CN207959712U - Novel fabricated bamboo and wood-concrete combination beam - Google Patents
Novel fabricated bamboo and wood-concrete combination beam Download PDFInfo
- Publication number
- CN207959712U CN207959712U CN201721621614.7U CN201721621614U CN207959712U CN 207959712 U CN207959712 U CN 207959712U CN 201721621614 U CN201721621614 U CN 201721621614U CN 207959712 U CN207959712 U CN 207959712U
- Authority
- CN
- China
- Prior art keywords
- bamboo
- wood
- concrete
- buried
- novel fabricated
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Rod-Shaped Construction Members (AREA)
Abstract
The utility model discloses a kind of novel fabricated bamboo and wood concrete combination beams, it is characterised in that:Pre-buried bamboo and wood block (2) in precast slab (1);The drilling in pre-buried bamboo and wood block (2) and bamboo and wood beam (3) is combined precast slab (1) and bamboo and wood beam (3) by being inserted into compound shear connector (4);The compound shear connector (4), it is characterised in that:Steel pipe (5) outsourcing ultra-high performance concrete (6);Tapping screw (7) is anchored at by the duct in steel pipe (5) in bamboo and wood beam (3).The utility model has the advantages such as assembly method simple, construction efficiency is high, excellent in mechanical performance, has good application prospect in the transformation of modern bamboo and wood building and existing building.
Description
Technical field
The utility model is related to a kind of assembled bamboo and wood-concrete combination beam, belong to the building structure neck in civil engineering
Domain.
Background technology
Building the main problem faced now is being produced and is being constructed as the traditional structural materials of representative using steel and cement
Caused environment influences in the process.It is carried forward vigorously with bamboo and wood knot during China is planned in " 13 " to cope with this challenge
Structure is the green building of representative, and development assembled architecture.Bamboo and wood materials are used as structural material, it should be to have China special
The road of the Green Architectural Development of color.
Since bamboo and wood materials elasticity modulus is low so that the bending stiffness of simple bamboo and wood beam is relatively low, and bearing capacity is often by deforming
Control, this significantly limits the span of bamboo-wood structure and reduces the utilization ratio of material.And the form of composite structure is used,
It in bamboo and wood beam top casting concrete plate, is combined both by shear connector, forms bamboo/wood-concrete combination beam,
This technology is succeeded application in modern wood structure.Compared with simple bamboo and wood beam, combination beam can effectively improve structure
Rigidity and bearing capacity, increase the span of structure, and sound insulation, vibration isolation capability and the thermal and insulating performance of structure can be improved.With biography
The concrete structure of system compares, and combination beam can also improve the cracking resistance of component, effectively reduces the dead weight of structure.In this way, energy
Two kinds of respective advantages of material are given full play to, while having the characteristics that environmentally protective, reduction carbon emission amount, meet building industrialization
The requirement of development.
Assembled bamboo and wood-concrete combination beam is because it is with advantages such as construction efficiency height, wet-less operations, in assembled architecture
In have a good application prospect.The form of construction work of existing assembled bamboo and wood-concrete combination beam is complex, generally prefabricated
During concrete slab or bamboo and wood beam, need for shear connector to be anchored at concrete slab or bamboo and wood beam in a manner of pre-buried
In, then upper and lower two components are connected at the construction field (site).This combination and form of construction work is main is disadvantageous in that:
First, connector is anchored with a component in advance, and positioning requirements are accurate, and component difficulty of processing is big;Second, when assembling at the scene,
Rigging error caused by being processed due to component self-deformation and component, causes connector to be difficult to coincide one by one with preformed hole, scene
Adjustment is difficult, leads to low construction efficiency.Therefore, exploitation novel fabricated bamboo and wood-concrete combination beam, becomes and improves this combination
The key of component construction efficiency.
Invention content
The purpose of this utility model is to provide a kind of novel fabricated bamboo and wood-concrete combination beam, has assembly method letter
The advantages such as list, construction efficiency are high, mechanical property is good.
The technical solution of the utility model is:A kind of novel fabricated bamboo and wood-concrete combination beam, it is characterised in that:In advance
Pre-buried bamboo and wood block (2) in concrete slab (1) processed;The drilling in pre-buried bamboo and wood block (2) and bamboo and wood beam (3), by being inserted into compound cut
Power connector (4) combines precast slab (1) and bamboo and wood beam (3);The compound shear connector (4), feature
It is:Steel pipe (5) outsourcing ultra-high performance concrete (6);Tapping screw (7) is anchored at bamboo and wood beam by the duct in steel pipe (5)
(3) in.It is characterized in that:In compound shear connector (4), ultra-high performance concrete (6) mixing of steel fiber or synthetic fibers.
Compared with existing bamboo and wood-concrete combination beam, the utility model has the advantage of:
(1) assembly method is simple, and construction efficiency is high.First, in actual use, concrete slab, bamboo and wood beam are cut with compound
Power connector is prefabricated standard component, separate machined, and the mode of production is simple.Secondly, connector does not need pre-buried, effectively eliminates
The pre-buried rigging error brought.Furthermore it by bamboo and wood block and is embedded in concrete slab, in this way, the peace of concrete slab and bamboo and wood beam
Dress hole live can drill, and installation error problem is also just not present.Alternatively, the mounting hole of two components is pre-drilled in factory,
Scene is arrived, even if there are certain rigging error, since pre-buried bamboo and wood block has preferable deformability, erection tolerance
Larger, the installation difficulty of compound shear connector is small.
(2) excellent in mechanical performance.In combination beam, compound shear connector directly takes on interface shear stress.Outside due to steel pipe
The ultra-high performance concrete of packet has higher ductility and shearing strength, can effectively cooperate with steel pipe, the mechanics of connector
Performance can be not fully exerted.Thus, the combined effect of combination beam is high, excellent in mechanical performance.
In general, the utility model proposes novel fabricated bamboo and wood-concrete combination beam, realizing assembly construction
While efficient, but also with superior mechanical property, the deficiencies in the prior art are overcome, are had a good application prospect.
Description of the drawings
Fig. 1 is the compound section schematic diagram of novel fabricated bamboo and wood-concrete combination beam;
Fig. 2 is the vertical view of novel fabricated bamboo and wood-concrete combination beam;
Fig. 3 is the A-A cross-sectional views of novel fabricated bamboo and wood-concrete combination beam;
Fig. 4 is the longitudinal profile schematic diagram of compound shear connector.
Marginal data
1 be precast slab 2 be pre-buried bamboo and wood block 3 is bamboo and wood beam
4 for compound shear connector 5 be steel pipe 6 be ultra-high performance concrete
7 be tapping screw
Specific implementation mode
The utility model is as shown in the picture, novel fabricated bamboo and wood-concrete combination beam, it is characterised in that:Concrete
Pre-buried bamboo and wood block (2) in native plate (1);The drilling in pre-buried bamboo and wood block (2) and bamboo and wood beam (3), by being inserted into compound Shear connection
Part (4) combines precast slab (1) and bamboo and wood beam (3);The compound shear connector (4), it is characterised in that:Steel
Manage (5) outsourcing ultra-high performance concrete (6);Tapping screw (7) is anchored at by the duct in steel pipe (5) in bamboo and wood beam (3).Its
It is characterized in that:In compound shear connector (4), ultra-high performance concrete (6) mixing of steel fiber or synthetic fibers.
When implementation, first, pre-buried bamboo and wood block (2) is placed on the design position in precast slab (1), pours coagulation
Soil completes the making of precast slab (1).At the same time, processing bamboo and wood beam (3);After the processing is completed, by prefabricated group
Part is transported to construction site, and bamboo and wood beam (3) is set up, then precast slab (1) is shelved on the top of bamboo and wood beam (3);It connects
Get off, drills on pre-buried bamboo and wood block (2), until at the top of bamboo and wood beam (3), then with bit change, in bamboo and wood beam (3) internal bore;
After the completion of drilling, compound shear connector (4) is inserted into drilling, position is attached it to using hammering method;Finally, by self tapping spiral shell
It follows closely (7) to be inserted into the duct of steel pipe (5), and is screwed into bamboo and wood beam (3), complete assembly construction.
Claims (2)
1. novel fabricated bamboo and wood-concrete combination beam, it is characterised in that:Pre-buried bamboo and wood block (2) in precast slab (1);
The drilling in pre-buried bamboo and wood block (2) and bamboo and wood beam (3), by be inserted into compound shear connector (4) by precast slab (1) with
Bamboo and wood beam (3) combines;The compound shear connector (4), it is characterised in that:Steel pipe (5) outsourcing ultra-high performance concrete
(6);Tapping screw (7) is anchored at by the duct in steel pipe (5) in bamboo and wood beam (3).
2. novel fabricated bamboo and wood-concrete combination beam according to claim 1, it is characterised in that:Compound Shear connection
In part (4), ultra-high performance concrete (6) mixing of steel fiber or synthetic fibers.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721621614.7U CN207959712U (en) | 2017-11-28 | 2017-11-28 | Novel fabricated bamboo and wood-concrete combination beam |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721621614.7U CN207959712U (en) | 2017-11-28 | 2017-11-28 | Novel fabricated bamboo and wood-concrete combination beam |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207959712U true CN207959712U (en) | 2018-10-12 |
Family
ID=63728150
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721621614.7U Active CN207959712U (en) | 2017-11-28 | 2017-11-28 | Novel fabricated bamboo and wood-concrete combination beam |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207959712U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107989262A (en) * | 2017-11-28 | 2018-05-04 | 湖南大学 | Novel fabricated bamboo and wood-concrete combination beam |
CN110778025A (en) * | 2019-11-11 | 2020-02-11 | 沈阳建筑大学 | Steel pipe-spliced wood-recycled concrete composite column |
-
2017
- 2017-11-28 CN CN201721621614.7U patent/CN207959712U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107989262A (en) * | 2017-11-28 | 2018-05-04 | 湖南大学 | Novel fabricated bamboo and wood-concrete combination beam |
CN110778025A (en) * | 2019-11-11 | 2020-02-11 | 沈阳建筑大学 | Steel pipe-spliced wood-recycled concrete composite column |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107268890B (en) | A kind of assembled bamboo and wood-concrete combination beam | |
CN105649220B (en) | Composite prefabricated concrete wallboard bridge cut-off connector, production method and construction method | |
CN106013432B (en) | A kind of high ductility prefabricated integral frame interior joint connection structure and construction method | |
CN207959712U (en) | Novel fabricated bamboo and wood-concrete combination beam | |
CN110565860A (en) | connecting system of prefabricated wood-concrete combined structure | |
CN109898741A (en) | Novel fabricated triangle timber truss structure | |
CN107989262A (en) | Novel fabricated bamboo and wood-concrete combination beam | |
CN109403509A (en) | Assembled composite shear wall based on self-resetting combined end post-slurry anchor shear wall | |
CN101575872A (en) | Energy-saving building structure system suitable for industrial production | |
CN203452195U (en) | Double-pre-buried-plate opposite-pulling-type built-in fitting | |
CN100441793C (en) | Composite thermal insulation concrete shear wall | |
CN110106977A (en) | A kind of assembling type steel structure beam column grouting anchorage node | |
CN103437494A (en) | Engineered wood-profiled steel sheet-lightweight aggregate concrete composite beam and preparation and installation method thereof | |
CN201411775Y (en) | Energy-saving building structure system suitable for industrial production | |
CN105951984B (en) | A kind of high ductility prefabricated integral frame mid-side node connection structure and construction method | |
CN211037485U (en) | Connecting system of prefabricated wood-concrete combined structure | |
CN110130485B (en) | Prefabricated assembly type beam column node with toothed plates and assembly method thereof | |
CN107060144A (en) | A kind of light steel wood mixing keel combined wall and its implementation | |
CN209413129U (en) | Lightweight assembled bamboo and wood-concrete combination beam | |
CN111075217A (en) | Masonry structure reinforced by longitudinal drilling steel-penetrating pull rods and end plates and construction method thereof | |
CN207177089U (en) | A kind of assembled bamboo and wood concrete combination beam | |
CN215857812U (en) | Prefabricated prestressed bar reinforced concrete foundation | |
CN110016992A (en) | A kind of assembled primary-secondary beam mounting structure and installation method | |
CN106013466B (en) | A kind of bolted bilateral plate node and assembly method | |
CN109707102A (en) | Lightweight assembled bamboo and wood-concrete combination beam |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |