CN207974125U - Expansive soil slope intelligent early-warning and guard system - Google Patents
Expansive soil slope intelligent early-warning and guard system Download PDFInfo
- Publication number
- CN207974125U CN207974125U CN201721340064.1U CN201721340064U CN207974125U CN 207974125 U CN207974125 U CN 207974125U CN 201721340064 U CN201721340064 U CN 201721340064U CN 207974125 U CN207974125 U CN 207974125U
- Authority
- CN
- China
- Prior art keywords
- slope
- expansive soil
- soil slope
- moisturizing
- expansive
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
- Testing Or Calibration Of Command Recording Devices (AREA)
- Emergency Alarm Devices (AREA)
Abstract
The utility model discloses a kind of expansive soil slope intelligent early-warning and guard systems, including:Vegetation is layed in expansive soil slope surface;Distribution type fiber-optic tester;Cracking situation for detecting expansive soil slope;Information collecting device, the characterization for detecting expansive soil slope soil;Communication apparatus is used for transmission data with described, information collecting device data connection;Water replanishing device comprising cistern and moisturizing band, the moisturizing band are connected to the cistern, and the moisturizing band is uniformly layed on expansive soil slope, and the moisturizing band is equipped with multiple water outlets;And signal processing system carries out analyzing processing with the communication apparatus, water replanishing device data connection to the data received.The system of the utility model, can monitor side slope surface crack situation, and Real-time Feedback is also carried out for the deformation inside side slope;Expansion slight slope can be regulated and controled by remote control water replanishing device, monitoring has timeliness.
Description
Technical field
The utility model is related to side slope protection field, more particularly to a kind of expansive soil slope intelligent early-warning and guard system.
Background technology
With the rapid development of social economy, the engineerings such as civil engineering, water conservancy and traffic build to have obtained swift and violent development;But
In the construction of engineering, many inevitable disasters can be inevitably encountered, for example landslide disaster, especially in expansive soil slope
In construction, meet moat that must slide, Around resident personal safety and the economic development of locality bring huge loss.
Swelled ground is a kind of cohesive soil of particularity, and the sliding of slight slope, which is generally initially carried out by crack, to be caused, and is then gone here and there
Logical weak structural face forms continuous sliding surface, and then generates landslide.Swelled ground its with water swelling, the characteristic of dehydration shrinkage, when
When moisture content changes, volume can also occur significantly to change therewith immediately.Expansive soil slope has apparent seasonality,
In period in rainy season, the moisture content of soil property persistently increases in expansive soil slope, in turn results in soil softening, shearing strength is caused to drop rapidly
It is low.The moisture evaporation of soil property makes the moisture content rapid decrease of expansive soil slope in period of drought, expansive soil slope, this makes
Expansive soil slope surface generates rapidly fine cracks, these cracks are although small, but quantity is more, is distributed in each angle of slope surface
It falls, easy to form complicated Fracture Networks, at rainy season, rainwater is flowed by crack inside slight slope, and then softening inside leads to slight slope
The possibility for generating landslide increases.And in China, swelled ground distribution is very wide, and existing China is still in developing period, development
Dynamics goes from strength to strength with the development of the times, grand especially for realization " two 100 years " is planned, and realizes to shake off poverty and assault fortified position
The notable swell-shrink characteristic of great target, expansive soil slope brings serious security risk to the design of engineering, construction and operation.Cause
This, it is necessary to effectively monitoring and safeguard procedures are carried out to expansive soil slope.
From the point of view of the guard technology of current expansive soil slope, mainly there is physics for the protection of the side slope of swelled ground, changes
The method for strengthening such as, biology, commonly use at home the measure of processing expansive soil slope mainly it is artificial be laid with geomembrane, change fill out, supporting and retaining system
Deng, on the one hand primarily to avoid influence of the rainwater to swelled ground, on the other hand by huge retaining structure side slope into
Row supporting and retaining system further maintains the stability of side slope.But such methods are higher for the material requirements of laying, and soil removal enginnering amount is big,
Labour is big, and economy is undesirable.
Mainly based on personal monitoring, it is backward, data information to have technological means for traditional expansive soil slope monitoring
The features such as acquisition is difficult and the accuracy of acquisition of information is not high, the measuring point period is long, time-consuming and laborious, poor in timeliness.Personal monitoring
It can only find that the more apparent exception in side slope surface shows in the process, can not find side slope interior change situation, and artificial
Rugged environment may be met in monitoring process, while (heavy rain, earthquake) expansive soil slope easily occurs under rugged environment
Unstability and wreck, make monitoring that can not carry out.
The information for being disclosed in the background technology part is merely intended to increase the understanding to the general background of the utility model, and
It is not construed as recognizing or implying in any form that information composition has been existing well known to persons skilled in the art
Technology.
Utility model content
The purpose of this utility model is to provide a kind of expansive soil slope intelligent early-warning and guard systems, artificial to overcome
Monitor time-consuming and laborious, of high cost, the unconspicuous disadvantage of protection effect.
To achieve the above object, the utility model provides a kind of expansive soil slope intelligent early-warning and guard system, including:
Vegetation comprising a variety of green plantss are layed in expansive soil slope surface;Distribution type fiber-optic tester is set to swelled ground side
On slope, the cracking situation for detecting expansive soil slope;Information collecting device is set on expansive soil slope, swollen for detecting
The characterization of swollen soil side slope soil;Communication apparatus is used with the distribution type fiber-optic tester, information collecting device data connection
In transmission data;Water replanishing device comprising cistern and moisturizing band, the moisturizing band are connected to the cistern, the moisturizing
Band is uniformly layed on expansive soil slope, and the moisturizing band is equipped with multiple water outlets;And signal processing system, lead to described
Equipment, water replanishing device data connection are interrogated, analyzing processing is carried out to the data received;Wherein, according to the signal processing system
The setting value of middle setting expansive soil slope cracking water content, control water replanishing device carry out moisturizing to expansive soil slope.
Preferably, in above-mentioned technical proposal, described information collecting device includes camera, pore pressure meter, distribution type fiber-optic survey
Try instrument and inclinometer.
Preferably, in above-mentioned technical proposal, the water replanishing device further includes constant pressure supply water mechanism, the constant pressure supply water mechanism
It is connect with the cistern.
Preferably, in above-mentioned technical proposal, the slope soil internal fissure of the signal processing system setting is 1-3mm,
When beyond setting value, signal processing system sends out alarm.
A method of side slope protection being carried out using expansive soil slope intelligent early-warning and guard system, is included the following steps:
(1) in the green plants of expansive soil slope surface grafting different cultivars;
(2) by pore pressure meter, distribution type fiber-optic tester, inclinometer instrument embedding in slight slope surface layer and inside, camera peace
Top mounted in side slope surface;
(3) communication apparatus is installed;
(4) water replanishing device is installed, in side slope surface broken line moisturizing band arranged in a crossed manner, moisturizing band is connected to cistern, along
On the inclined direction of side slope, a plurality of drainage channel is offered, gutter is equipped with below side slope, gutter connects with drainage channel
It is logical;
(5) it is connect by signal processing system and the information received is subjected to analyzing processing.
Preferably, the green plants Bermuda grass planted in the step (1) in above-mentioned technical proposal and paspalum notatum.
Preferably, in above-mentioned technical proposal, the seed amount of broadcasting for the green plants planted in the step (1) is 25-30g/ ㎡.
Compared with prior art, the utility model has the advantages that:
(1) the expansive soil slope intelligent early-warning and guard system of the utility model, the green plants that expansion slight slope upper berth is set
The guard system of a green ecological, wide, the selected green plants of the cover plant range of green plants are constituted with limit pressure water feeding equipment
It can be well adapted for changeable, complicated natural environment, there is indomitable vitality especially under rainstorm weather and dry weather,
Constant pressure supply water system can control air humidity and soil temperature and can be risen to slight slope and be well protected against effect;With light in a distributed manner on slight slope
Fine tester and corresponding photographic device and all kinds of field data harvesters form protection early warning with above-mentioned guard system
Integral system can monitor slight slope on a large scale;The alarming devices such as set alarm can effectively in real time to slight slope into
Row monitoring and warning and make protection.This system is not only the crack situation on monitoring side slope surface, the deformation inside side slope
Also it is fed back in real time.
(2) system of the utility model, environmentally protective, the plantation of green plants can not only prevent slope wash, effectively
The drying and watering cycle for preventing side slope, the protection for expanding slight slope play a good role, and also help greening.The utility model
Middle limit pressure water feeding equipment, distribution type fiber-optic tester and field data acquisition system combinative prevention system form preferably pre-
Alert and protection integrated, rather than protect, monitor separated carry out.Side slope surface crack situation is not only monitored, for side slope inside
Deformation also carry out Real-time Feedback;Can be by remote control constant pressure water compensation apparatus to regulate and control to expansion slight slope, monitoring has
Timeliness, cost of labor spend few, economy height, conducive to environmental protection.
Description of the drawings
Fig. 1 is the schematic diagram of expansive soil slope intelligent early-warning and guard system according to the present utility model.
Fig. 2 is expansive soil slope surface arrangement schematic diagram according to the present utility model.
Specific implementation mode
Below in conjunction with the accompanying drawings, specific embodiment of the present utility model is described in detail, it is to be understood that this practicality
Novel protection domain is not restricted by specific implementation.
Unless otherwise explicitly stated, otherwise in entire disclosure and claims, term " comprising " or its change
It changes such as "comprising" or " including " etc. and will be understood to comprise stated element or component, and do not exclude other members
Part or other component parts.
As shown in Figs. 1-2, according to a kind of expansive soil slope intelligent early-warning of specific embodiment of the present invention and protection
System, vegetation (not shown), distribution type fiber-optic tester 1, information collecting device 2 (including camera, pore pressure meter, inclinometer),
Communication apparatus 3, water replanishing device 4 and signal processing system 5.Distribution type fiber-optic tester 1 is set on expansive soil slope, for detecting
The fracture width of the soil of expansive soil slope;Information collecting device 2 is set on expansive soil slope, for detecting expansive soil slope soil
The characterization of earth.Camera shooting is carried out using monitoring camera side slope situation to photograph to record, and uses distribution type fiber-optic to detect side simultaneously
Slope inside soil body crack and temperature.Communication apparatus 3 is GPRS communication apparatus, communication apparatus and distribution type fiber-optic tester 1, letter
2 data connection of collecting device is ceased, data are used for transmission.Communication apparatus 3 and 4 data connection of signal processing system, GPRS communications are set
It is subject to analyzing processing for collected signal is propagated to signal processing system 4, analysis result is exported over the display.Signal
Processing system 5 carries out analyzing processing to the data received.Water replanishing device 4 and 5 data connection of signal processing system.Water replanishing device
4 include cistern 41 and moisturizing band 42, and moisturizing band 42 is connected to cistern 41, and moisturizing band 42 is uniformly layed in expansive soil slope 6
On, moisturizing band is equipped with multiple water outlets.Cistern 41 is connect with constant pressure supply water mechanism.Constant pressure supply water mechanism and signal processing system
5 data connections.
When output result is then considered safe less than setting value (1~3mm of slope soil internal fissure setting value);When defeated
Going out value, then alarm sends out alarm higher than setting value, and staff makes an immediate response, by the live slight slope photo of captured in real-time and
The information material (such as detection case in distribution type fiber-optic side slope inside soil body crack, temperature) of collection in worksite does manual analysis
(being quantified undisturbed unsaturated expansive soils surface, internal crack and aqueous magnitude relation using binaryzation pixels statistics method) carries out safety
Assessment controls constant pressure water compensation apparatus 4 to stablize the wet of slight slope if expansion slight slope humidity is excessive or too small during security evaluation
Degree, preventing slight slope from generating multiple cracking causes to generate landslide.
A method of side slope protection being carried out using expansive soil slope intelligent early-warning and guard system, is included the following steps:
(1) in the green plants of expansive soil slope surface grafting different cultivars;
Specifically, in expansion slight slope upper berth kind green plants, wherein green plants can intersect plantation Bermuda grass and paspalum notatum
(broadcasting seed amount 25-30g/ ㎡), paspalum notatum cross growth, Bermuda grass longitudinal growth, the crisscross growth of growing area form good
Moisturizing, keeping warmth space make soil be in suitable humidity and temperature.Using the transpiration of green plants, (its process is:Expansion
Moisture → root hair → root inner catheter → stem inner catheter → leaf inner catheter → stomata → air in soil) and plant stem-leaf retention
Effect so that swelled ground is stable at certain moisture, is unlikely to occur breathing variation and generates crack to eventually lead to slope instability.
(2) by pore pressure meter, distribution type fiber-optic tester, inclinometer instrument embedding in slight slope surface layer and inside;It uses simultaneously
Distribution type fiber-optic detects slope soil internal fissure and temperature, and camera is mounted on the top on side slope surface;
(3) communication apparatus is installed, communication apparatus is installed on slight slope surface layer, and be aided with steam-electric power plant to communication apparatus
Electric energy supplement;
(4) water replanishing device is installed, in side slope surface broken line moisturizing band 41 arranged in a crossed manner, moisturizing band 42 connects with cistern 41
It is logical, along on 6 inclined direction of side slope, offer a plurality of drainage channel 61, be equipped with gutter 62 below side slope, gutter with
Drainage channel is connected to.Being laid with moisturizing band makes growing area 63 be completely within the scope of moisturizing, while cistern is arranged and is filled for moisturizing
It sets and draws water and certain row's storage can be played in rainy season.Matched constant pressure supply water mechanism can realize remote control, and moisturizing fills
It is not disposably to pour into the short time to set in operation, small to directly affecting for ground temperature, and can reduce air humidity and tie up
It holds in a certain range, can thus prevent the swelled ground soil body from generating crack so that the side slope swelled ground soil body is more stable.
(5) it is connect by signal processing system and the information received is subjected to analyzing processing.Specific control is analyzed as follows:
When output result is then considered safe less than setting value (1~3mm of slope soil internal fissure setting value);When defeated
Going out value, then alarm sends out alarm higher than setting value, and staff makes an immediate response, by the live slight slope photo of captured in real-time and
The information material (such as detection case in distribution type fiber-optic side slope inside soil body crack, temperature) of collection in worksite does manual analysis
(being quantified undisturbed unsaturated expansive soils surface, internal crack and aqueous magnitude relation using binaryzation pixels statistics method) carries out safety
Assessment controls constant pressure water compensation apparatus 5 to stablize the wet of slight slope if expansion slight slope humidity is excessive or too small during security evaluation
Degree, preventing slight slope from generating multiple cracking causes to generate landslide.
In period of drought, when swelled ground excessively drying is also easy to produce crack, constant pressure water compensation apparatus is automatically turned on to maintain at this time
The humidity and temperature of swelled ground;In, light rain period, due to the imbibition characteristic volume change after absorbing water of swelled ground, supervise at this time
Control room alarm is limited to:Slope soil internal fissure is 1~3mm, and when alarm is sent out, constant pressure water compensation apparatus is automatically closed, cistern
The storage effect of the row of performance.When to torrential rain period, extra moisture can be by the drainage channel and draining ditch water discharge of side slope, in moisturizing
Nearby setting cistern, the water of discharge can flow into cistern or be discharged to road surface 7 band.Warning line is set in cistern,
Alarm is sent out to monitoring center when water storage pool water level reaches warning line, while the realtime graphic situation of expansive soil slope being sent
To monitoring center to do further assessment.
The description of the aforementioned specific exemplary embodiment to the utility model is in order to illustrate and illustration purpose.These
Description is not wishing to for the utility model to be limited to disclosed precise forms, and it will be apparent that according to the above instruction, can carry out
Many change and variations.The purpose of selecting and describing the exemplary embodiment is that explaining the specific principle of the utility model
And its practical application, so that those skilled in the art can realize and utilize a variety of different examples of the utility model
Property embodiment and various chooses and changes.The scope of the utility model is intended to by claims and its waits similar shapes
Formula is limited.
Claims (4)
1. a kind of expansive soil slope intelligent early-warning and guard system, which is characterized in that including:
Vegetation comprising a variety of green plantss are layed in expansive soil slope surface;
Distribution type fiber-optic tester is set on expansive soil slope, the fracture width of the soil for detecting expansive soil slope;
Information collecting device is set on expansive soil slope, the characterization for detecting expansive soil slope soil;
Communication apparatus is used for transmission data with described information collecting device data connection;
Water replanishing device comprising cistern and moisturizing band, the moisturizing band are connected to the cistern, and the moisturizing band is uniformly spread
On expansive soil slope, the moisturizing band is equipped with multiple water outlets;And
Signal processing system carries out at analysis the data received with the communication apparatus, water replanishing device data connection
Reason;Wherein, according to the setting value for setting expansive soil slope fracture width in the signal processing system, control water replanishing device is to swollen
Swollen soil side slope carries out moisturizing.
2. expansive soil slope intelligent early-warning according to claim 1 and guard system, which is characterized in that described information acquires
Equipment includes camera, pore pressure meter, distribution type fiber-optic tester and inclinometer.
3. expansive soil slope intelligent early-warning according to claim 1 and guard system, which is characterized in that the water replanishing device
Further include constant pressure supply water mechanism, the constant pressure supply water mechanism is connect with the cistern.
4. expansive soil slope intelligent early-warning according to claim 1 and guard system, which is characterized in that the signal processing
The slope soil internal fissure of system setting is 1-3mm, and when exceeding setting value, signal processing system sends out alarm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721340064.1U CN207974125U (en) | 2017-10-18 | 2017-10-18 | Expansive soil slope intelligent early-warning and guard system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721340064.1U CN207974125U (en) | 2017-10-18 | 2017-10-18 | Expansive soil slope intelligent early-warning and guard system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207974125U true CN207974125U (en) | 2018-10-16 |
Family
ID=63770912
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721340064.1U Active CN207974125U (en) | 2017-10-18 | 2017-10-18 | Expansive soil slope intelligent early-warning and guard system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207974125U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107916672A (en) * | 2017-10-18 | 2018-04-17 | 广西大学 | Expansive soil slope intelligent early-warning and guard system |
CN114960697A (en) * | 2022-06-06 | 2022-08-30 | 中国电建集团昆明勘测设计研究院有限公司 | Hot and dry river valley area highway structure with water-holding scour prevention function |
-
2017
- 2017-10-18 CN CN201721340064.1U patent/CN207974125U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107916672A (en) * | 2017-10-18 | 2018-04-17 | 广西大学 | Expansive soil slope intelligent early-warning and guard system |
CN114960697A (en) * | 2022-06-06 | 2022-08-30 | 中国电建集团昆明勘测设计研究院有限公司 | Hot and dry river valley area highway structure with water-holding scour prevention function |
CN114960697B (en) * | 2022-06-06 | 2023-04-11 | 中国电建集团昆明勘测设计研究院有限公司 | Hot and dry river valley area highway structure with water-holding scour prevention function |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Arnaez et al. | Factors affecting runoff and erosion under simulated rainfall in Mediterranean vineyards | |
Fan et al. | Estimating groundwater recharge and evapotranspiration from water table fluctuations under three vegetation covers in a coastal sandy aquifer of subtropical Australia | |
Ghimire et al. | Negative trade-off between changes in vegetation water use and infiltration recovery after reforesting degraded pasture land in the Nepalese Lesser Himalaya | |
Brown et al. | Surface vegetation controls on evapotranspiration from a sub‐humid Western Boreal Plain wetland | |
Kirkby | Modelling the links between vegetation and landforms | |
Chi et al. | Multi-temporal characterization of land surface temperature and its relationships with normalized difference vegetation index and soil moisture content in the Yellow River Delta, China | |
Kato et al. | Field measurement of infiltration rate using an oscillating nozzle rainfall simulator in the cold, semiarid grassland of Mongolia | |
Likitlersuang et al. | Performance of geosynthetic cementitious composite mat and vetiver on soil erosion control | |
CN105325226A (en) | Stripped live plant fence type sand-barrier protection system planting method | |
CN109858142A (en) | A kind of ecological replacement dykes and dams based on big data | |
Van Schaik et al. | The influence of preferential flow on hillslope hydrology in a semi‐arid watershed (in the Spanish Dehesas) | |
Bowling et al. | Evaluation of the effects of forest roads on streamflow in Hard and Ware Creeks, Washington | |
Rodrigo-Comino et al. | Temporal changes in soil water erosion on sloping vineyards in the Ruwer-Mosel Valley. The impact of age and plantation works in young and old vines | |
Klinge et al. | Modeling forest lines and forest distribution patterns with remote-sensing data in a mountainous region of semiarid central Asia | |
Xiaomei et al. | A study of the relationship between vegetation growth and groundwater in the Yinchuan Plain | |
Mangala et al. | Study of infiltration capacity of different soils | |
CN207974125U (en) | Expansive soil slope intelligent early-warning and guard system | |
CN102661842A (en) | Method and device for quantitatively estimating annual soil wind-erosion amount | |
CN107916672A (en) | Expansive soil slope intelligent early-warning and guard system | |
Turunen et al. | Effects of terrain slope on long-term and seasonal water balances in clayey, subsurface drained agricultural fields in high latitude conditions | |
Pirastru et al. | Subsurface flow and large-scale lateral saturated soil hydraulic conductivity in a Mediterranean hillslope with contrasting land uses | |
Ben-Asher et al. | Runoff irrigation | |
Gregory et al. | Large‐scale rainfall simulation over shallow caves on karst shrublands | |
Suo et al. | Stochastic modelling of soil water dynamics and sustainability for three vegetation types on the Chinese Loess Plateau | |
CN102138467A (en) | Measure for promoting vegetation in cold regions to restore rapidly |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |