CN207988312U - Close spelling formula cellular board ceiling connecting structure - Google Patents
Close spelling formula cellular board ceiling connecting structure Download PDFInfo
- Publication number
- CN207988312U CN207988312U CN201820328837.2U CN201820328837U CN207988312U CN 207988312 U CN207988312 U CN 207988312U CN 201820328837 U CN201820328837 U CN 201820328837U CN 207988312 U CN207988312 U CN 207988312U
- Authority
- CN
- China
- Prior art keywords
- corner brace
- inserted block
- ceiling
- secondary joist
- joist
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The utility model is related to a kind of close spelling formula cellular board ceiling connecting structures, main joist is connect with building civil engineering main body, connector is fixedly connected on main joist, secondary joist is connected on connector, secondary joist is connect by grafting corner brace component with honeycomb ceiling board, grafting corner brace component includes slot corner brace and inserted block corner brace, inserted block corner brace and slot corner brace are separately positioned on two pieces of adjacent honeycomb ceiling boards, inserted block corner brace is fastenedly connected by screw and secondary joist, inserted block corner brace is connected with the inserting of slot corner brace, realizes the installation of adjacent two pieces of honeycomb ceiling boards.It is that two pieces of adjacent ceiling boards are fixed on jointly on primary and secondary keel by the corner brace of mutually matched plug-in type.Corner brace is mounted on ceiling board in advance, and after one piece of ceiling board installation is in place, next piece of adjacent ceiling board is connect with it by way of grafting, easy to operate, easy for installation, without the gluing between two pieces of adjacent ceiling boards, after installation is complete, the smooth beauty of furred ceiling.
Description
Technical field
The utility model is related to building decoration technology fields, and in particular to one kind can save gluing process and more beautiful
It sees, the close spelling formula cellular board ceiling connecting structure of no glue-line smooth, easy for installation.
Background technology
Curtain wall is an a kind of general designation using various intensity height, light weight, the outer building external decoration regarding good visual effect.
Curtain wall ceiling structure is also prevalent in each curtain wall construction project.
Currently, conventional curtain wall furred ceiling generally occurs within the concave-convex phenomenon of plate face out-of-flatness, and hanging after the completion of construction
The injection for being sealed glue, fluid sealant is needed to will appear apparent line of demarcation with furred ceiling plate between top plate block and plate, it is beautiful
Effect is poor.
Utility model content
In conclusion in order to overcome the shortcomings of that prior art problem, the utility model provide a kind of close spelling formula cellular board
Ceiling connecting structure, it is that two pieces of adjacent ceiling boards are fixed on primary and secondary jointly by the corner brace of mutually matched plug-in type
On keel.Corner brace is mounted on ceiling board in advance, and after one piece of ceiling board installation is in place, next piece of adjacent ceiling board passes through with it
The mode of grafting connects, easy to operate, easy for installation, without the gluing between two pieces of adjacent ceiling boards, after installation is complete, hangs
Push up smooth beauty.
In order to solve the above technical problems, the technical solution adopted in the utility model is:
A kind of close spelling formula cellular board ceiling connecting structure, wherein:Including main joist, secondary joist, connector, grafting corner brace group
Part and honeycomb ceiling board, the main joist are connect with building civil engineering main body, and connector is fixedly connected on main joist, described
Secondary joist is connected on connector, the secondary joist is connect by grafting corner brace component with honeycomb ceiling board, the grafting
Corner brace component includes slot corner brace and inserted block corner brace, and the inserted block corner brace and slot corner brace are separately positioned on two pieces of adjacent bees
On nest ceiling board, inserted block corner brace is fastenedly connected by screw and secondary joist, and inserted block corner brace is connected with the inserting of slot corner brace, realizes phase
The installation of adjacent two pieces of honeycomb ceiling boards.
Further, the inserted block corner brace includes the intercalation part of integral structure, interconnecting piece and fixed part, the intercalation part
With slot corner brace grafting, the interconnecting piece is fastenedly connected by screw and secondary joist, the fixed part and honeycomb ceiling board
It is fastenedly connected.
Further, the slot corner brace includes that the connection of integral structure turns plate and turns the gusset of plate upper end positioned at connection,
Gusset and connection form the inserting groove mating with the intercalation part of inserted block corner brace between turning plate, and plate and honeycomb are turned in the connection
Ceiling board is fastenedly connected.
Further, the connector is fastenedly connected with secondary joist by connecting bolt, the connector and secondary joist
Between be provided with nylon spacer.
Further, flexible check washer is set between the interconnecting piece and secondary joist of the inserted block corner brace.
Further, it is provided with rubber cushion between the intercalation part and the inserting groove of slot corner brace of the inserted block corner brace.
The beneficial effects of the utility model are:
1, the utility model is to be fixed on two pieces of adjacent ceiling boards jointly by the corner brace of mutually matched plug-in type
On primary and secondary keel.Corner brace is mounted on ceiling board in advance, after the installation of one piece of ceiling board is in place, next piece of adjacent ceiling board with
It is connected by way of grafting, easy to operate, easy for installation, without the gluing between two pieces of adjacent ceiling boards, is installed
Cheng Hou, the smooth beauty of furred ceiling.
2, the utility model is after installation is complete, and the close spelling of plate stitch, is saved for conventional gap between two pieces of adjacent ceiling boards
The process for breaking fluid sealant.The apparent aberration phenomenon that fluid sealant is generated with ceiling board by material difference is avoided, ensures to install
Furred ceiling aesthetics and uniformity.
3, the utility model is simple in structure, easy to use, installation is easy, nylon spacer, elastic check washer and rubber cushion
The structural stability of furred ceiling curtain wall can effectively be improved by being arranged, and the setting of rubber cushion can reduce friction noise and ensure that grafting is stablized
Securely, the problem of setting of nylon spacer can adjust horizontal error and the bimetallic corrosion of keel.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model;
Main joist 1, secondary joist 2, connector 3, slot corner brace 4, inserted block corner brace 5, honeycomb ceiling board 6, nylon spacer 7, bullet
Property check washer 8, rubber cushion 9.
Fig. 2 is the structural schematic diagram of the inserted block corner brace of the utility model;
Intercalation part 51, interconnecting piece 52, fixed part 53.
Fig. 3 is the structural schematic diagram of the slot corner brace of the utility model;
Plate 41, gusset 42, inserting groove 43 are turned in connection.
Specific implementation mode
The utility model is described in further detail below in conjunction with the accompanying drawings.
As shown in Figure 1, Figure 2, Figure 3 shows, a kind of close spelling formula cellular board ceiling connecting structure, including main joist 1, secondary joist 2, even
Fitting 3, grafting corner brace component and honeycomb ceiling board 6, the main joist 1 is connect with building civil engineering main body, fixed on main joist 1
It is connected with connector 3, the connector 3 is fastenedly connected with secondary joist 2 by connecting bolt, the connector 3 and time dragon
Nylon spacer 7 is provided between bone 2, the secondary joist 2 is connect by grafting corner brace component with honeycomb ceiling board 6, described
Grafting corner brace component includes slot corner brace 4 and inserted block corner brace 5, and the inserted block corner brace 5 and slot corner brace 4 are separately positioned on adjacent
Two pieces of honeycomb ceiling boards 6 on, inserted block corner brace 5 is fastenedly connected by screw and secondary joist 2, and inserted block corner brace 5 and slot corner brace 4 are inserted
Load connects, and realizes the installation of adjacent two pieces of honeycomb ceiling boards 6.The inserted block corner brace 5 includes the intercalation part 51 of integral structure, even
Socket part 52 and fixed part 53, the intercalation part 51 and 4 grafting of slot corner brace, the interconnecting piece 52 pass through screw and secondary joist
2 are fastenedly connected, and flexible check washer 8, the fixed part 53 are arranged between the interconnecting piece 52 and secondary joist 2 of inserted block corner brace 5
It is fastenedly connected with honeycomb ceiling board 6.
Slot corner brace 4 includes that the connection of integral structure turns plate 41 and turns the gusset 42 of 41 upper end of plate, gusset 42 positioned at connection
With connect turn plate 41 between form the inserting groove 43 mating with the intercalation part 51 of inserted block corner brace 5, the intercalation part of inserted block corner brace 5
Rubber cushion 9 is provided between 51 and the inserting groove 43 of slot corner brace 4, the connection is turned plate 41 and is fastenedly connected with honeycomb ceiling board 6.
When installation, inserted block corner brace 5 and slot corner brace 4 are connected to the both sides of honeycomb ceiling board 6 by tightening of rivet respectively,
Then, main joist 1, connector 3 and secondary joist 2 be installed on building body, then will be with inserted block corner brace 5 and slot corner brace 4
After honeycomb ceiling board 6 is placed into corresponding position, inserted block corner brace 5 and secondary joist 2 are fastenedly connected by attachment screw, realizing should
The installation of honeycomb ceiling board 6, later inserting the slot corner brace 4 of next piece of honeycomb ceiling board 6 and mounted honeycomb ceiling board 6
The inserting connection of block corner brace 5, and so on.So far, the installation of whole secondary platform sling plate is completed.The honeycomb that the utility model uses is hung
The bottom surface of one end for being provided with slot corner brace 4 of top plate 6 is provided with over-hang part, and the over-hang part is in slot corner brace 4 and inserted block corner brace 5
After inserting connection, the gap between two pieces of adjacent honeycomb ceiling boards 6 is covered.
It is noted that above-described embodiment is to the illustrative and not limiting of technical solutions of the utility model, affiliated technology neck
The equivalent replacement of domain those of ordinary skill or the other modifications made according to the prior art, as long as not exceeding the utility model skill
The thinking and range of art scheme, should be included within the interest field required by the utility model.
Claims (6)
1. a kind of close spelling formula cellular board ceiling connecting structure, it is characterised in that:Including main joist(1), secondary joist(2), connector
(3), grafting corner brace component and honeycomb ceiling board(6), the main joist(1)It is connect with building civil engineering main body, main joist(1)On
It is fixedly connected with connector(3), the connector(3)On be connected with secondary joist(2), the secondary joist(2)Pass through grafting
Corner brace component and honeycomb ceiling board(6)Connection, the grafting corner brace component includes slot corner brace(4)And inserted block corner brace(5), institute
The inserted block corner brace stated(5)And slot corner brace(4)It is separately positioned on two pieces of adjacent honeycomb ceiling boards(6)On, inserted block corner brace(5)It is logical
Cross screw and secondary joist(2)It is fastenedly connected, inserted block corner brace(5)With slot corner brace(4)Inserting connection realizes that adjacent two pieces of honeycombs are hung
Top plate(6)Installation.
2. close spelling formula cellular board ceiling connecting structure according to claim 1, it is characterised in that:The inserted block corner brace
(5)Intercalation part including integral structure(51), interconnecting piece(52)And fixed part(53), the intercalation part(51)With slot corner brace
(4)Grafting, the interconnecting piece(52)Pass through screw and secondary joist(2)It is fastenedly connected, the fixed part(53)It is hung with honeycomb
Top plate(6)It is fastenedly connected.
3. close spelling formula cellular board ceiling connecting structure according to claim 2, it is characterised in that:The slot corner brace
(4)Plate is turned in connection including integral structure(41)And turn plate positioned at connection(41)The gusset of upper end(42), gusset(42)With connect
Turn plate(41)Between formed with inserted block corner brace(5)Intercalation part(51)Mating inserting groove(43), the connection turns plate
(41)With honeycomb ceiling board(6)It is fastenedly connected.
4. close spelling formula cellular board ceiling connecting structure according to claim 1, it is characterised in that:The connector(3)
With secondary joist(2)It is fastenedly connected by connecting bolt, the connector(3)With secondary joist(2)Between be provided with nylon spacer
(7).
5. close spelling formula cellular board ceiling connecting structure according to claim 2, it is characterised in that:The inserted block corner brace
(5)Interconnecting piece(52)With secondary joist(2)Between flexible check washer is set(8).
6. close spelling formula cellular board ceiling connecting structure according to claim 2, it is characterised in that:The inserted block corner brace
(5)Intercalation part(51)With slot corner brace(4)Inserting groove(43)Between be provided with rubber cushion(9).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820328837.2U CN207988312U (en) | 2018-03-12 | 2018-03-12 | Close spelling formula cellular board ceiling connecting structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820328837.2U CN207988312U (en) | 2018-03-12 | 2018-03-12 | Close spelling formula cellular board ceiling connecting structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207988312U true CN207988312U (en) | 2018-10-19 |
Family
ID=63827695
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820328837.2U Expired - Fee Related CN207988312U (en) | 2018-03-12 | 2018-03-12 | Close spelling formula cellular board ceiling connecting structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207988312U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112554415A (en) * | 2020-12-24 | 2021-03-26 | 浙江亚厦装饰股份有限公司 | Buckle type ceiling closing-in structure and installation method thereof |
-
2018
- 2018-03-12 CN CN201820328837.2U patent/CN207988312U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112554415A (en) * | 2020-12-24 | 2021-03-26 | 浙江亚厦装饰股份有限公司 | Buckle type ceiling closing-in structure and installation method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203782938U (en) | Novel steel hidden frame fireproof curtain wall | |
CN207988312U (en) | Close spelling formula cellular board ceiling connecting structure | |
CN207776274U (en) | Water-proof roofing harden structure and building | |
CN102535698A (en) | Heat insulation curtain wall | |
CN205577329U (en) | Wall fastener | |
CN104389442B (en) | Ecologic residential house building module | |
CN205025027U (en) | Wallboard of getting ready | |
CN203769160U (en) | Honeycomb plate type curtain wall | |
CN209429343U (en) | A kind of plate-jointing structure of concealed frame glass curtain wall | |
CN208396210U (en) | A kind of installation node of connection component and cladding panel | |
CN207700466U (en) | Fast installation glass curtain wall system | |
CN110206221B (en) | High strength building wallboard | |
CN209179391U (en) | A kind of decorative panel that splicing is firm | |
CN209308237U (en) | Corner curtain wall | |
CN204174961U (en) | Ecological residence room building block | |
CN204691013U (en) | A kind of Novel curtain wall structure built for the low energy | |
CN211143414U (en) | Curtain decorative board structure for steel structure building and steel structure building | |
CN201024580Y (en) | Insert type sealed edge metal honeycomb partition board for sanitation and bathing | |
CN203475625U (en) | Compound heat-insulation plate used for building external wall | |
CN202450675U (en) | Heat-insulating curtain wall | |
CN214955841U (en) | Colorful curtain wall of transform | |
CN203769156U (en) | Layering type curtain wall | |
CN214884829U (en) | Integrated fast-assembling wall body board of full life cycle | |
CN219118610U (en) | Combined decorative wall brick structure | |
CN209384563U (en) | A kind of high efficiency environment-friendly type building facade Insulation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181019 Termination date: 20210312 |