CN208014261U - A kind of power transmission lines overhauling line marker device - Google Patents

A kind of power transmission lines overhauling line marker device Download PDF

Info

Publication number
CN208014261U
CN208014261U CN201820548723.9U CN201820548723U CN208014261U CN 208014261 U CN208014261 U CN 208014261U CN 201820548723 U CN201820548723 U CN 201820548723U CN 208014261 U CN208014261 U CN 208014261U
Authority
CN
China
Prior art keywords
fixing piece
tight loop
outer tight
retainer plate
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820548723.9U
Other languages
Chinese (zh)
Inventor
侯健健
荣建华
延自新
赵强
张军委
王金亮
荣若斐
延明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Shandong Electric Power Co Guangrao Power Supply Co
Dongying Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Shandong Electric Power Co Guangrao Power Supply Co
Dongying Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Shandong Electric Power Co Guangrao Power Supply Co, Dongying Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Shandong Electric Power Co Guangrao Power Supply Co
Priority to CN201820548723.9U priority Critical patent/CN208014261U/en
Application granted granted Critical
Publication of CN208014261U publication Critical patent/CN208014261U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

The utility model discloses a kind of power transmission lines overhauling line marker devices, including the first outer tight loop, it is fixed with the first fixinig plate on the left of the first outer tight loop, and first is connected with the first fixing piece on the right side of outer tight loop, and the first outer tight loop rear is connected with the second outer tight loop, first fixinig plate lower end is provided with the second fixinig plate, it is fixed with the second fixing piece inside first fixing piece, and first fixing piece lower end Sign Board is installed, the second fixing piece external stability has the second fixed link, interior retainer plate fixing piece is provided in described first outside retainer plate, clamping ring is installed outside the interior retainer plate fixing piece, and outer tight loop fixing piece is fixed with inside clamping ring, the outer tight loop fixing piece is externally connected to the first outer tight loop.The power transmission lines overhauling is used simply with line marker device, and has Sign Board on the device, and disassembly and installation is more convenient, and staff is facilitated to use.

Description

A kind of power transmission lines overhauling line marker device
Technical field
The utility model is related to transmission line overhauling device technical field, specially a kind of power transmission lines overhauling circuit mark Remember device.
Background technology
Power transmission lines overhauling refers to the problem of power transmission sequence is according to tour, detection, found experiment, carries out being intended to eliminate lacking It falls into, improve the equipment general level of the health, prevent accident, ensure the work of line security operation and development, be power industry term, defeated It may require that the circuit for having overhauled completion is marked in line marker device in electric line maintenance process.
Existing power transmission lines overhauling line marker device bad disassembly and installation when in use, and can not be according to thick Thin different shaft tower is fixed, and use is very inconvenient.
Utility model content
The purpose of this utility model is to provide a kind of power transmission lines overhauling line marker devices, to solve above-mentioned background The power transmission lines overhauling line marker device existing currently on the market proposed in technology bad disassembly and installation when in use, And it can not be fixed according to the different shaft tower of thickness, inconvenient problem with use.
To achieve the above object, the utility model provides the following technical solutions:A kind of power transmission lines overhauling line marker Device, including the first outer tight loop, the first outer tight loop left side are fixed with the first fixinig plate, and on the right side of the first outer tight loop It is connected with the first fixing piece, and the first outer tight loop rear is connected with the second outer tight loop, first fixinig plate lower end is set It is equipped with the second fixinig plate, the second fixing piece is fixed with inside first fixing piece, and the first fixing piece lower end is equipped with mark Board, the second fixing piece external stability have the second fixed link, retainer plate in second are provided on the inside of the second outer tight loop, Retainer plate in first is provided in described second on the outside of retainer plate, and is fixed with tread plate in second on the inside of retainer plate, and the Interior retainer plate fixing piece is installed in two outside retainer plate, interior retainer plate fixing piece is provided with outside retainer plate in described first, Clamping ring is installed outside the interior retainer plate fixing piece, and is fixed with outer tight loop fixing piece inside clamping ring, it is described outer tight Admittedly circle fixing piece is externally connected to the first outer tight loop.
Preferably, symmetrical point of the center line of the described first outer tight loop and the second outer tight loop about the first fixing piece Cloth, and the first outer tight loop and the second outer tight loop are double-layer structure.
Preferably, it is prismatic outside the tread plate, and it is about retainer plate in retainer plate and second in first The symmetrical distribution of center line, and tread plate uses rubber material.
Preferably, clamping ring far ultraviolet tight loop fixing piece end is helicitic texture, and the closely outer tight loop of clamping ring is fixed Part end is hollow structure.
Preferably, the outer tight loop fixing piece is evenly distributed on the inside of the first outer tight loop and the second outer tight loop, And outer tight loop fixing piece outside is laminated structure, and outer tight loop fixing piece laminated structure outer dia is more than outer tight loop The outer dia of fixing piece.
Compared with prior art, the utility model has the beneficial effects that:The power transmission lines overhauling line marker device makes With simple, and there is Sign Board on the device, disassembly and installation is more convenient, and staff is facilitated to use.The device First outer tight loop and the second outer tight loop can make in the first of inside retainer plate in retainer plate and second when being closed Shaft tower can be fixed, Sign Board can be fixed on shaft tower in this way, and disassembly and installation is more convenient, and it is anti-skidding Item can improve and shaft tower and first in friction effect in retainer plate and second between retainer plate, prevent in first retainer plate and Retainer plate improves fixed effect the case where being slided on shaft tower in second.
Description of the drawings
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the utility model side structure schematic view;
Fig. 3 is the utility model overlooking structure diagram;
Fig. 4 is enlarged structure schematic diagram at A in the utility model Fig. 3;
Fig. 5 is the utility model clamping ring internal structure schematic diagram.
In figure:1, the first outer tight loop, the 2, first fixinig plate, the 3, second fixinig plate, the 4, first fixing piece, 5, second fixes Part, the 6, second fixed link, 7, Sign Board, the 8, second outer tight loop, retainer plate in 9, second, retainer plate in 10, first, 11, One fixed link, 12, tread plate, 13, interior retainer plate fixing piece, 14, clamping ring, 15, outer tight loop fixing piece.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work The every other embodiment obtained, shall fall within the protection scope of the present invention.
- 5 are please referred to Fig.1, the utility model provides a kind of technical solution:A kind of power transmission lines overhauling is filled with line marker It sets, including the first outer tight loop 1,1 left side of the first outer tight loop is fixed with the first fixinig plate 2, and 1 right side of the first outer tight loop connects It is connected to the first fixing piece 4, and 1 rear of the first outer tight loop is connected with the second outer tight loop 8, the first outer tight loop 1 and second Center line symmetrical distribution of the outer tight loop 8 about the first fixing piece 4, and the first outer tight loop 1 and the second outer tight loop 8 are For double-layer structure, the first outer tight loop 1 and 8 sound construction of the second outer tight loop of this structure, it is not easy to be broken, Er Qie One outer tight loop 1 and the second outer tight loop 8 can fix retainer plate 9 in retainer plate 10 and second in first, make in this way Retainer plate 9 firmly fixes shaft tower in retainer plate 10 and second in one, and 2 lower end of the first fixinig plate is provided with the second fixinig plate 3, The second fixing piece 5 is fixed with inside first fixing piece 4, and 4 lower end of the first fixing piece is equipped with Sign Board 7, outside the second fixing piece 5 Portion is fixed with the second fixed link 6, and 8 inside of the second outer tight loop is provided with retainer plate 9 in second, and 9 outside of retainer plate is set in second Retainer plate 10 in first are equipped with, and 9 inside of retainer plate is fixed with tread plate 12, and 9 outside peace of retainer plate in second in second Equipped with interior retainer plate fixing piece 13, the outside of tread plate 12 is prismatic, and it is about solid in retainer plate 10 and second in first Surely the symmetrical distribution of center line of circle 9, and tread plate 12 uses rubber material, the tread plate 12 of this structure increase shaft tower with Friction effect in first in retainer plate 10 and second between retainer plate 9, retainer plate 9 in retainer plate 10 and second in such first It can firmly be fixed on shaft tower, be not in be provided with interior fixation in first outside retainer plate 10 the case where falling off Fixing piece 13 is enclosed, clamping ring 14 is installed outside interior retainer plate fixing piece 13, and it is solid to be fixed with outer tight loop inside clamping ring 14 Determine part 15,14 far ultraviolet tight loop fixing piece of clamping ring, 15 end is helicitic texture, and nearly outer 15 end of tight loop fixing piece of clamping ring 14 Clamping ring 14 for hollow structure, this structure plays the role of retainer plate fixing piece 13 and outer tight loop fixing piece 15 in connection, Clamping ring 14 can fix interior retainer plate fixing piece 13, in this way when being rotated on outer tight loop fixing piece 15 Just retainer plate 9 in retainer plate 10 and second in first on interior retainer plate fixing piece 13 is fixed on retainer plate 10 and second in first The inside of interior retainer plate 9, outer tight loop fixing piece 15 are externally connected to the first outer tight loop 1, and outer tight loop fixing piece 15 is uniform It is distributed in the inside of the first outer tight loop 1 and the second outer tight loop 8, and 15 outside of outer tight loop fixing piece is laminated structure, and And outer 15 laminated structure outer dia of tight loop fixing piece is more than the outer dia of outer tight loop fixing piece 15, this structure it is outer tight Admittedly the laminated structure on circle fixing piece 15 is rotated in 14 hollow structure of clamping ring, such clamping ring 14 can pass through spiral shell Line structure fixes interior retainer plate fixing piece 13, and the installing and dismounting of retainer plate 9 in retainer plate 10 and second in first is made to compare It is convenient.
Operation principle:When using power transmission lines overhauling line marker device, the second fixed link 6 and first is first passed through Fixed link 11 opens the first outer tight loop 1 and the second outer tight loop 8, and then the first outer tight loop 1 and the second outer tight loop 8 are being beaten It can be driven by the interior retainer plate fixing piece 13 on outer tight loop fixing piece 15 when holding in first in retainer plate 10 and second 9 remote first fixing piece, 4 end of retainer plate is opened to both sides, in first in retainer plate 10 and second between 9 distal end of retainer plate Distance is more than the diameter of shaft tower, then retainer plate 9 in retainer plate 10 and second in first is sleeved on to the outside of shaft tower, loose again later It opens, is then again closed the first outer tight loop 1 and the second outer tight loop 8 by the second fixed link 6 and the first fixed link 11, make Inside one outer tight loop 1 and the second outer tight loop 8 first in retainer plate 10 and second retainer plate 9 shaft tower is entangled, in this way The tread plate 12 of 9 inside of retainer plate can be tightly attached to the outside of shaft tower in retainer plate 10 and second in first, and tread plate 12 can be reinforced Friction effect in shaft tower and first in retainer plate 10 and second between retainer plate 9, to improve retainer plate 10 and the in first The fixed effect of retainer plate 9 in two, prevents in first that the feelings slided occurs outside shaft tower in retainer plate 9 in retainer plate 10 and second Then first fixinig plate 2 and the second fixinig plate 3 are fixed together by silk thread by condition again, the information for later again overhauling needs It fills on Sign Board 7, just completes the record case of the shaft tower in this way, to complete a series of work.
Although the utility model is described in detail with reference to the foregoing embodiments, those skilled in the art is come Say, still can with technical scheme described in the above embodiments is modified, or to which part technical characteristic into Row equivalent replacement, within the spirit and principle of the utility model, any modification, equivalent replacement, improvement and so on should all It is included within the scope of protection of this utility model.

Claims (5)

1. a kind of power transmission lines overhauling line marker device, including the first outer tight loop (1), it is characterised in that:Described first It is fixed with the first fixinig plate (2) on the left of outer tight loop (1), and the first fixing piece (4) is connected on the right side of the first outer tight loop (1), And the first outer tight loop (1) rear is connected with the second outer tight loop (8), and the first fixinig plate (2) lower end is provided with second Fixinig plate (3), first fixing piece (4) is internal to be fixed with the second fixing piece (5), and the first fixing piece (4) lower end is equipped with Sign Board (7), the second fixing piece (5) external stability have the second fixed link (6), are set on the inside of the second outer tight loop (8) It is equipped with retainer plate in second (9), retainer plate (9) outside is provided with retainer plate in first (10) in described second, and solid in second It is fixed with tread plate (12) on the inside of fixed circle (9), and interior retainer plate fixing piece (13) is installed outside retainer plate (9) in second, Interior retainer plate fixing piece (13) is provided in described first outside retainer plate (10), is pacified outside the interior retainer plate fixing piece (13) Equipped with clamping ring (14), and outer tight loop fixing piece (15), the outer tight loop fixing piece are fixed with inside clamping ring (14) (15) it is externally connected to the first outer tight loop (1).
2. a kind of power transmission lines overhauling line marker device according to claim 1, it is characterised in that:Outside described first The symmetrical distribution of center line of tight loop (1) and the second outer tight loop (8) about the first fixing piece (4), and fastened outside first It is double-layer structure to enclose (1) and the second outer tight loop (8).
3. a kind of power transmission lines overhauling line marker device according to claim 1, it is characterised in that:The tread plate (12) external is prismatic, and its center line about retainer plate (9) in retainer plate (10) and second in first is symmetrical Distribution, and tread plate (12) uses rubber material.
4. a kind of power transmission lines overhauling line marker device according to claim 1, it is characterised in that:The clamping ring (14) far ultraviolet tight loop fixing piece (15) end is helicitic texture, and nearly outer tight loop fixing piece (15) end of clamping ring (14) is hollow Structure.
5. a kind of power transmission lines overhauling line marker device according to claim 1, it is characterised in that:The outer fastening Circle fixing piece (15) is evenly distributed on the inside of the first outer tight loop (1) and the second outer tight loop (8), and outer tight loop fixing piece (15) external is laminated structure, and outer tight loop fixing piece (15) laminated structure outer dia is more than outer tight loop fixing piece (15) outer dia.
CN201820548723.9U 2018-04-16 2018-04-16 A kind of power transmission lines overhauling line marker device Expired - Fee Related CN208014261U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820548723.9U CN208014261U (en) 2018-04-16 2018-04-16 A kind of power transmission lines overhauling line marker device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820548723.9U CN208014261U (en) 2018-04-16 2018-04-16 A kind of power transmission lines overhauling line marker device

Publications (1)

Publication Number Publication Date
CN208014261U true CN208014261U (en) 2018-10-26

Family

ID=63892832

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820548723.9U Expired - Fee Related CN208014261U (en) 2018-04-16 2018-04-16 A kind of power transmission lines overhauling line marker device

Country Status (1)

Country Link
CN (1) CN208014261U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109147557A (en) * 2018-10-31 2019-01-04 华北理工大学 A kind of bulletin notice board
CN117268355A (en) * 2023-09-21 2023-12-22 国网安徽省电力有限公司岳西县供电公司 Power transmission line tower positioning and pit digging marking device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109147557A (en) * 2018-10-31 2019-01-04 华北理工大学 A kind of bulletin notice board
CN117268355A (en) * 2023-09-21 2023-12-22 国网安徽省电力有限公司岳西县供电公司 Power transmission line tower positioning and pit digging marking device
CN117268355B (en) * 2023-09-21 2024-03-12 国网安徽省电力有限公司岳西县供电公司 Power transmission line tower positioning and pit digging marking device

Similar Documents

Publication Publication Date Title
CN208014261U (en) A kind of power transmission lines overhauling line marker device
CN207171873U (en) A kind of reusable dismountable positioning jacket
CN206156656U (en) Tight for line lever block who takes tension measurement mechanism
CN206540572U (en) A kind of waterproof fast disassembly type Temperature Humidity Sensor
CN108490500A (en) A kind of bolt anti-fall device
CN208044974U (en) Wrap-up and safe wrap-up
CN214124650U (en) Circuit installation device of network information data safety prevention system
CN206658121U (en) The hole carbon brush box device of high-power wind-driven generator three
CN208047071U (en) A kind of induction wireless communication system based on digital signal processing platform
CN202257636U (en) RFID hook recognition device for an animal slaughtering line
CN106971669A (en) A kind of cable identification device
CN207196039U (en) Safety monitoring device location fixing device
CN206885638U (en) A kind of trystate label receiver and its insulating bar
CN207279157U (en) Pipeline heat insulation layer fixing device
CN218160605U (en) Ultrathin battery easy to fix and capable of being bent and punched for watchband
CN206980056U (en) A kind of attachment structure of wired game controller signals line and mainboard
CN209515120U (en) A kind of security identifier frame for electric system
CN206427967U (en) A kind of high reliability balancer interval positioner
CN208385728U (en) A kind of USB Type-C socket connector
CN207664306U (en) A kind of power battery quick plugging/unplugging device
CN206666873U (en) A kind of Multifunctional clothes airing device
CN209688352U (en) A kind of soft insulation construction
CN210842959U (en) Department of anesthesia's fiberoptic bronchoscope structure
CN205964940U (en) Sports teaching is with stake of portable football training obstacle
CN205940956U (en) Real vehicle buckle location simulating mechanism

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181026

Termination date: 20200416

CF01 Termination of patent right due to non-payment of annual fee