CN208055780U - Soft Soil Layer presss from both sides the ruggedized construction of the roadbed ground of basaltic layer structure - Google Patents

Soft Soil Layer presss from both sides the ruggedized construction of the roadbed ground of basaltic layer structure Download PDF

Info

Publication number
CN208055780U
CN208055780U CN201721624975.7U CN201721624975U CN208055780U CN 208055780 U CN208055780 U CN 208055780U CN 201721624975 U CN201721624975 U CN 201721624975U CN 208055780 U CN208055780 U CN 208055780U
Authority
CN
China
Prior art keywords
layer
reinforcing pile
basaltic
pile
roadbed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721624975.7U
Other languages
Chinese (zh)
Inventor
崔俊杰
姚瑞珽
杜文山
刘明宇
马旭东
王晶
张世杰
周先才
向俊红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Engineering Consulting Group Co Ltd
Original Assignee
China Railway Engineering Consulting Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Engineering Consulting Group Co Ltd filed Critical China Railway Engineering Consulting Group Co Ltd
Priority to CN201721624975.7U priority Critical patent/CN208055780U/en
Application granted granted Critical
Publication of CN208055780U publication Critical patent/CN208055780U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses the ruggedized constructions that a kind of Soft Soil Layer presss from both sides the roadbed ground of basaltic layer structure comprising:At least two ranked first reinforcing pile, and each first reinforcing pile top is extend into the roadbed, first reinforcing pile lower end sequentially pass through the Soft Soil Layer on the basaltic layer top of the roadbed ground, basaltic layer and basaltic layer lower part Soft Soil Layer;At least one arranges the 2nd reinforcing pile, and each second reinforcing pile is arranged in the Soft Soil Layer on the basaltic layer top.The utility model uses the foundation reinforcing structure and reinforcement means of " reinforced concrete drilling is perfused long stake+loading plate+cement mortar and stirs stub+blotter " for high-speed railway settlement control.Use that long-short pile processing is combined, rigid pile and flexible pile act on the mode mutually coordinated so that Technological Economy rationally, strong applicability, there is apparent technical economic benefit.

Description

Soft Soil Layer presss from both sides the ruggedized construction of the roadbed ground of basaltic layer structure
Technical field
The utility model is related to the roadbed grounds that subgrade engineering field more particularly to a kind of Soft Soil Layer press from both sides basaltic layer structure Ruggedized construction.
Background technology
The key of high-speed railway subgrade design is settlement after construction Deformation control, especially non-fragment orbit high-speed railway, The control of sedimentation and deformation requires to arrived grade, far above the control standard of common railway and industry, civil buildings.It is stringent Post-construction settlement of subgrade deformation is controlled, the main method that high-speed railway weak soil, soft foundation are handled at present has:It is mixing pile, compacted Stake, CFG, screw rod pile etc.;Stake top structure mainly has rubble reinforcement cushion, dirt reinforcement cushion, armored concrete pile cover and raft The patterns such as plate.If interlayer containing basalt etc. is difficult to pass through in chance soft foundation, generally use engineering driller pilot hole, but this place The requirement of reason method Construction control is stringent, progress is slow, project cost is excessively high.
Therefore, it is necessary to provide the ruggedized construction and reinforcement means of a kind of fast, low cost the roadbed ground of construction speed, make It is suitable for the roadbed ground of basaltic layer structure is pressed from both sides with Soft Soil Layer.
Utility model content
The purpose of this utility model is to solve defect in the prior art, provides a kind of Soft Soil Layer folder basaltic layer knot The ruggedized construction of the roadbed ground of structure.
The technical solution that the utility model is proposed with regard to above-mentioned technical problem is as follows:
The utility model provides a kind of ruggedized construction of the roadbed ground for Soft Soil Layer folder basaltic layer structure, packet It includes:
At least two ranked first reinforcing pile, and each first reinforcing pile top is extend into the roadbed, and described first adds Gu stake lower end sequentially passes through the Soft Soil Layer on the basaltic layer top of the roadbed ground, basaltic layer and basaltic layer lower part Soft Soil Layer;
At least one arranges the 2nd reinforcing pile, and each second reinforcing pile is arranged at the Soft Soil Layer on the basaltic layer top In.
Preferably, further include:Blotter is laid on the weak soil layer surface on the basaltic layer top;And each institute The top for stating the second reinforcing pile is connect with the blotter.
Preferably, also it is embedded with reinforcer inside the blotter.
Preferably, the reinforcer is TGXG.
Preferably, the roadbed is internally provided with loading plate;And each first reinforcing pile top extend into it is described In loading plate.
Preferably, the lower face of the loading plate is provided with concrete cushion;And each first reinforcing pile top is equal It is being extend into the loading plate after the concrete cushion.
Preferably, each first reinforcing pile lower end extend into supporting course or is abutted with supporting course.
Preferably, first reinforcing pile is that long stake is perfused in reinforced concrete drilling;Second reinforcing pile is cement bonded sand Slurry stirring stub.
Preferably, the upper surface of the roadbed is additionally provided with surface layer of subgrade bed.
The utility model is to press from both sides basalt ground for deep (pine) weak soil, provides a kind of settled for high-speed railway and becomes The foundation stabilization knot of " reinforced concrete drilling is perfused long stake+loading plate+cement mortar and stirs stub+blotter " of shape control Structure and reinforcement means.Wherein, the part of " long stake+loading plate is perfused in reinforced concrete drilling " is mainly used for settlement of foundation control System, loading plate are placed in embankment surface layer of subgrade bed bottom surface, and long stake, which is perfused, using reinforced concrete drilling penetrates top soft stratum, the Black Warrior Rock interlayer, lower part soft stratum to lower part supporting course;" cement mortar stirs stub+blotter " part is then mainly used for the Black Warrior The processing of the above soft stratum of rock improves the stability of ground with this, reduces top soft foundation and grows stake to armored concrete Negative friction.
Description of the drawings
Fig. 1 is the schematic cross-sectional view of the ruggedized construction of the utility model embodiment one.
Fig. 2 is the stream for the reinforcement means that the Soft Soil Layer of the utility model embodiment two presss from both sides the roadbed ground of basaltic layer structure Cheng Tu.
Specific implementation mode
For a clearer understanding of the technical features, objectives and effects of the utility model, now control attached drawing is detailed Illustrate specific embodiment of the present utility model.
Embodiment one:
Fig. 1 shows the schematic cross-sectional view of the ruggedized construction in the present embodiment, and the ruggedized construction in the utility model can The roadbed ground of basaltic layer structure is pressed from both sides suitable for Soft Soil Layer, the Soft Soil Layer folder basaltic layer structure is from top to bottom, successively For the structure of Soft Soil Layer-basaltic layer-Soft Soil Layer, and the weak soil includes mollisol.The ruggedized construction includes:
At least two ranked first reinforcing pile 5, and each first reinforcing pile, 5 top is extend into the roadbed 100, and described One reinforcing pile, 5 lower end sequentially passes through Soft Soil Layer, basaltic layer and the basaltic layer on the basaltic layer top of the roadbed ground The Soft Soil Layer of lower part, 5 lateral arrangement of the first reinforcing pile, and quantity are 2 or more, can be arranged in a symmetrical uniformly spaced setting;Described The diameter and type of one reinforcing pile 5 can be depending on actual reinforcing needs, and e.g., in the present embodiment, first reinforcing pile 5 is Long stake, a diameter of 800-2000mm, particularly preferably 1200mm is perfused in reinforced concrete drilling;And in order to ensure the firm of structure Property, each first reinforcing pile, 5 lower end extend into supporting course and fixes or abutted with supporting course simultaneously;
At least one arranges the 2nd reinforcing pile 4, and the second reinforcing pile 4 is disposed longitudinally on the basaltic layer top described in each row Soft Soil Layer in, 4 lateral arrangement of the second reinforcing pile, and quantity be 2 or more, can uniform intervals setting;Likewise, described The diameter and type of two reinforcing piles 4 can be depending on actual reinforcing needs, and e.g., in the present embodiment, second reinforcing pile 4 is Cement mortar stirs stub, a diameter of 300-1000mm, particularly preferably 500mm.
In the present embodiment, first reinforcing pile 5 is mainly used for settlement control, and the second reinforcing pile 4 is mainly used for profound The processing of Wu Yan or more soft stratums, improves the stability of ground, and reduction top soft foundation is grown stake to armored concrete and born Friction.By the way of it is combined using long-short pile processing, rigid pile is mutually coordinated with flexible pile effect, Technological Economy is reasonable, applicable Property it is strong, have apparent technical economic benefit.
Meanwhile the ruggedized construction further includes:Blotter 3 is laid on the Soft Soil Layer table on the basaltic layer top Face, and extending direction of the blotter 3 along the cross section of the roadbed ground extends;And the top of each second reinforcing pile 4 Portion is connect with the blotter 3, meanwhile, the upper end of the bottom of each second reinforcing pile 4 with the basaltic layer Face abuts.Preferably, 3 thickness of the blotter is 0.4-1.0m (particularly preferably 0.5m), particularly preferably graded broken stone Bed course, and the grain size of rubble is not more than 50mm, preferably 20mm.
To further enhance the settlement Control effect of basaltic layer top Soft Soil Layer, also it is embedded inside the blotter 3 There is reinforcer, and the reinforcer is TGXG.
Meanwhile being also set up inside the roadbed 100 and have loading plate 1 (such as by pouring), the loading plate 1 can be by coagulation Soil is made, and the upper surface of the loading plate 1 and the upper surface of the roadbed 100 maintain an equal level, on this basis, the roadbed 100 Upper surface be additionally provided with surface layer of subgrade bed 200, and 200 0.4-0.6 meters of thickness of the surface layer of subgrade bed, filler is graded broken stone, and rubble Grain size is no more than 50mm;
Each first reinforcing pile, 5 top is extend into the loading plate 1;More preferably, to be held described in reinforcing The lower face of the degree that is connected firmly between support plate 1 and the first reinforcing pile 5, the loading plate 1 is additionally provided with concrete mats simultaneously Layer 2, the top of each first reinforcing pile 5 is being extend into after the concrete cushion 2 in the loading plate, thus The top of first reinforcing pile 5 is more firmly fixed in the loading plate 1.
Embodiment two:
Fig. 2 shows the reinforcement means that a kind of Soft Soil Layer presss from both sides the roadbed ground of basaltic layer structure comprising following steps:
S1, it at least one is arranged in the Soft Soil Layer on basaltic layer top arranges the 2nd reinforcing pile 4;
S2, it is laid with blotter 3 on the top of the Soft Soil Layer on the basaltic layer top, and makes each described second to add Gu the top of stake 4 is connect with the blotter 3;
S3, the placement in layers above the blotter 3 to form roadbed 100, and are arranged inside the roadbed 100 Loading plate 1;
S4, the first reinforcing pile 5 of setting so that 5 top of the first reinforcing pile is extend into the roadbed 100, and is made The lower end of first reinforcing pile 5 sequentially pass through the Soft Soil Layer on the basaltic layer top of the roadbed ground, basaltic layer and It extend into supporting course after the Soft Soil Layer of basaltic layer lower part or is abutted with supporting course;
S5, in 100 upper surface placement in layers surface layer of subgrade bed 200 of the roadbed.
It should be noted that the technical characteristic in above-described embodiment one, two can in any combination, arbitrarily combination is obtained Technical solution belongs to the scope of protection of the utility model.
In conclusion the utility model is to press from both sides basalt ground for deep (pine) weak soil, provide a kind of for high speed " reinforced concrete drilling is perfused long stake+loading plate+cement mortar and stirs stub+blotter " of railway settlement control Foundation reinforcing structure and reinforcement means.Wherein, the part of " long stake+loading plate is perfused in reinforced concrete drilling " is mainly used for ground Base settlement Control, loading plate are placed in embankment surface layer of subgrade bed bottom surface, and long stake, which is perfused, using reinforced concrete drilling penetrates top weakness Stratum, basalt interlayer, lower part soft stratum to lower part supporting course;It then leads " cement mortar stirs stub+blotter " part It is used for the processing of the above soft stratum of basalt, the stability of ground is improved with this, reduces top soft foundation to reinforcing bar Concrete grows the negative friction of stake.Therefore, the utility model use long-short pile processing be combined, rigid pile and flexible pile effect phase The mode of coordination so that Technological Economy rationally, strong applicability, have apparent technical economic benefit.
The above is only the preferred embodiment of the present invention, is not intended to limit the utility model, all in this practicality Within novel spirit and principle, any modification, equivalent replacement, improvement and so on should be included in the guarantor of the utility model Within the scope of shield.

Claims (9)

1. a kind of ruggedized construction of the roadbed ground of Soft Soil Layer folder basaltic layer structure, which is characterized in that including:
At least two ranked first reinforcing pile, and each first reinforcing pile top is extend into the roadbed, first reinforcing pile Lower end sequentially pass through the Soft Soil Layer on the basaltic layer top of the roadbed ground, basaltic layer and basaltic layer lower part weak soil Layer;
At least one arranges the 2nd reinforcing pile, and each second reinforcing pile is arranged in the Soft Soil Layer on the basaltic layer top.
2. ruggedized construction as described in claim 1, which is characterized in that further include:Blotter is laid on the basalt The weak soil layer surface on layer top;And the top of each second reinforcing pile is connect with the blotter.
3. ruggedized construction as claimed in claim 2, which is characterized in that be also embedded with reinforcer inside the blotter.
4. ruggedized construction as claimed in claim 3, which is characterized in that the reinforcer is TGXG.
5. ruggedized construction as described in claim 1, which is characterized in that the roadbed is internally provided with loading plate;And each institute The first reinforcing pile top is stated to extend into the loading plate.
6. ruggedized construction as claimed in claim 5, which is characterized in that the lower face of the loading plate is provided with concrete mats Layer;And each first reinforcing pile top is being extend into after the concrete cushion in the loading plate.
7. ruggedized construction as described in claim 1, which is characterized in that each first reinforcing pile lower end extend into supporting course Or it is abutted with supporting course.
8. ruggedized construction as described in claim 1, which is characterized in that first reinforcing pile is perfused for reinforced concrete drilling Long stake;Second reinforcing pile is that cement mortar stirs stub.
9. ruggedized construction as described in claim 1, which is characterized in that the upper surface of the roadbed is additionally provided with surface layer of subgrade bed.
CN201721624975.7U 2017-11-28 2017-11-28 Soft Soil Layer presss from both sides the ruggedized construction of the roadbed ground of basaltic layer structure Active CN208055780U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721624975.7U CN208055780U (en) 2017-11-28 2017-11-28 Soft Soil Layer presss from both sides the ruggedized construction of the roadbed ground of basaltic layer structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721624975.7U CN208055780U (en) 2017-11-28 2017-11-28 Soft Soil Layer presss from both sides the ruggedized construction of the roadbed ground of basaltic layer structure

Publications (1)

Publication Number Publication Date
CN208055780U true CN208055780U (en) 2018-11-06

Family

ID=63996665

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721624975.7U Active CN208055780U (en) 2017-11-28 2017-11-28 Soft Soil Layer presss from both sides the ruggedized construction of the roadbed ground of basaltic layer structure

Country Status (1)

Country Link
CN (1) CN208055780U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107938455A (en) * 2017-11-28 2018-04-20 中铁工程设计咨询集团有限公司 The ruggedized construction and reinforcement means of the roadbed ground of Soft Soil Layer folder basaltic layer structure
CN114808582A (en) * 2022-05-24 2022-07-29 北京城建华威公路工程有限公司 Anti-settlement reinforcing structure for soft soil roadbed and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107938455A (en) * 2017-11-28 2018-04-20 中铁工程设计咨询集团有限公司 The ruggedized construction and reinforcement means of the roadbed ground of Soft Soil Layer folder basaltic layer structure
CN114808582A (en) * 2022-05-24 2022-07-29 北京城建华威公路工程有限公司 Anti-settlement reinforcing structure for soft soil roadbed and construction method thereof

Similar Documents

Publication Publication Date Title
CN107938455A (en) The ruggedized construction and reinforcement means of the roadbed ground of Soft Soil Layer folder basaltic layer structure
CN106522037B (en) Side broad way based structures based on existing railway roadbed and its construction method
CN103276639B (en) Roadbed structure for deep soft soil region
CN104278608A (en) Novel highway embankment widened structure and construction method
CN110578290B (en) Bridge abutment back backfill structure and construction method thereof
CN101634143A (en) Method for treating spiral oil-extruding filling pile composite foundation in stratum containing soft clay
CN101463599A (en) Bidirectional reinforcing and water drainage reinforcing means for highway soft soil foundation
CN204940030U (en) Reconstruction and extension project new-old concrete bond Pavement mosaic structure
CN109235159A (en) A kind of road structure and construction method for helping wide enlarging for runing high-speed railway
CN104532714B (en) Roadbed structure for treating deep soft soil karst foundation
CN206157508U (en) Light soil roadbed structure
CN208055780U (en) Soft Soil Layer presss from both sides the ruggedized construction of the roadbed ground of basaltic layer structure
CN103643691B (en) A kind of sintering water penetration pile method for processing foundation
CN206706479U (en) A kind of light-duty embankment suitable for deep soft soil foundation
CN102839683B (en) Granular pile-permeable concrete stake dual compound foundation and processing method
CN107841908A (en) For eliminating the road structure of the high embankment lateral variation sedimentation in high-speed railway abrupt slope
CN104695417B (en) A kind of manufacture method of grouting behind shaft or drift lining broken stone pile
CN102839647B (en) Stirring pile-permeable concrete pile compound foundation and treatment method thereof
CN103276716B (en) A kind of changeover portion CFG stake and mattress layer composite foundation stabilization construction method
CN211872447U (en) Side wide roadbed structure
CN202787295U (en) Dispersive pile-permeable concrete pile novel dual compound foundation
RU2593282C1 (en) Method for reinforcement of railway road bed on weak base
CN210797245U (en) Structure is backfilled to bridgehead abutment back of body
CN208933944U (en) Relative settlement optimal control structure
CN113914304A (en) CFG pile long spiral drill hole core pipe pumping mixture pouring pile-forming construction method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant