CN207959022U - Changeable type steel bridge maintenance step plate - Google Patents

Changeable type steel bridge maintenance step plate Download PDF

Info

Publication number
CN207959022U
CN207959022U CN201820295778.3U CN201820295778U CN207959022U CN 207959022 U CN207959022 U CN 207959022U CN 201820295778 U CN201820295778 U CN 201820295778U CN 207959022 U CN207959022 U CN 207959022U
Authority
CN
China
Prior art keywords
steel
plate
web
bottom horizontal
turbogrid plates
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820295778.3U
Other languages
Chinese (zh)
Inventor
王�琦
李传琳
车文庆
姚志国
陈美伶
蒋永联
彭勃
夏德俊
徐华
李鸿波
张煜
梁俊雄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CREEC Kunming Survey Design and Research Co Ltd
Original Assignee
CREEC Kunming Survey Design and Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CREEC Kunming Survey Design and Research Co Ltd filed Critical CREEC Kunming Survey Design and Research Co Ltd
Priority to CN201820295778.3U priority Critical patent/CN207959022U/en
Application granted granted Critical
Publication of CN207959022U publication Critical patent/CN207959022U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of changeable type steel bridges to overhaul step plate, including girder steel, bottom horizontal connecting plate, web, vertical ribbed stiffener, I-shaped steel longitudinal beam and steel Turbogrid plates, the web of girder steel both sides and vertical ribbed stiffener are connected by the way that bottom horizontal connecting plate is arranged in steel beam bottom, I-shaped steel longitudinal beam is set on bottom horizontal connecting plate, steel Turbogrid plates are laid on I-shaped steel longitudinal beam, when being arranged which solve railway steel bridge internal overhaul pavement using monoblock steel plate or armored concrete step strip come weight it is big, it is difficult to install, the high problem of cost, the utility model can substantially reduced maintenance walk plate weight, reduce cost, it is easily installed the maintenance and replacement with operation stage, not only economical but also applicable.

Description

Changeable type steel bridge maintenance step plate
Technical field
The present utility model is related to railway traffic engineering technology, specifically a kind of changeable type steel bridge maintenance step Plate.
Background technology
With China's expanding economy, railway, the increase of highway construction and state return home the implementation of production capacity policy, in the present In road construction afterwards, steel structure bridge will be more and more, when steel structure bridge box baseplate uses non-monolithic structure, Inevitably encounter the setting maintenance step plate on lower horizontal-associate the problem of, if routinely mixed using integral plate or reinforcing bar Concrete board necessarily will appear the problem that weight is big, difficult to install, cost is high, therefore study a kind of not only economic but also safety maintenance Step plate is very important.
Maintenance step plate in conventional railway steel structure girder has integral plate and armoured concrete slab etc., using integral plate Or armoured concrete slab, it is that weight increases first, has an adverse effect to the whole stress of girder steel;Secondly difficult to install, maintenance It replaces difficult;It is exactly cost height to have again.
Invention content
The purpose of this utility model is that in view of the above-mentioned deficiencies in the prior art, providing a kind of changeable type steel Bridge maintenance step plate, light weight is fabricated separately, easy for installation, and maintenance and replacement is also convenient for, and is examined when being arranged in railway steel structure girder When repairing step plate, it is contemplated that weight, installation and maintenance convenience and saving cost should not use integral plate and armoured concrete slab When, the changeable type steel bridge maintenance step plate using the utility model is to solve the setting maintenance step plate in railway steel structure girder most to pass through Ji and feasible scheme.Can avoid using monoblock steel plate or armored concrete step strip come weight it is big, difficult to install, cost is high The problem of, step plate weight substantially reduced can be overhauled, cost is reduced, is easily installed the maintenance and replacement with operation stage, in railway Setting changeable type steel bridge overhauls step plate inside steel bridge, is a kind of novel processing mode.
To solve the above problems, the utility model uses following technical scheme:
Changeable type steel bridge maintenance step plate, including girder steel, bottom horizontal connecting plate, web, vertical ribbed stiffener, I-shaped steel longitudinal beam With steel Turbogrid plates, the web of girder steel both sides and vertical ribbed stiffener are connected by the way that bottom horizontal connecting plate is arranged in steel beam bottom, the bottom of at I-shaped steel longitudinal beam is set on cross connecting plate, steel Turbogrid plates are laid on I-shaped steel longitudinal beam.
Preferably:The steel Turbogrid plates are made of side wrapped plate, cross bar and load band steel, are laterally arranged one every 25mm The load band steel of high 25mm, thick 5mm, transverse width are adjusted according to web spacing, and longitudinal mono- section of 4m that presses carries out factory's making, Between high 25mm, the side wrapped plate of thick 5mm every 1m be arranged a high 5mm, the cross bar of thick 5mm, beam-ends according to beam length need into Row adjustment, each section are all made of the making of Q235 steel.
The utility model changeable type steel bridge maintenance step plate has the following advantages:
(1)Changeable type steel bridge maintenance step plate can solve the problems, such as the setting maintenance step plate in railway steel structure girder.
(2)Its is light-weight, and installation and replacement are convenient, and service personnel walks steady comfortable above, and appearance is preferable.
(3)Engineering can be safely performed more, short time limit, save engineering cost, economical rationality, technological innovation.
Description of the drawings
Fig. 1 is the utility model beam body section and maintenance step plate figure.
Fig. 2 is the utility model steel Turbogrid plates organigram.
Fig. 3 is the utility model steel Turbogrid plates longitudinal cross-section schematic diagram.
In figure:1- bottom horizontals connecting plate, 2- I-shaped steel longitudinal beams, 3- steel Turbogrid plates, 4- girder steels, 5- webs, 6- vertical reinforceds Rib, 7- side wrapped plates, 8- cross bars, 9- load band steel.
Specific implementation mode
The utility model is further described in 1-3 and embodiment below in conjunction with the accompanying drawings, and embodiment is not constituted to this reality With novel limitation:
As shown in Figs. 1-3, the changeable type steel bridge maintenance step plate of the utility model, is connected using 4 bottom horizontal connecting plate 1 of girder steel I-shaped steel longitudinal beam 2 is arranged, then in I-shaped in the web 5 and vertical ribbed stiffener 6 for connecing girder steel 4 on 4 bottom horizontal connecting plate 1 of girder steel It is laid with steel Turbogrid plates 3 on steel longeron 2 and forms maintaining roadway.
Changeable type steel bridge maintenance step plate using 4 bottom horizontal connecting plate of girder steel, 1 length L can according to 5 spacing of beam body web into Row adjustment, 2 sectional making of I-shaped steel longitudinal beam installation, beam head adjust length, 3 transverse width d of steel Turbogrid plates by 5 spacing of web into Row adjustment, longitudinal by mono- section of progress factory making of 4m, beam-ends is adjusted according to beam length needs.Each section is all made of Q235 steel It makes.Steel Turbogrid plates 3 are specifically made of side wrapped plate 7, cross bar 8 and load band steel 9, and a high 25mm laterally is arranged every 25mm, The load band steel of thick 5mm(9), a piece high 5mm, thick 5mm are set every 1m between high 25mm, the side wrapped plate 7 at the both ends of thick 5mm Cross bar 8.
The main construction procedure and method of the utility model are as follows:
1, construction bridges basis, bridge pier.
2,4 structure of prefabrication girder steel, I-shaped steel longitudinal beam 2, steel Turbogrid plates 3.
3, beam body assembling, the bottom horizontal connecting plate 1 for girder steel 4 of constructing.
4, I-shaped steel longitudinal beam 2 is set up on 4 bottom horizontal connecting plate 1 of girder steel.
5, steel Turbogrid plates 3 are laid on I-shaped steel longitudinal beam 2.
6, remaining work such as construction bridges bridge deck.
Basic principles, main features, and advantages of the present invention has been shown and described above.Ability The technical staff in domain should be recognized that the present utility model is not limited to the above embodiments, described in the above embodiment and specification Only illustrate the principles of the present invention, on the premise of not departing from the spirit and scope of the utility model, the utility model can also There are various changes and modifications, these changes and improvements are both fallen in claimed range.

Claims (2)

1. a kind of changeable type steel bridge maintenance step plate, it is characterised in that:Including girder steel(4), bottom horizontal connecting plate(1), web (5), vertical ribbed stiffener(6), I-shaped steel longitudinal beam(2)With steel Turbogrid plates(3), by girder steel(4)Bottom is arranged bottom horizontal and connects Plate(1)Connect girder steel(4)The web of both sides(5)With vertical ribbed stiffener(6), in bottom horizontal connecting plate(1)Upper setting I-steel is vertical Beam(2), I-shaped steel longitudinal beam(2)Upper laying steel Turbogrid plates(3).
2. changeable type steel bridge maintenance step plate according to claim 1, it is characterised in that:The steel Turbogrid plates(3)Including Side wrapped plate(7), cross bar(8)With load band steel(9), a piece high 25mm, the load band steel of thick 5mm laterally are set every 25mm(9), Transverse width is according to web(5)Spacing is adjusted, longitudinal by mono- section of progress factory making of 4m, in high 25mm, the bound edge of thick 5mm Plate(7)Between every 1m be arranged a high 5mm, the cross bar of thick 5mm(8), beam-ends according to beam length needs be adjusted, side wrapped plate (7), cross bar(8)With load band steel(9)It is all made of the making of Q235 steel.
CN201820295778.3U 2018-03-03 2018-03-03 Changeable type steel bridge maintenance step plate Active CN207959022U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820295778.3U CN207959022U (en) 2018-03-03 2018-03-03 Changeable type steel bridge maintenance step plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820295778.3U CN207959022U (en) 2018-03-03 2018-03-03 Changeable type steel bridge maintenance step plate

Publications (1)

Publication Number Publication Date
CN207959022U true CN207959022U (en) 2018-10-12

Family

ID=63740771

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820295778.3U Active CN207959022U (en) 2018-03-03 2018-03-03 Changeable type steel bridge maintenance step plate

Country Status (1)

Country Link
CN (1) CN207959022U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113737849A (en) * 2021-08-11 2021-12-03 中铁二局集团有限公司 Post-installed concrete slab lower access passage device and installation method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113737849A (en) * 2021-08-11 2021-12-03 中铁二局集团有限公司 Post-installed concrete slab lower access passage device and installation method thereof

Similar Documents

Publication Publication Date Title
US9222225B2 (en) Pre-stressed concrete track slab of slab-type ballast-less track
CN106245511B (en) A kind of two-fold shape combined beam structure and its construction method
CN201843076U (en) Groove-shaped steel bridge deck structure of high-speed railway steel tied arched bridge
US10704215B2 (en) System for construction of composite U shaped reinforced girders bridge deck and methods thereof
CN106894347B (en) A kind of splicing bridge and bridge reorganization and expansion method based on cast-in-place united layer supertronic
CN110344315A (en) A kind of Long span steel reinforced concrete combined bridge structure and construction technology
CN108505405A (en) A kind of suspension type monorail and highway bridge build structure jointly
CN109024219A (en) A kind of prefabricated ultra-high performance concrete-normal concrete composite beam bridge girder construction and construction method
CN108677679A (en) Overhead steel reinforced concrete combination beam
CN206328669U (en) The narrow composite beam of steel box of new concrete
CN108060634A (en) Duplexing font ultra-high performance concrete-normal concrete composite beam bridge girder construction and its construction method
CN207959022U (en) Changeable type steel bridge maintenance step plate
CN108221636B (en) Steel-concrete composite beam bridge constructed by adopting bracket-free scheme for midspan and bridge forming method
CN110725194B (en) Unequal-spacing suction transformation device and construction method thereof
CN206256363U (en) A kind of two-fold shape combined beam structure
CN208701485U (en) Overhead steel reinforced concrete combination beam
CN208933808U (en) Using the steel_concrete composite beam of plain plate and corrugated sheet steel mixing web
CN106638261A (en) Railway bridge separated dual-box pre-stressed concrete main girder structure
CN103205930A (en) Structure for continuous transformation of existing simply supported hollow slab girder bridge and construction method of structure
CN105648898A (en) Prefabricated ultra-high-performance concrete half-through beam units, bridge beam structure and construction method
CN203613460U (en) RPC railway ballast trough plate of railway steel truss girder
CN206298821U (en) Simply supported girder bridge composite connection board is constructed
CN210737255U (en) Box frame and reinforced concrete box frame road bed for road bed
CN208183539U (en) A kind of four beam type I-shaped steel-concrete composite beams of bridge
CN209941469U (en) Steel box girder thin-wall pier rigid frame cable-stayed bridge suitable for straddle type monorail

Legal Events

Date Code Title Description
GR01 Patent grant