CN207974586U - A kind of sand-fixing greening system based on wind-solar hybrid power generation station - Google Patents

A kind of sand-fixing greening system based on wind-solar hybrid power generation station Download PDF

Info

Publication number
CN207974586U
CN207974586U CN201720866738.5U CN201720866738U CN207974586U CN 207974586 U CN207974586 U CN 207974586U CN 201720866738 U CN201720866738 U CN 201720866738U CN 207974586 U CN207974586 U CN 207974586U
Authority
CN
China
Prior art keywords
sand
generation module
module installation
wind
power generation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720866738.5U
Other languages
Chinese (zh)
Inventor
姚志民
李丽芸
张爱霞
牛冰玉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Shining Crystal Amperex Technology Ltd
Original Assignee
Anhui Shining Crystal Amperex Technology Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Shining Crystal Amperex Technology Ltd filed Critical Anhui Shining Crystal Amperex Technology Ltd
Priority to CN201720866738.5U priority Critical patent/CN207974586U/en
Application granted granted Critical
Publication of CN207974586U publication Critical patent/CN207974586U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A40/00Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
    • Y02A40/10Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in agriculture
    • Y02A40/22Improving land use; Improving water use or availability; Controlling erosion

Landscapes

  • Photovoltaic Devices (AREA)

Abstract

The utility model discloses a kind of sand-fixing greening systems based on wind-solar hybrid power generation station, include mainly sand-proof wall, forest zone, grassland, wind power generation module installation pedestal, solar electrical energy generation module installation region and well;Wind power generation module installation pedestal is arranged close to sand-proof wall leeward side;Forest zone, grassland and solar electrical energy generation module installation region are successively set on sand-proof wall leeward side;The reinforcing bar of more cross arrangements for being partitioned into matrix form solar electrical energy generation module installation region on the ground;Pile is buried at the cross one another position of reinforcing bar, reinforcing bar forms integral structure with pile;Well is excavated in any solar electrical energy generation module installation region.A kind of generating equipment foundation structure that entirety is excellent is provided in the sand-fixing greening scheme of the utility model, especially suitable for establishing wind light mutual complementing power generation station in desert, gobi border district.The electric energy that wind-powered electricity generation and solar energy generate irrigates forest zone and grassland for drawing water, and is conducive to Desertification and establishes the stable ecosystem.

Description

A kind of sand-fixing greening system based on wind-solar hybrid power generation station
Technical field
The utility model belongs to wind light mutual complementing power generation and method of tackling desert field, and in particular to one kind is based on scene mixing The sand-fixing greening system in power station.
Background technology
Desertification is one of serious natural calamity of facing mankind.China is that desert area is larger in the world, is distributed Relatively wide, desertification endangers one of serious country, there is nearly that 2,000,000,000 mu of farmlands, grassland are by desertification, the shifting of sand dunes every year at present, greatly Amount hydraulic engineering is invaded by dust storm, severe water and soil erosion, and loss is huge.
Desertification, shifting of sand dunes area natural environment severe, not directly available goods and materials and the energy are not suitable for human living And existence.
But these desertification, shifting of sand dunes area often have abundant wind energy, solar energy resources.In addition, in desertification There are available underground water sources for edge zone and oasis.
Therefore, in the shifting of sand dunes area edge sets up the wind-solar hybrid power generation station of energy acquisition, to obtain sufficient electric power energy Source, will be highly beneficial to blocking desertification and desert afforestation engineering.
Utility model content
The purpose of this utility model is not suitable for human living for shifting of sand dunes area, available directly utilizes scarcity of resources Natural environment feature, it is proposed that a kind of sand-fixing greening system, by make rational planning for and be arranged can resist high wind scene mix Power station efficiently solves the problems, such as the energy and the water source self-sufficiency of desert afforestation engineering.
The utility model provides a kind of sand-fixing greening system based on wind-solar hybrid power generation station, includes mainly:Sand-proof wall, Forest zone, grassland, wind power generation module installation pedestal, solar electrical energy generation module installation region and well;
Wind power generation module installation pedestal is arranged close to sand-proof wall leeward side;
Forest zone, grassland and solar electrical energy generation module installation region are successively set on sand-proof wall leeward side;
The reinforcing bar of more cross arrangements for being partitioned into matrix form solar electrical energy generation module installation region on the ground;
Pile is buried at the cross one another position of reinforcing bar, reinforcing bar forms integral structure with pile;
Well is excavated in any solar electrical energy generation module installation region.
As preferred means, reinforcing bar is replaced using angle steel or macromolecule rigid material.
As preferred means, pile is using drill rod or uses concrete casting.
Further, the reinforcing bar of cross arrangement forms multiple closings or semi-open solar energy in the foundation structure of power station Electricity generation module installation region.
Further, by holder by solar power generation unit proper alignment in solar electrical energy generation module installation region, By solar power generation unit locking component series/parallel between each holder, solar power generation unit locking component is consolidated with reinforcing bar Fixed connection.
Preferably, at least two reinforcing bars are used as one group side by side.
Further, road surface is covered on the longitudinal direction of at least two reinforcing bars.
Further, conduit pipe system is installed respectively in forest zone, grassland and solar electrical energy generation module installation region.
The sand-fixing greening system of the utility model provides practicable sand-fixing greening scheme.Wherein more provide one The whole excellent generating equipment foundation structure of kind, especially suitable for establishing wind light mutual complementing power generation station in desert, gobi border district. The electric energy that wind-powered electricity generation and solar energy generate irrigates forest zone and grassland for drawing water, and is conducive to Desertification and establishes stable ecosystem System.The system that the sand-fixing greening scheme of the utility model is related to can self-operating, can be used for the renewable energy of Arid Desert Region Source acquires and environmental improvement.When a certain region complete afforest after, by formed can self―sustaining the ecosystem.Gradually use this reality It, being capable of fast and effeciently Desert Control with novel sand-fixing greening scheme.
Description of the drawings
Fig. 1 is the utility model sand-fixing greening system overview block schematic diagram;
Fig. 2 is the schematic diagram of the foundation structure one involved in the utility model;
Fig. 3 is the schematic diagram of the foundation structure two involved in the utility model;
Fig. 4 is the mounting structure schematic diagram of solar electrical energy generation module in the utility model.
Reference sign:
W1, sand-proof wall;W2, wind power generation module installation pedestal;F, forest zone;G, grassland;S, solar electrical energy generation module is installed Region;W3, well;
1, reinforcing bar;3, solar power generation unit locking component;
A, position or pile position one are anchored;B, position or pile position two are anchored;C, channel or road surface.
Specific implementation mode
The utility model is described in further detail below in conjunction with the accompanying drawings:
Embodiment one
Referring to attached drawing 1, a kind of sand-fixing greening system based on wind-solar hybrid power generation station of the utility model, main includes anti- Husky wall, forest zone, grassland, wind power generation module installation pedestal, solar electrical energy generation module installation region and well.
Sand-proof wall is set first, wind power generation module installation pedestal is set close to sand-proof wall leeward side.Sand-proof wall is less than wind The height of power power generation shaft tower.Wind power generation module installation pedestal can be used earth anchor and the mode of steel bar concrete casting added to make.
Sand-proof wall is mainly used for stopping sandstone, and especially in Arid Desert Region, height generally need not be very high.Certainly The wind-force that leeward side can be subtracted has certain protective role to sand-fixing greening region.
Wind-driven generator shaft tower is mounted in wind power generation module installation pedestal, and height is higher by sand-proof wall, blade windward Setting, such setting can further decrease the wind-force of leeward side.
Forest zone, grassland and solar electrical energy generation module installation region are planned successively in sand-proof wall leeward side.Such setting makes Forest zone, grassland, solar power station are independent of each other, and after afforesting successfully, forest zone can further weaken wind-force, to grassland with Solar power station plays a protective role.
Pouring, the diversion of trickle irrigation, refrigerating function are installed respectively in forest zone, grassland and solar electrical energy generation module installation region Pipe-line system, to meet the water requirements to sand-fixing greening.
Referring to attached drawing 2, solar power plant is built.
The ground of solar power plant uses more 1 cross arrangements of reinforcing bar, is partitioned into matrix form solar energy hair on the ground Electric module mounting area.Wherein reinforcing bar 1 can also use angle steel or macromolecule rigid material to replace.According to the specific needs in power station Determine that the quantity and longitudinal length of reinforcing bar 1, single steel bar obviously can be spliced by welding mean.
Pile is buried at 1 cross one another position A of reinforcing bar.Pile using drill rod (earth anchor) or with concrete casting, and Reinforcing bar 1 is become one structure using fixing means with pile.By receiving above, in power station, lattice arrangement is fully Stake, is linked together by the reinforcing bar network of intersection, forms firm foundation structure.
As shown in Figure 2,4, multiple closings or semi-open solar electrical energy generation module peace are formed in the foundation structure of power station Region is filled, the arrangement of multiple solar power generation units is mounted in solar electrical energy generation module installation region.Specifically, referring to attached drawing 4, by holder by solar power generation unit proper alignment in solar electrical energy generation module installation region, by too between each holder Positive energy generator unit locking component 3 carries out series/parallel, finally fixes solar power generation unit locking component 3 and reinforcing bar 1 and connects It connects.
Embodiment two
The intensity of power station foundation structure in order to further increase selects at least two reinforcing bars 1 in previous embodiment one It is used as one group side by side, referring to attached solid line shown in Fig. 3 and dotted line, and buries pile at 1 cross one another position B of reinforcing bar.
Means as a further preference cover road surface C on the longitudinal direction of at least two reinforcing bars 1 so that this at least two Reinforcing bar 1 forms an entirety, such as reinforced concrete pavement or conventional asphalt surface.Traffic is same in road surface C offers power station When, further strengthen foundation structure.
In all embodiments of the utility model, it may be selected to open in any or all solar electrical energy generation modules installation region Dig well.Using power station electric power groundwater abstraction, supplied water to grassland, forest zone by conduit pipe system.In solar power station Cooling water pipeline can be to needing cooling component such as generator, photovoltaic panel etc. cool down.
Certainly, well can also be arranged in other regions.
In the sand-fixing greening scheme of the utility model, a kind of with specifically providing the generating equipment that entirety is excellent base junction Structure, especially suitable for establishing wind light mutual complementing power generation station in desert, gobi border district.The electric energy that wind-powered electricity generation and solar energy generate uses Electronic power convertor progress is grid-connected, provides basic energy resource for the operation, control and maintenance of power equipment in station, excrescent electric power is used Accumulator is stored or is delivered to human lives region and is incorporated to public electric wire net, or carries out sand-fixing greening.Setting, which is irrigated, in standing uses Deep well provides the cooling water of power station operation using electric power in station and carries out thermal energy collecting, can additionally provide work people Member's domestic water.
The utility model provides practicable sand-fixing greening scheme.It, can by being formed after a certain region completes to afforest The ecosystem of self―sustaining.The sand-fixing greening scheme for gradually using the utility model, being capable of fast and effeciently Desert Control.
It is obvious to a person skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and And without departing substantially from the spirit or essential attributes of the utility model, it can realize that this practicality is new in other specific forms Type.Therefore, in all respects, the present embodiments are to be considered as illustrative and not restrictive, this practicality is new The range of type is indicated by the appended claims rather than the foregoing description, it is intended that containing in the equivalent requirements of the claims will be fallen All changes in justice and range are embraced therein.Any reference numeral in claim should not be considered as limitation Involved claim.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art The other embodiment being appreciated that.
The utility model is not limited to the above description to embodiment, and those skilled in the art disclose according to the utility model Content need not pass through improvement and modification that creative work is carried out on the basis of the utility model, all should be new in this practicality Within the protection domain of type.

Claims (1)

1. a kind of sand-fixing greening system based on wind-solar hybrid power generation station, it is characterised in that:
Include mainly sand-proof wall, forest zone, grassland, wind power generation module installation pedestal, solar electrical energy generation module installation region and water Well;
Wind power generation module installation pedestal is arranged close to sand-proof wall leeward side;
Forest zone, grassland and solar electrical energy generation module installation region are successively set on sand-proof wall leeward side;
The reinforcing bar of more cross arrangements for being partitioned into matrix form solar electrical energy generation module installation region on the ground;
Pile is buried at the cross one another position of reinforcing bar, reinforcing bar forms integral structure with pile;
Well is excavated in any solar electrical energy generation module installation region.
CN201720866738.5U 2017-07-17 2017-07-17 A kind of sand-fixing greening system based on wind-solar hybrid power generation station Expired - Fee Related CN207974586U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720866738.5U CN207974586U (en) 2017-07-17 2017-07-17 A kind of sand-fixing greening system based on wind-solar hybrid power generation station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720866738.5U CN207974586U (en) 2017-07-17 2017-07-17 A kind of sand-fixing greening system based on wind-solar hybrid power generation station

Publications (1)

Publication Number Publication Date
CN207974586U true CN207974586U (en) 2018-10-16

Family

ID=63770505

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720866738.5U Expired - Fee Related CN207974586U (en) 2017-07-17 2017-07-17 A kind of sand-fixing greening system based on wind-solar hybrid power generation station

Country Status (1)

Country Link
CN (1) CN207974586U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107227869A (en) * 2017-07-17 2017-10-03 安徽光鼎晶新能源科技有限公司 A kind of sand-fixing greening system based on wind-solar hybrid power generation station
CN114541469A (en) * 2022-03-01 2022-05-27 上海电力设计院有限公司 Flood control structure suitable for desert gobi terrain and construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107227869A (en) * 2017-07-17 2017-10-03 安徽光鼎晶新能源科技有限公司 A kind of sand-fixing greening system based on wind-solar hybrid power generation station
CN107227869B (en) * 2017-07-17 2020-03-31 合肥市智慧桥信息科技有限公司 Sand fixation and greening system based on wind-solar hybrid power station
CN114541469A (en) * 2022-03-01 2022-05-27 上海电力设计院有限公司 Flood control structure suitable for desert gobi terrain and construction method

Similar Documents

Publication Publication Date Title
Chen et al. Assessment of renewable energy reserves in Taiwan
CN103124845B (en) For the method and apparatus producing electric energy supplement
CN102322155B (en) Unconcerned table Great Wall extra large, multi-functional and Prevention of Sandstorm
Citiroglu et al. An approach to wave energy converter applications in Eregli on the western Black Sea coast of Turkey
CN207974586U (en) A kind of sand-fixing greening system based on wind-solar hybrid power generation station
CN107245995A (en) A kind of sand-fixing greening method based on wind-solar hybrid power generation station
CN107360751B (en) Sand-fixing greening method
CN107338805B (en) A kind of wind-solar hybrid power generation station foundation construction method
CN208023542U (en) A kind of sand-fixing greening system
CN101917139A (en) Method for railway and expressway photovoltaic power generation technology
Tansel et al. Solar energy harvesting at closed landfills: Energy yield and wind loads on solar panels on top and side slopes
CN206738072U (en) A kind of large-scale wind energy, which generates electricity, integrates steel tower system
CN207228149U (en) A kind of solar power plant foundation structure
CN107227869A (en) A kind of sand-fixing greening system based on wind-solar hybrid power generation station
CN107165183B (en) A kind of solar power plant foundation construction method
KR20120022419A (en) Step retaining wall structure having solar power generation function
CN207228140U (en) A kind of wind-solar hybrid power generation station foundation structure
CN107165184B (en) A kind of wind-solar hybrid power generation station foundation structure
CN107165189B (en) A kind of solar power plant foundation structure
CN107190723A (en) A kind of sand-fixing greening system
CN204928674U (en) Build solar photovoltaic power station on tailing storehouse
Weisensee et al. Integrated wind and solar qattara depression project with pumped storage as part of desertec
Katsaprakakis Energy storage for offshore wind farms
CN202672175U (en) Square-stone windproof and sand-stabilization tower footing structure
CN208028228U (en) A kind of earthing or grounding means of coastal high soil resistivity Wind turbines

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181016

Termination date: 20200717

CF01 Termination of patent right due to non-payment of annual fee