CN208000492U - A kind of Auto-Test System that benefit is tested for SVG chain links - Google Patents

A kind of Auto-Test System that benefit is tested for SVG chain links Download PDF

Info

Publication number
CN208000492U
CN208000492U CN201820463004.7U CN201820463004U CN208000492U CN 208000492 U CN208000492 U CN 208000492U CN 201820463004 U CN201820463004 U CN 201820463004U CN 208000492 U CN208000492 U CN 208000492U
Authority
CN
China
Prior art keywords
control unit
main control
chain link
connect
tested
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820463004.7U
Other languages
Chinese (zh)
Inventor
范方起
王罡
周超超
贺延周
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ShanDong TaiKai Power Electronic Co Ltd
Original Assignee
ShanDong TaiKai Power Electronic Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ShanDong TaiKai Power Electronic Co Ltd filed Critical ShanDong TaiKai Power Electronic Co Ltd
Priority to CN201820463004.7U priority Critical patent/CN208000492U/en
Application granted granted Critical
Publication of CN208000492U publication Critical patent/CN208000492U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)

Abstract

The utility model discloses a kind of for SVG chain links to mending the Auto-Test System tested, it include the display for experimentation data, storage and the monitoring device started, main control unit for Control experiment process and each component normal operation of guarantee, the trigger pulse and phase difference angle that issue are instructed for receiving main control unit, and segment parameters when operation and failure are uploaded to the chain link control device of main control unit, the data acquisition equipment of dynamic data for monitoring test process, the action directive sent out for executing main control unit, and running state information is fed back to the executive component of main control unit;The main control unit is connect with monitoring device, chain link control device, data acquisition equipment and executive component respectively;The chain link control device is also connect by optical fiber with the chain link for being tested, and chain link control device is connect by serial line interface with main control unit;Data acquisition equipment is connect by serial ports with main control unit.

Description

A kind of Auto-Test System that benefit is tested for SVG chain links
Technical field
The utility model is related to SVG field of automatic testing, and in particular to a kind of automatic survey for SVG chain links to benefit experiment Test system.
Background technology
Chain link is the important tests that must be carried out before SVG puts into operation to mending experiment, it is therefore an objective to verify chain link withstanding voltage electric current The ability of combined strength.SVG chain links are tested using back-to-back two chain links mending to test.By controlling two chain link exchange side The amplitude of output voltage and phase difference change the exchanged reactive power size and Orientation of two chain links.
Chain link is to mending experiment inlet wire contactor divide-shut brake, triggering, current-limiting resistance switching, wind turbine at present(Water dispenser)Start and stop, examination It is manual operation to test the operations such as process voltage current regulation, and since process is cumbersome, inevitable maloperation, there are certain safety is hidden Suffer from.And personnel's operating habit is different, and causing test parameters to adjust, numerical value is unstable, and product testing standard is poor.It realizes to mending The automation of experiment standardizes, and helps to improve the accuracy reliability of chain link detection;Security risk is reduced, tester is promoted The reliability of working environment.
Utility model content
In view of the foregoing drawbacks, the purpose of this utility model is to provide a kind of for SVG chain links to mending the automatic survey tested Test system, it can carry out full process automatization operation to mending in chain link, help to improve the accuracy of chain link detection in experiment Reliability;Security risk is reduced, the reliability of tester's working environment is promoted.
The utility model to achieve the above object, is achieved through the following technical solutions:One kind is tested for SVG chain links mending Auto-Test System, include the monitoring device of the display for experimentation data, storage and startup, be used for Control experiment mistake Journey and the main control unit for ensureing each component normal operation instruct the trigger pulse and phase angle that issue for receiving main control unit Degree, and by the chain link control device of segment parameters upload main control unit when operation and failure, it is used for the dynamic of monitoring test process The data acquisition equipment of data, the action directive sent out for executing main control unit, and running state information is fed back to The executive component of main control unit;The main control unit respectively with monitoring device, chain link control device, data acquisition equipment and execution Element connects;The chain link control device is also connect by optical fiber with the chain link for being tested, and chain link control device passes through Serial line interface is connect with main control unit;Data acquisition equipment is connect by serial ports with main control unit.
Further, the main control unit is PLC controller, and PLC controller is used to receive chain link control device and data are adopted Collect the data information that equipment uploads, and corresponding executive component is driven to act.
Further, the chain link, which is equipped with record, has chain link to number, the Quick Response Code of capacity and voltage data.
Further, the monitoring device is host computer, and host computer is used for and main control unit interactive information, each portion of real-time display Status information, operating parameter and the real-time waveform divided, and record storage;Barcode scanning gun is connected on host computer, barcode scanning gun is for sweeping Chain link Quick Response Code is retouched, 2 D code information is sent to host computer.
Further, the chain link control device includes dsp chip and fpga chip, and dsp chip is connect with fpga chip, Fpga chip is equipped with optical fiber interface and serial line interface;Fpga chip is connect by optical fiber interface with chain link, and fpga chip passes through Serial line interface and main control unit chain link.
Further, the data acquisition equipment is respectively provided at monitoring device, main control unit, chain link control device and executes member On part, data acquisition equipment includes current transformer, voltage transformer and temperature sensor, current transformer, voltage transformer It being connect respectively with main control unit with temperature sensor, the data acquisition equipment is used to acquire inlet wire current voltage when operation, To mending the temperature information of electric current, each key position, and main control unit is sent to as process monitoring foundation.
Further, the executive component includes inlet wire contactor, adjustable DC power supply, current-limiting resistance, wind turbine or water dispenser, into Line contactor, adjustable DC power supply, current-limiting resistance, wind turbine or water dispenser are connect with main control unit respectively, for receiving main control unit Instruction, execute the start stop operation of divide-shut brake, pressure regulation, resistance switching, wind turbine or water dispenser, and by status information feedback to master control list Member.
The prior art is compared, the utility model advantageous effect is:It is provided by the utility model a kind of for SVG chain links pair It mends the Auto-Test System of experiment, including monitoring device, main control unit, chain link control device, data acquisition equipment and executes member Part;The main control unit is connect with monitoring device, chain link control device, data acquisition equipment and executive component respectively.Master control list Member is PLC controller, realizes the automatic data information for receiving chain link control device and data acquisition equipment and uploading, and drive phase Executive component is answered to act.Using host computer as monitoring device, the information exchange with main control unit, each portion of real-time display are realized Status information, operating parameter and the real-time waveform divided, and relative recording is stored, it is connected with barcode scanning gun on host computer, realizes chain It saves the data such as number, capacity, voltage and reads and convert automatically storage.Data acquisition equipment includes current transformer, mutual induction of voltage Device and temperature sensor can acquire inlet wire current voltage when operation, to mending the temperature information of electric current, each key position, and Main control unit is sent as process monitoring foundation.Executive component includes the inlet wire contactor being connect respectively with main control unit, adjustable DC power supply, current-limiting resistance, wind turbine or water dispenser, can receive the instruction of main control unit, execute divide-shut brake, pressure regulation, resistance switching, The start stop operation of wind turbine or water dispenser, and by status information feedback main control unit.
It is thrown it can be seen that the utility model realizes chain link mending the division of experiment inlet wire contactor, current-limiting resistance and wind turbine Cut, trigger, voltage and current adjust, data display storage etc. operations full process automatization standardization control, help to improve chain Save the accuracy reliability of detection;Security risk is reduced, the reliability of tester's working environment is promoted.
Description of the drawings
Attached drawing 1 is the system schematic of the utility model.
Attached drawing 2 is the chain link of the utility model automatically to mending test flow chart.
Specific implementation mode
It explains below in conjunction with the accompanying drawings to specific embodiment of the present utility model.
A kind of Auto-Test System that benefit is tested for SVG chain links as shown in Figure 1, including monitoring device, master control list Member, chain link control device, data acquisition equipment and executive component;Main control unit respectively with monitoring device, chain link control device, number It is connected with executive component according to collecting device.Main control unit uses PLC controller, monitoring device to use host computer, connect on host computer It is connected to barcode scanning gun, 2 D code information is sent to host computer, chain link control device includes by barcode scanning gun for scanning chain link Quick Response Code Dsp chip and fpga chip, dsp chip are connect with fpga chip, and fpga chip is equipped with optical fiber interface and serial line interface; Fpga chip is connect by optical fiber interface with the chain link for being tested, and fpga chip passes through serial line interface and PLC controller Connection.Data acquisition equipment includes that current transformer, voltage transformer and the temperature being respectively provided on test various parts pass Sensor, data acquisition equipment are connect by serial line interface with PLC controller.The executive component include respectively with PLC controller Inlet wire contactor, adjustable DC power supply, current-limiting resistance, wind turbine or the water dispenser of connection.
Each position of the utility model realizes automatically controlling for experiment process by the interaction of information.As shown in Fig. 2, from It is dynamic as follows to mending testing process:
Step 1:Barcode scanning gun scans chain link information, and check and correction is normal, clicks and starts on monitoring device;
Step 2:Main control unit detects each position status information, meets test requirements document and then controls the actuation of inlet wire contactor;Such as There are current-limiting resistances the abnormalities such as not to put into, then refuses to start and feed back to monitoring device, trigger police instruction;
Step 3:Wind turbine is put into after delay(Water dispenser), control DC power supply boosting.
Step 4:When chain link control device uploads chain link voltage 150VDC, stop boosting.Voltage is uploaded to set with data acquisition Standby collection voltages are calibrated, and DC power supply is depressured if abnormal, wind turbine and inlet wire contactor disjunction, and are alarmed and referred on monitoring device Show
Step 4:Main control unit control chain link control device issues trigger pulse, if chain link return is normal, then disconnects side Chain link power supply, and current-limiting resistance is bypassed, control other side DC power supply boosting.If chain link returns abnormal, then stopping alarm.
Step 5:Chain link returns voltage to 850VDC, stops boosting.If boost process chain link failure and voltage check are abnormal, Then stopping alarm.
Step 6:Main control unit control chain link control device issues difference angle, adjusts to mending electric current to setting electric current, fortune Row 30 minutes.Main control unit uploads electric current and critical component monitoring temperature to data acquisition equipment, if any abnormal then stopping alarm. Such as current regulation process chain link failure, same stopping alarm.
Step 7:Negative angle difference is issued, setting electric current is adjusted to, same operation 30 minutes.
Step 8:Electric current stops zero, DC power supply decompression zero, inlet wire contactor and wind turbine(Water dispenser)Disjunction, current limliting electricity Resistance input.
Step 9:Monitoring device stores test data to database, and test process resets.
With reference to the drawings and specific embodiments, the utility model is described in further detail.It should be understood that these embodiments are only used for Illustrate the utility model rather than limitation the scope of the utility model.In addition, it should also be understood that, having read the utility model instruction Content after, those skilled in the art can make various changes or modifications the utility model, and such equivalent forms are equally fallen In range defined herein.

Claims (7)

1. a kind of Auto-Test System tested benefit for SVG chain links, includes the chain link for being tested, feature exists In:
Further include the monitoring device of the display for experimentation data, storage and startup,
For Control experiment process and ensure the main control unit of each component normal operation,
The trigger pulse and phase difference angle that issue are instructed for receiving main control unit, and will be on segment parameters when operation and failure The chain link control device of main control unit is passed,
The data acquisition equipment of dynamic data for monitoring test process,
The action directive sent out for executing main control unit, and execute member by what running state information fed back to main control unit Part;
The main control unit is connect with monitoring device, chain link control device, data acquisition equipment and executive component respectively;
The chain link control device is also connect by optical fiber with chain link, and chain link control device is connected by serial line interface and main control unit It connects;
The data acquisition equipment is connect by serial line interface with main control unit.
2. the Auto-Test System according to claim 1 tested benefit for SVG chain links, it is characterised in that:The master Control unit is PLC controller, and PLC controller is used to receive the data information that chain link control device and data acquisition equipment upload, And corresponding executive component is driven to act.
3. the Auto-Test System according to claim 1 tested benefit for SVG chain links, it is characterised in that:The chain Section, which is equipped with record, has chain link to number, the Quick Response Code of capacity and voltage data.
4. the Auto-Test System according to claim 3 tested benefit for SVG chain links, it is characterised in that:The prison Control device is host computer, and host computer is used for and main control unit interactive information, the status information, operating parameter of real-time display each section And real-time waveform, and record storage;
Barcode scanning gun is connected on host computer, 2 D code information is sent to host computer by barcode scanning gun for scanning chain link Quick Response Code.
5. the Auto-Test System according to claim 1 tested benefit for SVG chain links, it is characterised in that:The chain It includes dsp chip and fpga chip to save control device, and dsp chip is connect with fpga chip, and fpga chip connects equipped with optical fiber Mouth and serial line interface;Fpga chip is connect by optical fiber interface with chain link, and fpga chip passes through serial line interface and main control unit chain Section.
6. the Auto-Test System according to claim 1 tested benefit for SVG chain links, it is characterised in that:The number It is respectively provided on main control unit, chain link control device and executive component according to collecting device, data acquisition equipment includes Current Mutual Inductance Device, voltage transformer and temperature sensor, current transformer, voltage transformer and temperature sensor connect with main control unit respectively It connects, the data acquisition equipment is used to acquire inlet wire current voltage when operation, and the temperature to mending electric current, each key position is believed Breath, and main control unit is sent to as process monitoring foundation.
7. the Auto-Test System according to claim 1 tested benefit for SVG chain links, it is characterised in that:It is described to hold Units include inlet wire contactor, adjustable DC power supply, current-limiting resistance, wind turbine or water dispenser, inlet wire contactor, straight-adjustable galvanic electricity Source, current-limiting resistance, wind turbine or water dispenser are connect with main control unit respectively, the instruction for receiving main control unit, are executed divide-shut brake, are adjusted The start stop operation of pressure, resistance switching, wind turbine or water dispenser, and by status information feedback to main control unit.
CN201820463004.7U 2018-03-30 2018-03-30 A kind of Auto-Test System that benefit is tested for SVG chain links Active CN208000492U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820463004.7U CN208000492U (en) 2018-03-30 2018-03-30 A kind of Auto-Test System that benefit is tested for SVG chain links

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820463004.7U CN208000492U (en) 2018-03-30 2018-03-30 A kind of Auto-Test System that benefit is tested for SVG chain links

Publications (1)

Publication Number Publication Date
CN208000492U true CN208000492U (en) 2018-10-23

Family

ID=63840283

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820463004.7U Active CN208000492U (en) 2018-03-30 2018-03-30 A kind of Auto-Test System that benefit is tested for SVG chain links

Country Status (1)

Country Link
CN (1) CN208000492U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110456198A (en) * 2019-08-14 2019-11-15 国网湖南省电力有限公司 Soft powering method under chain type SVG two and a string of test patterns

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110456198A (en) * 2019-08-14 2019-11-15 国网湖南省电力有限公司 Soft powering method under chain type SVG two and a string of test patterns
CN110456198B (en) * 2019-08-14 2021-09-28 国网湖南省电力有限公司 Soft power-on method in chain type SVG two-in-one-string test mode

Similar Documents

Publication Publication Date Title
CN110907158B (en) Comprehensive test system of anastomat
CN102692598B (en) Electric cabinet logic tester device of railway vehicle
CN101650411A (en) Universal power-aging testing system
CN208000492U (en) A kind of Auto-Test System that benefit is tested for SVG chain links
CN106093776A (en) A kind of simulated machine load characteristic low voltage test system based on converter
CN112234707B (en) High-energy synchrotron radiation light source magnet power failure recognition system
CN105553362A (en) Internal combustion locomotive main generator excitation control device
CN209085791U (en) Transformer temperature rise automatic checkout system
CN209148845U (en) A kind of driving control system for electric machine efficiency Detecting data frame based on power control
CN201583643U (en) Automatic test and calibration device of electric energy quality analyzer
CN104459589A (en) Automatic test system of current sensor
CN108919783A (en) A kind of driving mechanism trouble-shooter and method
CN202132312U (en) Automatic test and debug system of hydraulic valve
CN105785161A (en) Uninterruptible power supply static by-pass switch voltage monitoring card testing system and method
CN101286075B (en) Adjustable energy supply linear programmed control device
CN107421745A (en) A kind of engine automation ground detection system and method based on engine data logger
CN205120924U (en) Automatic change throttle motor detecting system
CN111626542A (en) Big data-based detection method for generator excitation system
CN108897304B (en) Test system of variable-pitch driver control panel
CN110375771B (en) Three-floating inertial instrument floater running-in equipment
CN204556742U (en) Distribution network cable line monitoring running state and failure wave-recording diagnostic device
CN106526503A (en) Inverter power supply main control board fault detection device in rail transit and detection method thereof
CN103592532B (en) A kind of parameter detection method of wind energy turbine set Static Var Compensator and system
CN208172186U (en) A kind of low-voltage circuit breaker electric life monitoring test macro
CN105572514A (en) Independent testing system and method of uninterruptible power supply static bypass switch interface board

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant