CN207988220U - Combined steel plate shearing force wall - Google Patents

Combined steel plate shearing force wall Download PDF

Info

Publication number
CN207988220U
CN207988220U CN201820370942.2U CN201820370942U CN207988220U CN 207988220 U CN207988220 U CN 207988220U CN 201820370942 U CN201820370942 U CN 201820370942U CN 207988220 U CN207988220 U CN 207988220U
Authority
CN
China
Prior art keywords
wall
walls
steel plate
shearing force
newel post
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820370942.2U
Other languages
Chinese (zh)
Inventor
郝际平
刘瀚超
薛强
黄育琪
何梦楠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xi'an Jianda Assembly Steel Structure Research Institute Co., Ltd.
Original Assignee
Xian University of Architecture and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian University of Architecture and Technology filed Critical Xian University of Architecture and Technology
Priority to CN201820370942.2U priority Critical patent/CN207988220U/en
Application granted granted Critical
Publication of CN207988220U publication Critical patent/CN207988220U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The utility model is related to building structure technology fields, more particularly to combined steel plate shearing force wall, including at least one wall and at least two, the newel post at wall both ends is set, the shear wall of diversified forms is formed by the combination of wall and newel post, wall includes two blocks of steel plates being oppositely arranged, it is connected by the ribbed stiffener of undaform between two blocks of steel plates, is connected by plug welding mode between the top and steel plate at ribbed stiffener inflection point;Newel post includes square steel, and two pieces of edgess of plate are connect with two edges of a side of square steel by welded corner joint mode respectively;Concrete is filled in the cavity that the inner cavity of square steel and square steel are formed after being connect with two blocks of steel plates.The shear wall has stable structure, the characteristics of being unlikely to deform.

Description

Combined steel plate shearing force wall
Technical field
The utility model is related to building structure technology fields, and in particular to combined steel plate shearing force wall.
Background technology
In the wall structure of existing structure, existing shear wall be easy to cause metope after casting concrete and heaves Deformation, causes the structural instability of shear wall, and existing shear wall, there is also complicated, difficulty of processing is big, at This high defect.
Invention content
To solve problems of the prior art, the purpose of this utility model is to provide combined steel plate shearing force walls, should Shear wall has stable structure, the characteristics of being unlikely to deform.
Technical solution used by the utility model is as follows:
Newel post at wall both ends is arranged in combined steel plate shearing force wall, including at least one wall and at least two, passes through wall The combination of body and newel post forms the shear wall of diversified forms, and wall includes two blocks of steel plates being oppositely arranged, and is led between two blocks of steel plates The ribbed stiffener connection of undaform is crossed, is connected by plug welding mode between the top and steel plate at ribbed stiffener inflection point;
Newel post includes square steel, and two pieces of edgess of plate pass through welded corner joint side with two edges of a side of square steel respectively Formula connects;
Concrete is filled in the cavity that the inner cavity of square steel and square steel are formed after being connect with two blocks of steel plates.
Including a wall and two newel posts, two newel posts are separately positioned on the both ends of wall.
Including two walls and three newel posts, two walls are mutually perpendicular to, the setting of one of newel post two walls it Between turning outside, other two newel post is separately positioned on the free end of two walls.
Including four walls and five newel posts, four walls are in cross distribution, and four walls are held with one of respectively Four sides of column connect, remaining four newel post connect with the free end of four walls respectively.
Including three walls and four newel posts, three T-shaped distributions of wall, three walls, three with a newel post respectively Side connects, and excess-three newel post connect with the free end of three walls respectively.
The cross sectional shape of the ribbed stiffener is V-type, M types or the W type repeated.
Compared with prior art, the utility model has the advantages that:
The combined steel plate shearing force wall of the utility model includes that at least one wall and at least two are arranged at wall both ends Newel post, therefore the shear wall of diversified forms can be combined by the combination of newel post and wall;Wall includes two be oppositely arranged Block steel plate is connected by the ribbed stiffener of undaform between two blocks of steel plates, passes through plug between the top and steel plate at ribbed stiffener inflection point Weldering mode connects, therefore the invigoration effect for passing through ribbed stiffener so that the steel plate non-deformability as metope enhances;When two blocks of steel Between plate after casting concrete, steel plate is not easy to heave deformation so that the good integrity of shear wall, stable structure;Two blocks of steel plates Edge respectively with the square steel welding as newel post's skeleton, therefore, the combined steel plate shearing force wall of the utility model have it is simple in structure, It is easy for construction, save cost the characteristics of.
Further, the cross sectional shape of ribbed stiffener is V-type, M types or the W type repeated, therefore, when pouring coagulation between steel plate After soil, each edge of ribbed stiffener is not easy to be elongated so that the overall stiffness of wall enhances, and is unlikely to deform.
Description of the drawings
Fig. 1 is the structural schematic diagram of the "-" type combined steel plate shearing force wall of the utility model;
Fig. 2 is the structural schematic diagram of the L-type combined steel plate shearing force wall of the utility model;
Fig. 3 is the structural schematic diagram of the cross combined steel plate shearing force wall of the utility model;
Fig. 4 is the structural schematic diagram of the T-type combined steel plate shearing force wall of the utility model.
Wherein, 1- steel plates, 2- square steel, 3- ribbed stiffeners, 4- concrete.
Specific implementation mode
The utility model is further described with reference to the accompanying drawings and examples.
The combined steel plate shearing force wall of the utility model, including at least one wall and at least two are arranged at wall both ends Newel post, forms the shear wall of diversified forms by the combination of wall and newel post, and wall includes two blocks of steel plates 1 being oppositely arranged, and two It is connected by the ribbed stiffener of undaform 3 between block steel plate 1, the cross sectional shape of ribbed stiffener 3 is V-type, M types or the W type repeated, is put more energy into It is connected by plug welding mode between top and steel plate 1 at 3 inflection point of rib;Newel post includes square steel 2, the edge difference of two blocks of steel plates 1 It is connect by welded corner joint mode with two edges of a side of square steel 2;The inner cavity of square steel 2 and square steel 2 and two blocks of steel plates 1 Concrete 4 is filled in the cavity formed after connection.
Embodiment 1
When combined steel plate shearing force wall is "-" type combined steel plate shearing force wall, combined steel plate shearing force wall include wall and Two newel posts, two newel posts are separately positioned on the both ends of wall.
Embodiment 2
When combined steel plate shearing force wall is L-type combined steel plate shearing force wall, including two walls and three newel posts, two walls It is mutually perpendicular to, the outside at the turning between two walls is arranged in one of newel post, and other two newel post is separately positioned on two The free end of wall.
Embodiment 3
When combined steel plate shearing force wall is cross combined steel plate shearing force wall, including four walls and five newel posts, four Wall is in cross distribution, and four walls connect with four sides of one of newel post respectively, remaining four newel post respectively with The free end connection of four walls.
Embodiment 4
When combined steel plate shearing force wall is T-type combined steel plate shearing force wall, including three walls and four newel posts, three walls T-shaped distribution, three walls are connect with three sides of a newel post respectively, excess-three newel post respectively with three walls from It is connected by end.
When needing the shear wall of other forms, it is combined by the wall and newel post of the utility model.

Claims (6)

1. combined steel plate shearing force wall, which is characterized in that be arranged at the end at wall both ends including at least one wall and at least two Column, wall include two pieces of steel plates (1) being oppositely arranged, and are connected, are added by the ribbed stiffener (3) of undaform between two pieces of steel plates (1) It is connect by plug welding mode between top and steel plate (1) at strength rib (3) inflection point;
Newel post includes square steel (2), and the edge of two pieces of steel plates (1) passes through angle with two edges of a side of square steel (2) respectively Welding manner connects;
Concrete (4) is filled in the cavity that the inner cavity of square steel (2) and square steel (2) are formed after being connect with two pieces of steel plates (1).
2. combined steel plate shearing force wall according to claim 1, which is characterized in that including a wall and two newel posts, two A newel post is separately positioned on the both ends of wall.
3. combined steel plate shearing force wall according to claim 1, which is characterized in that including two walls and three newel posts, two A wall is mutually perpendicular to, and the outside at the turning between two walls is arranged in one of newel post, and other two newel post is respectively set In the free end of two walls.
4. combined steel plate shearing force wall according to claim 1, which is characterized in that including four walls and five newel posts, four A wall is in cross distribution, and four walls are connect with four sides of one of newel post respectively, remaining four newel post's difference It is connect with the free end of four walls.
5. combined steel plate shearing force wall according to claim 1, which is characterized in that including three walls and four newel posts, three A T-shaped distribution of wall, three walls are connect with three sides of a newel post respectively, excess-three newel post respectively with three walls The free end of body connects.
6. combined steel plate shearing force wall according to claim 1, which is characterized in that the cross sectional shape of the ribbed stiffener (3) is V-type, M types or the W types repeated.
CN201820370942.2U 2018-03-19 2018-03-19 Combined steel plate shearing force wall Active CN207988220U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820370942.2U CN207988220U (en) 2018-03-19 2018-03-19 Combined steel plate shearing force wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820370942.2U CN207988220U (en) 2018-03-19 2018-03-19 Combined steel plate shearing force wall

Publications (1)

Publication Number Publication Date
CN207988220U true CN207988220U (en) 2018-10-19

Family

ID=63827216

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820370942.2U Active CN207988220U (en) 2018-03-19 2018-03-19 Combined steel plate shearing force wall

Country Status (1)

Country Link
CN (1) CN207988220U (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111021587A (en) * 2019-12-29 2020-04-17 北京工业大学 Double-layer steel plate composite shear wall with transverse type hole-opening corrugated web
CN111021589A (en) * 2019-12-29 2020-04-17 北京工业大学 Double-layer steel plate composite shear wall with corrugated steel plates resisting side drawknot
CN111042397A (en) * 2019-12-29 2020-04-21 北京工业大学 Double-layer steel plate composite shear wall formed by pulling and connecting I-shaped steel components of staggered corrugated webs
CN111042393A (en) * 2019-12-29 2020-04-21 北京工业大学 Double-layer steel plate composite shear wall with symmetrically-arranged open-hole corrugated web plates in drawknot mode
CN111042394A (en) * 2019-12-29 2020-04-21 北京工业大学 Double-deck steel sheet composite shear wall that division hole wave form web was stiffened
CN111042396A (en) * 2019-12-29 2020-04-21 北京工业大学 Double-layer steel plate composite shear wall with transversely staggered corrugated web plate I-shaped steel members
CN111101624A (en) * 2019-12-29 2020-05-05 北京工业大学 Double-layer steel plate shear wall with symmetrically-arranged corrugated web plates in drawknot mode
CN111188431A (en) * 2019-12-29 2020-05-22 北京工业大学 Double-layer steel plate combined shear wall of truss type drawknot of I-shaped steel member with corrugated web
CN117005578A (en) * 2023-10-07 2023-11-07 中交第四航务工程勘察设计院有限公司 Steel bar net rack steel plate combined shear wall

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111021587A (en) * 2019-12-29 2020-04-17 北京工业大学 Double-layer steel plate composite shear wall with transverse type hole-opening corrugated web
CN111021589A (en) * 2019-12-29 2020-04-17 北京工业大学 Double-layer steel plate composite shear wall with corrugated steel plates resisting side drawknot
CN111042397A (en) * 2019-12-29 2020-04-21 北京工业大学 Double-layer steel plate composite shear wall formed by pulling and connecting I-shaped steel components of staggered corrugated webs
CN111042393A (en) * 2019-12-29 2020-04-21 北京工业大学 Double-layer steel plate composite shear wall with symmetrically-arranged open-hole corrugated web plates in drawknot mode
CN111042394A (en) * 2019-12-29 2020-04-21 北京工业大学 Double-deck steel sheet composite shear wall that division hole wave form web was stiffened
CN111042396A (en) * 2019-12-29 2020-04-21 北京工业大学 Double-layer steel plate composite shear wall with transversely staggered corrugated web plate I-shaped steel members
CN111101624A (en) * 2019-12-29 2020-05-05 北京工业大学 Double-layer steel plate shear wall with symmetrically-arranged corrugated web plates in drawknot mode
CN111188431A (en) * 2019-12-29 2020-05-22 北京工业大学 Double-layer steel plate combined shear wall of truss type drawknot of I-shaped steel member with corrugated web
CN111042396B (en) * 2019-12-29 2020-11-03 北京工业大学 Double-layer steel plate composite shear wall with transversely staggered corrugated web plate I-shaped steel members
CN111021587B (en) * 2019-12-29 2020-11-27 北京工业大学 Double-layer steel plate composite shear wall with transverse type hole-opening corrugated web
CN111042397B (en) * 2019-12-29 2020-11-27 北京工业大学 Double-layer steel plate composite shear wall formed by pulling and connecting I-shaped steel components of staggered corrugated webs
CN111042394B (en) * 2019-12-29 2020-11-27 北京工业大学 Double-deck steel sheet composite shear wall that division hole wave form web was stiffened
CN111101624B (en) * 2019-12-29 2021-02-05 北京工业大学 Double-layer steel plate shear wall with symmetrically-arranged corrugated web plates in drawknot mode
CN117005578A (en) * 2023-10-07 2023-11-07 中交第四航务工程勘察设计院有限公司 Steel bar net rack steel plate combined shear wall
CN117005578B (en) * 2023-10-07 2023-12-19 中交第四航务工程勘察设计院有限公司 Steel bar net rack steel plate combined shear wall

Similar Documents

Publication Publication Date Title
CN207988220U (en) Combined steel plate shearing force wall
CN203080736U (en) Combined profile steel box-shaped steel plate shear wall
CN204753843U (en) PC primary and secondary roof beam bolted connection node
CN103132653A (en) Double-channel beam concrete combination column
CN108589971A (en) A kind of closed-section steel deck combined concrete shear wall connecting node and production method
CN104032864A (en) Perforated web plate H-shaped steel connecting joint for connecting buckling-restrained steel plate wall with concrete frame
CN103174222A (en) Steel casting modularization panel point for connection of steel pipe column and H-shaped beam
CN110359554A (en) A kind of assembling frame Structure Beam-column energy consumption connecting key
CN107023077B (en) Corner beam column joint of square column and H-shaped steel, assembly type connecting piece and construction method
CN108086535A (en) A kind of assembled square steel tube steel plate concrete combined shear wall
CN203201018U (en) Composite beam of hollow ring-shaped profile steel and reinforced concrete
CN208934254U (en) A kind of assembled Steel Reinforced Concrete Special-Shaped Columns connecting structure
CN208293762U (en) A kind of connection structure in steel building
CN204626961U (en) A kind of steel form trussed construction of swallow-tail form large-sized concrete pier stud
CN103046462A (en) Steel box component and steel box-concrete combined U-shaped girder composed of same
CN207314537U (en) A kind of assembled Outsourcing-type steel chain type combining structure
CN202416704U (en) Obliquely-arranged concrete cap
CN206570927U (en) It is a kind of can quick assembling steel structure technique
CN209194817U (en) A kind of multidirectional beam of standardization
CN103741857A (en) Floor system with U-shaped steel beams, steel bar trusses and floor bearing plates
CN203834692U (en) Connection node structure of section steel column and non-energy-dissipation section steel short beam of mixed coupled wall
CN209040286U (en) Steel concrete assembled connected node
CN209723215U (en) A kind of assembled architecture dry type beam-column connection
CN207988221U (en) A kind of abnormity double steel plate wall column system
CN209228032U (en) Regularization formwork inside-corner reinforcing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20190805

Address after: 710055 Shaanxi province Xi'an Beilin District Yanta Road No. 13

Patentee after: Xi'an construction division big Assets Management Co., Ltd.

Address before: 710055 Shaanxi province Xi'an Beilin District Yanta Road No. 13

Patentee before: Xi'an Architectural Sci & Tech. Univ.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190828

Address after: 710055 Campus of Xi'an University of Architectural Science and Technology, No. 13 Yanta Road, Beilin District, Xi'an City, Shaanxi Province

Patentee after: Xi'an Jianda Assembly Steel Structure Research Institute Co., Ltd.

Address before: 710055 Shaanxi province Xi'an Beilin District Yanta Road No. 13

Patentee before: Xi'an construction division big Assets Management Co., Ltd.

TR01 Transfer of patent right