CN207991539U - A kind of bridge construction survey device - Google Patents

A kind of bridge construction survey device Download PDF

Info

Publication number
CN207991539U
CN207991539U CN201820331285.0U CN201820331285U CN207991539U CN 207991539 U CN207991539 U CN 207991539U CN 201820331285 U CN201820331285 U CN 201820331285U CN 207991539 U CN207991539 U CN 207991539U
Authority
CN
China
Prior art keywords
bridge construction
support leg
sleeve
pedestal
survey device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820331285.0U
Other languages
Chinese (zh)
Inventor
刘立军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201820331285.0U priority Critical patent/CN207991539U/en
Application granted granted Critical
Publication of CN207991539U publication Critical patent/CN207991539U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model is related to measuring device technical field, a kind of road bridge construction measuring device is disclosed, including tripod and the total powerstation that is placed on the tripod;The tripod includes the tablet for fixation total powerstation, elevating lever is fixedly installed at the plate center, the elevating lever includes fixing end and lift side, the fixing end is to set female sleeve, the lift side is the lifting screw being connect with the bush whorl, the upper end of the lifting screw is fixedly connected with the tablet, and lower end connects handle;Rotation adjustment device is arranged in the sleeve upper end, and the rotation adjustment device includes being fixed at the adjusting knob of sleeve upper end and is in the pedestal that circumferential tooth socket disengaging type is connect with the adjusting knob;The pedestal is equipped with three stabilizer blades being connect with the base runner.The utility model can arbitrarily adjust height, arbitrarily adjust measurement direction, easy to use.

Description

A kind of bridge construction survey device
Technical field
The utility model is related to measuring device technical field more particularly to a kind of bridge construction survey devices.
Background technology
The use of more survey tool is total powerstation in bridge work progress, total powerstation be a kind of collection it is light, mechanical, electrical be one The high-tech measuring instrument of body is the mapping for integrating horizontal angle, vertical angle, distance (oblique distance, flat away from), vertical survey function Instrument system can once dispose instrument that can complete all to measure work on the survey station.It is to put during the use of total powerstation It sets on tripod, tripod is paved certain height, ensures the stationarity of tripod, is total powerstation accurate testing Premise.But tripod is in use, often there are problems that height, measurement angle are not easy to adjust or can not adjust;Separately Outside, it often also needs to worker and adjusts the inclined angle of stabilizer blade institute manually, to ensure that tripod has higher levelness, therefore adjust Section process is usually time-consuming, laborious, inconvenient to use.
Utility model content
The technical problem to be solved by the utility model is to provide one kind can arbitrarily adjusting height, arbitrarily adjusts measurement direction , bridge construction survey device easy to use.
In order to solve the above technical problems, technical solution adopted in the utility model is:
A kind of bridge construction survey device, including tripod and the total powerstation that is placed on the tripod;Its feature exists In:The tripod includes the tablet for fixation total powerstation, and elevating lever, the elevating lever is fixedly installed at the plate center Including fixing end and lift side, the fixing end is to set female sleeve, and the lift side is to connect with the bush whorl The lifting screw connect, the upper end of the lifting screw are fixedly connected with the tablet, and lower end connects handle;The sleeve upper end is set Rotation adjustment device is set, the rotation adjustment device includes being fixed at the adjusting knob of sleeve upper end and being revolved with the adjusting Button is in the pedestal of circumferential tooth socket disengaging type connection;The pedestal is equipped with three stabilizer blades being connect with the base runner.
Further technical solution is:The adjusting knob is equipped with circumferentially spaced convex in the side that disengaging type connects Tooth, the pedestal are equipped with circumferentially spaced groove in the side that disengaging type connects, and the double wedge is connect with groove disengaging type.
Further technical solution is:The stabilizer blade include the connecting rod being connected with pedestal by axis pin, upper support leg and under Upper support leg is installed in the bottom end of stabilizer blade, the connecting rod, and lower support leg is installed in the upper support leg bottom end.
Further technical solution is:Pass through axis pin between the connecting rod and upper support leg, between upper support leg and lower support leg Connection.
Further technical solution is:The connecting rod is equipped with sliding slot, is equipped with sliding block in the sliding slot, on the sliding block It is hinged with auxiliary support bar, the other end of the auxiliary support bar is equipped with the arc piece that central angle is 120 °, and the arc is spelled The side side wall of block is equipped with fixture block, and other side side wall is equipped with the card slot for being engaged by clamping with fixture block.
Further technical solution is:Three arc pieces can be spliced into a circular ring structure by fixture block and card slot, The circular ring structure is consistent with sleeve outer diameter and is set in sleeve lower end.
Further technical solution is:It is coated on the fixture block, card slot for increasing fixture block and card slot male-female engagement The magnetosphere of tightness.
Further technical solution is:The pedestal is equipped with the angle index value around adjusting knob setting.
It is using advantageous effect caused by above-mentioned technical proposal:
1) by the setting of elevating lever, the measurement height of manually adjustable total powerstation is easy to operate;
2) by the setting of rotation adjustment device, the measurement angle of total powerstation can arbitrarily be adjusted;
3) by the setting of auxiliary support bar and arc piece, when use will auxiliary connecting rod and arc piece, rotation is extremely Horizontality carries out male-female engagement with card slot using the fixture block on arc piece side wall, and then three arc pieces is assembled into The circular ring structure being set on sleeve helps to ensure that tripod when in use steady at this point, the levelness of tripod is higher Property.
Description of the drawings
Utility model will be further described in detail below with reference to the attached drawings and specific embodiments.
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the structural schematic diagram of the utility model connecting rod;
Fig. 3 is the structural schematic diagram of the utility model arc piece;
Wherein:1- total powerstations, 2- tablets, 3- sleeves, 4- auxiliary support bars, 5- lifting screws, 6- handles, 7- lower support legs, 8- upper support legs, 9- connecting rods, 10- pedestals, 11- adjusting knobs, 91- sliding slots, 92- sliding blocks, 93- arcs piece, 931- fixture blocks, 932- card slots.
Specific implementation mode
With reference to the attached drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out clear Chu is fully described by, it is clear that and described embodiment is only a part of the embodiment of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work The every other embodiment obtained, shall fall within the protection scope of the present invention.
Many details are elaborated in the following description in order to fully understand the utility model, but this practicality is new Type can also be implemented using other different from other manner described here, and those skilled in the art can be without prejudice to this reality With doing similar popularization in the case of novel intension, therefore the utility model is not limited by following public specific embodiment.
As shown in Figs. 1-3, a kind of bridge construction survey device, including tripod and the whole station that is placed on the tripod Instrument 1;It is characterized in that:The tripod includes the tablet 2 for fixation total powerstation 1, is fixedly installed and rises at 2 center of the tablet Bar drops, and the elevating lever includes fixing end and lift side, and the fixing end is to set female sleeve 3, and the lift side is The lifting screw 5 being threadedly coupled with the sleeve 3, the upper end of the lifting screw 5 are fixedly connected with the tablet 2, and lower end connects Connect handle 6;Rotation adjustment device is arranged in 3 upper end of the sleeve, and the rotation adjustment device includes being fixed at 3 upper end of sleeve Adjusting knob 11 and be in the pedestal 10 that circumferential tooth socket disengaging type is connect with the adjusting knob 11;The pedestal 10 be equipped with Three stabilizer blades that the pedestal 10 is flexibly connected.Sleeve 3 and the combination of lifting screw 5 form a manually screw lifting device, It can realize that the height of tablet 2 and total powerstation 1 is adjusted by the handle 6 on rotation and lifting screw rod 5;It can by rotation of adjustment knob 11 Band moving sleeve 3 and then drive lifting screw 5 and the rotation of tablet 2, tablet 2 drive total powerstation 1 to rotate in turn, play and adjust measurement angle The effect of degree.
Preferably:The adjusting knob 11 is equipped with circumferentially spaced double wedge, the base in the side that disengaging type connects Seat 10 is equipped with circumferentially spaced groove in the side of disengaging type connection, and the double wedge is connect with groove disengaging type.
Preferably:The stabilizer blade includes connecting rod 9, upper support leg 8 and the lower support leg 7 being connected with pedestal 10 by axis pin, institute The bottom end installation upper support leg 8 of connecting rod 9 is stated, lower support leg 7 is installed in 8 bottom end of the upper support leg.
Preferably:It is connected again by axis pin between the connecting rod 9 and upper support leg 8, between upper support leg 8 and lower support leg 7.
Preferably:The connecting rod 9 is equipped with sliding slot 91, and sliding block 92 is equipped in the sliding slot 91, is cut with scissors on the sliding block 92 It is connected to auxiliary support bar 4, the other end of the auxiliary support bar 4 is equipped with the arc piece 93 that central angle is 120 °, the arc The side side wall of piece 93 is equipped with fixture block 931, and other side side wall is equipped with the card slot 932 for being engaged by clamping with fixture block 931.
Preferably:Three arc pieces 93 can be spliced into a circular ring structure by fixture block 931 and card slot 932, described Circular ring structure is consistent with 3 outer diameter of sleeve and is set in 3 lower end of sleeve.
Preferably:It is coated on the fixture block 931, card slot 932 for increasing fixture block 931 and 932 male-female engagement of card slot The magnetosphere of tightness.
Preferably:The pedestal 10 is equipped with the angle index value being arranged around adjusting knob 11.
For the utility model by the setting of elevating lever, the measurement height of manually adjustable total powerstation 1 is easy to operate;Pass through The setting of rotation adjustment device can arbitrarily adjust the measurement angle of total powerstation 1;Pass through auxiliary support bar 4 and arc piece 93 Setting, when use will auxiliary connecting rod 9 and arc piece 93, rotate to horizontality, utilize the card on 93 side wall of arc piece Block 931 carries out male-female engagement with card slot 932, and then three arc pieces 93 are assembled into the circular ring structure being set on sleeve 3, At this point, the levelness of tripod is higher, the stationarity of tripod when in use is helped to ensure that.

Claims (8)

1. a kind of bridge construction survey device, it is characterised in that:Including tripod and the total powerstation being placed on the tripod (1);It is characterized in that:The tripod includes the tablet (2) for fixation total powerstation (1), is fixed at tablet (2) center Elevating lever is set, and the elevating lever includes fixing end and lift side, and the fixing end is to set female sleeve (3), described Lift side is the lifting screw (5) being threadedly coupled with the sleeve (3), upper end and the tablet (2) of the lifting screw (5) It is fixedly connected, lower end connects handle (6);Rotation adjustment device is arranged in sleeve (3) upper end, and the rotation adjustment device includes It is fixed at the adjusting knob (11) of sleeve (3) upper end and is in what circumferential tooth socket disengaging type was connect with the adjusting knob (11) Pedestal (10);The pedestal (10) is equipped with three stabilizer blades being flexibly connected with the pedestal (10).
2. bridge construction survey device according to claim 1, it is characterised in that the adjusting knob (11) is in disengaging type The side of connection is equipped with circumferentially spaced double wedge, and the pedestal (10) is equipped with circumferentially-spaced cloth in the side that disengaging type connects The groove set, the double wedge are connect with groove disengaging type.
3. bridge construction survey device according to claim 1 or 2, it is characterised in that the stabilizer blade include by axis pin with The bottom end of pedestal (10) connected connecting rod (9), upper support leg (8) and lower support leg (7), the connecting rod (9) is installed by upper support leg (8), upper support leg (8) the bottom end installation lower support leg (7).
4. bridge construction survey device according to claim 3, it is characterised in that the connecting rod (9) and upper support leg (8) Between, connect by axis pin between upper support leg (8) and lower support leg (7).
5. bridge construction survey device according to claim 4, it is characterised in that the connecting rod (9) is equipped with sliding slot (91), it is equipped with sliding block (92) in the sliding slot (91), auxiliary support bar (4), the auxiliary branch are hinged on the sliding block (92) The other end of strut (4) is equipped with the arc piece (93) that central angle is 120 °, is set on the side side wall of the arc piece (93) There are fixture block (931), other side side wall to be equipped with the card slot (932) for being engaged by clamping with fixture block (931).
6. bridge construction survey device according to claim 5, it is characterised in that three arc pieces (93) can lead to It crosses fixture block (931) and is spliced into a circular ring structure with card slot (932), the circular ring structure is consistent with sleeve (3) outer diameter and is arranged In sleeve (3) lower end.
7. bridge construction survey device according to claim 6, it is characterised in that on the fixture block (931), card slot (932) It is coated with the magnetosphere for increasing fixture block (931) and the tightness of card slot (932) male-female engagement.
8. bridge construction survey device according to claim 7, it is characterised in that the pedestal (10) is equipped with around tune Save the angle index value that knob (11) is arranged.
CN201820331285.0U 2018-03-12 2018-03-12 A kind of bridge construction survey device Expired - Fee Related CN207991539U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820331285.0U CN207991539U (en) 2018-03-12 2018-03-12 A kind of bridge construction survey device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820331285.0U CN207991539U (en) 2018-03-12 2018-03-12 A kind of bridge construction survey device

Publications (1)

Publication Number Publication Date
CN207991539U true CN207991539U (en) 2018-10-19

Family

ID=63826764

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820331285.0U Expired - Fee Related CN207991539U (en) 2018-03-12 2018-03-12 A kind of bridge construction survey device

Country Status (1)

Country Link
CN (1) CN207991539U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110043760A (en) * 2019-04-30 2019-07-23 桐乡市城乡规划设计院有限公司 A kind of landscape design measuring device
CN110375167A (en) * 2019-07-12 2019-10-25 陕西科技大学 A kind of measuring device of rotation and lifting
CN111289025A (en) * 2020-03-25 2020-06-16 郑州铁路职业技术学院 Road and bridge construction measuring device
CN113758510A (en) * 2021-07-29 2021-12-07 福建省永正工程质量检测有限公司 Monitoring devices based on public municipal administration and building facility are healthy

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110043760A (en) * 2019-04-30 2019-07-23 桐乡市城乡规划设计院有限公司 A kind of landscape design measuring device
CN110375167A (en) * 2019-07-12 2019-10-25 陕西科技大学 A kind of measuring device of rotation and lifting
CN111289025A (en) * 2020-03-25 2020-06-16 郑州铁路职业技术学院 Road and bridge construction measuring device
CN113758510A (en) * 2021-07-29 2021-12-07 福建省永正工程质量检测有限公司 Monitoring devices based on public municipal administration and building facility are healthy

Similar Documents

Publication Publication Date Title
CN207991539U (en) A kind of bridge construction survey device
CN205333077U (en) Geographical survey and drawing scale of easy operation
CN208968539U (en) A kind of engineering mapping instrument positioning device
CN102777737A (en) Sleeve clip type measurement tripod
CN110056017A (en) Stake heart positioning device and its measurement method
CN212005030U (en) Special measuring device of architectural design convenient to adjust
CN205580457U (en) Hang down straightness's 360 rotating prism of survey building
CN208488098U (en) A kind of height-adjustable laser level of conveniently moving
CN209654938U (en) A kind of construction supervision auxiliary device
CN217684228U (en) Tester for urban and rural building planning
CN217442563U (en) Laser level for surveying and mapping
CN210603277U (en) Level gauge convenient to measure
CN216410219U (en) Quick correcting device for leveling rod circular level
CN212692890U (en) Measurement fixing device for building surveying and mapping
CN210831214U (en) Tripod for mapping engineering
CN212721429U (en) Device convenient to engineering measuring instrument centering
CN205228469U (en) Forestry geological compass appearance
CN211176125U (en) Slidable over-and-under type survey and drawing support
CN208751562U (en) A kind of engineering detecting line laser line marker with Level tune function
CN109489645A (en) A kind of engineering mapping total station
CN206772296U (en) A kind of centering total station tripod
CN210375101U (en) Building surveying level
CN205504361U (en) Leveling sighting rod foot rest
CN210831258U (en) Total powerstation support
CN210638695U (en) Measuring device for inclination rates of three tower buildings

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181019

Termination date: 20190312