CN208034019U CN201820238286.0U CN201820238286U CN208034019U CN 208034019 U CN208034019 U CN 208034019U CN 201820238286 U CN201820238286 U CN 201820238286U CN 208034019 U CN208034019 U CN 208034019U
Authority
CN
China
Prior art keywords
tube socket
mounting groove
pipe
jack
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820238286.0U
Other languages
Chinese (zh)
Inventor
杨峰
辛亮智
黄三子
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Special Equipment Co Ltd
Original Assignee
Guangzhou Special Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Special Equipment Co Ltd filed Critical Guangzhou Special Equipment Co Ltd
Priority to CN201820238286.0U priority Critical patent/CN208034019U/en
Application granted granted Critical
Publication of CN208034019U publication Critical patent/CN208034019U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Butt Welding And Welding Of Specific Article (AREA)

Abstract

The utility model discloses pipes to dock balancer, including workbench, workbench is equipped with mounting groove, fixed tube socket, mobile tube socket, fixed tube socket is mounted on by the first standing screw on mounting groove, mobile tube socket is mounted on by the second standing screw on mounting groove, and mobile tube socket is connect by connecting screw with fixed tube socket;At least provided with 1 jack between every group of strip mounting groove, each jack in every group of mounting groove is in line with corresponding jack in other group of mounting groove;Further include having and the matched inserted sheet of jack.The utility model has the advantage of:Various sizes of pipe, the pipe that minimum solderable centre-to-centre spacing is 175mm can be welded equipped with mobile tube socket;Quickly multiple mobile tube socket installations can be in line equipped with jack and inserted sheet;Can single-tube welding two-tube can also weld, single tube, two-tube butt joint standardization, docking the body of rod more balance.

Description

Pipe docks balancer
Technical field
The utility model is related to a kind of pipes to dock balancer.
Background technology
Building, stage are built circular tube truss in place and are emerged in large numbers.For the component of Complicated Loads, pipe connection and entire component Carrying, deformability it is closely bound up.When pipe is operated with pipe butt welding, often pipe butt joint is easily bent deformation, Cause single tube or two-tube butt joint nonstandard, seriously affects quality.
Utility model content
The purpose of this utility model is to provide pipes to dock balancer.
The utility model adopts the following technical solution in order to achieve the above object:
Pipe docks balancer, including workbench, and it is fixed that the workbench is equipped at least 2 groups of mounting grooves, at least two Tube socket, at least two movable type tube socket, the fixed tube socket are mounted on by the first standing screw on mounting groove, the movement Formula tube socket is mounted on by the second standing screw on mounting groove, and the movable type tube socket is connected by connecting screw and fixed tube socket It connects;
Every group of mounting groove is equipped with 2 strip mounting grooves, at least provided with 1 jack between every group of 2 strip mounting grooves, often Each jack in group mounting groove is in line with corresponding jack in other group of mounting groove;
Further include having and the matched inserted sheet of the jack.
Further, the fixed tube socket is equipped with the first pipe and places position and first base, and first pipe is placed Position both sides are equipped with the first standing screw hole downward through first base, and first standing screw passes through the first standing screw hole Reconnection has the first fixing nut to be fixed on strip mounting groove;
The movable type tube socket is equipped with the second pipe and places position and second base, and second pipe is placed position both sides and is equipped with Downward through the second standing screw hole of second base, second standing screw, which passes through the second standing screw hole to reconnect, the Two fixing nuts are to be fixed on strip mounting groove.
Further, the fixed tube socket is to be integrally formed, and the movable type tube socket is to be integrally formed.
Further, first pipe places position and the second pipe places position and is equipped with U-type groove
Further, the first base and second base are equipped with perforative connecting screw mounting hole, the connection spiral shell Bar mounting hole is parallel with strip mounting groove;
The connecting screw passes through the connecting screw mounting hole of first base and second base, connecting screw end engaging lug Piece nut, connecting screw is connected with connecting screw nut with junction on the inside of first base and second base, to fixed Tube socket and mobile tube socket are connected and fixed.
Further, the inserted sheet is L-shaped, and galianconism is matched with jack, and height is less than connection spiral shell when galianconism is inserted in jack The height of stem nut.
Further, the workbench includes carrier and mounting plate, and the mounting plate is mounted on carrier, the length Mounting groove is arranged on the mounting plate.
Further, the strip mounting groove is parallel to each other, and strip mounting groove both ends endpoint is in line respectively.
The utility model has the advantage of:Various sizes of pipe can be welded equipped with mobile tube socket, during minimum is solderable The heart is away from the pipe for 175mm;Quickly multiple mobile tube socket installations can be in line equipped with jack and inserted sheet;It being capable of single tube weldering It connects and two-tube can also weld, single tube, two-tube butt joint standardization, docking pipe ontology more balance.
Description of the drawings
Attached drawing described herein is used to provide a further understanding of the present invention, and is constituted part of this application, It does not constitute improper limits to the present invention, in the accompanying drawings:
Fig. 1 is the utility model embodiment overall structure diagram;
Fig. 2 is the utility model side structure schematic diagram;
Fig. 3 is the structural schematic diagram of carrier;
Fig. 4 is the structural schematic diagram of mounting plate;
Fig. 5 is plate-inserting structure schematic diagram;
Fig. 6 is fixed tube socket and mobile tube socket mounting structure schematic diagram;
Fig. 7 is mobile tube socket structural schematic diagram;
Fig. 8 is fixed tube socket structural schematic diagram;
Fig. 9 is connecting screw structural schematic diagram;
Figure 10 is the first standing screw, the second standing screw, the first fixing nut, the second fixing nut, ear nut Structural schematic diagram;
Figure 11 is the structural schematic diagram that inserted sheet is inserted in jack;
Figure 12 is that inserted sheet is inserted in jack from mounting plate bottom upward structural schematic diagram.
Specific implementation mode
The utility model is described in detail below in conjunction with attached drawing and specific embodiment, herein showing with the utility model Meaning property embodiment and explanation are used for explaining the utility model, but are not intended to limit the scope of the present invention.
As shown in figs. 1-12, pipe docks balancer, including workbench, the workbench include carrier 1 and mounting plate 2, the mounting plate 2 is installed on the carrier 1 there, and the mounting plate 2 is equipped at least 2 groups of mounting grooves, the fixed tube socket of at least two 4, at least two movable type tube socket 3, every group of mounting groove are equipped with 2 strip mounting grooves 21, and the fixed tube socket 4 is solid by first Screw rod 51 is determined on strip mounting groove 21, and the movable type tube socket 3 is installed by the second standing screw 61 mounted on strip On slot 21, the movable type tube socket 3 is connect by connecting screw 7 with fixed tube socket 4;
At least provided with 1 jack 22 between every group of 2 strip mounting grooves 21, each jack 22 in every group of mounting groove is equal Jack corresponding in other group of mounting groove 22 is in line;
Further include having and 22 matched inserted sheet 23 of the jack.
The fixed tube socket 4 is equipped with the first pipe and places position 41 and first base 42, and first pipe places position 41 Both sides are equipped with the first standing screw hole 421 downward through first base 42, and first standing screw 51 passes through first to fix The reconnection of screw hole 421 has the first fixing nut 52 to be fixed on strip mounting groove 21;
The movable type tube socket 3 is equipped with the second pipe and places position 31 and second base 32, and second pipe places position 31 Both sides are equipped with the second standing screw hole 321 downward through second base 32, and second standing screw 61 passes through second to fix The reconnection of screw hole 321 has the second fixing nut 62 to be fixed on strip mounting groove 21.
The fixed tube socket 4 is to be integrally formed, and the movable type tube socket 3 is to be integrally formed.
First pipe places position 41 and the second pipe places position 31 and is equipped with U-type groove.
The first base 42 and second base 32 are equipped with perforative connecting screw mounting hole 422,322, the connection Screw rod mounting hole 422,322 is parallel with strip mounting groove 21;
The connecting screw 7 passes through the connecting screw mounting hole 422,322 of first base 42 and second base 32, connects spiral shell 7 end of bar connects ear nut 71, and connecting screw 7 is connected with first base 42 and 32 inside junction of second base and connect spiral shell Stem nut 72, to which fixed tube socket 4 and mobile tube socket 3 are connected and fixed.
The inserted sheet 23 is L-shaped, and galianconism 231 is matched with jack 22, and height is less than connection when galianconism 231 is inserted in jack 22 The height of bolt and nut 72.
The strip mounting groove is parallel to each other, and strip mounting groove both ends endpoint is in line respectively.
The working condition of the utility model is:
The case where being docked for single tube directly can utilize fixed tube socket 4 to complete.With the first standing screw 51 many It is mounted in 21 one end of corresponding mounting groove in 2 fixed tube sockets 4, all fixed tube sockets 4 are on the same straight line, will 2 pipe butt tubes are placed on fixed tube socket 4, it is only necessary to manually be killed, for more than 10kg or more, no bending is existing The pipe butt tube of elephant, does not need manual pressure, and dead weight can be accomplished to be adjacent to tube socket U-type groove.2 pipe butt tubes can be carried out Welding operation.
Fixed tube socket 4 is first fixed on corresponding mounting groove 21 1 by the case where for two-tube welding according to aforesaid operations In end, all fixed tube sockets 4 are on the same straight line, and then no less than 2 mobile tube sockets 3 are individually placed to corresponding In strip mounting groove 21, mobile tube socket 3 is connected with corresponding fixed tube socket 4 with connecting screw 7, according to two-tube Centre-to-centre spacing requirement, is inserted in inserted sheet 23 with fixed tube socket 4 in suitable jack 22, turn connecting screw 7 can be shifting Dynamic formula tube socket 3 is moved toward 4 direction of fixed tube socket, is blocked until encountering inserted sheet 23, you can with the second standing screw 61 shifting Dynamic formula tube socket 3 is fixed in mounting groove 21, takes inserted sheet 23 away, and in the end of connecting screw 7, connection ear nut 71, that is, complete one The installation of a movable type tube socket 3, other mobile tube sockets 3 are installed by above-mentioned installation method, can be quickly each mobile tube socket 3 Installation is in line, and then docking pipe can be welded, and has welded to the connection looped pipeline between welded pipe again after interface.
The utility model has the advantages that:Various sizes of pipe, minimum solderable center can be welded equipped with mobile tube socket Away from the pipe for 175mm;Quickly multiple mobile tube socket installations can be in line equipped with jack and inserted sheet;It being capable of single-tube welding Also it two-tube can weld, single tube, two-tube butt joint standardization, docking pipe ontology more balance.
The technical solution provided above the utility model embodiment is described in detail, used herein specifically A example is expounded the principle and embodiment of the utility model embodiment, and the explanation of above example is only applicable to help Assistant solves the principle of the utility model embodiment;Meanwhile for those of ordinary skill in the art, implementing according to the utility model Example, the there will be changes in specific implementation mode and application range, in conclusion the content of the present specification should not be construed as Limitations of the present invention.

Claims (8)

1. pipe docks balancer, it is characterised in that:
Including workbench, it is mobile that the workbench is equipped at least 2 groups of mounting grooves, the fixed tube socket of at least two, at least two Tube socket, the fixed tube socket are mounted on by the first standing screw on mounting groove, and the movable type tube socket is fixed by second Screw rod is mounted on mounting groove, and the movable type tube socket is connect by connecting screw with fixed tube socket;
Every group of mounting groove is equipped with 2 strip mounting grooves, at least provided with 1 jack, every group of peace between every group of 2 strip mounting grooves Each jack in tankage is in line with corresponding jack in other group of mounting groove;
Further include having and the matched inserted sheet of the jack.
2. pipe according to claim 1 docks balancer, it is characterised in that:
The fixed tube socket is equipped with the first pipe and places position and first base, and first pipe is placed position both sides and is equipped with downwards Through the first standing screw hole of first base, first standing screw, which passes through the first standing screw hole to reconnect, has first to consolidate Nut is determined to be fixed on strip mounting groove;
The movable type tube socket is equipped with the second pipe and places position and second base, and second pipe places position both sides equipped with downward Through the second standing screw hole of second base, second standing screw, which passes through the second standing screw hole to reconnect, has second to consolidate Nut is determined to be fixed on strip mounting groove.
3. pipe according to claim 2 docks balancer, it is characterised in that:
The fixed tube socket is to be integrally formed, and the movable type tube socket is to be integrally formed.
4. pipe according to claim 3 docks balancer, it is characterised in that:
First pipe places position and the second pipe places position and is equipped with U-type groove.
5. pipe according to claim 2 docks balancer, it is characterised in that:
The first base and second base are equipped with perforative connecting screw mounting hole, the connecting screw mounting hole and strip Mounting groove is parallel;
The connecting screw passes through the connecting screw mounting hole of first base and second base, connecting screw end to connect ear spiral shell Mother, connecting screw is connected with connecting screw nut with junction on the inside of first base and second base, to fixed tube socket It is connected and fixed with mobile tube socket.
6. pipe according to claim 5 docks balancer, it is characterised in that:
The inserted sheet is L-shaped, and galianconism is matched with jack, and height is less than the height of connecting screw nut when galianconism is inserted in jack.
7. pipe according to claim 1 docks balancer, it is characterised in that:
The workbench includes carrier and mounting plate, and the mounting plate is mounted on carrier, the strip mounting groove setting On the mounting plate.
8. pipe according to claim 1 docks balancer, it is characterised in that:
The strip mounting groove is parallel to each other, and strip mounting groove both ends endpoint is in line respectively.
CN201820238286.0U 2018-02-10 2018-02-10 Pipe docks balancer Active CN208034019U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820238286.0U CN208034019U (en) 2018-02-10 2018-02-10 Pipe docks balancer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820238286.0U CN208034019U (en) 2018-02-10 2018-02-10 Pipe docks balancer

Publications (1)

Publication Number Publication Date
CN208034019U true CN208034019U (en) 2018-11-02

Family

ID=63952848

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820238286.0U Active CN208034019U (en) 2018-02-10 2018-02-10 Pipe docks balancer

Country Status (1)

Country Link
CN (1) CN208034019U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110193693A (en) * 2019-06-14 2019-09-03 上海外高桥造船有限公司 Positioning tool and the service of connection devices

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110193693A (en) * 2019-06-14 2019-09-03 上海外高桥造船有限公司 Positioning tool and the service of connection devices

Similar Documents

Publication Publication Date Title
CN202570872U (en) Cold bending correction device for steel pipe rods
CN201702215U (en) Earth wire linear compression coupling pipe correcting device
CN208034019U (en) Pipe docks balancer
CN203926308U (en) A kind of quick installation expanding nut connecting fast for sheet metal part
CN202031935U (en) Pipeline connection device
CN101408070B (en) Steel tube direct connecting components
CN202090658U (en) Insert plate used for node connection of steel tubular tower, steel tubular tower and nodes thereof
CN204823665U (en) Platform spud leg semicircle pipe hoist
CN207848606U (en) A kind of New pipe holder
CN202914468U (en) Square tube connecting piece
CN203003412U (en) Corrector for assembling equipment barrel of pressure vessel
CN209828063U (en) Trampoline frame
CN214756153U (en) Assembled photovoltaic support convenient to fold
CN214479457U (en) Strain clamp stable in clamping
CN211542453U (en) Non-roundness correction device for port of large-diameter plastic pipeline
CN105987230A (en) Pipe clamp cross arm
CN107350680A (en) The flange bending weld jig of adjustable positioning
CN113179077A (en) Photovoltaic support convenient to fold and assemble and using method
CN210625453U (en) Lower guide rod structure
CN201310187Y (en) Steel tube straight connecting component
CN203857860U (en) Evaporator mounting component and heat exchanging device
CN205703094U (en) Multistation welding positioner
CN203962607U (en) A kind of connection structure for furniture
CN220935061U (en) Push rod arm and photovoltaic support
CN210978905U (en) PVC amortization elbow

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant