CN207974298U - Island staggered floor construction at the top of a kind of integrated wall plate - Google Patents

Island staggered floor construction at the top of a kind of integrated wall plate Download PDF

Info

Publication number
CN207974298U
CN207974298U CN201820252820.3U CN201820252820U CN207974298U CN 207974298 U CN207974298 U CN 207974298U CN 201820252820 U CN201820252820 U CN 201820252820U CN 207974298 U CN207974298 U CN 207974298U
Authority
CN
China
Prior art keywords
type
lead screw
wall plate
hanging piece
proximate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820252820.3U
Other languages
Chinese (zh)
Inventor
杨建中
刘鑫荣
王枝悦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Dingshang Integrated Home Furnishing Co ltd
Original Assignee
Zhejiang Dingshang Intelligent Household Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Dingshang Intelligent Household Co Ltd filed Critical Zhejiang Dingshang Intelligent Household Co Ltd
Priority to CN201820252820.3U priority Critical patent/CN207974298U/en
Application granted granted Critical
Publication of CN207974298U publication Critical patent/CN207974298U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

Island staggered floor construction and installation method at the top of a kind of integrated wall plate, the panel structure is divided into upper layer and lower layer, superstructure is made of A proximate matters, Type B material, two blocks of wallboards, lead screw, metope height beam installation hanging piece and fixing nut, one end of the A proximate matters and Type B material respectively comes with 90 degree of U-type grooves, there are one the rectangular slot with opening, the other ends the transverse slat of stretching for laterally inboard;One end cuboid and the laterally inboard rectangular slot of A proximate matters and Type B material of the metope height beam installation hanging piece are respectively cooperating with, and the other end carries the circular hole coordinated with lead screw.

Description

Island staggered floor construction at the top of a kind of integrated wall plate
Technical field
The utility model is related to a kind of installation methods of island staggered floor construction in integrated wall plate top simplifying installation, belong to Integrated wall plate technical field.
Background technology
Currently, in integrated wall plate field, to realize that this structure generally uses following two modes:
First, doing gypsum top, cost is higher, and material is gypsum, and moisture resistivity is poor, and usage time has been grown and has been easy to take off later It falls.
Second is that needing to beat wooden frame in advance, then wallboard rifle is followed closely into nail on wooden frame, not only wastes material in this way, and It takes long, working hour is more, high labor cost.
Invention content
The purpose of the utility model is to overcome the shortcomings of the prior art, and offer is a kind of simple in structure, can simplify Mounting structure reduces installation operation degree-of-difficulty factor, reduces labor intensity, island staggered floor in reducing at the top of the integrated wall plate of waste of material The installation method of structure.
The purpose of this utility model is completed by following technical solution, at the top of a kind of integrated wall plate in island staggered floor knot Structure, the panel structure are divided into upper layer and lower layer, and superstructure is by A proximate matters, Type B material, two blocks of wallboards, lead screw, metope height beam Hanging piece is installed and fixing nut forms, one end of the A proximate matters and Type B material respectively comes with 90 degree of U-type grooves, and laterally inboard also has one A rectangular slot with opening, the other end have the transverse slat of stretching;One end cuboid and A of the metope height beam installation hanging piece The laterally inboard rectangular slot of proximate matter and Type B material is respectively cooperating with, and the other end carries the circular hole coordinated with lead screw;The wallboard by By two opposite 90 degree of U-type groove plugged and fixeds, the A proximate matters and Type B material pass through the silk on the outside of proximate matter for A proximate matters A and Type B material Bar, metope height beam installation hanging piece and fixing nut are fixed, and the lead screw is fixed on the ceiling by swell fixture;
The understructure is by four Type B materials, two blocks of straight wall plates, one piece of cross wall plate, lead screw, screw connecting piece, metope It is the rectangular sheet of thickness 1mm that height beam, which installs hanging piece and fixing nut composition, the screw connecting piece, is had multiple identical straight The circular hole of diameter coordinates with lead screw or bolt, and the straight wall plate is consolidated by two Type B materials by two opposite 90 degree of U-type groove grafting Fixed, the Type B material installs hanging piece by lead screw, the metope height beam on the inside of proximate matter and fixing nut is fixed, and passes through lead screw Connector connects symmetrical part, and the cross wall plate is placed on the transverse slat that the two Type B materials in downside left and right stretch out;
The superstructure and understructure are by being located at the Type B of upside in Type B material in superstructure, understructure Material is connected with the cross wall plate for being placed between the two, and the lead screw in understructure is used in combination to withstand;The wallboard overall structure passes through The L-type corner brace snapped onto on A proximate matters and Type B material is fixed on the front-back wall in channel.
The utility model change is fixing wallboard by proximate matter, forms the structure and shape of wallboard, it is no longer necessary in addition beat Wooden frame or plasterboard.
The utility model has simple in structure, can simplify mounting structure, reduce installation operation degree-of-difficulty factor, reduce and work by force The features such as degree, reduction waste of material.
Description of the drawings
Fig. 1 is integrated wall plate overall structure appearance sectional view described in the utility model.
Fig. 2 is integrated wall plate overall structure sectional view described in the utility model.
Fig. 3 is the structural schematic diagram of integrated wall plate special-purpose section A described in the utility model.
Fig. 4 is the structural schematic diagram of integrated wall plate special-purpose section B described in the utility model.
Specific implementation mode
The utility model is described in detail below in conjunction with attached drawing:As shown in Figs 1-4, one kind described in the utility model Island staggered floor construction at the top of integrated wall plate, the panel structure are divided into upper layer and lower layer, superstructure by A proximate matters 1, Type B material 31, 32, two blocks of wallboards 21,22, lead screw 41, metope height beam installation hanging piece 6 and fixing nut 7 form, the A proximate matters 1 and Type B material 31,32 one end respectively comes with 90 degree of U-type grooves, and there are one the rectangular slot with opening, the other ends stretching for laterally inboard Transverse slat;One end cuboid and the laterally inboard of A proximate matters 1 and Type B material 31,32 of the metope height beam installation hanging piece 6 are rectangular Shape slot is respectively cooperating with, and the other end carries the circular hole coordinated with lead screw 41;The wallboard 21,22 is by A proximate matters 1 and Type B material 31,32 By two opposite 90 degree of U-type groove plugged and fixeds, the A proximate matters 1 and Type B material 31,32 pass through lead screw 41, the wall on the outside of proximate matter Face height beam installation hanging piece 6 and fixing nut 7 are fixed, and the lead screw 41 is fixed on the ceiling by swell fixture;
The understructure is connected by four 33, two blocks of Type B material, 23, one blocks of straight wall plate cross wall plates 24, lead screw 42, lead screw Part 5, metope height beam installation hanging piece 6 and fixing nut 7 form, and the screw connecting piece 5 is the rectangular sheet of thickness 1mm, The circular hole and lead screw 42 or bolt for having multiple same diameters coordinate, and the straight wall plate 23 passes through two by two Type B materials 32,33 90 degree of opposite U-type groove plugged and fixeds, the Type B material 33 install hanging piece 6 by lead screw 41, the metope height beam on the inside of proximate matter And fixing nut 7 is fixed, and connected symmetrical part by screw connecting piece 5, it is left that the cross wall plate 24 is placed in downside On the transverse slat that right two Type B materials 33 stretch out;
The superstructure and understructure are by being located at the B of upside in Type B material 32 in superstructure, understructure Proximate matter 33 and the cross wall plate 24 being placed between the two connect, and the lead screw 42 being used in combination in understructure is withstood;The wallboard is whole Structure is fixed on by the L-type corner brace 8 snapped onto on A proximate matters 1 and Type B material 31 on the front-back wall in channel.
The installation method of island staggered floor construction at the top of a kind of integrated wall plate as described above, the installation method includes as follows Step:
a)Superstructure passes through metope by A proximate matters, Type B material and the two blocks of wallboards of four root long degree customized good length as needed Height beam installation hanging piece, lead screw connect composition with fixing nut, and the smallpox on roof is then fixed on by lead screw and swell fixture On plate, the height of superstructure is adjusted by the height of wallboard, is used in combination L-type corner brace that A proximate matters and Type B material are fixed on two abutment walls On;
b)It is another that two Type B materials is taken to be fixedly connected by metope height beam installation hanging piece, lead screw and fixing nut with straight wall plate, The right corresponding portion is installed according to same steps, and then left and right two parts are connected with two screw connecting pieces, and cross wall plate is placed in On the transverse slat that the two Type B materials in downside or so stretch out, the height of superstructure is adjusted by the height of wallboard;
c)The Type B material in superstructure, the Type B material that is located at upside in understructure are connected by another block of cross wall plate again Connect, the lead screw in understructure be used in combination to withstand cross wall plate, the right corresponding portion is installed according to same steps, complete superstructure and The connection of understructure is fixed four Type B materials on the wall with L-type corner brace.
In the step a), the height of integrally-built total length and superstructure is calculated;Every A proximate matter and B Proximate matter need to determine with accessory, the quantity of lead screw and spacing by the respective length of A proximate matters and Type B material, of length no more than 2 meters, match Two lead screws and its respective accessory are fixed, and every special-purpose section length is more than 2 meters, are often increased by 1.5 meters, are then further added by lead screw 1 Root and respective accessory are fixed;More than three meters, using two special-purpose sections, connected with plane link plate;
In the step c), the Specific construction of understructure is:The width and height of understructure are calculated, then by cross wall Plate one end is tilted a certain angle, and is inserted into the Type B material of side, then the other end is inserted into the Type B material of the other side.
Embodiment:Shown in Fig. 1-4, at the top of a kind of integrated wall plate described in the utility model in island staggered floor construction, actually For a kind of two layers of panel structure, the integrated wall plate is mainly made of special-purpose section and wallboard, including:A proximate matters 1, wallboard 21,22,23,24, Type B material 31,32,33, lead screw 41,42, screw connecting piece 5, metope height beam installation hanging piece 6, fixing nut 7, L-type corner brace 8.
According to size, corresponding lead screw, proximate matter, wallboard are decided.
First fixing nut 7 and metope height beam installation hanging piece 6 are set on lead screw 41, wouldn't be fixed.
Wallboard 21 is put into the U-type groove of A proximate matters 1 and Type B material 31, fixing nut 7 is locked, A proximate matters 1 and Type B material 31 is connected Connect fixation;Lead screw 41 is fixed on the ceiling on roof with swell fixture, then, with L-type corner brace 8 by A proximate matters 1 and Type B material 31 fix on the wall;The right corresponding portion is installed by same steps.Again by screw connecting piece 5, metope height beam installation hanging piece 6, Fixing nut 7 is set on lead screw 42, wouldn't be fixed.
Wallboard 23 is put into the U-type groove of two Type B materials 32,33, is connected two Type B materials 32,33 by lead screw 42, with fixation Nut 6 is fixed.
Wallboard 22 is placed in the centre of two Type B materials 32,31, lead screw 42 is used in combination to withstand;The right corresponding portion is according to being synchronised Rapid installation, is connected the right and left with screw connecting piece 5;It is finally inserted wallboard 24, is consolidated two Type B materials 32,33 with L-type corner brace 8 Determine on the wall.

Claims (1)

1. island staggered floor construction at the top of a kind of integrated wall plate, the panel structure are divided into upper layer and lower layer, superstructure is by A types Material, Type B material, two blocks of wallboards, lead screw, metope height beam installation hanging piece and fixing nut composition, it is characterised in that the A proximate matters and One end of Type B material respectively comes with 90 degree of U-type grooves, and there are one the rectangular slot with opening, the other ends stretching for laterally inboard Transverse slat;One end cuboid of the metope height beam installation hanging piece is distinguished with the laterally inboard rectangular slot of A proximate matters and Type B material Cooperation, the other end carry the circular hole coordinated with lead screw;The wallboard is U-shaped by two opposite 90 degree by A proximate matters A and Type B material Slot plugged and fixed, the A proximate matters and Type B material install hanging piece and fixing nut by lead screw, the metope height beam on the outside of proximate matter Fixed, the lead screw is fixed on the ceiling by swell fixture;
The understructure is by four Type B materials, two blocks of straight wall plates, one block of cross wall plate, lead screw, screw connecting piece, metope height It is the rectangular sheet of thickness 1mm that beam, which installs hanging piece and fixing nut composition, the screw connecting piece, there is multiple same diameters Circular hole and lead screw or bolt coordinate, the straight wall plate by two Type B materials by two opposite 90 degree of U-type groove plugged and fixeds, The Type B material installs hanging piece by lead screw, the metope height beam on the inside of proximate matter and fixing nut is fixed, and is connected by lead screw Part connects symmetrical part, and the cross wall plate is placed on the transverse slat that the two Type B materials in downside left and right stretch out;
The superstructure and understructure by be located in Type B material in superstructure, understructure upside Type B material and It is placed in cross wall plate connection between the two, the lead screw in understructure is used in combination to withstand;The wallboard overall structure passes through snapping L-type corner brace on A proximate matters and Type B material is fixed on the front-back wall in channel.
CN201820252820.3U 2018-02-12 2018-02-12 Island staggered floor construction at the top of a kind of integrated wall plate Active CN207974298U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820252820.3U CN207974298U (en) 2018-02-12 2018-02-12 Island staggered floor construction at the top of a kind of integrated wall plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820252820.3U CN207974298U (en) 2018-02-12 2018-02-12 Island staggered floor construction at the top of a kind of integrated wall plate

Publications (1)

Publication Number Publication Date
CN207974298U true CN207974298U (en) 2018-10-16

Family

ID=63767582

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820252820.3U Active CN207974298U (en) 2018-02-12 2018-02-12 Island staggered floor construction at the top of a kind of integrated wall plate

Country Status (1)

Country Link
CN (1) CN207974298U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108265858A (en) * 2018-02-12 2018-07-10 浙江顶上智能家居股份有限公司 Island staggered floor construction and installation method at the top of a kind of integrated wall plate

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108265858A (en) * 2018-02-12 2018-07-10 浙江顶上智能家居股份有限公司 Island staggered floor construction and installation method at the top of a kind of integrated wall plate
CN108265858B (en) * 2018-02-12 2023-08-25 浙江顶上集成家居股份有限公司 Island staggered layer structure at top of integrated wallboard and mounting method

Similar Documents

Publication Publication Date Title
CN201598791U (en) Dry-hang dale keel
CN207974298U (en) Island staggered floor construction at the top of a kind of integrated wall plate
CN207553403U (en) The mounting assembly of Architecture Outer Curtain Wall
CN111980208B (en) Mounting structure of assembled wallboard
CN206585292U (en) A kind of adjustable Fast Installation Built-in terminal box
CN108265858A (en) Island staggered floor construction and installation method at the top of a kind of integrated wall plate
CN108643421A (en) Trellis system on the outside of glass curtain wall
CN206510286U (en) SMC moulds for producing double reinforcement panel structures
CN201546405U (en) Wallboard mounting and fixing device
CN214658451U (en) Clip type wall surface quick leveling structure
CN208267090U (en) A kind of light cement prefab conducive to installation and transportation
CN108019016B (en) Bamboo wood plastic external wall board
CN203654665U (en) Mounting structure for decoration wall boards of autoclaved aerated concrete block walls
CN209429343U (en) A kind of plate-jointing structure of concealed frame glass curtain wall
CN209686750U (en) A kind of stair protective device of scalable sizing
CN209260990U (en) Cell curtain wall
CN208934214U (en) A kind of stone curtain wall fixed structure
CN207974424U (en) A kind of mounting device of strip panel
CN203160526U (en) Curtain wall plate with adjacent associated connection structures
CN108442636B (en) Top high-low staggered floor mounting structure of integrated wall panel
CN207227971U (en) A kind of combined concrete template system
CN218406211U (en) Assembled kitchen wall connecting piece of making level
CN201129020Y (en) Construction bracket for building board
CN219548089U (en) Novel metal surface composite partition plate keel
CN210597970U (en) Dado erection joint device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230508

Address after: 314001, 1st Floor, Building 1, East Side of Jing'er Road, Yuxin Town, Nanhu District, Jiaxing City, Zhejiang Province

Patentee after: Zhejiang Dingshang Integrated Home Furnishing Co.,Ltd.

Address before: 314000 Building 8, east of Jinger Road, Yuxin Town, Nanhu District, Jiaxing City, Zhejiang Province

Patentee before: ZHEJIANG DING-SHANG SMART HOME FURNISHING Co.,Ltd.