CN208039805U - Novel building engineering means for fastening scaffolding - Google Patents
Novel building engineering means for fastening scaffolding Download PDFInfo
- Publication number
- CN208039805U CN208039805U CN201820413592.3U CN201820413592U CN208039805U CN 208039805 U CN208039805 U CN 208039805U CN 201820413592 U CN201820413592 U CN 201820413592U CN 208039805 U CN208039805 U CN 208039805U
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- fixing
- scaffolding
- fixing sleeve
- female connector
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Mutual Connection Of Rods And Tubes (AREA)
Abstract
Novel building engineering means for fastening scaffolding,Including No.1 scaffolding steel pipe,No. two scaffolding steel pipes,No.1 fixing sleeve,No. two fixing sleeves,Steel pipe connecting female connector,No.1 fixing insertion,No. two fixing insertions,Pass through No. two fixing bolt joint steel pipe connector sleeves on the outside of the No.1 scaffolding steel pipe,Fastener for connection set has multiple steel pipe connecting access slots,Joint steel pipe link slot on the right side of No. two scaffolding steel pipes,No. two scaffolding steel pipe tops connect No.1 fixing sleeve lower part by No. two scaffolding steel pipes,No.1 fixing sleeve top passes through No.1 screw joint steel pipe connector sleeve top,No.1 screw sequentially passes through No.1 fixing sleeve,Steel pipe connecting female connector connects No.1 scaffolding steel pipe,No.1 fixing insertion top connects No.1 fixing sleeve by No. three screws,No.1 fixing insertion lower part sequentially passes through No.1 fixing sleeve,Steel pipe connecting female connector connects No. two scaffolding steel pipe tops.
Description
Technical field
The utility model is related to scaffold field more particularly to a kind of novel building engineering means for fastening scaffolding.
Background technology
In architectural engineering scaffold in use, since architectural engineering scaffolding steel pipe connector sleeve overall structure is unreasonable,
Make scaffolding steel pipe connection built on the sand, to cause the loosening of architectural engineering scaffold to collapse, injures staff by a crashing object, give work people
Member brings security risk.
Utility model content
The utility model is directed to deficiencies of the prior art, provides a kind of novel building engineering foot reasonable for structure
Hand cradle attachment device.
The purpose of this utility model is to be achieved through the following technical solutions:
A kind of novel building engineering means for fastening scaffolding, including No.1 scaffolding steel pipe, No. two scaffolding steel pipes, No.1s
Fixing sleeve, No. two fixing sleeves, steel pipe connecting female connector, No.1 fixing insertion, No. two fixing insertions, the No.1 scaffolding steel pipe outside
By No. two fixing bolt joint steel pipe connector sleeves, fastener for connection set has multiple steel pipe connecting access slots, No. two scaffolding steel pipe right sides
Side joint steel pipe link slot, No. two scaffolding steel pipe tops connect No.1 fixing sleeve lower part by No. two scaffolding steel pipes, described
No.1 fixing sleeve top sequentially passes through No.1 fixing sleeve, steel pipe by No.1 screw joint steel pipe connector sleeve top, No.1 screw
Connector sleeve connects No.1 scaffolding steel pipe, and No.1 fixing insertion top connects No.1 fixing sleeve by No. three screws, and No.1 is fixed
Plate lower part sequentially passes through No.1 fixing sleeve, steel pipe connecting female connector connects No. two scaffolding steel pipe tops, No. two scaffold steel
Pipe lower part by No.1 fixing bolt connect No. two fixing sleeve tops, No.1 fixing bolt sequentially pass through No.1 fixing sleeve, No. two
Scaffolding steel pipe, No. two fixing sleeves are connected and fixed nut, and No. two fixing sleeve lower parts pass through under No. two screw joint steel pipe connector sleeves
Portion.
No. two screws sequentially pass through No. two fixing sleeves, steel pipe connecting female connector connection No.1 scaffolding steel pipe, No. two fixations
Plate lower part connects No. two fixing sleeves by No. three screws, and No. two fixing insertion tops sequentially pass through No. two fixing sleeves, steel pipe connectings
Female connector connects No. two scaffolding steel pipe lower parts.
Advantageous effect:
Under the action of No.1 fixing insertion, No.1 fixing sleeve is set to be connect with No. two scaffolding steel pipes more firm, effectively
Prevent No.1 fixing sleeve to be detached with No. two scaffolding steel pipes, keep overall structure more reasonable, in the effect of No. two fixing insertions
Under, so that No. two fixing sleeves is connect with No. two scaffolding steel pipes more firm, effectively prevents No. two fixing sleeves and No. two foot hands
Frame steel pipe detaches, and keeps overall structure more reasonable, at the same No.1 fixing sleeve, No. two fixing sleeves collective effect under, increase two
The contact area of number scaffolding steel pipe and steel pipe connecting female connector, makes No. two scaffolding steel pipes be connect with steel pipe connecting female connector more firm,
Keep overall structure more reasonable.
Description of the drawings
Fig. 1 is novel building engineering means for fastening scaffolding partial sectional view described in the utility model.
Fig. 2 is novel building engineering means for fastening scaffolding structural schematic diagram described in the utility model.
Specific implementation mode
The utility model is described in further detail below according to drawings and examples:
A kind of novel building engineering means for fastening scaffolding, including 01, No. two scaffolding steel pipe 02 of No.1 scaffolding steel pipe,
06, No. two 03, No. two fixing sleeve 04 of No.1 fixing sleeve, steel pipe connecting female connector 05, No.1 fixing insertion fixing insertion 07, the No.1
By No. two 11 joint steel pipe connector sleeves 05 of fixing bolt, steel pipe connecting female connector 05 has multiple steel pipe connectings in scaffolding steel pipe 01 outside
Access slot 12, No. two 02 right side joint steel pipe link slots 12 of scaffolding steel pipe, No. two 02 tops of scaffolding steel pipe pass through No. two foot hands
Frame steel pipe 02 connects 03 lower part of No.1 fixing sleeve, and 03 top of No.1 fixing sleeve passes through 08 joint steel pipe connector sleeve of No.1 screw
05 top, No.1 screw 08 sequentially passes through No.1 fixing sleeve 03, steel pipe connecting female connector 05 connects No.1 scaffolding steel pipe 01, and No.1 is solid
Determine 06 top of plate and connect No.1 fixing sleeve 03 by No. three screws 10,06 lower part of No.1 fixing insertion sequentially passes through No.1 and fixes
Set 03, steel pipe connecting female connector 05 connect No. two 02 tops of scaffolding steel pipe, and 02 lower part of No. two scaffolding steel pipes is solid by No.1
Determine bolt 09 and connect No. two 04 tops of fixing sleeve, No.1 fixing bolt 09 sequentially passes through 03, No. two scaffold steel of No.1 fixing sleeve
02, No. two fixing sleeve 04 of pipe is connected and fixed nut, and No. two 04 lower parts of fixing sleeve pass through No. two 13 joint steel pipe connector sleeves 05 of screw
Lower part.
No. two screws 13 sequentially pass through No. two fixing sleeves 04, steel pipe connecting female connector 05 connects No.1 scaffolding steel pipe 01,
No. two 07 lower parts of fixing insertion connect No. two fixing sleeves 04 by No. three screws 10, and No. two 07 tops of fixing insertion sequentially pass through two
Number fixing sleeve 04, steel pipe connecting female connector 05 connect No. two 02 lower parts of scaffolding steel pipe.
Under the action of No.1 fixing insertion 06, No.1 fixing sleeve 03 is set to be connect with No. two scaffolding steel pipes 02 more steady
Gu effectively preventing No.1 fixing sleeve 03 to detach with No. two scaffolding steel pipes 02, keep overall structure more reasonable, in No. two fixations
Under the action of plate 07, so that No. two fixing sleeves 04 is connect with No. two scaffolding steel pipes 02 more firm, effectively prevent No. two
Fixing sleeve 04 is detached with No. two scaffolding steel pipes 02, keeps overall structure more reasonable, while in 03, No. two fixing sleeve of No.1 fixing sleeve
Under 04 collective effect, the contact area of No. two scaffolding steel pipes 02 and steel pipe connecting female connector 05 is increased, makes No. two scaffold steel
Pipe 02 connect more firm with steel pipe connecting female connector 05, keeps overall structure more reasonable.
Claims (2)
1. a kind of novel building engineering means for fastening scaffolding, it is characterized in that:Including No.1 scaffolding steel pipe, No. two scaffold steel
Pipe, No.1 fixing sleeve, No. two fixing sleeves, steel pipe connecting female connector, No.1 fixing insertion, No. two fixing insertions, the No.1 scaffold
There are multiple steel pipe connecting access slots, No. two foot hands by No. two fixing bolt joint steel pipe connector sleeves, fastener for connection set on the outside of steel pipe
Joint steel pipe link slot on the right side of frame steel pipe, No. two scaffolding steel pipe tops are connected by No. two scaffolding steel pipes under No.1 fixing sleeve
Portion, No.1 fixing sleeve top are sequentially passed through No.1 and are fixed by No.1 screw joint steel pipe connector sleeve top, No.1 screw
Set, steel pipe connecting female connector connect No.1 scaffolding steel pipe, and No.1 fixing insertion top connects No.1 fixing sleeves by No. three screws, and one
Number fixing insertion lower part sequentially passes through No.1 fixing sleeve, steel pipe connecting female connector connects No. two scaffolding steel pipe tops, No. two feet
Hand cradle steel pipe lower part connects No. two fixing sleeve tops by No.1 fixing bolt, and No.1 fixing bolt sequentially passes through No.1 and fixes
Set, No. two scaffolding steel pipes, No. two fixing sleeves are connected and fixed nut, and No. two fixing sleeve lower parts are connected by No. two screw joint steel pipes
Female connector lower part.
2. novel building engineering means for fastening scaffolding according to claim 1, it is characterized in that:No. two screws according to
Secondary to pass through No. two fixing sleeves, steel pipe connecting female connector connection No.1 scaffolding steel pipe, No. two fixing insertion lower parts are connected by No. three screws
No. two fixing sleeves are connect, No. two fixing insertion tops sequentially pass through No. two fixing sleeves, steel pipe connecting female connector connects No. two scaffolding steel pipes
Lower part.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820413592.3U CN208039805U (en) | 2018-03-27 | 2018-03-27 | Novel building engineering means for fastening scaffolding |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820413592.3U CN208039805U (en) | 2018-03-27 | 2018-03-27 | Novel building engineering means for fastening scaffolding |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208039805U true CN208039805U (en) | 2018-11-02 |
Family
ID=63948835
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820413592.3U Active CN208039805U (en) | 2018-03-27 | 2018-03-27 | Novel building engineering means for fastening scaffolding |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208039805U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110565940A (en) * | 2019-08-29 | 2019-12-13 | 中建二局第一建筑工程有限公司 | Scaffold for bearing construction |
-
2018
- 2018-03-27 CN CN201820413592.3U patent/CN208039805U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110565940A (en) * | 2019-08-29 | 2019-12-13 | 中建二局第一建筑工程有限公司 | Scaffold for bearing construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208039805U (en) | Novel building engineering means for fastening scaffolding | |
CN201428238Y (en) | Expansion sleeve type scaffold connecting part | |
CN201190413Y (en) | Double-poling steel tube rectangular fastener | |
CN208039806U (en) | A kind of architectural engineering scaffold device | |
CN210790738U (en) | Inner hexagonal powerful sleeve | |
CN209114839U (en) | A kind of room is built with simple scaffold | |
CN210917759U (en) | Construction locking device for building steel structure | |
CN201443198U (en) | Plug-in type scaffold | |
CN207161881U (en) | A kind of para-seismic support longitudinal bracing connector | |
CN207245185U (en) | Steel structure concrete building template | |
CN203034788U (en) | Flexible scaffold capable of being rapidly assembled and detached | |
CN207462597U (en) | Novel feather ball-collecting rack fixing device | |
CN207033934U (en) | A kind of suspension bracket turnbuckle | |
CN204326513U (en) | Jaw type Outsourcing-type is to clasp | |
CN205777621U (en) | A kind of construction provisional protection hurdle | |
CN208056638U (en) | Building engineering construction fixing templates | |
CN204920267U (en) | Guardrail bar is prevented to adjustable stair of regularization | |
CN205908010U (en) | Curtain wall construction scaffold frame is wall spare device even | |
CN205934953U (en) | Assembled reinforced concrete tower pole basis | |
CN201031500Y (en) | Building foot-plate | |
CN203961088U (en) | For the scaffolding steel pipe linkage of multistory building | |
CN203906490U (en) | Multifunctional u-shaped adjusting bolt | |
CN210289096U (en) | Anti-skidding building steel fastener | |
CN209397901U (en) | A kind of scaffold track-type facilities | |
CN208200307U (en) | A kind of civil engineering fixes device with elevator |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |