CN208021517U - A kind of water conservancy construction handling device - Google Patents

A kind of water conservancy construction handling device Download PDF

Info

Publication number
CN208021517U
CN208021517U CN201820302319.3U CN201820302319U CN208021517U CN 208021517 U CN208021517 U CN 208021517U CN 201820302319 U CN201820302319 U CN 201820302319U CN 208021517 U CN208021517 U CN 208021517U
Authority
CN
China
Prior art keywords
steel pipe
placing box
fixedly mounted
bottom plate
pipe placing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820302319.3U
Other languages
Chinese (zh)
Inventor
庞玉花
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201820302319.3U priority Critical patent/CN208021517U/en
Application granted granted Critical
Publication of CN208021517U publication Critical patent/CN208021517U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a kind of water conservancy construction handling devices,Including steel pipe placing box,Bottom plate,Elastic base,Putting hole and arc gripping block,Universal wheel easy to remove is fixedly mounted in the bottom of the bottom plate,Elastic base is fixedly mounted on the top center position of bottom plate by fixing bolt,Steel pipe placing box is fixedly mounted on the top of elastic base,Pushing hands is fixedly mounted on the left side outer wall of bottom plate,Two the second engaging lugs are fixedly mounted on the top of bottom plate,And two the second engaging lugs are symmetrical arranged relative to steel pipe placing box,The first engaging lug is fixedly mounted on the left and right sides outer wall of steel pipe placing box,The bottom of sleeve is hinged with the second engaging lug,The top of loop bar is hinged with the first engaging lug,And loop bar is sleeved in the internal cavities of sleeve,The water conservancy construction handling device is simple in structure,It is easy to use,Improve the travelling speed and transport quantity of steel pipe,Realize making full use of for space,Reduce worker's work difficulty.

Description

A kind of water conservancy construction handling device
Technical field
The utility model is related to a kind of handling device, specifically a kind of water conservancy construction handling device.
Background technology
Hydraulic engineering is the surface water and groundwater for controlling and allocating nature, reaches and removes the evil emerging sharp purpose and build Engineering.Also referred to as Hydraulic Projects.Water is human being's production and essential precious resources of living, but the state of its naturally occurring is simultaneously Not in full conformity with the needs of the mankind.Hydraulic engineering is only built, flow could be controlled, prevents flood, and carry out water It adjusts and distributes, to meet the needs of people's lives and production to water resource.Hydraulic engineering needs to build dam, dike, spillway, water Lock, water inlet, channel, the different types of hydraulic structure such as cross mortise, log chute, fish pass, to realize its target.
Steel pipe is the tool that can be used in water conservancy construction, but the transport of steel pipe annoyings always people, when steel pipe transmission The stability of placement is poor, inconvenient, is asked with steel pipe special conveying equipment to solve this so designing a kind of construction Topic.
Utility model content
The purpose of this utility model is to provide a kind of water conservancy construction handling devices, to solve to carry in above-mentioned background technology The problem of going out.
To achieve the above object, the utility model provides the following technical solutions:
A kind of water conservancy construction handling device, including steel pipe placing box, bottom plate, elastic base, putting hole and arc clamp Universal wheel easy to remove is fixedly mounted in the bottom of block, the bottom plate, and elastic base is fixedly mounted on bottom plate by fixing bolt Top center position, steel pipe placing box is fixedly mounted on the top of elastic base, and pushing hands is fixedly mounted on outside the left side of bottom plate On wall, two the second engaging lugs are fixedly mounted on the top of bottom plate, and two the second engaging lugs are symmetrical relative to steel pipe placing box It is arranged, the first engaging lug is fixedly mounted on the left and right sides outer wall of steel pipe placing box, the bottom of sleeve is cut with scissors with the second engaging lug It connects, the top of loop bar and the first engaging lug are hinged, and loop bar is sleeved in the internal cavities of sleeve, the bottom of loop bar and sleeve It is connected by spring between cavity bottom, opens up several putting holes on steel pipe placing box, the quantity of putting hole is in the present embodiment Five, and putting hole longitudinal arrangement.
As further program of the utility model:The inside of the steel pipe placing box opens up two the first sliding grooves, and two A the first sliding groove is located at the left and right sides of putting hole, and sliding bar is mounted in the first sliding groove, is also opened in steel pipe placing box If second sliding slot, second sliding slot is vertical with the first sliding groove, and one end of second sliding slot is connected to the first sliding groove, second sliding slot it is another One end is connected to putting hole.
As the utility model further scheme:Wedge block, wedge block position are slidably fitted in the second sliding slot In close to one end of the first sliding groove, arc gripping block is slidably mounted in second sliding slot, and arc gripping block is located at close to placement The one end in hole is connected between arc gripping block and wedge block by compressed spring.
As the utility model further scheme:The both sides of the putting hole and with it is solid in second sliding slot communicating position Dingan County fills the limit baffle ring for preventing arc gripping block to be drawn out.
As the utility model further scheme:The bottom of the slide bar be equipped with chamfering, the inclined surface of wedge block with Chamfering matches, and the top of slide bar is connect by steel cable with draw ring.
Compared with prior art, the utility model has the beneficial effects that:
This utility structure is simple, easy to use, and multiple putting holes are opened up on steel pipe placing box, fully sharp to reach space Purpose, the quantity of increase carrying steel pipe, slide bar and wedge block make arc gripping block by steel tube clamping, simultaneously It is convenient to remove, avoid steel pipe in transport length of run from falling, elastic base can reach good shock-absorbing effect, and loop bar and sleeve are matched Closing use avoids steel pipe placing box from shaking, and improves travelling speed and conevying efficiency, reduces worker's work difficulty.
Description of the drawings
Fig. 1 is the structural schematic diagram of water conservancy construction handling device.
Fig. 2 is the sectional view of water conservancy construction handling device.
Fig. 3 is the structural schematic diagram of second sliding slot in water conservancy construction handling device.
In figure:Draw ring 1, slide bar 2, steel pipe placing box 3, chamfering 4, the first engaging lug 5, the first sliding groove 6, loop bar 7, sleeve 8, Second engaging lug 9, bottom plate 10, universal wheel 11, pushing hands 12, elastic base 13, putting hole 14, compressed spring 15, wedge block 16, Two sliding slots 17 and arc gripping block 18.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work The every other embodiment obtained, shall fall within the protection scope of the present invention.
Please refer to Fig.1~3, in the utility model embodiment, a kind of water conservancy construction handling device, including draw ring 1, slide bar 2, steel pipe placing box 3, chamfering 4, the first engaging lug 5, the first sliding groove 6, loop bar 7, sleeve 8, the second engaging lug 9, bottom plate 10, universal Wheel 11, pushing hands 12, elastic base 13, putting hole 14, compressed spring 15, wedge block 16, second sliding slot 17 and arc gripping block 18, Universal wheel 11 easy to remove is fixedly mounted in the bottom of the bottom plate 10, and elastic base 13 is fixedly mounted on bottom by fixing bolt The top center position of plate 10, steel pipe placing box 3 are fixedly mounted on the top of elastic base 13, and pushing hands 12 is fixedly mounted on bottom plate On 10 left side outer wall, two the second engaging lugs 9 are fixedly mounted on the top of bottom plate 10, and two the second engaging lugs 9 relative to Steel pipe placing box 3 is symmetrical arranged, and the first engaging lug 5 is fixedly mounted on the left and right sides outer wall of steel pipe placing box 3, sleeve 8 Bottom is hinged with the second engaging lug 9, and the top of loop bar 7 is hinged with the first engaging lug 5, and loop bar 7 is sleeved on the inside sky of sleeve 8 In chamber, is connected by spring between the bottom and the cavity bottom of sleeve 8 of loop bar 7, several putting holes are opened up on steel pipe placing box 3 14, the quantity of putting hole 14 is five in the present embodiment, and 14 longitudinal arrangement of putting hole, the inside of the steel pipe placing box 3 are opened If two the first sliding grooves 6, and two the first sliding grooves 6 are located at the left and right sides of putting hole 14, slide bar 2 is slidably mounted on first In sliding slot 6, second sliding slot 17 is also opened up in steel pipe placing box 3, second sliding slot 17 is vertical with the first sliding groove 6, and second sliding slot 17 One end be connected to the first sliding groove 6, the other end of second sliding slot 17 is connected to putting hole 14;Sliding peace in the second sliding slot 17 Equipped with wedge block 16, wedge block 16 is located at close to one end of the first sliding groove 6, and arc gripping block 18 is slidably mounted on second sliding slot 17 In, and arc gripping block 18 is located at close to one end of putting hole 14, by compressed spring between arc gripping block 18 and wedge block 16 15 connections;The both sides of the putting hole 14 and in 17 communicating position of second sliding slot be fixedly mounted for preventing arc gripping block 18 The limit baffle ring being drawn out;The bottom of the slide bar 2 is equipped with chamfering 4, and inclined surface and the chamfering 4 of wedge block 16 match, slide bar 2 Top connect with draw ring 1 by steel cable;Slide bar 2 is taken out in use, first passing through draw ring 1, arc gripping block 18 is at this time Free state, it would be desirable to which the steel pipe of carrying is placed in putting hole 14, then slide bar 2 is inserted into the first sliding groove 6, and slide bar 2 The chamfering 4 of bottom is contacted towards one end of putting hole 14, chamfering 4 with the inclined surface of wedge block 16, to make 16 direction of wedge block The direction of putting hole 14 is moved, while being pushed arc gripping block 18 under the action of compressed spring 15 and being pressed from both sides the both sides of steel pipe Tightly, vibrations are will produce in the length of run of carrying, elastic base 13 can reach good shock-absorbing functions, while in loop bar 7 and set So that steel pipe placing box 3 is more stablized under the cooperating of cylinder 8, greatly improves work task efficiency.
The operation principle of the utility model is:
Slide bar 2 is taken out in use, first passing through draw ring 1, arc gripping block 18 is in free state at this time, it would be desirable to carry Steel pipe be placed in putting hole 14, then slide bar 2 is inserted into the first sliding groove 6, and the chamfering 4 of 2 bottom of slide bar is towards placement The one end in hole 14, chamfering 4 are contacted with the inclined surface of wedge block 16, to make wedge block 16 be moved towards the direction of putting hole 14, Arc gripping block 18 is pushed under the action of compressed spring 15 simultaneously and clamps the both sides of steel pipe, can be produced in the length of run of carrying Raw vibrations, elastic base 13 can reach good shock-absorbing functions, while make steel pipe under the cooperating of loop bar 7 and sleeve 8 Placing box 3 is more stablized, and work task efficiency is greatly improved.
Although the utility model is described in detail with reference to the foregoing embodiments, those skilled in the art is come Say, still can with technical scheme described in the above embodiments is modified, or to which part technical characteristic into Row equivalent replacement, within the spirit and principle of the utility model, any modification, equivalent replacement, improvement and so on should all It is included within the scope of protection of this utility model.

Claims (5)

1. a kind of water conservancy construction handling device, including steel pipe placing box (3), bottom plate (10), elastic base (13), putting hole (14) and arc gripping block (18), which is characterized in that universal wheel easy to remove is fixedly mounted in the bottom of the bottom plate (10) (11), elastic base (13) is fixedly mounted on the top center position of bottom plate (10) by fixing bolt, and steel pipe placing box (3) is solid Dingan County is mounted in the top of elastic base (13), and pushing hands (12) is fixedly mounted on the left side outer wall of bottom plate (10), two second companies Lug (9) is fixedly mounted on the top of bottom plate (10), and two the second engaging lugs (9) symmetrically set relative to steel pipe placing box (3) It sets, the first engaging lug (5) is fixedly mounted on the left and right sides outer wall of steel pipe placing box (3), the bottom of sleeve (8) connects with second Lug (9) is hinged, and the top of loop bar (7) and the first engaging lug (5) are hinged, and loop bar (7) is sleeved on the internal cavities of sleeve (8) In, it is connect by spring between the bottom and the cavity bottom of sleeve (8) of loop bar (7), opening up several on steel pipe placing box (3) puts Hole (14) is set, the quantity of putting hole (14) is five, and putting hole (14) longitudinal arrangement.
2. water conservancy construction handling device according to claim 1, which is characterized in that the steel pipe placing box (3) it is interior Portion opens up two the first sliding grooves (6), and two the first sliding grooves (6) are located at the left and right sides of putting hole (14), and slide bar (2) is sliding It is dynamic to be mounted in the first sliding groove (6), second sliding slot (17) is also opened up in steel pipe placing box (3), second sliding slot (17) is slided with first Vertically, and one end of second sliding slot (17) is connected to slot (6) with the first sliding groove (6), the other end and putting hole of second sliding slot (17) (14) it is connected to.
3. water conservancy construction handling device according to claim 2, which is characterized in that sliding in the second sliding slot (17) Wedge block (16) is installed, wedge block (16) is located at close to one end of the first sliding groove (6), and arc gripping block (18) is slidably mounted on In second sliding slot (17), and arc gripping block (18) is located at close to one end of putting hole (14), arc gripping block (18) and wedge shape It is connected by compressed spring (15) between block (16).
4. water conservancy construction handling device according to claim 1, which is characterized in that the both sides of the putting hole (14) and With limit baffle ring of the fixed installation for preventing arc gripping block (18) to be drawn out in second sliding slot (17) communicating position.
5. water conservancy construction handling device according to claim 2, which is characterized in that the bottom of the slide bar (2) is equipped with Chamfering (4), inclined surface and the chamfering (4) of wedge block (16) match, and the top of slide bar (2) is connect by steel cable with draw ring (1).
CN201820302319.3U 2018-03-06 2018-03-06 A kind of water conservancy construction handling device Expired - Fee Related CN208021517U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820302319.3U CN208021517U (en) 2018-03-06 2018-03-06 A kind of water conservancy construction handling device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820302319.3U CN208021517U (en) 2018-03-06 2018-03-06 A kind of water conservancy construction handling device

Publications (1)

Publication Number Publication Date
CN208021517U true CN208021517U (en) 2018-10-30

Family

ID=63905282

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820302319.3U Expired - Fee Related CN208021517U (en) 2018-03-06 2018-03-06 A kind of water conservancy construction handling device

Country Status (1)

Country Link
CN (1) CN208021517U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115892171A (en) * 2023-03-13 2023-04-04 山西太水市政工程有限公司 Pipeline handling device is used in municipal works construction

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115892171A (en) * 2023-03-13 2023-04-04 山西太水市政工程有限公司 Pipeline handling device is used in municipal works construction
CN115892171B (en) * 2023-03-13 2023-05-26 山西太水市政工程有限公司 Pipeline handling device for municipal works construction

Similar Documents

Publication Publication Date Title
CN208021517U (en) A kind of water conservancy construction handling device
CN213456211U (en) River water sampling equipment for hydraulic engineering
CN207504482U (en) MPP separation type electrical cable protection pipes
CN207170323U (en) Deashing device for USB interface of computer
CN206310839U (en) A kind of water conservancy and hydropower equipment damp-proof treatment device
CN206971745U (en) A kind of pulling-on piece fixed for concrete placings mould
CN206558886U (en) The movable inlet wire pore structure of power distribution cabinet
CN206128806U (en) Communication tower connecting elements and communication tower
CN211148085U (en) Soil sampling device for soil investigation
CN204491605U (en) A kind of cross shaped pile embraces pressure Pile holding mechanism
CN207569147U (en) A kind of rope hook of adjustable rope lengths
CN203589579U (en) Cable trench cover plate fixture
CN206254106U (en) Buckle presses assembly tool
CN210649648U (en) Drilling equipment for machine-building
CN213363408U (en) Multi-element doped high-rate lithium manganate composite positive electrode material production push plate furnace
CN211874188U (en) Cabinet capable of being opened remotely
CN217601418U (en) Concrete pipe pile with quick connection structure
CN209007429U (en) A kind of oil field multifunctional combination wrench
CN212462108U (en) Terminal connecting device of dry type transformer
CN214145241U (en) Slide rail type protective airtight door
CN212616746U (en) Pipeline fixing device for construction
CN217272536U (en) Anti vibration connects suitable for high pressure hydrogen
CN216381453U (en) Mining engineering is with wide stock of application scope
CN212170892U (en) Drilling is with directly arranging porous cooling device that adds water
CN212927096U (en) Instrument centre gripping fixing device for construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181030

Termination date: 20190306