CN208063221U - It is a kind of to complain to alert communication equipment in multiple distribution open frames - Google Patents

It is a kind of to complain to alert communication equipment in multiple distribution open frames Download PDF

Info

Publication number
CN208063221U
CN208063221U CN201820684713.8U CN201820684713U CN208063221U CN 208063221 U CN208063221 U CN 208063221U CN 201820684713 U CN201820684713 U CN 201820684713U CN 208063221 U CN208063221 U CN 208063221U
Authority
CN
China
Prior art keywords
control board
frame
rack
level
master control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820684713.8U
Other languages
Chinese (zh)
Inventor
宋冬生
张宏
李爱平
夏细苟
邓庆林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Changjiang Computing Technology Co ltd
Fiberhome Telecommunication Technologies Co Ltd
Original Assignee
Fiberhome Telecommunication Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fiberhome Telecommunication Technologies Co Ltd filed Critical Fiberhome Telecommunication Technologies Co Ltd
Priority to CN201820684713.8U priority Critical patent/CN208063221U/en
Application granted granted Critical
Publication of CN208063221U publication Critical patent/CN208063221U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Small-Scale Networks (AREA)

Abstract

Alert communication equipment can be complained in multiple distribution open frames the utility model discloses a kind of, be related to technical field of communication equipment, the utility model is summarized and handled the alarm data of all boards in the communication equipment by master control board card.Alarm data is sent to master control board card by the board respectively to break down by the communication link between extension circle and in extension circle.Master control board card summarizes the alarm data of each board, level-one frame control board into the rack for sending alarm data sends alert command, warning light lighting or signal alarm bell jingle bell in the same rack can be triggered by receiving the level-one frame control board of alert command, equipment operation maintenance personnel is allowed quickly clearly to know that the board of which rack in numerous racks is faulty, board faults are excluded in time, to reduce remover apparatus fault time, equipment O&M efficiency is improved.

Description

It is a kind of to complain to alert communication equipment in multiple distribution open frames
Technical field
The utility model is related to technical field of communication equipment, and in particular to it is a kind of can be complained in multiple distribution open frames it is alert Communication equipment.
Background technology
With the high speed development of the big data business such as big bandwidth special line lease, Internet of Things, cloud computing, 5G/AR/VR, have More flexible dispatching, stronger packet switch function larger communication equipment become the weight competitively researched and developed of each communications equipment manufacturer Point.The system complexity of communication equipment also becomes higher and higher therewith, usual one large-scale communication node (abbreviation network element) Equipment need to collectively constitute after being cascaded by multiple subscriber devices, it is (also known as single that many boards are inserted in each subscriber device Disk), and these subscriber devices are placed on again in the sub- frame of distributed subsystem and rack one by one.
It is responsible for the subsystem frame that entire node is communicated with other nodes or network management workstation when communication device works to be known as Main control frame is responsible for the specific board that entire node is communicated with other nodes or network management workstation on main control frame as master control board card (again Claim main control unit);The sub- frame of other subsystems is known as expansion subrack, and it is frame control board to be responsible for the board communicated with main control unit on expansion subrack (also known as frame controlled tray).
Communication apparatus construction was fairly simple in the past, and the sub- frame of all subsystems can be placed in a rack, and each son The alarm of all boards (also known as single-deck) is summarized by the master control board card in main control frame in sub-frame of system.When there is plate in rack When card failure generates alarm, rack where being driven the frame top warning light lighting of its place rack by master control board card, driven it Frame top alarm thumper ring signal alarm bell, so as to equipment operation maintenance personnel carry out troubleshooting.
And larger communication equipment is often cascaded by the multiple subscriber devices being distributed in different racks and is formed jointly, and Sometimes these racks are not again in the same computer room or apart from far, in addition each subscriber device is inserted with many boards again.When When the faulty generation of certain board in the sub- frame of certain subsystem where non-main control frame in rack alerts, alerted according to traditional frame top What lamp lighting scheme was then lighted is not the frame top of rack where the frame top warning light but master control board card of rack where failure board Warning light, can not allow in this way equipment operation maintenance personnel rapidly comform the board known in multi-frame in which rack it is faulty and and Shi Jinhang troubleshootings.
Utility model content
In view of the deficiencies in the prior art, the purpose of this utility model is to provide one kind can be in multiple distributed machines The communication equipment alerted on frame quickly determines board faults position, reduces remover apparatus fault time.
To achieve the above objectives, the technical scheme adopted by the utility model is that:One kind can be complained in multiple distribution open frames Alert communication equipment comprising multiple racks, each rack are equipped at least one warning light, and multiple racks include:
One master control rack, the main controller are provided with main control frame, and the main control frame is equipped with master control board card;
Multiple controlled racks, each controlled rack are equipped with multiple expansion subrack, and one in multiple expansion subrack It is equipped with level-one frame control board in expansion subrack, two level frame control board, the level-one frame control plate in same rack are equipped in other expansion subrack Card is connected with all two level frame control boards, meanwhile, the level-one frame control board is connected with the master control board card, and the master control Board and level-one frame control board are connected with the warning light of its affiliated rack.
On the basis of said program, expansion subrack is additionally provided in the rack equipped with the main control frame, the expansion subrack includes One two level frame control board and multiple boards connected to it;The master control board card and the two level frame control in the same rack Board connects.
On the basis of said program, the master control board card and pass through with the two level frame control board in the same rack RJ-45 twisted pair line connections.
On the basis of said program, the multiple boards being connect with the master control board card are additionally provided in the main control frame.
On the basis of said program, other boards in the master control board card and the same main control frame pass through backboard ether Network bus connects.
On the basis of said program, at least one signal alarm bell is additionally provided in the rack equipped with the master control board card, it is described Master control board card is connect with the signal alarm bell.
On the basis of said program, it is additionally provided at least one signal alarm bell in the rack equipped with the expansion subrack, described one Grade frame control board is also connect with the signal alarm bell in the same rack.
On the basis of said program, the level-one frame control board respectively with multiple two level frames in the same rack Control board passes through RJ-45 twisted pair line connections.
On the basis of said program, the master control board card passes through RJ-45 multiple twins with each level-one frame control board respectively Line connects.
On the basis of said program, between other boards in the level-one frame control board and the same expansion subrack, institute It states and is connected by backboard industry ethernet between other boards in two level frame control board and the same expansion subrack.
Compared with prior art, the utility model has the advantage of:
The communication equipment of the utility model includes multiple racks, and each rack is equipped at least one warning light, Duo Geji Frame includes:One master control rack, main controller are provided with main control frame, and main control frame is equipped with master control board card;Multiple controlled racks, each Controlled rack is equipped with multiple expansion subrack, and is equipped with level-one frame control board in multiple expansion subrack in an expansion subrack, other extensions Two level frame control board is equipped in frame, the level-one frame control board in same rack is connected with all two level frame control boards, meanwhile, one Grade frame control board is connected with master control board card, and master control board card and level-one frame control board are connected with the warning light of its affiliated rack.
The utility model is summarized and is handled the alarm data of all boards in the communication equipment by master control board card.It is each to occur Alarm data is sent to master control board card by the board of failure by the communication link between extending circle and extension circle.Master control Board summarizes the alarm data of each board, and the level-one frame control board into the rack for sending alarm data sends alert command, connects Warning light lighting or alarm in the same rack can be triggered by receiving the level-one frame control board of the alert command of master control board card transmission Bell ring bell.Equipment operation maintenance personnel is allowed quickly clearly to know that the board of which rack in numerous racks is faulty, excludes board in time Failure improves equipment O&M efficiency to reduce remover apparatus fault time.
Description of the drawings
Fig. 1 is the structural representation that can complain to alert communication equipment in the utility model embodiment in multiple distribution open frames Figure;
Fig. 2 is that the workflow that can complain to alert communication equipment in multiple distribution open frames in the utility model embodiment is shown It is intended to.
Specific implementation mode
The utility model is described in further detail with reference to the accompanying drawings and embodiments.
Embodiment 1
Shown in Figure 1, the utility model embodiment provides and a kind of can complain to alert communication in multiple distribution open frames and set It is standby comprising multiple racks, each rack are equipped at least one warning light, and multiple racks include:
One master control rack, main controller are provided with main control frame, and main control frame is equipped with master control board card;
Multiple controlled racks are each controlled rack and are equipped with multiple expansion subrack, and in multiple expansion subrack in an expansion subrack Equipped with level-one frame control board, two level frame control board is equipped in other expansion subrack, the level-one frame control board in same rack with it is all Two level frame control board is connected, meanwhile, level-one frame control board is connected with master control board card, and master control board card and level-one frame control board are equal It is connected with the warning light of its affiliated rack.
Larger communication equipment is often the common grade of multiple subscriber devices by being distributed in different racks in the prior art Connection composition, and these racks are not again in the same computer room or apart from far sometimes, in addition each subscriber device is inserted with very again More boards.When the faulty generation alarm of certain board in the sub- frame of certain subsystem where non-main control frame in rack, according to tradition Frame top warning light lighting scheme then light be not the frame top warning light but master control board card of rack where failure board where The frame top warning light of rack can not allow equipment operation maintenance personnel rapidly to be comformed the board known in multi-frame in which rack in this way It is faulty and carry out troubleshooting in time.
The alarm data of the board to break down in the present embodiment passes through the RJ-45 twisted-pair feeders and expansion subrack between extending circle Alarm data is sent to master control borad by the communication link that frame entodorsum industry ethernet collectively forms.Master control board card summarizes and handles The level-one frame control board into corresponding rack sends alert command again after the alarm data of each failure board.Receive master control board card The level-one frame control board of the alert command of transmission can trigger the warning light lighting in the same rack.Make equipment operation maintenance personnel quick Clearly know that the board of which rack in numerous racks is faulty, exclude board faults in time, to reduce remover apparatus failure Time improves equipment O&M efficiency.Overcome in traditional frame top warning light lighting scheme, when with master control board card not in same machine The board of frame in the event of failure equipment light be rack where master control board card frame top warning light, equipment operation maintenance personnel can not be allowed fast The board known in multi-frame in which rack of comforming fastly is faulty and carries out the defect of troubleshooting in time.
Embodiment 2:
On the basis of embodiment 1, master control board card is additionally operable to the plate that management is set to it in expansion subrack in same rack Card failure alerts.Specific implementation mode is as follows:
It is additionally provided with expansion subrack in rack equipped with main control frame, expansion subrack includes a two level frame control board and connected to it Multiple boards;Master control board card and pass through RJ-45 twisted pair line connections with the two level frame control board in the same rack.In main control frame also Equipped with the multiple boards being connect with master control board card.Multiple boards in master control board card and the same main control frame pass through backboard Ethernet Bus connects.Master control board card is connect with the warning light in the same rack.
When the board to break down is in main control frame, alarm data is directly transferred to master control borad by backboard industry ethernet Card, master control board card triggering warning light start to alert.
When the board to break down is in expansion subrack, alarm data by with the two level frame control plate in its same expansion subrack Card is transferred to master control board card by RJ-45 twisted-pair feeders, and master control board card triggering warning light starts to alert.Equipment operation maintenance personnel is allowed also can Quickly know the board faults in main control frame, exclude board faults in time, to reduce remover apparatus fault time, improves equipment O&M efficiency.
Embodiment 3:
On the basis of embodiment 1, be additionally provided at least one signal alarm bell in the rack equipped with master control board card, master control board card with Signal alarm bell connects.
When the board to break down is in main control frame, alarm data is directly transferred to master control borad by backboard industry ethernet Card, master control board card triggering signal alarm bell start to alert.
When the board to break down is in expansion subrack, alarm data by with the two level frame control plate in its same expansion subrack Card is transferred to master control board card by RJ-45 twisted-pair feeders, and master control board card triggering signal alarm bell starts to alert.Allow equipment operation maintenance personnel not only It can know the board faults in main control frame by alerting modulating signal, moreover it is possible to board faults are excluded by signal alarm bell signal in time, from And remover apparatus fault time is reduced, improve equipment O&M efficiency.
Embodiment 4:
On the basis of embodiment 1, at least one signal alarm bell, level-one frame control board are additionally provided in the rack equipped with expansion subrack Also it is connect with the signal alarm bell in the same rack.
The alarm data of the board to break down by extend circle between RJ-45 twisted-pair feeders and extension circle entodorsum with Alarm data is sent to master control borad by the communication link that too network bus collectively forms.Master control board card summarizes and handles each failure board Alarm data after again level-one frame control board into corresponding rack send alert command.Receive the alarm of master control board card transmission The level-one frame control board of order can trigger the signal alarm bell jingle bell in the same rack.Allow equipment operation maintenance personnel that can not only pass through alarm Modulating signal knows the board faults in expansion subrack, moreover it is possible to exclude board faults in time by signal alarm bell signal, be excluded to reduce The equipment fault time improves equipment O&M efficiency.
Embodiment 5:
On the basis of embodiment 1, level-one frame control board is logical with multiple two level frame control boards in the same rack respectively Cross RJ-45 twisted pair line connections.
The alarm data of the board to break down with the two level frame control board in its same expansion subrack by passing through RJ-45 Twisted-pair communication is transferred to the level-one frame control board in the same rack, is summarized to master control board card by level-one frame control board, main Level-one frame control board of the control board again into the rack for sending alarm data sends out the order of alarm, receives alert command Level-one frame control board can trigger the signal alarm bell in the same rack.
Embodiment 6:
On the basis of embodiment 1, master control board card passes through RJ-45 twisted pair line connections with each level-one frame control board respectively.One Its between other boards in grade frame control board and the same expansion subrack, in the two level frame control board and the same expansion subrack It is connected by backboard industry ethernet between his board.
The alarm data of the board to break down with the two level frame control board in its same expansion subrack by passing through RJ-45 Twisted-pair communication is transferred to the level-one frame control board in the same rack, passes through the RJ-45 multiple twin congruences by level-one frame control board Always to master control board card, level-one frame control board of the master control board card again into the rack for sending alarm data is sent out by RJ-45 twisted-pair feeders The order for sending out alarm is sent, signal alarm bell in the same rack can be triggered by receiving the level-one frame control board of alert command.
Embodiment 7:
It is shown in Figure 2, on the basis of embodiment 1, the work of alert communication equipment can be complained in multiple distribution open frames It is as follows to make flow:
S1. primary expansion subrack of any one expansion subrack as the rack is selected in each rack, and one is equipped in frame Grade frame control board;For other expansion subrack in rack as common expansion subrack, frame is interior to be equipped with two level frame control board.Main control frame can be with It is considered as a kind of special primary expansion subrack, master control board card can also be considered as a kind of special level-one frame control board.
S2. configuration association, primary expansion subrack are carried out to board and the expansion subrack in each rack on a workstation and other is general Logical expansion subrack carries out configuration association.
S3. the configuration association relationship configured in S2 is handed down to by master control board card by work station so that master control board card can Know which expansion subrack any one piece of board belongs to, point rack warning light is implemented by the main frame control board on which primary expansion subrack It is operated with signal alarm bell is rung.
Level-one frame control board is inserted in primary expansion subrack, and two level frame control board is inserted in common expansion subrack;Primary expansion subrack It is connected by RJ-45 twisted-pair feeders with common expansion subrack with common expansion subrack, common expansion subrack, RJ-45 twisted-pair feeders serve as each extension The channel that alarm data interacts between frame.
S4. when equipment works after master control board card receives the alarm of other failure boards, board place is calculated successively Expansion subrack, the associated primary expansion subrack of the expansion subrack and the level-one frame control board on the primary expansion subrack address.If Master control board card is stuck in the same expansion subrack with faulty board, then alarm data is reported to by faulty board card by backboard industry ethernet Master control board card;If master control board card and failure board, not in same sub- frame, faulty board card is by between frame on RJ-45 twisted-pair feeders Offer master control board card.
S5. master control board card sends alert command to calculated correct in S4 by the RJ-45 twisted-pair feeders between expansion subrack Level-one frame control board on primary expansion subrack, allows the frame of rack where its level-one frame control board (i.e. failure board place rack) Warning light is pushed up, while driving the frame top alarm thumper of level-one frame control board place rack (i.e. rack where failure board) to ring and accusing Alarm bell;Rather than put master control board card where rack or other top warning lights, nor driving master control board card where rack or The frame top alarm thumper of other racks rings signal alarm bell.
S6. level-one frame control board lights the frame top warning light of its place rack after receiving alert command, driving alarm is thundered Device rings signal alarm bell.
The present embodiment realizes the board event that equipment operation maintenance personnel can not only be known by alarm modulating signal in main control frame Barrier, moreover it is possible to board faults be excluded by signal alarm bell signal in time, to reduce remover apparatus fault time, improve equipment O&M effect Rate.Overcome according in traditional frame top warning light lighting scheme when with master control board card not the board of same rack in the event of failure What equipment was lighted is not the frame top warning light of rack where the frame top warning light but master control board card of rack where failure board, this Sample can not allow equipment operation maintenance personnel rapidly comform the board known in multi-frame in which rack it is faulty and carry out in time therefore Barrier excludes.
The utility model is not limited to the above embodiment, for those skilled in the art, not Under the premise of being detached from the utility model principle, several improvements and modifications can also be made, these improvements and modifications are also considered as this reality Within novel protection domain.The content not being described in detail in this specification belongs to well known to professional and technical personnel in the field The prior art.

Claims (10)

1. a kind of can complain to alert communication equipment in multiple distribution open frames comprising multiple racks, each rack are equipped with extremely A few warning light, which is characterized in that multiple racks include:
One master control rack, the main controller are provided with main control frame, and the main control frame is equipped with master control board card;
Multiple controlled racks, each controlled rack are equipped with multiple expansion subrack, and an extension in multiple expansion subrack Be equipped with level-one frame control board in frame, two level frame control board be equipped in other expansion subrack, the level-one frame control board in same rack with All two level frame control boards are connected, meanwhile, the level-one frame control board is connected with the master control board card, and the master control board card It is connected with the warning light of its affiliated rack with level-one frame control board.
2. a kind of as described in claim 1 can complain to alert communication equipment in multiple distribution open frames, it is characterised in that:It is equipped with It is additionally provided with expansion subrack in the rack of the main control frame, the expansion subrack includes a two level frame control board and connected to it multiple Board;The master control board card is connect with the two level frame control board in the same rack.
3. a kind of as claimed in claim 2 can complain to alert communication equipment in multiple distribution open frames, it is characterised in that:It is described Master control board card and pass through RJ-45 twisted pair line connections with the two level frame control board in the same rack.
4. a kind of as claimed in claim 2 can complain to alert communication equipment in multiple distribution open frames, it is characterised in that:It is described The multiple boards being connect with the master control board card are additionally provided in main control frame.
5. a kind of as claimed in claim 4 can complain to alert communication equipment in multiple distribution open frames, it is characterised in that:It is described Master control board card is connected with other boards in the same main control frame by backboard industry ethernet.
6. a kind of as described in claim 1 can complain to alert communication equipment in multiple distribution open frames, it is characterised in that:It is equipped with At least one signal alarm bell is additionally provided in the rack of the master control board card, the master control board card is connect with the signal alarm bell.
7. a kind of as described in claim 1 can complain to alert communication equipment in multiple distribution open frames, it is characterised in that:It is equipped with Be additionally provided at least one signal alarm bell in the rack of the expansion subrack, the level-one frame control board also with the alarm in the same rack Bell connects.
8. a kind of as described in claim 1 can complain to alert communication equipment in multiple distribution open frames, it is characterised in that:It is described Level-one frame control board passes through RJ-45 twisted pair line connections with multiple two level frame control boards in the same rack respectively.
9. a kind of as described in claim 1 can complain to alert communication equipment in multiple distribution open frames, it is characterised in that:It is described Master control board card passes through RJ-45 twisted pair line connections with each level-one frame control board respectively.
10. a kind of as described in claim 1 can complain to alert communication equipment in multiple distribution open frames, it is characterised in that:Institute State between other boards in level-one frame control board and the same expansion subrack, the two level frame control board in the same expansion subrack Other boards between connected by backboard industry ethernet.
CN201820684713.8U 2018-05-09 2018-05-09 It is a kind of to complain to alert communication equipment in multiple distribution open frames Active CN208063221U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820684713.8U CN208063221U (en) 2018-05-09 2018-05-09 It is a kind of to complain to alert communication equipment in multiple distribution open frames

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820684713.8U CN208063221U (en) 2018-05-09 2018-05-09 It is a kind of to complain to alert communication equipment in multiple distribution open frames

Publications (1)

Publication Number Publication Date
CN208063221U true CN208063221U (en) 2018-11-06

Family

ID=63981952

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820684713.8U Active CN208063221U (en) 2018-05-09 2018-05-09 It is a kind of to complain to alert communication equipment in multiple distribution open frames

Country Status (1)

Country Link
CN (1) CN208063221U (en)

Similar Documents

Publication Publication Date Title
CN105099789B (en) A kind of network element updating method and apparatus
CN103473152B (en) A kind of active and standby management module backup of blade server and update method
CN106789264B (en) A kind of method and apparatus that link aggregation group channel is switched fast
CN102917286A (en) Hand-in-hand protection switching method and system in EPON (Ethernet Passive Optical Network)
CN106549774A (en) A kind of link failure report method and forwarding unit based on software defined network
CN102904818A (en) Method and device for updating ARP (Address Resolution Protocol) information table
CN102215124A (en) Fault processing method, sink node and optical network protection system
CN109768882B (en) Automatic networking system based on network equipment and fault self-checking method thereof
CN103581025B (en) Method and system for processing routing information and equipment
CN105119820B (en) The more example parallel execution systems of Routing Protocol and its method is performed parallel
CN105357114A (en) Distributed network equipment
CN105790825B (en) Method and device for hot backup of controller in distributed protection
CN104869125A (en) SDN-based method for dynamically preventing MAC address spoofing
CN105634952A (en) Fast notification method and apparatus for LSP message
CN107369327A (en) Intersection traffic whistle control system and method based on the buses of RS 485
CN104125079B (en) A kind of method and device for determining two-node cluster hot backup configuration information
CN208063221U (en) It is a kind of to complain to alert communication equipment in multiple distribution open frames
CN108235157A (en) Virtualize the control method and system of gateway status
CN104779994B (en) The guard method of ethernet passive optical network and device
CN106656311A (en) Data link backup apparatus and method
CN104253747B (en) A kind of message carries out 1 in link aggregation group:The transmission method and device of 1 protection
CN107682078A (en) One kind is based on the co-operating ONU failure management methods of OLT and ONU
CN102111299A (en) Redundant network system and method for realizing redundancy
CN109245911A (en) A kind of implementation method that BRAS is hot standby, equipment and computer readable storage medium
CN101771592A (en) Method for automatically configuring EAPS transmission nodes

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20240708

Address after: 430000 No. 6, High-tech Fourth Road, Donghu High-tech Development Zone, Wuhan City, Hubei Province

Patentee after: FIBERHOME TELECOMMUNICATION TECHNOLOGIES Co.,Ltd.

Country or region after: China

Patentee after: Wuhan Changjiang Computing Technology Co.,Ltd.

Address before: 430000 No. 6, High-tech Fourth Road, Donghu High-tech Development Zone, Wuhan City, Hubei Province

Patentee before: FIBERHOME TELECOMMUNICATION TECHNOLOGIES Co.,Ltd.

Country or region before: China

TR01 Transfer of patent right