CN207994505U - Novel bridge frame connection structure - Google Patents

Novel bridge frame connection structure Download PDF

Info

Publication number
CN207994505U
CN207994505U CN201721414672.2U CN201721414672U CN207994505U CN 207994505 U CN207994505 U CN 207994505U CN 201721414672 U CN201721414672 U CN 201721414672U CN 207994505 U CN207994505 U CN 207994505U
Authority
CN
China
Prior art keywords
crane span
plate
span structure
gossip
fond
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721414672.2U
Other languages
Chinese (zh)
Inventor
尚新春
孙保建
王玉玲
郭梁才
李成行
王轲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XUCHANG MEETALL CABLE TRAY CO Ltd
Original Assignee
XUCHANG MEETALL CABLE TRAY CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XUCHANG MEETALL CABLE TRAY CO Ltd filed Critical XUCHANG MEETALL CABLE TRAY CO Ltd
Priority to CN201721414672.2U priority Critical patent/CN207994505U/en
Application granted granted Critical
Publication of CN207994505U publication Critical patent/CN207994505U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of Novel bridge frame connection structure, including crane span structure, the both sides of the crane span structure set fixed plate respectively, and several mounting holes are respectively equipped in the fixed plate;The crane span structure is at least 2, and the inside of the both ends docking of 2 crane span structures, crane span structure docking is equipped with interior connecting plate, and the interior connecting plate is equipped with several arcuate receptacles outwardly protruded, and the quantity of the arcuate receptacle is consistent with the quantity of the mounting hole;The outside of the described crane span structure docking is equipped with plate, the plate be equipped with it is fond of gossip, it is described fond of gossip to be matched with the socket;Described is fond of gossip equipped with circular arc reinforcing rib, and the shape of the arc-shaped reinforcing rib is consistent with the shape of the socket.The technical solution adopted in the utility model, on the basis of meeting crane span structure bearing capacity, the non-bolt that crane span structure may be implemented quickly clamps, and improves 10 times of installation effectiveness or more, and maintenance cost is low, crane span structure engineering whole service life is long.

Description

Novel bridge frame connection structure
Technical field
The utility model belongs to field of machining, more particularly, to a kind of Novel bridge frame connection structure.
Background technology
Traditional cable crane span structure when mounted, is fixed between section and section by the connecting plate of end both sides, and every connecting plate needs 6~8 sets of connection bolts are wanted, then each connection end needs 12~16 sets of connection bolts to fix.Installation effectiveness is low, causes work Journey installation progress seriously lags.
Connection bolt shared quantity in entire engineering material doses is larger, and surface treatment general in industry at present is general For plating, the surface treatment with crane span structure ontology seriously mismatches.Cable testing bridge pacifies surface treatment in engineering and is generally plastic-spraying or heat Zinc is soaked, service life is not less than 40 years.And vital part of the bolt as connection crane span structure, its service life of the erosion resistant coating of plating No more than 15 years, especially the service life can be lower in a humid environment.There are two types of traditional solutions, and one is periodic replacement spiral shells Bolt, another kind are to use dedicated bolt, improve the service life of bolt.The first solve solution service life at least 3 bolts are needed replacing, maintenance cost is high, and maintenance cost is high, inconvenient to use;Second of solution needs to improve bolt Material, initial stage input is larger, and construction cost is high.
Utility model content
The purpose of this utility model is to provide a kind of Novel bridge frame connection structures, improve the installation progress of crane span structure engineering, Reduce maintenance cost.
To achieve the above object, the technical solution adopted in the utility model is:Novel bridge frame connection structure, including crane span structure, The both sides of the crane span structure are respectively equipped with fixed plate, and several mounting holes are respectively equipped in the fixation;The crane span structure is at least 2, and 2 One end of a crane span structure is docked, and the inside of crane span structure docking is equipped with interior connecting plate, and the interior connecting plate is equipped with several outside The socket of protrusion, the quantity of the socket are consistent with the quantity of mounting hole on described 2 docking rear axle stands;The crane span structure docking Outside be equipped with plate, the plate be equipped with it is fond of gossip, it is described fond of gossip to be matched with the arcuate receptacle;It is described it is fond of gossip on Equipped with reinforcing rib, the shape of the reinforcing rib is consistent with the shape of the socket.
The technical solution adopted in the utility model, on the basis of meeting crane span structure bearing capacity, may be implemented crane span structure without spiral shell Bolt quickly clamps, and improves 10 times of installation effectiveness or more, and maintenance cost is low, crane span structure engineering whole service life is long.
Further, the socket is domes, it is described it is fond of gossip on reinforcing rib be arc-shaped reinforcing rib, the circle The shape of arc reinforcing rib and the shape of the arcuate receptacle match.
Further, the mounting hole of each crane span structure is two rows, and the arcuate receptacle is arranged for two rows, on The arcuate receptacle of row is in the surface of the arcuate receptacle of lower row, and upper and lower two rows of arcuate receptacle be respectively at it is corresponding in On heart line;The size of upper row's arcuate receptacle is slightly larger than the size of lower row's arcuate receptacle;The quantity fond of gossip with it is described interior The quantity of single arcuate receptacle is consistent on connecting plate.
Interior connecting plate is up and down in four arch tearing notch structures, and upper arch tearing notch structure is slightly larger than lower arch tearing notch structure, just Upper arch tearing notch structure is smoothly initially passed through in plate is fond of gossip.
Further, the upper end of the plate is equipped with external arc hook structure, and the root of the external arc hook structure is to dividing into Have two sections of boss structures, it is described it is fond of gossip be arranged in the lower section of boss structure, lower end fond of gossip is equipped with protrusion.
Plate circular arc hook structure matches on increasing plate rigid foundation with the arc hook section in crane span structure section, just It is tapped in tool indeformable;On the one hand two sections of downward boss structures of plate arc hook root increase plate rigidity, on the other hand Upside boss does not influence cover board installation after ensureing crane span structure assembly, and downside boss then gives the interference volume of plate outward, is filled in plate It is more fastened with it is made in the process;Plate lower part lower end fond of gossip is equipped with bulge-structure, the connecting plate arch tearing notch structure in insertion In after have the function of retaining.
Further, the upper end of the interior connecting plate is equipped with Inner arc hook structure, and lower end is equipped with right angle crimp structure.
The right angle crimp structure of the elongated arc hook in upper end of interior connecting plate, lower end has intensity of joint board and rigidity in enhancing Effect.
Description of the drawings
Fig. 1, interior connecting board structure schematic diagram;
Fig. 2, portal structure schematic diagram.
Fig. 3, board plug structure schematic diagram;
The structural schematic diagram that Fig. 4, Novel bridge frame connection structure are installed on crane span structure;
Wherein:1, plate, 2, interior connecting plate, 3, external arc hook, 4, convex platform, 5, lower convex platform, 6, fond of gossip, 7, protrusion, 8, Inner arc muscle, 9, Inner arc hook, arcuate receptacle, 11. times arcuate receptacles on 10., 12, right angle crimp, 13, crane span structure.
Specific implementation mode
Embodiment one:
As Figure 1-Figure 4, Novel bridge frame connection structure, including 2 crane span structures, this 13, the both sides of the crane span structure 13 are set respectively Fixed plate, fixed plate can adopt punching press and be made to be an integral structure with crane span structure, can also use split structure.In each fixation Two rows rectangle mounting hole is provided on plate, often row can be multiple, such as 2,3 etc..The both ends docking of straight-through crane span structure 13, The inside of crane span structure docking is equipped with interior connecting plate 2, and punching stretch has two rows arcuate receptacle on interior connecting plate 1, the quantity often arranged It is equal with the quantity on two docking crane span structure mounting plates.The upper arch of upper row insert 10 mouthfuls of arcuate receptacles 11 in lower row just on Side, and upper and lower two rows of arcuate receptacle is respectively on two center lines.Set on plate it is spaced be equipped with 4 it is fond of gossip, with arch Shape socket matches.Fond of gossip 6 are equipped with circular arc reinforcing rib 8, the shape one of the shape of the arc-shaped reinforcing rib 8 and the socket It causes.This programme has as follows a little:(1) four arch tearing notches, elongated arc hook above and below interior connecting plate, right angle crimp structure is by mould Tool punching stretch is made, and can increase by one times of self-strength or more, while reducing material thickness, reduces steel consumption;(2) on plate Portion uses circular arc hook structure, and being equipped with 2 boss structures below circular arc hook structure designs, and plate lower part tongue is reinforced using circular arc Muscle improves plate self-strength 2 times or more;(3) interior connecting plate four arch tearing notch structures and cooperation fond of gossip below plate up and down Installation can be completed in inserting, quick and easy for installation;(4) arch tearing notch structure omits clear space height, equal with width on interior connecting plate More than plate circular arc muscle height fond of gossip and tongue width, upper arch tearing notch structure is smoothly initially passed through convenient for plate is fond of gossip, it can be quick Installation positioning, improves installation speed;(5) arc hook is identical as crane span structure arc hook above plate, installs rear axle stand bridge position straight line It spends, appearance looks elegant;(6) arc hook stable structure above plate, is tapped indeformable using tool;(7) arc hook above plate The 1st boss of root reaches opening position above crane span structure, completes installation;(8) end fond of gossip of plate uses the domes of gradual change, It can make end fond of gossip that can easily enter through the tearing notch structure of interior connecting plate, realize quick inserting function;(9) plate lower end is inserted The circular arc muscle of tongue makes it have good rigidity, ensures that itself is indeformable during interference fit, promotes interior connecting plate tearing notch Malformation and its cambered surface are completely close, ensure the intensity of junction.
Plate circular arc reinforcing rib fond of gossip can increase rigidity fond of gossip, and during inserting, deformation fond of gossip is much smaller than interior connection Arch tearing notch structure deformation, and circular arc reinforcing rib give circular arc camber fond of gossip increase it is fond of gossip with interior connecting plate arch The contact area of tearing notch structure greatly increases the clamp force and frictional force of connecting plate and plate in folder in interference fit.
The size of the arcuate receptacle 10 of upper row is slightly larger than the size of lower row's arcuate receptacle 11, is smoothly first worn convenient for plate is fond of gossip Cross arch tearing notch structure.
Embodiment two:
As Figure 1-Figure 4, for the ease of installation, Inner arc hook structure 9, lower end are equipped in the upper end of interior connecting plate Equipped with right angle crimp 12, the right angle crimp structure of the interior elongated arc hook in connecting plate upper end, lower end has intensity of joint board in enhancing With the effect of rigidity.It is equipped with external arc hook structure 3 in the upper end of plate, plate circular arc hook structure is increasing plate rigid foundation On, and match with the arc hook section in crane span structure section, it is tapped convenient for tool indeformable.The root of outer circular arc hook structure 3 to Two sections of boss structures 4,5 are had, on the one hand two sections of downward boss structures of plate arc hook root increase plate rigidity, separately On the one hand upside boss does not influence cover board installation after ensureing crane span structure assembly, and downside boss then gives the interference volume of plate outward, It is set more to fasten in plate assembling process.The interior lower four arches tearing notch structure clear space height of connecting plate is slightly above plate lower end The circular arc muscle height of tongue, but the lower four arches tearing notch structure clear space width of interior connecting plate is slightly less than the width of plate lower end tongue Degree, to realize that plate is fond of gossip in the interior connecting plate arch tearing notch of tool percussion insertion, interior lower four tearing notches of connecting plate occur Interference deforms, and ensure that the tightness of attachment device assembly.
It is described it is fond of gossip be arranged in the lower section of boss structure 4,5, outer surface fond of gossip is equipped with triangular groove texture 7.Plate is fond of gossip Lower end is equipped with protrusion, rear in connecting plate arch tearing notch structure in insertion to have the function of increasing friction force and retaining.On plate Square arc hook root be equipped with 2 boss, the 2nd boss plate it is fond of gossip be close on the outside of crane span structure enter interior connecting plate under four arches When tearing notch, the 2nd boss root reaches crane span structure opening position, and during continuing grafting, the 2nd boss, which enters, to be adjacent on the outside of crane span structure Meanwhile giving that plate is elastic outward, simultaneously plate tongue is in the portion by four arch tearing notch structures on interior connecting plate Four arch tearing notches on connecting plate, keep plate more more slotting tighter in the separated stretching outward that begins.To further improve assembly Tightness;1st boss plays the role of hiding cover board rigging position in bridge cover plate installation process;Plate lower part length is sublingual End is equipped with bulge-structure, rear in connecting plate arch tearing notch structure in insertion to have the function of retaining.
The installation process of the utility model is as follows:
The first step straight-through 13 is docked two-by-two;
Connecting plate 2 is assemblied in straight-through 13 inside in second step, and 2 arcuate receptacle knot 8,9 of interior connecting plate passes through straight-through hole;
Third step holds plate 1, so that plate 1 fond of gossip 6 is inserted into from straight-through 13 outside and is torn by the upper arch of interior connecting plate 2 Mouth structure 8,16 end fond of gossip circular arc portion of plate enter in the lower arch tearing notch structure 11 of interior connecting plate 2, plate 1 fond of gossip 6 Width, height are respectively less than the upper arch outlet structure 10 of interior connecting plate 2, assemble external institute's spacing size after leading directly to and are slightly larger than The size of the lower arch outlet structure 11 of interior connecting plate 2;
4th step taps the external arc hook 3 of the top of plate 1 by wooden mallet, make fond of gossip the 6 of plate 1 completely into and pass through The lower arch outlet structure 11 of interior connecting plate 2 completes assembly.The clamping force source of assembly:1. the lower arch for passing through interior connecting plate 2 Fond of gossip 6 interference fit of tearing notch structure 9 and plate 1 clamps straight-through;2. the lower convex platform 5 of plate 1 is expected by straight-through outside simultaneously Interference fit outward is generated when thick, when assembly, which changes interference fit, can be transmitted to fond of gossip the 6 of plate 1 and the upper arch of interior connecting plate 2 Outlet structure 10 makes it generate interference fit, straight-through to clamp.
Scheme provided by the utility model is widely suitable for each field, does not use connection bolt.There is the following excellent Gesture:1. being not necessarily to bolt cost, project cost is saved;2. connecting plate is consistent with crane span structure ontology anti-corrosion, increase the use of crane span structure entirety Service life;3. connected structure designs, the quick connection of crane span structure is realized, improve project installation progress;4. the mounting means tapped, operation Simply;5, crane span structure attachment device is close to install, not lofty, keeps crane span structure system overall appearance beautiful, and reduce hidden danger of colliding with;6.X、 Y, Z tripartite limits, and connection type is safe and reliable;7. crane span structure attachment device backing stop structure has anti-theft feature after so that crane span structure is installed, Linkage function safety higher;8. convenient for the installation of bridge cover plate;9. when crane span structure Lin Qiang is installed, with the side of being bolted Formula is compared, and installation difficulty can be greatly lowered in crane span structure connection decoration.

Claims (5)

1. a kind of Novel bridge frame connection structure, including crane span structure, which is characterized in that the both sides of the crane span structure are respectively equipped with fixed plate, should Several mounting holes are respectively equipped in fixed plate;The crane span structure is at least 2, and the both ends of crane span structure are docked, the inside of crane span structure docking Equipped with interior connecting plate, the interior connecting plate is equipped with several sockets outwardly protruded, the quantity of the socket and the installation The quantity in hole is consistent;The outside of the described crane span structure docking is equipped with plate, the plate be equipped with it is fond of gossip, it is described it is fond of gossip with it is described Socket matches;Described is fond of gossip equipped with reinforcing rib, and the shape of the reinforcing rib and the shape of the socket match.
2. Novel bridge frame connection structure described in accordance with the claim 1, which is characterized in that the socket is domes, institute State it is fond of gossip on reinforcing rib be arc-shaped reinforcing rib, the shape phase of the shape of the arc-shaped reinforcing rib and the arcuate receptacle Matching.
3. Novel bridge frame connection structure according to claim 2, which is characterized in that the socket sets for two rows It sets, the arcuate receptacle of upper row is in the surface of the arcuate receptacle of lower row, and upper and lower two rows of arcuate receptacle is respectively at correspondence Center line on;The size of upper row's arcuate receptacle is slightly larger than the size of lower row's arcuate receptacle.
4. Novel bridge frame connection structure described in accordance with the claim 1, which is characterized in that the upper end of the plate is equipped with outer circle Arc hook structure, the root of the external arc hook structure are described fond of gossip to be arranged in boss structure to having two sections of boss structures Lower section, lower end fond of gossip are equipped with bulge-structure.
5. Novel bridge frame connection structure described in accordance with the claim 1, which is characterized in that the upper end of the interior connecting plate is equipped with Inner arc hook structure, lower end are equipped with right angle crimp structure.
CN201721414672.2U 2017-10-31 2017-10-31 Novel bridge frame connection structure Expired - Fee Related CN207994505U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721414672.2U CN207994505U (en) 2017-10-31 2017-10-31 Novel bridge frame connection structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721414672.2U CN207994505U (en) 2017-10-31 2017-10-31 Novel bridge frame connection structure

Publications (1)

Publication Number Publication Date
CN207994505U true CN207994505U (en) 2018-10-19

Family

ID=63803463

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721414672.2U Expired - Fee Related CN207994505U (en) 2017-10-31 2017-10-31 Novel bridge frame connection structure

Country Status (1)

Country Link
CN (1) CN207994505U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107732817A (en) * 2017-10-31 2018-02-23 许昌美特桥架股份有限公司 Novel bridge frame attachment structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107732817A (en) * 2017-10-31 2018-02-23 许昌美特桥架股份有限公司 Novel bridge frame attachment structure

Similar Documents

Publication Publication Date Title
CN201104633Y (en) Self-help metal cupboard
CN207994505U (en) Novel bridge frame connection structure
CN203584996U (en) Connecting piece
CN2816444Y (en) Inlaying type fastening hoop
CN201434347Y (en) Fastening structure of protecting cover of LED street lamp
CN208433707U (en) Novel bridge frame attachment device
CN204225332U (en) A kind of installation of ceiling assembly
CN206360336U (en) Aluminum alloy mould plate and its connector being connected with back cord
CN107732817A (en) Novel bridge frame attachment structure
CN207994532U (en) A kind of Novel bridge frame attachment device
CN203475676U (en) Soft membrane ceiling convenient to detach and assemble
CN208337067U (en) A kind of Novel bridge frame connection structure
CN201449035U (en) Connecting structure for control box and panel shell of wall-mounted boiler
CN201852069U (en) Steam generator
CN202117210U (en) Hung ceiling
CN202749937U (en) Buckling type rear protective cover for electric generator
CN205039486U (en) Computer lab wire casing
CN204677894U (en) Air-conditioning duct buckle
CN201680309U (en) Lamp holder
CN219144388U (en) Anti-drop apron
CN219140066U (en) Riser pipe strap
CN203066410U (en) Self-fastened aluminum suspension loop
CN2435600Y (en) Fixing means for handle of water tap
CN209637899U (en) A kind of motorcycle crankcase
CN203977788U (en) The fastening connecting piece of a kind of buckle

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181019

CF01 Termination of patent right due to non-payment of annual fee