop-over.
CN201820351412.3U 2018-03-14 2018-03-14 A kind of pressure free current is to pressure flow fluidised form conversion facility Active CN208072326U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820351412.3U CN208072326U (en) 2018-03-14 2018-03-14 A kind of pressure free current is to pressure flow fluidised form conversion facility

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820351412.3U CN208072326U (en) 2018-03-14 2018-03-14 A kind of pressure free current is to pressure flow fluidised form conversion facility

Publications (1)

Publication Number Publication Date
CN208072326U true CN208072326U (en) 2018-11-09

Family

ID=64046067

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820351412.3U Active CN208072326U (en) 2018-03-14 2018-03-14 A kind of pressure free current is to pressure flow fluidised form conversion facility

Country Status (1)

Country Link
CN (1) CN208072326U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108221846A (en) * 2018-03-14 2018-06-29 天津市水利勘测设计院 A kind of pressure free current is to pressure flow fluidised form conversion facility

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108221846A (en) * 2018-03-14 2018-06-29 天津市水利勘测设计院 A kind of pressure free current is to pressure flow fluidised form conversion facility
CN108221846B (en) * 2018-03-14 2023-10-27 天津市水务规划勘测设计有限公司 Pressureless flow-to-pressured flow state conversion facility

Similar Documents

Publication Publication Date Title
CN203188185U (en) United energy dissipation structure under ultralow Froude number
CN101148866A (en) Drainage system estuary pier bar swirl chamber composite energy dissipation method
CN102002925A (en) Artificially turning method of sandy river engineering project mobile bed model and artificially turning diversion trench
CN106759833A (en) A kind of combined type fairing for improving urban rainwater pumping plant Inlet flow pattern
CN109555088B (en) Rectifying vortex-preventing device
CN208072326U (en) A kind of pressure free current is to pressure flow fluidised form conversion facility
CN106337401A (en) Flow-guide type grading energy-dissipation defoaming siphonic water-collecting well in front of weir flow and method
CN106120673A (en) The turning spillway being applicable under high Froude number
CN109629525A (en) A kind of deep water intake system and its operating method
CN106930199B (en) Improve the fairing of arc Box-shaped Drainage Culvert water outlet fluidised form
CN108221846A (en) A kind of pressure free current is to pressure flow fluidised form conversion facility
CN111535269A (en) Layered directional permeable flow-isolating dike
CN204456047U (en) A kind of water-carriage system with base plate gallery road, middle energy dissipating room
CN106869090A (en) Dreg-blocking board sub-assembly and diversion tunnel debris retaining Slagoff method
CN211646291U (en) Combined water diversion device
CN109056672A (en) A method of improving hydroenergy storage station lower storage reservoir intake-outlet hydraulic characteristic
CN103643665B (en) A kind of have the ship lock drainage system that independent porous distributes gate structure
CN103758091B (en) Method and device for aeration of pressed inlet of gentle slope open channel
CN111395278A (en) Continuous flow guiding and energy dissipating type spillway and arc-shaped force dissipating pier
CN208167640U (en) Aerated flow slit-type energy dissipation hydraulic model test device
CN110616693A (en) Combined water diversion device
CN105862687A (en) Spoiler pipeline type fish way and design method
CN110273406A (en) A kind of three-dimensional tunneling boring side diffused air aeration bank
CN109594533A (en) A kind of minor air cell's stilling pond
CN212248137U (en) Continuous diversion energy dissipation type spillway, arc-shaped force dissipation pier and energy dissipation unit

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 300204 No. 217 Racecourse Road, Tianjin, Hexi District

Patentee after: Tianjin Water Planning Survey and Design Co., Ltd

Address before: 300204 No. 217 Racecourse Road, Tianjin, Hexi District

Patentee before: TIANJIN WATER RESOURCES SURVEY AND DESIGN INSTITUTE