CN207982299U - Hot charging tundish brick cup mouth of a river positioning device - Google Patents
Hot charging tundish brick cup mouth of a river positioning device Download PDFInfo
- Publication number
- CN207982299U CN207982299U CN201820318870.7U CN201820318870U CN207982299U CN 207982299 U CN207982299 U CN 207982299U CN 201820318870 U CN201820318870 U CN 201820318870U CN 207982299 U CN207982299 U CN 207982299U
- Authority
- CN
- China
- Prior art keywords
- tundish
- brick cup
- guide rod
- river
- chassis
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model belongs to metallurgy and turns over packet technology field, more particularly, to a kind of hot charging tundish brick cup mouth of a river positioning device, it is characterized by comprising the chassis being arranged at middle water containing opening, guide rod in this center chassis is set, guide rod extends to tundish outside suitable for reading across the mouth of a river by bottom in tundish, positioning clamping fixture there are one being also socketed along guide rod, is arranged the brick cup bracket in brick cup bottom, positioning clamping fixture center is overlapped with guide rod center.The utility model is simple in structure, it is easy to operate, brick cup can quickly be installed to positioning during tundish hot repair in tundish, enter without worker and carry out positioning operation in tundish, the time is reorganized and outfit to save tundish, is created conditions for tundish reuse.
Description
Technical field
The utility model belongs to metallurgy and turns over packet technology field, positions and fills more particularly, to a kind of hot charging tundish brick cup mouth of a river
It sets.
Background technology
In having enough to meet the need middle water containing opening quick-replaceable, since the brick cup of connection middle water containing opening is manually installed, so
Tundish temperature must be dropped to people could work into the matters temperature of tundish, so that causing because of packet time mistake of drying in the air
It is long and to lead to build by laying bricks or stones tundish excessively slow, to influence tundish utilization rate, improve production cost.
Invention content
The purpose of this utility model be to provide it is a kind of can be in tundish building process in the hot charging of Fast Installation brick cup
Between back stall brick mouth of a river positioning device.
The purpose of this utility model is realized by following technical proposals:
The hot charging tundish brick cup mouth of a river positioning device of the utility model, it is characterised in that including being arranged in middle water containing opening
The guide rod in this center chassis is arranged, during the guide rod is extended to across the mouth of a river by bottom in tundish in the chassis at place
Between wrap outside mouth, be also socketed along the guide rod there are one positioning clamping fixture, the brick cup bracket in brick cup bottom be set, it is described
Positioning clamping fixture center overlapped with the guide rod center.
Positioning clamping fixture shape positioning clamping fixture consistent with the cavity shape of the brick cup and described and the brick cup
Inner cavity be completely superposed.
It is fixed by one group of positioning pin between the chassis and tundish bottom plate.
It is fixed by the hook of the chassis both sides between the chassis and tundish bottom plate.
The brick cup bracket is disk, four-bladed vane or cross bar.
The advantages of the utility model:
The hot charging tundish brick cup mouth of a river positioning device structure of the utility model is simple, easy to operate, can be in tundish
During hot repair brick cup is quickly installed to positioning in tundish, enters without worker and carry out positioning operation in tundish, from
And save tundish and reorganize and outfit the time, it creates conditions for bakie working lining reuse.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model.
Specific implementation mode
Specific embodiment of the present utility model is further illustrated below in conjunction with the accompanying drawings.
As shown in Figure 1, hot charging tundish brick cup mouth of a river positioning device, it is characterised in that including being arranged at 5 mouth of a river 6 of tundish
The chassis 4 at place, is arranged the guide rod 1 at 4 center of this chassis, and the guide rod 1 is prolonged across the mouth of a river 6 by bottom in tundish 5
5 outside suitable for reading of tundish is reached, is also socketed along the guide rod 1 there are one positioning clamping fixture 2, the seat in 3 bottom of brick cup is set
Brick bracket 7,2 center of positioning clamping fixture are overlapped with 1 center of guide rod.
2 shape of positioning clamping fixture positioning clamping fixture 2 consistent with the cavity shape of the brick cup 3 and described with it is described
The inner cavity of brick cup 3 is completely superposed.
It is fixed by one group of positioning pin between 5 bottom plate of chassis 4 and tundish.
It is fixed by the hook of 4 both sides of the chassis between 5 bottom plate of chassis 4 and tundish.
The brick cup bracket 7 is disk, four-bladed vane or cross bar.
Centered on tundish 5 wraps bottom by 56 central point of the mouth of a river of tundish, chassis 4 is set, the guide rod 1 on chassis 4 is worn
It crosses the mouth of a river 6 to be extended to outside tundish 5 by bottom in tundish 5, turns over the tundish 5 after the completion of packet, with manipulator by tundish 5
3 permanent layer of brick cup around clean out, install positioning clamping fixture 2 along guide rod 1, ensure 2 center of positioning clamping fixture and guide rod 1
Center overlaps;Brick cup bracket 7 is installed, prevents brick cup 3 from landing too fast, the brick cup 3 of clay will be coated with along guide rod 1 with manipulator
It is put into tundish 5, ensures that the inner cavity of brick cup 3 is completely superposed with positioning clamping fixture 2, compress brick cup 3, after clay solidification, extract
Positioning clamping fixture 2 simultaneously disassembles chassis 4, and brick cup 3 is made to build by laying bricks or stones in tundish 5, completes the installation of brick cup 3, and mounted brick cup 3 is
It can quickly connect and replace the mouth of a river 6.
The hot charging tundish brick cup mouth of a river positioning device structure of the utility model is simple, easy to operate, can be in tundish 5
The quickly installation positioning in tundish 5 by brick cup 3, enters without worker and carries out positioning operation in tundish 5 during hot repair,
The time is reorganized and outfit to save tundish 5, is created conditions for the reuse of 5 working lining of tundish.
Claims (5)
1. a kind of hot charging tundish brick cup mouth of a river positioning device, it is characterised in that including the chassis being arranged at middle water containing opening,
Guide rod in this center chassis is set, and it is suitable for reading outer that the guide rod passes through the mouth of a river by bottom in tundish to extend to tundish
Portion is also socketed along the guide rod there are one positioning clamping fixture, and brick cup bracket is arranged in brick cup bottom, the positioning clamping fixture
The heart is overlapped with the guide rod center.
2. the hot charging tundish brick cup mouth of a river according to claim 1 positioning device, it is characterised in that the positioning clamping fixture
Shape is consistent with the cavity shape of the brick cup, and the inner cavity of the positioning clamping fixture and the brick cup is completely superposed.
3. the hot charging tundish brick cup mouth of a river according to claim 1 positioning device, it is characterised in that the chassis is in
Between fixed by one group of positioning pin between packet bottom plate.
4. the hot charging tundish brick cup mouth of a river according to claim 1 positioning device, it is characterised in that the chassis is in
Between fixed by the hook of the chassis both sides between packet bottom plate.
5. the hot charging tundish brick cup mouth of a river according to claim 1 positioning device, it is characterised in that the brick cup bracket
For disk, four-bladed vane or cross bar.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820318870.7U CN207982299U (en) | 2018-03-08 | 2018-03-08 | Hot charging tundish brick cup mouth of a river positioning device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820318870.7U CN207982299U (en) | 2018-03-08 | 2018-03-08 | Hot charging tundish brick cup mouth of a river positioning device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207982299U true CN207982299U (en) | 2018-10-19 |
Family
ID=63826527
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820318870.7U Active CN207982299U (en) | 2018-03-08 | 2018-03-08 | Hot charging tundish brick cup mouth of a river positioning device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207982299U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113695565A (en) * | 2020-05-22 | 2021-11-26 | 中冶宝钢技术服务有限公司 | Method and device for installing brick cup in tundish |
-
2018
- 2018-03-08 CN CN201820318870.7U patent/CN207982299U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113695565A (en) * | 2020-05-22 | 2021-11-26 | 中冶宝钢技术服务有限公司 | Method and device for installing brick cup in tundish |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103071765A (en) | Partial air cooling method for precast aperture passage in investment casting shell | |
CN207982299U (en) | Hot charging tundish brick cup mouth of a river positioning device | |
CN203495140U (en) | Negative-pressure casting system of coated sand mould | |
CN206780615U (en) | A kind of layer-stepping mould of laminated floor slab | |
CN103774905B (en) | The production technique of a kind of electric pole | |
CN205816609U (en) | A kind of waste material discharge device of molding press | |
CN105135889A (en) | Construction method for fireproof material of throat part of grate cooler | |
CN208214272U (en) | Cone-shaped electric machine stator Cast Aluminum Dies | |
CN207549261U (en) | A kind of rubber production pours device | |
CN202882099U (en) | Prefabricated assembly-type round inspection well with integrated base and well room | |
CN103658567A (en) | Device and method for casting anode plate copper mold through rotary anode furnace | |
CN206276871U (en) | A kind of evaporative pattern of electric machine casing | |
CN205919665U (en) | Well formula carbonitriding stove | |
CN201960126U (en) | Built-in air-permeable brick formed by blowing argon at bottom of steel ladle | |
CN205957738U (en) | Rotatory preheater of salt core | |
CN202291329U (en) | Novel centrifuge roller pouring pipe | |
CN207267027U (en) | Motor casing has the evaporative pattern mold of accurate positioning | |
CN208628376U (en) | A kind of foamed molding die of lost foam casting electric machine stand | |
CN209439409U (en) | A kind of reciprocal water cooling ingot mould device of grid type | |
CN105478673B (en) | Aluminium essence casting leads continuous pipe one can coiler and its casting mould and preparation method | |
CN206494637U (en) | The upset vacuum cup of tunnel segment demoulding and turnover lifting appliance | |
CN207081313U (en) | The flexible more stove spraying Tower Systems of one kind conversion | |
CN207415822U (en) | A kind of novel energy-conserving reflector makes mold | |
CN205165727U (en) | Knockout ware is used in casting based on dual cooling | |
CN208052209U (en) | A kind of carbon black furnace side air inlet brick is with pouring mold |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |