CN207982261U - Vacuum melting rapid hardening ingot furnace - Google Patents

Vacuum melting rapid hardening ingot furnace Download PDF

Info

Publication number
CN207982261U
CN207982261U CN201820362900.4U CN201820362900U CN207982261U CN 207982261 U CN207982261 U CN 207982261U CN 201820362900 U CN201820362900 U CN 201820362900U CN 207982261 U CN207982261 U CN 207982261U
Authority
CN
China
Prior art keywords
flow
liquid bucket
guiding structure
ingot
vacuum melting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820362900.4U
Other languages
Chinese (zh)
Inventor
宋志成
王亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ai Fa Ke Vacuum Technology (shenyang) Co Ltd
Original Assignee
Ai Fa Ke Vacuum Technology (shenyang) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ai Fa Ke Vacuum Technology (shenyang) Co Ltd filed Critical Ai Fa Ke Vacuum Technology (shenyang) Co Ltd
Priority to CN201820362900.4U priority Critical patent/CN207982261U/en
Application granted granted Critical
Publication of CN207982261U publication Critical patent/CN207982261U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Manufacture And Refinement Of Metals (AREA)

Abstract

Vacuum melting rapid hardening ingot furnace belongs to vacuum melting furnace technical field.Vacuum melting rapid hardening ingot furnace, including furnace body, it is characterised in that:Molten steel input end lower end in furnace body, which is equipped with, receives liquid bucket, receives liquid bucket lower end and is equipped with leakage fluid dram, corresponding with leakage fluid dram to be equipped with flow-guiding structure, the flow-guiding structure is connected with oil cylinder;Water cooled rolls and ingot mold are equipped in furnace body, the water cooled rolls is set to the side for receiving liquid bucket lower end, and ingot mold is corresponding with the leakage fluid dram of liquid bucket is received.When flow-guiding structure is placed in and receives liquid bucket lower end, flow-guiding structure is sent the molten steel that liquid bucket is discharged is received to water cooled rolls upper end the utility model;It needs to remove flow-guiding structure by oil cylinder when ingot casting, the molten steel received in liquid bucket will flow into ingot mold.It can thus be realized in a stove and get rid of two functions of steel disc and ingot casting.

Description

Vacuum melting rapid hardening ingot furnace
Technical field
The utility model belongs to vacuum melting furnace technical field, more particularly, to the smelting equipment of a kind of rejection tablet and ingot casting.
Background technology
Existing vacuum melting furnace is not after metal molten, being that molten steel is got rid of into steel disc by water cooled rolls is exactly to pass through mold Ingot is cast, every stove can be only done a kind of technique, and use is very inconvenient.
Utility model content
In view of the deficienciess of the prior art, the technical problem to be solved by the utility model is to provide one kind can getting rid of steel Piece again can ingot casting vacuum melting rapid hardening ingot furnace.
The utility model adopts the following technical scheme that complete:Vacuum melting rapid hardening ingot furnace, including furnace body, it is special Sign is:Molten steel input end lower end in furnace body, which is equipped with, receives liquid bucket, receives liquid bucket lower end and is equipped with leakage fluid dram, corresponding with leakage fluid dram Equipped with flow-guiding structure, the flow-guiding structure is connected with oil cylinder;Water cooled rolls and ingot mold are equipped in furnace body, the water cooled rolls is set It is placed in the side for receiving liquid bucket lower end, ingot mold is corresponding with the leakage fluid dram of liquid bucket is received.
As another preferred embodiment, the flow-guiding structure is the deflector being obliquely installed, and deflector both ends are equipped with gear Plate;When flow-guiding structure, which is placed in, receives liquid bucket lower end, baffle and deflector jointly cooperation will receive the discharge of liquid bucket molten steel send to Water cooled rolls upper end;It needs to remove flow-guiding structure by oil cylinder when ingot casting, the molten steel received in liquid bucket will flow into ingot mould In tool.
The utility model has the beneficial effects that:The utility model is when flow-guiding structure is placed in and receives liquid bucket lower end, water conservancy diversion Structure send the molten steel for receiving the discharge of liquid bucket to water cooled rolls upper end;It needs to remove flow-guiding structure by oil cylinder when ingot casting, receive Molten steel in liquid bucket will flow into ingot mold.It can thus be realized in a stove and get rid of two functions of steel disc and ingot casting.
Description of the drawings
FIG. 1 is a schematic structural view of the utility model.
In figure, 1 be aqueous cold plate, 2 be water cooled rolls, 3 be receive liquid bucket, 4 be flow-guiding structure, 5 be ingot mold.
Specific implementation mode
The utility model is described in further detail with reference to the accompanying drawings and detailed description.
The technical issues of in order to keep the utility model solved, technical solution and advantageous effect are more clearly understood, below In conjunction with specific embodiments, the utility model is further described.It should be appreciated that specific embodiment described herein is only To explain the utility model, be not used to limit the utility model.
With reference to the accompanying drawings shown in 1, vacuum melting rapid hardening ingot furnace, including furnace body, the molten steel input end lower end in furnace body is equipped with Liquid bucket is received, 3 lower end of liquid bucket is received and is equipped with leakage fluid dram, corresponding with leakage fluid dram to be equipped with flow-guiding structure 4, the flow-guiding structure 4 connects There is oil cylinder;Water cooled rolls 2 and ingot mold 5 are equipped in furnace body, the water cooled rolls 2 is set to the side for receiving 3 lower end of liquid bucket, water cooling 2 side of roller is equipped with aqueous cold plate 1, and ingot mold 5 is corresponding with the leakage fluid dram of liquid bucket 3 is received, and ingot mold 5 is connected with drive mechanism.
As another preferred embodiment, the flow-guiding structure is the deflector being obliquely installed, and deflector both ends are equipped with gear Plate;When flow-guiding structure, which is placed in, receives liquid bucket lower end, baffle and deflector jointly cooperation will receive the discharge of liquid bucket molten steel send to Water cooled rolls upper end;It needs to remove flow-guiding structure by oil cylinder when ingot casting, the molten steel received in liquid bucket will flow into ingot mould In tool.
When flow-guiding structure is placed in and receives liquid bucket lower end, flow-guiding structure is sent the utility model by the molten steel that liquid bucket is discharged is received To water cooled rolls upper end;It needs to remove flow-guiding structure by oil cylinder when ingot casting, the molten steel received in liquid bucket will flow into ingot casting In mold.It can thus be realized in a stove and get rid of two functions of steel disc and ingot casting.
The preferred embodiment of the utility model described in detail above.It should be appreciated that the ordinary skill people of this field Member according to the present utility model can conceive without creative work makes many modifications and variations.Therefore, all this technology necks Technical staff passes through logic analysis, reasoning or limited reality on the basis of existing technology according to the design of the utility model in domain Available technical solution is tested, it all should be in the protection domain being defined in the patent claims.

Claims (2)

1. vacuum melting rapid hardening ingot furnace, including furnace body, it is characterised in that:Molten steel input end lower end in furnace body, which is equipped with, receives liquid Bucket receives liquid bucket lower end and is equipped with leakage fluid dram, and corresponding with leakage fluid dram to be equipped with flow-guiding structure, the flow-guiding structure is connected with oil cylinder; Water cooled rolls and ingot mold are equipped in furnace body, the water cooled rolls is set to the side for receiving liquid bucket lower end, ingot mold and receipts liquid The leakage fluid dram of bucket is corresponding.
2. vacuum melting rapid hardening ingot furnace according to claim 1, it is characterised in that:The flow-guiding structure is to tilt to set The deflector set, deflector both ends are equipped with baffle.
CN201820362900.4U 2018-03-17 2018-03-17 Vacuum melting rapid hardening ingot furnace Expired - Fee Related CN207982261U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820362900.4U CN207982261U (en) 2018-03-17 2018-03-17 Vacuum melting rapid hardening ingot furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820362900.4U CN207982261U (en) 2018-03-17 2018-03-17 Vacuum melting rapid hardening ingot furnace

Publications (1)

Publication Number Publication Date
CN207982261U true CN207982261U (en) 2018-10-19

Family

ID=63828219

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820362900.4U Expired - Fee Related CN207982261U (en) 2018-03-17 2018-03-17 Vacuum melting rapid hardening ingot furnace

Country Status (1)

Country Link
CN (1) CN207982261U (en)

Similar Documents

Publication Publication Date Title
CN208528079U (en) A kind of continuous casting production dam
CN207982261U (en) Vacuum melting rapid hardening ingot furnace
CN205629348U (en) Cast magnesium alloy waters package with pushing off slag function
CN102676834A (en) Crystallizer used for electroslag remelting
CN208825496U (en) Rotary type molten aluminum chute
CN217929751U (en) Melting furnace with protection function in stainless steel casting machining process
CN206936339U (en) A kind of Rotating caster mold cooling system
CN207537330U (en) A kind of cover-plate glass platinum channel throat tubular construction
CN202465746U (en) Novel slag trough
CN205165860U (en) Prevent molten iron of slag backward flow and take off slag plate
CN209945006U (en) Novel double-chamber furnace for casting aluminum and aluminum alloy
CN201678696U (en) Combined taper oxygen lance
CN202984655U (en) Combined water opening seat brick
CN202621902U (en) Metal delivery pouring device
CN205414400U (en) Precision casting aluminum alloy pouring pressure -maintaining equipment
CN206069971U (en) For the matte chute of bath smelting furnace copper mouth
CN209773454U (en) Integral structure lower slide plate and lower nozzle combined brick
CN204438810U (en) Bottom blowing copper smelter feed inlet device
CN218404355U (en) Lead liquid transfer trolley
CN202741729U (en) Special accident flashboard for intermediate container
CN204676114U (en) A kind of converter tapping slag-blocking apparatus
CN214735870U (en) Iron swinging die
CN204524181U (en) A kind of casting mold with argon protective device
CN209550591U (en) A kind of connection structure of ladle electromagnetism slag induction coil
CN209935848U (en) Ladle long nozzle water-cooling lever fixing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181019

Termination date: 20210317