CN208024281U - Snow deposit drilling reducing hot melting drill head - Google Patents

Snow deposit drilling reducing hot melting drill head Download PDF

Info

Publication number
CN208024281U
CN208024281U CN201820520235.7U CN201820520235U CN208024281U CN 208024281 U CN208024281 U CN 208024281U CN 201820520235 U CN201820520235 U CN 201820520235U CN 208024281 U CN208024281 U CN 208024281U
Authority
CN
China
Prior art keywords
heat block
core
connecting rod
block
articulated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820520235.7U
Other languages
Chinese (zh)
Inventor
李亚洲
范晓鹏
帕维尔达拉拉伊
孙友宏
米沙
杨阳
王婷
李枭
赵高莉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jilin University
Original Assignee
Jilin University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jilin University filed Critical Jilin University
Priority to CN201820520235.7U priority Critical patent/CN208024281U/en
Application granted granted Critical
Publication of CN208024281U publication Critical patent/CN208024281U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Processing Of Stones Or Stones Resemblance Materials (AREA)

Abstract

The utility model discloses a kind of snow deposit drilling reducing hot melting drill heads, it include the first heat block, second heat block, core and connection core bar, wherein the first heat block and the second heat block are provided with several piece, first heat block and the second heat block, which interlock, is located at the border of core, connection core bar is threaded through the intermediate position of core, the lower end of connection core bar is fixed with core fixed block, it is articulated with first connecting rod on the madial wall of first heat block, the upper end of first connecting rod is articulated in the top of core by axis pin, it is articulated with second connecting rod on the madial wall of second heat block, the upper end of second connecting rod is also articulated in the top of core by axis pin, the lower part of first heat block is articulated in by axis pin on the compression bar of core fixed block, advantageous effect:It is simple in structure, reliable operation.And the drill bit is based on modular design, is convenient for changing damage component, improves the reliability of drilling tool, reduce making and maintenance cost.

Description

Snow deposit drilling reducing hot melting drill head
Technical field
The utility model is related to a kind of hot melting drill head, more particularly to a kind of snow deposit drilling reducing hot melting drill head.
Background technology
Currently, Antarctica is covered by thick ice sheet, the ice sheet of this huge thickness is to pass through long-term accumulation by accumulated snow Compaction and formed.From in the depth bounds of 60m~120m, there is no fully consolidated for snowfall below ice sheet surface to earth's surface Cheng Bing, but form closely knit granular snow layer.Currently, hot melt drilling technology has been widely used in the ice sheet drilling well of the South Pole.Hot melt In the fine and close ice sheet of drilling, the melt water of generation can not miss drill bit, and then reaming can occur make to be formed by drilling to be slightly larger than The diameter of hot melting drill head.And when granular snow layer is crept into, it is all missed into the gap of snow deposit around due to melting the melt water generated, So reaming phenomenon will not occur, the bore diameter of formation and the diameter of hot melting drill head are almost the same.It is raising and decentralizing in this way Lock of tool drilling is easily lead to during hot melt drilling tool.
Invention content
Purpose of the utility model is to solve provided the problem of being easy to cause lock of tool drilling when granular snow layer is crept into A kind of snow deposit drilling use reducing hot melting drill head.
Snow deposit drilling reducing hot melting drill head provided by the utility model include the first heat block, the second heat block, Core and connection core bar, wherein the first heat block and the second heat block are provided with several piece, the first heat block and the second heat block are handed over Mistake is located at the border of core, and connection core bar is threaded through the intermediate position of core, and the lower end for connecting core bar is fixed with core fixed block, First connecting rod is articulated on the madial wall of first heat block, the upper end of first connecting rod is articulated in the top of core by axis pin, the Second connecting rod is articulated on the madial wall of two heat blocks, the upper end of second connecting rod is also articulated in the top of core by axis pin, the The lower part of one heat block is articulated in by axis pin on the compression bar of core fixed block, and the lower end of the second heat block is free end, and first The radian of the adjacent wall of heat block and the second heat block is corresponding, and the first heat block and the second heat block can be pasted closely It closes.
The material of first heat block and the second heat block is red copper, wherein being inserted with the first heating rod in the first heat block With the second heating rod, the first heating rod is inserted with two, and the second heating rod is plugged between two first heating rods, the first heating The length of stick is more than the length of the second heating rod, and second heating rod is inserted in the second heat block.
Core is cone, the medial surface radian phase of the radian of core lateral surface and the first heat block and the second heat block It answers, the shape for the border composition that the first heat block and the second heat block are staggeredly disposed around core is also cone.
The first connecting rod being pivotally connected on first heat block madial wall is L-type.
The top of first connecting rod and second connecting rod offers what sliding slot, first connecting rod and second connecting rod were articulated with core Axis pin is plugged in sliding slot, and axis pin can slide in sliding slot, and the length of first connecting rod upper hopper chute is more than second connecting rod upper hopper chute Length.
The top of connection core bar is threaded through the intermediate position of fixed block plate, and fixed block plate is connected in the inner cavity of outer tube, even The top for connecing core bar is fixed on sliding block plate, and sliding block plate is located at the top of fixed block plate, and sliding block plate can be in outer tube It is slided in inner cavity.
The operation principle of the utility model:
When hot melting drill head heats downwards drilling, drill bit is contacted with bottom hole always, and bit face is complete circular cone at this time Shape, drill bit open and the diameter of consistently greater than drilling tool outer tube are kept to be crept into, therefore bore diameter is more than drilling tool outer tube diameter.
When completion hot melt drilling needs to carry brill, drilling tool outer tube moves upwards first under landscape apparatus lifting effect, and Drive fixed block plate and core synchronize move upwards, slide block plate, connection core bar and core fixed block at this time due to Gravitative Loads Remains stationary, while the axis pin being connect with the first heat block and the second heat block on core will be along first connecting rod and second connecting rod On sliding slot slided, the first heat block and the second heat block also remains stationary under Gravitative Loads at this time.Due to the second company Sliding slot on bar is short compared with the sliding slot on first connecting rod, therefore the connection axis pin on core arrives first at second when moving upwards The upper limit of connecting rod sliding slot, and drive the second heating BOB(beginning of block) to move upwards by second connecting rod, force the second heating block body It is detached from the first heating block body, and is inwardly collapsed.Core continues up, when core upper edge and first connecting rod " L " end in contact Afterwards, first connecting rod is forced to rotate by hinge of axis pin, at this time since sliding block plate, connection core bar and core fixed block still exist Remains stationary under Gravitative Loads, therefore the first heat block top will be under first connecting rod effect to contract, until the first heating Until block upper contact core, or the fixed block plate of sliding block plate contact.Hot melting drill head is contraction state at this time, and outer diameter will be less than Drilling tool outer tube diameter, therefore lock of tool drilling will not occur for drilling tool during entirely above carrying.
When hot melting drill head, which is transferred, starts drilling to bottom hole, the first heat block contact hole bottom first of three openings generates resistance Power stopping moves downward, and core fixed block, connection core bar and the sliding block plate being attached thereto stop transferring therewith.But drilling tool outer tube Continue to move downward with the fixation block plate and core being attached thereto.Second connecting rod together with the second heat block suspended in midair with It and moves downward, until the side contact of incline plane of first heat block in the skew back face and stop motion of the second heat block, at this moment, The upper surface flush of the upper surface of first heat block and the second heat block.This moment, the upper surface of core is still higher than the first heating The upper surface of block, still can be with free releasing.Core continues traveling downwardly, until core outer surface and the first heat block and second heat Block inner surface is bonded completely, and the first heat block and the second heat block is promoted to fit closely.Simultaneously as the first heat block is the bottom of along The fixed pin shaft rotation in portion is flared out, and when step contacts core fixed block lower surface in the first heat block bottom, first adds Stopping is flared out by heat block, therefore the first heat block and the second heat block are total in core outer surface and core fixed block lower surface Full cone hot melting drill head will be formed under same-action.
The beneficial effects of the utility model:
Snow deposit drilling provided by the utility model is solved with reducing hot melting drill head in snow deposit hot melting drill head drilling process It is easy to the problem of blocking, by designing combination radial variable hot melting drill head, realizes snow deposit hot melting drill head diameter and creeping into and carrying The automatic switchover under two states is risen, to promoting the development of hot melt drilling technology and polar research to play an important roll.This practicality The novel gravity for relying only on drilling tool itself and lifting power when carrying brill, only rely on internal structure linkage that bit diameter can be realized Variation, simple in structure, reliable operation.And the drill bit is based on modular design, is convenient for changing damage component, improves drilling tool Reliability, reduce making and maintenance cost.
Description of the drawings
Fig. 1 is drill bit overall structure exploded perspective view described in the utility model.
Fig. 2 is the first heat block structural schematic diagram described in the utility model.
Fig. 3 is the second heat block structural schematic diagram described in the utility model.
Fig. 4 is core fixed-block-architecture (FBA) schematic diagram described in the utility model.
1, the first heat block 2, the second heat block 3, core 4, connection core bar
5, core fixed block 6, first connecting rod 7, axis pin 8, second connecting rod 9, compression bar
10, the first heating rod 11, the second heating rod 12, sliding slot 13, fixed block plate
14, block plate 15, outer tube are slided.
Specific implementation mode
Shown in please referring to Fig.1 to Fig.4:
Snow deposit drilling reducing hot melting drill head provided by the utility model includes the first heat block 1, the second heat block 2, core 3 and connection core bar 4, wherein the first heat block 1 and the second heat block 2 are provided with several piece, the first heat block 1 and second adds Heat block 2, which is interlocked, is located at the border of core 3, and connection core bar 4 is threaded through the intermediate position of core 1, and the lower end of connection core bar 4 is fixed with Core fixed block 5 is articulated with first connecting rod 6 on the madial wall of first heat block 1, and the upper end of first connecting rod 6 is pivotally connected by axis pin 7 Second connecting rod 8 is articulated on the top of core 1, the madial wall of the second heat block 2, the upper end of second connecting rod 8 passes through axis pin 7 It is articulated in the top of core 1, the lower part of the first heat block 1 is articulated in by axis pin 7 on the compression bar 9 of core fixed block 5, and second adds The lower end of heat block 2 is free end, and the radian of the adjacent wall of the first heat block 1 and the second heat block 2 is corresponding, the first heat block 1 It can be closely bonded with the second heat block 2.
The material of first heat block 1 and the second heat block 2 is red copper, is added wherein being inserted with first in the first heat block 1 Hot pin 10 and the second heating rod 11, the first heating rod 10 are inserted with two, and the second heating rod 11 is plugged in two first heating rods Between 10, the length of the first heating rod 10 is more than the length of the second heating rod 11, and being inserted with one second in the second heat block 2 adds Hot pin 11.
Core 3 is cone, the medial surface radian of the radian of 3 lateral surface of core and the first heat block 1 and the second heat block 2 Accordingly, the shape that the first heat block 1 and the second heat block 2 are staggeredly disposed around the border composition of core 3 is also cone.
The first connecting rod 6 being pivotally connected on first heat block, 1 madial wall is L-type.
The top of first connecting rod 6 and second connecting rod 8 offers sliding slot 12, first connecting rod 6 and second connecting rod 8 and core 3 The axis pin 7 being articulated is plugged in sliding slot 12, and axis pin 7 can slide in sliding slot 12, and the length of 6 upper hopper chute 12 of first connecting rod is big In the length of 8 upper hopper chute 12 of second connecting rod.
The top of connection core bar 4 is threaded through the intermediate position of fixed block plate 13, and fixed block plate 13 is connected in the interior of outer tube 15 In chamber, the top of connection core bar 4 is fixed on sliding block plate 14, and sliding block plate 14 is located at the top of fixed block plate 13, sliding gear Disk 14 can be slided in the inner cavity of outer tube 15.
The operation principle of the utility model:
When hot melting drill head heats downwards drilling, drill bit is contacted with bottom hole always, and bit face is complete circular cone at this time Shape, drill bit open and the diameter of consistently greater than drilling tool outer tube are kept to be crept into, therefore bore diameter is more than drilling tool outer tube diameter.
When completion hot melt drilling needs to carry brill, drilling tool outer tube 15 moves upwards first under landscape apparatus lifting effect, And drive fixed block plate 13 and core 3 synchronize move upwards, slide at this time block plate 14, connection core bar 4 and core fixed block 5 due to Gravitative Loads remains stationary, while the axis pin 7 being connect with the first heat block 1 and the second heat block 2 on core 3 will connect along first Sliding slot 12 on bar 6 and second connecting rod 8 is slided, and the first heat block 1 and the second heat block 2 are also protected under Gravitative Loads at this time It holds static.Since the sliding slot 12 on second connecting rod 8 is short compared with the sliding slot 12 on first connecting rod 6, the connection axis pin 7 on core 3 When moving upwards, the upper limit of 8 sliding slot 12 of second connecting rod is arrived first at, and drive the second heat block 2 to open by second connecting rod 8 Beginning moves upwards, and forces 2 ontology of the second heat block to be detached from 1 ontology of the first heat block, and inwardly collapse.Core 3 continues up fortune It is dynamic, after 3 upper edge of core and " L " end in contact of first connecting rod 6, first connecting rod 6 is forced to rotate for hinge with axis pin 7, this When due to sliding block plate 14, connection core bar 4 and core fixed block 5 remains stationary still under Gravitative Loads, the first heat block 1 It top will be under the effect of first connecting rod 6 to contract, until 1 upper contact core 3 of the first heat block, or sliding block plate 14 connect Until touching fixed block plate 13.Hot melting drill head is contraction state at this time, and outer diameter will be less than drilling tool outer tube diameter, therefore entirely above carry Lock of tool drilling will not occur for drilling tool in the process.
When hot melting drill head, which is transferred, starts drilling to bottom hole, the first heat block 1 contact hole bottom first of three openings generates Resistance stopping moves downward, and core fixed block 5, connection core bar 4 and the sliding block plate 14 being attached thereto stop decentralization therewith.But it bores Tool outer tube 15 and the fixation block plate 13 being attached thereto and core 3 continue to move downward.Second connecting rod 8 is together with second suspended in midair Heat block 2 and then moves downward together, until first heat block 1 in the skew back face and stop motion of the second heat block 2 Side contact of incline plane, at this moment, the upper surface flush of the upper surface of the first heat block 1 and the second heat block 2.This moment, the upper table of core 3 Face is still higher than the upper surface of the first heat block 1, still can be with free releasing.Core 3 continues traveling downwardly, until 3 outer surface of core It is bonded completely with the first heat block 1 and 2 inner surface of the second heat block, promotes the first heat block 1 and the second heat block 2 closely patch It closes.Simultaneously as the first heat block 1 be along bottom fixed pin shaft 7 rotation be flared out, as 1 bottom Nei Tai of the first heat block When rank contacts core 5 lower surface of fixed block, stopping is flared out by the first heat block 1, therefore the first heat block 1 and second heats Block 2 will form full cone hot melting drill head under 5 lower surface collective effect of 3 outer surface of core and core fixed block.

Claims (6)

1. a kind of snow deposit drilling reducing hot melting drill head, it is characterised in that:Include the first heat block, the second heat block, core Body and connection core bar, wherein the first heat block and the second heat block are provided with several piece, the first heat block and the second heat block interlock It is located at the border of core, connection core bar is threaded through the intermediate position of core, and the lower end for connecting core bar is fixed with core fixed block, the It is articulated with first connecting rod on the madial wall of one heat block, the upper end of first connecting rod is articulated in the top of core by axis pin, and second It is articulated with second connecting rod on the madial wall of heat block, the upper end of second connecting rod is also articulated in the top of core by axis pin, and first The lower part of heat block is articulated in by axis pin on the compression bar of core fixed block, and the lower end of the second heat block is free end, and first adds The radian of the adjacent wall of heat block and the second heat block is corresponding, and the first heat block and the second heat block can be closely bonded.
2. a kind of snow deposit drilling reducing hot melting drill head according to claim 1, it is characterised in that:Described first adds Heat block and the material of the second heat block are red copper, wherein the first heating rod and the second heating rod are inserted in the first heat block, First heating rod is inserted with two, and the second heating rod is plugged between two first heating rods, and the length of the first heating rod is more than The length of second heating rod is inserted with second heating rod in the second heat block.
3. a kind of snow deposit drilling reducing hot melting drill head according to claim 1, it is characterised in that:The core is Cone, the radian of core lateral surface is corresponding to the first heat block and the medial surface radian of the second heat block, the first heat block and The shape that second heat block is staggeredly disposed around the border composition of core is also cone.
4. a kind of snow deposit drilling reducing hot melting drill head according to claim 1, it is characterised in that:Described first adds The first connecting rod being pivotally connected on heat block madial wall is L-type.
5. a kind of snow deposit drilling reducing hot melting drill head according to claim 1, it is characterised in that:Described first connects The top of bar and second connecting rod offers sliding slot, first connecting rod and second connecting rod and is plugged in sliding slot with the axis pin that core is articulated Interior, axis pin can slide in sliding slot, and the length of first connecting rod upper hopper chute is more than the length of second connecting rod upper hopper chute.
6. a kind of snow deposit drilling reducing hot melting drill head according to claim 1, it is characterised in that:The connection core The top of bar is threaded through the intermediate position of fixed block plate, and fixed block plate is connected in the inner cavity of outer tube, and the top for connecting core bar is solid It is scheduled on sliding block plate, sliding block plate is located at the top of fixed block plate, and sliding block plate can be slided in the inner cavity of outer tube.
CN201820520235.7U 2018-04-13 2018-04-13 Snow deposit drilling reducing hot melting drill head Expired - Fee Related CN208024281U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820520235.7U CN208024281U (en) 2018-04-13 2018-04-13 Snow deposit drilling reducing hot melting drill head

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820520235.7U CN208024281U (en) 2018-04-13 2018-04-13 Snow deposit drilling reducing hot melting drill head

Publications (1)

Publication Number Publication Date
CN208024281U true CN208024281U (en) 2018-10-30

Family

ID=63910470

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820520235.7U Expired - Fee Related CN208024281U (en) 2018-04-13 2018-04-13 Snow deposit drilling reducing hot melting drill head

Country Status (1)

Country Link
CN (1) CN208024281U (en)

Similar Documents

Publication Publication Date Title
CN208024281U (en) Snow deposit drilling reducing hot melting drill head
CN111379413A (en) Diameter-variable hole reservation device for building
CN108505946A (en) Snow deposit drilling reducing hot melting drill head
CN207127225U (en) A kind of device for preparing high purity copper and copper alloy casting ingot
CN206085337U (en) Materials agitating unit for building high -efficient
CN103334576A (en) Automatic wall painter plastering device enabling mortar to be compact
CN106761427A (en) One kind bores stake drilling tool
CN205858183U (en) A kind of cartridge type bottom expanding drill
CN206458325U (en) One kind bores stake drilling tool
CN202017199U (en) Squeezing and expanding device for branch piles
CN213785175U (en) Tea production is with equipment of completing
CN203925274U (en) A kind of novel long-spiral drilling machine with soil sampler device
CN208219658U (en) A kind of breakage of cast-in-place bored pile processing unit
CN207694871U (en) A kind of random broken reclaimer of corrugated board
CN208545781U (en) A kind of construction shovel sand device
CN203640639U (en) Multifunctional hydraulic elevator for petroleum drilling
CN113187182B (en) Impact-resistant structure of modified polymer nano heat-insulating material
CN110898889A (en) Old and useless PCBA board reducing mechanism
CN220487240U (en) Novel electronic information engineering communication tower
CN218951559U (en) Vacuum mechanism for crystal pulling equipment
CN215888179U (en) Highway engineering sample filling device
CN203362040U (en) Novel fishtail bit capable of relieving drill pasting and conducting pile-forming conveniently
CN219561334U (en) Molten copper casting switching chute
CN210854108U (en) Conveyor is used in production of UHPC high-speed railway apron
CN209174370U (en) A kind of sand sieving machine feeding device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181030

Termination date: 20190413