CN207959211U - A kind of efficient piling machine for building - Google Patents

A kind of efficient piling machine for building Download PDF

Info

Publication number
CN207959211U
CN207959211U CN201820119785.8U CN201820119785U CN207959211U CN 207959211 U CN207959211 U CN 207959211U CN 201820119785 U CN201820119785 U CN 201820119785U CN 207959211 U CN207959211 U CN 207959211U
Authority
CN
China
Prior art keywords
piling machine
guide rail
efficient
holder
pedestal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820119785.8U
Other languages
Chinese (zh)
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yichang Tianhong Construction Engineering Co Ltd
Original Assignee
Yichang Tianhong Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yichang Tianhong Construction Engineering Co Ltd filed Critical Yichang Tianhong Construction Engineering Co Ltd
Priority to CN201820119785.8U priority Critical patent/CN207959211U/en
Application granted granted Critical
Publication of CN207959211U publication Critical patent/CN207959211U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model is related to technical field of buildings, and disclose a kind of efficient piling machine for building, including pedestal, the bottom of the pedestal is installed with supporting leg, it is installed with holder at the top of the pedestal, it is installed with guide rail on the inside of holder, sliding block is movably installed on the inside of guide rail, two opposite sides of sliding block are installed with connecting plate, motor is installed at the top of connecting plate, one end is installed at the output shaft of motor to run through and extend to the shaft below connecting plate, the one end of shaft far from motor output shaft is installed with bearing block, the bottom of bearing block is installed with screw thread column casing, the bottom of screw thread column casing is installed with copper sheathing, it is installed with cushion block at the top of the connecting plate, metal frame is installed at the top of cushion block, it is installed with hydraulic press at the top of the holder.The efficient piling machine for building, piling is efficient, facilitates staff's construction usage.

Description

A kind of efficient piling machine for building
Technical field
The utility model is related to technical field of buildings, specially a kind of efficient piling machine for building.
Background technology
Currently, in construction, often uses stake cylinder and ram and expand pile-forming equipment, i.e. piling machine, piling machine is to use stake cylinder It is inserted into ground, the soil body in stake cylinder is rammed into out stake cylinder by weight, while ramming, and stake ambient earth is compacted, reach one When depthkeeping is spent, dry and hard concrete or other filler materials are filled from stake cylinder side port, with heavy tamping to desired quantity and hardness, weighing Hammer proposes stake cylinder, puts reinforcing bar into and concrete is then poured into stake cylinder, then stake cylinder is proposed.
Existing piling machine includes that structure is substantially similar, and stake cylinder is actively connected on the sliding rail of mobile jib, existing for not Foot is that stake cylinder buries by dead weight and vibration directly down completely, causes to bury and be unearthed have some setbacks, be not easy, and the soil body of surrounding It is not intensive, construction efficiency and quality are influenced, so a kind of efficient piling machine for building is proposed to solve above-mentioned proposed The problem of.
Utility model content
(1) the technical issues of solving
In view of the deficiencies of the prior art, the utility model provides a kind of efficient piling machine for building, has efficiency High and simple operation and other advantages solve existing piling machine and dead weight and vibration are leaned on to bury directly down completely, cause to bury with The problem of being unearthed and have some setbacks, be not easy, and the soil body of surrounding is not intensive, influencing construction efficiency and quality.
(2) technical solution
To realize that above-mentioned efficient and easy to operate purpose, the utility model provide the following technical solutions:It is a kind of for building The bottom of efficient piling machine, including pedestal, the pedestal is installed with supporting leg, is installed at the top of the pedestal Holder, holder inside are installed with guide rail, and sliding block is movably installed on the inside of guide rail, and peace is fixed in the opposite side of two sliding blocks Equipped with connecting plate, it is installed with motor at the top of connecting plate, one end is installed at the output shaft of motor and runs through and extends Shaft below to connecting plate, the one end of shaft far from motor output shaft are installed with bearing block, and the bottom of bearing block is fixed Screw thread column casing is installed, the bottom of screw thread column casing is installed with copper sheathing, cushion block is installed at the top of the connecting plate, pad It is installed with metal frame at the top of block, hydraulic press is installed at the top of the holder, the bottom of hydraulic press is fixedly mounted There is telescopic rod, tracheae is communicated on the right side of the hydraulic press, the one end of tracheae far from hydraulic press is communicated with positioned at cradle top Air accumulator.
Preferably, the bottom of the supporting leg, which is installed with, increases blocked portion tooth, and metal is installed on the outside of the copper sheathing Thorn.
Preferably, two sliding blocks are located at same level, and the sliding block is connected in the inside of guide rail.
Preferably, the back side of the air accumulator is provided with booster pump.
Preferably, the length of the guide rail is the half of threaded post tube length degree.
Preferably, the supporting leg, guide rail and sliding block are distributed by axial symmetry of the longitudinal midline of pedestal.
(3) advantageous effect
Compared with prior art, the utility model provides a kind of efficient piling machine for building, has following beneficial Effect:
1, the efficient piling machine for building can start motor, be connect with shaft when in use by the way that motor is arranged The rotation of Screw Pile cylinder, spiral wing is carried on Screw Pile cylinder, rotation is buried, and is solved original piling machine and is buried by the dead weight of stake cylinder More difficult problem, and the density of a surrounding soil can also be increased, it all can very easily to all kinds of soil layers, layer of sand, boulder bed Rotation is buried and rotation carries cylinder, and piling is efficient, facilitates staff's construction usage.
2, the efficient piling machine for building increases blocked portion tooth by being fixedly mounted in the bottom of supporting leg, strengthens device The ability for grabbing ground, improves the intensity and fastness of pile body, and use is safer, and gold is fixedly mounted finally by the outside of copper sheathing Belong to thorn, can there will be hard stone to smash in soil, piling efficiency is improved, and facilitates staff's construction usage.
Description of the drawings
FIG. 1 is a schematic structural view of the utility model.
In figure:1 pedestal, 2 supporting legs, 3 holders, 4 guide rails, 5 sliding blocks, 6 connecting plates, 7 motors, 8 shafts, 9 bearing blocks, 10 screw threads Column casing, 11 copper sheathings, 12 cushion blocks, 13 metal frames, 14 hydraulic presses, 15 telescopic rods, 16 tracheaes, 17 air accumulators.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work The every other embodiment obtained, shall fall within the protection scope of the present invention.
Referring to Fig. 1, a kind of efficient piling machine for building, including pedestal 1, the bottom of supporting leg 2 are installed with increasing The bottom of blocked portion tooth, pedestal 1 is installed with supporting leg 2, and the top of pedestal 1 is installed with holder 3, the fixed peace in 3 inside of holder Equipped with guide rail 4, the inside of guide rail 4 is movably installed with sliding block 5, and supporting leg 2, guide rail 4 and sliding block 5 are with the longitudinal midline of pedestal 1 Axial symmetry is distributed, and two sliding blocks 5 are located at same level, and sliding block 5 is connected in the inside of guide rail 4, the opposite side of two sliding blocks 5 It is installed with connecting plate 6, the top of connecting plate 6 is installed with motor 7, one end is installed at the output shaft of motor 7 Run through and extend to the shaft 8 of 6 lower section of connecting plate, the one end of shaft 8 far from 7 output shaft of motor is installed with bearing block 9, axis The bottom of bearing 9 is installed with screw thread column casing 10, and the length of guide rail 4 is the half of 10 length of screw thread column casing, threaded post The bottom of cylinder 10 is installed with copper sheathing 11, and the outside of copper sheathing 11 is installed with metal prong, and the top of connecting plate 6 is fixedly mounted There are cushion block 12, the top of cushion block 12 to be installed with metal frame 13, the top of holder 3 is installed with hydraulic press 14, hydraulic press 14 bottom is installed with telescopic rod 15, and the right side of hydraulic press 14 is communicated with tracheae 16, tracheae 16 far from hydraulic press 14 one End is communicated with the air accumulator 17 positioned at 3 top of holder, and the back side of air accumulator 17 is provided with booster pump, by the way that motor 7 is arranged, makes Used time can start motor 7, and the Screw Pile cylinder 10 that is connect with shaft 8 rotates, and spiral wing is carried on Screw Pile cylinder 10, rotate into Soil solves the problems, such as that original piling machine buries density that is more difficult, and can also increasing a surrounding soil by the dead weight of stake cylinder, right All kinds of soil layers, layer of sand, boulder bed all can easily rotate to bury and rotation carries cylinder very much, and piling is efficient, and staff is facilitated to apply Work uses, and increases blocked portion tooth by being fixedly mounted in the bottom of supporting leg 2, strengthens the ability that device grabs ground, improves the strong of pile body Degree and fastness, use is safer, and metal prong is fixedly mounted finally by the outside of copper sheathing 11, can will have in soil hard Stone smash, piling efficiency be improved, facilitate staff's construction usage.
When in use, starting motor 7, shaft 8 drives Screw Pile cylinder 10 to rotate, and spiral wing is carried on Screw Pile cylinder 10, Rotation is buried, and it is more difficult to solve the problems, such as that original piling machine buries by the dead weight of stake cylinder, piling is efficient, and staff is facilitated to apply Work uses.
In conclusion the efficient piling machine for building can start motor 7 when in use by setting motor 7, The Screw Pile cylinder 10 being connect with shaft 8 rotates, and spiral wing is carried on Screw Pile cylinder 10, and rotation is buried, and solves original piling Machine buries more difficult problem by the dead weight of stake cylinder, and can also increase the density of a surrounding soil, to all kinds of soil layers, layer of sand, ovum Rock layers all can easily rotate buries and rotation carries cylinder very much, and piling is efficient, facilitates staff's construction usage, by supporting leg 2 bottom, which is fixedly mounted, increases blocked portion tooth, strengthens the ability that device grabs ground, the intensity and fastness of pile body is improved, using more Safety is fixedly mounted metal prong finally by the outside of copper sheathing 11, can will have hard stone to smash in soil, piling effect Rate is improved, and facilitates staff's construction usage, solves existing piling machine completely by conducting oneself with dignity and vibrating directly down The problem of burying, causing to bury and be unearthed have some setbacks, be not easy, and the soil body of surrounding is not intensive, influence construction efficiency and quality.
It should be noted that herein, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also include other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that There is also other identical elements in process, method, article or equipment including the element.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is appreciated that can these embodiments be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of efficient piling machine for building, including pedestal (1), it is characterised in that:Peace is fixed in the bottom of the pedestal (1) Equipped with supporting leg (2), it is installed with holder (3) at the top of the pedestal (1), guide rail (4) is installed on the inside of holder (3), Sliding block (5) is movably installed on the inside of guide rail (4), two opposite sides of sliding block (5) are installed with connecting plate (6), connection It is installed with motor (7) at the top of plate (6), one end is installed at the output shaft of motor (7) and runs through and extends to connection Shaft (8) below plate (6), the one end of shaft (8) far from motor (7) output shaft are installed with bearing block (9), bearing block (9) bottom is installed with screw thread column casing (10), and the bottom of screw thread column casing (10) is installed with copper sheathing (11), the connection It is installed with cushion block (12) at the top of plate (6), metal frame (13), the holder (3) are installed at the top of cushion block (12) Top be installed with hydraulic press (14), the bottom of hydraulic press (14) is installed with telescopic rod (15), the hydraulic press (14) tracheae (16) is communicated on the right side of, the one end of tracheae (16) far from hydraulic press (14) is communicated at the top of holder (3) Air accumulator (17).
2. a kind of efficient piling machine for building according to claim 1, it is characterised in that:The bottom of the supporting leg (2) Portion, which is installed with, increases blocked portion tooth, and metal prong is installed on the outside of the copper sheathing (11).
3. a kind of efficient piling machine for building according to claim 1, it is characterised in that:Two sliding blocks (5) Positioned at same level, the sliding block (5) is connected in the inside of guide rail (4).
4. a kind of efficient piling machine for building according to claim 1, it is characterised in that:The air accumulator (17) The back side is provided with booster pump.
5. a kind of efficient piling machine for building according to claim 1, it is characterised in that:The length of the guide rail (4) Degree is the half of screw thread column casing (10) length.
6. a kind of efficient piling machine for building according to claim 1, it is characterised in that:The supporting leg (2), guide rail (4) it is distributed by axial symmetry of the longitudinal midline of pedestal (1) with sliding block (5).
CN201820119785.8U 2018-01-24 2018-01-24 A kind of efficient piling machine for building Expired - Fee Related CN207959211U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820119785.8U CN207959211U (en) 2018-01-24 2018-01-24 A kind of efficient piling machine for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820119785.8U CN207959211U (en) 2018-01-24 2018-01-24 A kind of efficient piling machine for building

Publications (1)

Publication Number Publication Date
CN207959211U true CN207959211U (en) 2018-10-12

Family

ID=63734852

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820119785.8U Expired - Fee Related CN207959211U (en) 2018-01-24 2018-01-24 A kind of efficient piling machine for building

Country Status (1)

Country Link
CN (1) CN207959211U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110965552A (en) * 2019-12-11 2020-04-07 刘士英 Be applied to impact pile driver of bridge construction
CN111576412A (en) * 2020-06-01 2020-08-25 福州大诚房屋征收工程有限公司 Movable punching pile driver
WO2022160058A1 (en) * 2021-02-01 2022-08-04 Terry Paun Rotary drive machine for helical pile installation and method of use

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110965552A (en) * 2019-12-11 2020-04-07 刘士英 Be applied to impact pile driver of bridge construction
CN110965552B (en) * 2019-12-11 2021-06-25 刘士英 Be applied to impact pile driver of bridge construction
CN111576412A (en) * 2020-06-01 2020-08-25 福州大诚房屋征收工程有限公司 Movable punching pile driver
WO2022160058A1 (en) * 2021-02-01 2022-08-04 Terry Paun Rotary drive machine for helical pile installation and method of use

Similar Documents

Publication Publication Date Title
CN207959211U (en) A kind of efficient piling machine for building
CN100476082C (en) Post-grouting construction method for long helical bore grouting pile and grouting device thereof
CN210597263U (en) Soil earthing compaction equipment is surveyed to geology
CN207891945U (en) A kind of electric pole bar hole easy to use excavating equipment
CN107461145A (en) A kind of construction piling equipment
CN105133851B (en) The method and its lift structure of terrace lifting leveling reparation on a kind of soft soil foundation
CN207392201U (en) A kind of packaged type slip casting platform
CN103866763B (en) Method for making pile by performing pile pressure irrigation through immersed tube and special device and application
CN206941610U (en) Clothoid type steel pipe support pile and support anchor rod
CN112012199A (en) Novel BNT carrier pile and construction equipment construction method thereof
CN212249871U (en) Pre-drilling device for vibroflotation gravel pile construction
CN214993701U (en) Inclinometer pipe installation auxiliary device
CN109898541A (en) Steel tower column foot construction technology and piling machine applied to the construction technology
CN212561495U (en) Foundation reinforcing pile
CN211395639U (en) Building slope protection tamping device
CN217733631U (en) Concrete sleeper drilling support
CN213143155U (en) Settlement reinforcing jacking leveling structure suitable for independent pile foundation of industrial plant
CN220565218U (en) Engineering pile convenient to use
CN210288521U (en) Foundation reinforcing device for building
CN218969983U (en) Middle digging post grouting root-solid reinforced hole-guiding and body-expanding pile
CN217536914U (en) To multi-storey building foundation stabilization construction equipment
CN211665738U (en) A sampling device for foundation basis detects
CN221167755U (en) Foundation reinforcing device
CN108978640A (en) Cast-in-place pile construction method
CN215405993U (en) Compaction equipment for building engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181012

Termination date: 20190124