CN207988004U - A kind of efficient waterway dredging mud cleaning plant - Google Patents

A kind of efficient waterway dredging mud cleaning plant Download PDF

Info

Publication number
CN207988004U
CN207988004U CN201820269493.2U CN201820269493U CN207988004U CN 207988004 U CN207988004 U CN 207988004U CN 201820269493 U CN201820269493 U CN 201820269493U CN 207988004 U CN207988004 U CN 207988004U
Authority
CN
China
Prior art keywords
plate
right angle
oil pressure
fixedly connected
hull
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820269493.2U
Other languages
Chinese (zh)
Inventor
周春煦
房世龙
蔡厚平
龙进军
曾庆杰
戴海霞
方正
姜伟
史誉州
许鹏鹏
曹翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Shipping College
Original Assignee
Nantong Shipping College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nantong Shipping College filed Critical Nantong Shipping College
Priority to CN201820269493.2U priority Critical patent/CN207988004U/en
Application granted granted Critical
Publication of CN207988004U publication Critical patent/CN207988004U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Cleaning Or Clearing Of The Surface Of Open Water (AREA)

Abstract

The utility model discloses a kind of efficient waterway dredging mud cleaning plants, including hull, right angle support plate and leaking net plate, the right part of the hull is equipped with movable mouth, the inner wall of the activity mouth is arranged with rectangular sliding slot, the top of the right angle support plate is installed with oil pressure telescopic rod, it is fixedly connected with connecting rod on the upside of the oil pressure telescopic rod bar portion, the outer end of the connecting rod is fixedly connected with square protruding, and the square protruding is slidably mounted on the inside of movable mouth by rectangular sliding slot.In the state that hull moves forwards, cooperation water body pours the silt for entering its internal bonding one in pipe fitting, by inclined cutter, coordinates the impact force of water body, one fragmentation will be bonded, then it drains on riverbed again, dredging tube is facilitated preferably to suck silt, bolt deviates from lockhole, pull up bolt, lantern ring deviates from rod piece, and plate deviates from board slot, facilitates and leaking net plate is disassembled to repair from funnel.

Description

A kind of efficient waterway dredging mud cleaning plant
Technical field
The utility model is related to dredged mud Removal Technology field, specially a kind of efficient waterway dredging mud cleaning plant.
Background technology
Dredging work refers to carrying out using dredger or other equipments and manually submerged digging, to widen and deepening water The channel design stress diagram of domain and the earth and rock works carried out, dredging work causes water by changing streamflow geometrical boundary Flow the variation of internal structure so that the water flow structure newly formed can not only ensure that silt no longer deposits in navigation channel, Er Qieneng It will be transported in lower deep trouth into the silt in people's grooving, maintain channel stabilization.
Silt in river is mostly directly sucked mud by existing efficient waterway dredging mud cleaning plant with dredging tube cooperation compression pump In storehouse, but accumulation is adhered to each other silt for a long time, it is difficult to sucked in dredging tube, while silt is sucked hopper dredger by dredging tube It when interior, needs to be filtered water plant by leaking net plate, be used for a long time, leaking net plate is a consumptive material, but is needed leaking net plate avris More screws disassemble, and leaking net plate could be disassembled to repair from funnel, very troublesome.
Utility model content
The purpose of this utility model is to provide a kind of efficient waterway dredging mud cleaning plants, to solve above-mentioned background technology The problem of middle proposition.
To achieve the above object, the utility model provides the following technical solutions:A kind of efficient waterway dredging mud cleaning plant, Hull is equipped with the movable mouth through hull upper and lower end face, is symmetrically arranged with rectangular sliding slot on the inner wall of movable mouth, on right angle support plate It is fixed with oil pressure telescopic rod, oil pressure telescopic rod is slidably arranged in movable mouth, and oil pressure telescopic rod, which is fixedly connected with, to be laterally arranged The end of connecting rod, connecting rod is fixedly connected with square protruding, and square protruding is slidably arranged in rectangular sliding slot;Oil pressure telescopic rod The lower part for stretching out hull is arranged with movable joint hose, and the upper end of movable joint hose is fixed on the bottom face of hull, under movable joint hose End is fixed on the upper surface of follow block, and follow block is secured transverse on oil pressure telescopic rod;The bottom face of oil pressure telescopic rod, which is fixed with, dredges Frame, pipe fitting are connected to frame of dredging by leakage hole, and inclined cutter is provided in pipe fitting.
Further, it is vertically arranged with column in the pipe fitting, is fixedly connected with the support column being laterally arranged on column, props up The left and right end ring shape dress of dagger is equipped with inclined cutter.
Further, the hull is equipped with hopper dredger, is provided with pipe part above hopper dredger, the upper end of pipe part is fixed with leakage The inner wall of bucket, funnel is vertically arranged with plate, and the left and right sides of leaking net plate lower face is equipped with board slot compatible with plate, slips through the net Plate is detachably connected with plate.
Further, the upper surface of the leaking net plate is fixed with right angle strut, and the upper end of right angle strut is fixedly connected with lantern ring, Lantern ring is slidably located on rod piece, and rod piece is fixed on the upper surface of funnel vertically.
Further, the rod piece is equipped with lockhole, and lantern ring is fixedly connected with right angle plate, and right angle plate is equipped with slide opening, Lockhole is arranged in the same horizontal line with slide opening, and right angle plate is slidably fitted with bolt by slide opening, and bolt passes through lock with rod piece Hole is detachably connected.
Further, spring is cased on the bolt, one end of spring is fixedly connected with right angle plate, and the other end of spring is solid Determine connecting bolt.
Compared with prior art, the utility model has the beneficial effects that:The efficient waterway dredging mud cleaning plant, passes through digging Mud frame can dig into the sludge on riverbed inside it, and in the state that hull moves forwards, cooperation water body will enter its inside It bonds one silt to pour in pipe fitting, by inclined cutter, coordinates the impact force of water body, one fragmentation will be bonded, then weighed It newly draining on riverbed, dredging tube is facilitated preferably to suck silt, bolt deviates from lockhole, pulls up bolt, and lantern ring deviates from rod piece, Plate deviates from board slot, facilitates and leaking net plate is disassembled to repair from funnel.
Description of the drawings
Fig. 1 is the main view cut-away illustration of the utility model.
Fig. 2 is the partial enlargement structural representation of the utility model.
In figure:1 hull, 2 movable mouths, 3 rectangular sliding slots, 4 right angle support plates, 5 oil pressure telescopic rods, 6 connecting rods, 7 square protrudings, 8 follow blocks, 9 movable joint hoses, 10 are dredged frame, 11 leakage holes, 12 pipe fittings, 13 columns, 14 support columns, 15 inclined cutters, 16 hopper dredgers, 17 right angles Rod piece, 18 pipe parts, 19 funnels, 20 plates, 21 leaking net plates, 22 board slots, 23 right angle struts, 24 lantern rings, 25 rod pieces, 26 lockholes, 27 right angle plates, 28 slide openings, 29 bolts, 30 springs.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work The every other embodiment obtained, shall fall within the protection scope of the present invention.
In the description of the present invention, it should be understood that term " longitudinal direction ", " transverse direction ", "upper", "lower", " preceding ", The orientation or positional relationship of the instructions such as " rear ", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outside" be based on Orientation or positional relationship shown in the drawings is merely for convenience of description the utility model, does not indicate or imply the indicated dress It sets or element must have a particular orientation, with specific azimuth configuration and operation, therefore should not be understood as to the utility model Limitation.
- 2 are please referred to Fig.1, the utility model provides a kind of technical solution:A kind of efficient waterway dredging mud cleaning plant, ship Body 1 is equipped with a movable mouth 2 for running through 1 upper and lower end face of hull, and rectangular sliding slot 3 is symmetrically arranged on the inner wall of movable mouth 2.Oil pressure is stretched Contracting bar 5 is slidably arranged in movable mouth 2, and oil pressure telescopic rod 5 is fixed by right angle support plate 4.Oil pressure telescopic rod 5 is fixedly connected with transverse direction The end of the connecting rod 6 of setting, connecting rod 6 is fixedly connected with square protruding 7, and square protruding 7 is slidably arranged in rectangular sliding slot 3 In, it ensure that the stability that oil pressure telescopic rod 5 moves up and down.The oil inlet and outlet of oil pressure telescopic rod 5 connects oil pressure by oil pressure pipe The oil inlet and outlet of pump, the model 37kw of oil pressure pump, oil pressure pump electric power connection line connect on the three phase mains configured on hull 1.
The lower part that oil pressure telescopic rod 5 stretches out hull 1 is arranged with movable joint hose 9, and the upper end of movable joint hose 9 is fixed on hull The lower end of 1 bottom face, movable joint hose 9 is fixed on the upper surface of follow block 8, and follow block 8 is secured transverse on oil pressure telescopic rod 5. Movable joint hose 9 meet oil pressure telescopic rod 5 it is normally flexible in the case of, ensure that water will not enter in movable mouth 2.
The bottom face of oil pressure telescopic rod 5 is installed with frame 10 of dredging, and the left end for frame 10 of dredging is installed with pipe fitting 12, Pipe fitting 12 is connected to frame 10 of dredging by leakage hole 11, and column 13 is vertically fixed in pipe fitting 12, branch is horizontally arranged on column 13 The left and right end ring shape dress of dagger 14, support column 14 is equipped with inclined cutter 15.By frame 10 of dredging, the sludge on riverbed can be dug into it Inside, in the state that hull 1 moves forwards, the silt for entering its internal bonding one is poured pipe fitting 12 by cooperation water body It is interior, by inclined cutter 15, coordinate the impact force of water body, one fragmentation will be bonded, then drained on riverbed again, when riverbed is super Cross frame 10 of dredging dredge depth when, start oil pressure telescopic rod 5, drive frame 10 of dredging is moved downward on riverbed, by rectangular The cooperation of sliding slot 3 and square protruding 7 ensure that the stability that 5 bar portion of oil pressure telescopic rod moves up and down, by movable joint hose 9, Meet oil pressure telescopic rod 5 it is normally flexible in the case of, ensure that water will not enter in movable mouth 2, ensure that 5 band of oil pressure telescopic rod Dynamic frame 10 of dredging moves up and down high-effect property, you can smashes the silt being bonded together on riverbed, facilitates dredging tube better Suck silt.
The middle part of hull 1 is equipped with hopper dredger 16, and the upper end left part of hull 1 is installed with right angle lever member 17, right angle lever member 17 Right end be fixedly connected with pipe part 18, the upper end of pipe part 18 is installed with funnel 19, and the upper inside wall of funnel 19 is fixed It is provided with plate 20, the left and right sides of 21 lower face of leaking net plate is equipped with board slot 22, and board slot 22 is matched with plate 20, leaking net plate 21 It is connected on plate 20 by board slot 22.Right angle strut 23, right angle are fixedly connected at left and right sides of the upper surface of leaking net plate 21 The upper end of strut 23 is fixedly connected with lantern ring 24.Lantern ring 24 is slidably located on rod piece 25, and rod piece 25 is fixed on the upper of funnel 19 End face.Rod piece 25 is equipped with lockhole 26, and the left side of lantern ring 24 is fixed with right angle plate 27, and right angle plate 27 is equipped with slide opening 28, lockhole 26 is arranged in the same horizontal line with slide opening 28, and bolt 29 is slidably mounted on by slide opening 28 on right angle plate 27, when Bolt 29 is inserted in 26 interior energy of lockhole and fixes rod piece 25.
Spring 30 is cased on bolt 29, one end of spring 30 is fixedly connected on right angle plate 27, the other end of spring 30 It is fixedly connected on bolt 29, ensure that the flexible stability of spring 30.By the cooperation of spring 30, bolt 29 and lockhole 26, So that plate 20 and the cooperation of board slot 22 are stablized so that the stabilization of leaking net plate 21 is placed on funnel 19, pulls out bolt 29, is inserted Pin 29 deviates from lockhole 26, and spring 30 is compressed, and bolt 29 is pulled up so that lantern ring 24 deviates from rod piece 25, while plate 20 is de- Go out board slot 22, then facilitates and leaking net plate 21 is disassembled into repair from funnel 19.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is appreciated that can these embodiments be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of efficient waterway dredging mud cleaning plant, it is characterised in that:Hull(1)Equipped with through hull(1)Upper and lower end face Movable mouth(2), movable mouth(2)Inner wall on be symmetrically arranged with rectangular sliding slot(3), right angle support plate(4)On to be fixed with oil pressure flexible Bar(5), oil pressure telescopic rod(5)It is slidably arranged in movable mouth(2)It is interior, oil pressure telescopic rod(5)It is fixedly connected with the company being laterally arranged Extension bar(6), connecting rod(6)End be fixedly connected with square protruding(7), square protruding(7)It is slidably arranged in rectangular sliding slot(3) In;Oil pressure telescopic rod(5)Stretch out hull(1)Lower part be arranged with movable joint hose(9), movable joint hose(9)Upper end be fixed on Hull(1)Bottom face, movable joint hose(9)Lower end be fixed on follow block(8)Upper surface, follow block(8)It is secured transverse to oil pressure Telescopic rod(5)On;Oil pressure telescopic rod(5)Bottom face be fixed with frame of dredging(10), frame of dredging(10)With pipe fitting(12)Pass through leakage Hole(11)Connection, pipe fitting(12)Inside it is provided with inclined cutter(15).
2. a kind of efficient waterway dredging mud cleaning plant according to claim 1, it is characterised in that:The pipe fitting(12)It is interior It is vertically arranged with column(13), column(13)With the support column being laterally arranged(14)It is fixedly connected, support column(14)Left and right end Annular is installed with inclined cutter(15).
3. a kind of efficient waterway dredging mud cleaning plant according to claim 1, it is characterised in that:The hull(1)On Equipped with hopper dredger(16), hopper dredger(16)Top is provided with pipe part(18), pipe part(18)Upper end be fixed with funnel(19), funnel (19)Inner wall be vertically arranged with plate(20), leaking net plate(21)The left and right sides of lower face is equipped with and plate(20)It is compatible Board slot(22), leaking net plate(21)With plate(20)It is detachably connected.
4. a kind of efficient waterway dredging mud cleaning plant according to claim 3, it is characterised in that:The leaking net plate(21) Upper surface be fixed with right angle strut(23), right angle strut(23)Upper end be fixedly connected with lantern ring(24), lantern ring(24)Sliding is set It sets in rod piece(25)On, rod piece(25)It is fixed on funnel vertically(19)Upper surface.
5. a kind of efficient waterway dredging mud cleaning plant according to claim 4, it is characterised in that:The rod piece(25)On Equipped with lockhole(26), lantern ring(24)It is fixedly connected with right angle plate(27), right angle plate(27)It is equipped with slide opening(28), lockhole(26) With slide opening(28)It is arranged in the same horizontal line, right angle plate(27)Pass through slide opening(28)It is slidably fitted with bolt(29), bolt (29)With rod piece(25)Pass through lockhole(26)It is detachably connected.
6. a kind of efficient waterway dredging mud cleaning plant according to claim 5, it is characterised in that:The bolt(29)On It is cased with spring(30), spring(30)One end be fixedly connected with right angle plate(27), spring(30)The other end be fixedly connected with bolt (29).
CN201820269493.2U 2018-02-26 2018-02-26 A kind of efficient waterway dredging mud cleaning plant Expired - Fee Related CN207988004U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820269493.2U CN207988004U (en) 2018-02-26 2018-02-26 A kind of efficient waterway dredging mud cleaning plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820269493.2U CN207988004U (en) 2018-02-26 2018-02-26 A kind of efficient waterway dredging mud cleaning plant

Publications (1)

Publication Number Publication Date
CN207988004U true CN207988004U (en) 2018-10-19

Family

ID=63825836

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820269493.2U Expired - Fee Related CN207988004U (en) 2018-02-26 2018-02-26 A kind of efficient waterway dredging mud cleaning plant

Country Status (1)

Country Link
CN (1) CN207988004U (en)

Similar Documents

Publication Publication Date Title
CN207063020U (en) A kind of dredging device for water conservancy projects
CN212223929U (en) Flushing and sucking device for non-drainage sinking construction process of open caisson
CN109083177B (en) Precipitation process of integrated directional vacuum well point pipe
CN114411847B (en) Multifunctional hydraulic engineering dredging device
CN109098221A (en) A kind of dedicated sand water mixing device of ship dredging construction
CN216170386U (en) Light well point filter tube structure
CN213143168U (en) Soft and hard garbage isolation treatment resistance-reducing blockage-free dredging, digging and sucking integrated device
CN207988004U (en) A kind of efficient waterway dredging mud cleaning plant
CN213233590U (en) Novel hydraulic engineering is with arranging silt device
CN206374947U (en) A kind of dredger device for high-efficiency cleaning
CN112502174A (en) Quick dewatering device for deep foundation pit
CN210507400U (en) Reverse filtering device for drainage of retaining wall
CN209603220U (en) A kind of mud-sucking device of dredger
CN209603214U (en) A kind of one-pass molding embankment gutter excavating device
CN108708385B (en) Integrated directional vacuum well point pipe
CN213627550U (en) Filter element type oil field underground sand control device
CN206495250U (en) A kind of new bucket
CN201268856Y (en) Submersible ditch excavator
CN209129049U (en) A kind of dedicated sand water mixing device of ship dredging construction
CN206736940U (en) A kind of water conservancy rushes heavy well construction equipment
CN210459345U (en) Debris clearing device in river silt
CN207567845U (en) A kind of air type suction dredge for subway underwater excavation
CN217431415U (en) Hydraulic stirrer
CN215977452U (en) Dredging device for hydraulic engineering
CN209227648U (en) Hydraulic excavation underwater trench device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181019

CF01 Termination of patent right due to non-payment of annual fee