CN207952572U - Hot scarfing machine oxygen/fuel gas pipeline leakage Integrated Early Warning System - Google Patents

Hot scarfing machine oxygen/fuel gas pipeline leakage Integrated Early Warning System Download PDF

Info

Publication number
CN207952572U
CN207952572U CN201820122431.9U CN201820122431U CN207952572U CN 207952572 U CN207952572 U CN 207952572U CN 201820122431 U CN201820122431 U CN 201820122431U CN 207952572 U CN207952572 U CN 207952572U
Authority
CN
China
Prior art keywords
oxygen
valve
sensors
gas
early warning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820122431.9U
Other languages
Chinese (zh)
Inventor
张永强
杨帆
程煌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI DONGZHEN METALLURGY ENGINEERING TECHNOLOGY Co Ltd
Original Assignee
SHANGHAI DONGZHEN METALLURGY ENGINEERING TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI DONGZHEN METALLURGY ENGINEERING TECHNOLOGY Co Ltd filed Critical SHANGHAI DONGZHEN METALLURGY ENGINEERING TECHNOLOGY Co Ltd
Priority to CN201820122431.9U priority Critical patent/CN207952572U/en
Application granted granted Critical
Publication of CN207952572U publication Critical patent/CN207952572U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Examining Or Testing Airtightness (AREA)
  • Pipeline Systems (AREA)

Abstract

The utility model is related to a kind of hot scarfing machine oxygen/fuel gas pipeline leakage Integrated Early Warning Systems, are made of descaling machine ontology P/E sensors, oxygen valve station outlet P/E sensors, gas valve station outlet P/E sensors, oxygen emergency stop valve, gas emergency cut-off valve, early warning system PLC, early warning system HMI.The pressure value that oxygen/gas valve station outlet P/E sensors detect is compared with the pressure that descaling machine ontology P/E sensors detect;R601, R603 calculate outlet pressure according to valve characteristic and are compared in descaling machine ontology P/E sensors;Pressure differential range is greater than the set value monitored picture prompt alarm or directly closes quick action emergency valve.

Description

Hot scarfing machine oxygen/fuel gas pipeline leakage Integrated Early Warning System
Technical field
The utility model is related to a kind of hot scarfing machine oxygen/fuel gas pipeline leakage Integrated Early Warning Systems.
Background technology
Hot scarfing machine is that the combustion flame formed using oxygen, gas medium implements removing surface to strand, and medium is adopted It is delivered to burner user's point with pipe-line system, since burner is kept in motion in scale removal process, device characteristics determine to need It largely to be connect with hard tube using hose, being splashed by slag during scafing is influenced with water system, equipment work Condition environment is extreme, unavoidably there is the security risk of medium gas leakage.Oxygen/gas leakage uses artificial judgment, detects manually Mode, only can be just found in a large amount of gas leakage of pipeline, prejudge that there are certain difficulty in advance to pipe leakage.
Invention content
The purpose of this utility model realizes the detection of oxygen/gas leakage, and prompts alarm or straight according to leakage rate size Connect closing oxygen/gas emergency cut-off valve.
The utility model proposes hot scarfing machine oxygen/fuel gas pipeline leakage Integrated Early Warning System, by descaling machine ontology P/E sensors 1, oxygen valve station P/E sensors 2, gas valve station P/E sensors 3, oxygen emergency stop valve 4, gas emergency cut-off Valve 5, early warning system PLC6 and early warning system HMI7 compositions, wherein:Oxygen emergency stop valve 4 is connected to oxygen valve by hard tube It stands, gas emergency cut-off valve 5 is connected to gas valve station by hard tube, and oxygen/gas valve station is connected with descaling machine ontology by pipeline It connects, descaling machine ontology P/E sensors 1, oxygen valve station P/E sensors 2 and gas valve station P/E sensors 3, oxygen emergency stop valve 4, the output end of gas emergency cut-off valve 5 and early warning system HMI7 are separately connected the input terminal of early warning system PLC6;Descaling machine sheet The acquisition of body P/E sensors 1 actual use point oxygen/combustion gas real-time pressure, it is every that oxygen valve station P/E sensors 2 acquire the outlet of valve station Root pipeline real-time pressure, gas valve station P/E sensors 3 acquire valve station and export every pipeline real-time pressure, oxygen emergency stop valve 4 Main line oxygen can be quickly cut off in an emergency situation, and gas emergency cut-off valve 5 can quickly cut off main line in an emergency situation Combustion gas, early warning system HMI7 are set according to leak threshold, provide alarm indication;
In process of production, oxygen valve station P/E sensors 2, gas valve station P/E sensors 3 and descaling machine ontology P/E sensings Collected real-time pressure is sent to early warning system PLC6, early warning system PLC6 and determines whether pipeline is let out by comparing by device 1 Leakage occurs, and executes relevant operation according to leakage class;When minor leakage alarm occurs, only carried in early warning system HMI7 Show, operating personnel are not involved in control;When medium leak alarm occurs, cleaning is prompted to start to start, and without operation, when clear Occur medium leak alarm in reason, this cleaning can be kept to complete, and lower block slab cleaning cycle is prevented to start, until alarm solves It removes;Oxygen emergency stop valve 4, gas emergency cut-off valve 5 is automatically closed in serious leak alarm.
The utility model is novel, simple in structure, can save the repair and maintenance time.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model:
Figure label:1 be descaling machine ontology P/E sensors, 2 be oxygen valve station P/E sensors, 3 be gas valve station P/E pass Sensor, 4 be oxygen emergency stop valve, 5 be gas emergency cut-off valve, 6 be early warning system PLC, 7 be early warning system HMI.
Specific implementation mode
The utility model is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1:As shown in Figure 1, this system is by descaling machine ontology P/E sensors 1, oxygen valve station P/E sensors 2, combustion Air valve station P/E sensors 3, oxygen emergency stop valve 4, gas emergency cut-off valve 5, early warning system PLC6, early warning system HMI7 structures At;Oxygen emergency stop valve 4 is connected to oxygen valve station by hard tube, and gas emergency cut-off valve 5 is connected to gas valve by hard tube It stands, oxygen/gas valve station is connected using a large amount of hard tubes with hose with descaling machine ontology, and connector is more, long-play connector Place is easy to loosen, and oxygen leakage easily causes equipment burnout accident after loosening.
Oxygen valve station P/E sensors 2, gas valve station P/E sensors 3 are with descaling machine ontology P/E sensors 1 in production process Middle send collected real-time pressure to early warning system PLC6 is compared to determine whether pipeline has a leakage, and according to letting out Leakage grade is automatically brought into operation to carry out lower step.
The course of work of the utility model is as follows:
Oxygen main line oxygen emergency stop valve 4 is opened, oxygen is sent to oxygen valve station;
Combustion gas main line gas emergency cut-off valve 5 is opened, combustion gas is sent to gas valve station;
Alarming value is set on early warning system HMI7, and early warning system alarm is divided into, minor leakage alarm, medium leak report It is alert, serious leak alarm;
Oxygen/gas valve station valve is opened when descaling machine produces, and gas is sent to descaling machine ontology;
Oxygen valve station P/E sensors 2 carry out pressure comparison with descaling machine ontology P/E sensors 1 in production, if pressure Difference reaches set alarm threshold value on early warning system HMI7, triggers corresponding alarm;
Early warning system PLC6 judges alarm level, on minor leakage alarm HMI prompt be not involved in control with it is chain;It is medium to let out It fails to report alert as cleaning and starts entry condition, use not as service condition, when occurring medium leak alarm in cleaning, can keep This cleaning is completed, and lower block slab cleaning cycle is prevented to start, until alarm release;Oxygen is automatically closed in serious leak alarm Quick action emergency valve 4, gas emergency cut-off valve 5.
This system can automatic decision pipeline whether have leakage, and trigger relevant action, ensure production safety.

Claims (1)

1. hot scarfing machine oxygen/fuel gas pipeline leakage Integrated Early Warning System, by descaling machine ontology P/E sensors(1), oxygen valve It stands P/E sensors(2), gas valve station P/E sensors(3), oxygen emergency stop valve(4), gas emergency cut-off valve(5), early warning System PLC(6)With early warning system HMI(7)Composition, it is characterised in that:Oxygen emergency stop valve(4)It is connected to oxygen by hard tube Valve station, gas emergency cut-off valve(5)It is connected to gas valve station by hard tube, oxygen/gas valve station passes through pipe with descaling machine ontology Road connects, descaling machine ontology P/E sensors(1), oxygen valve station P/E sensors(2)With gas valve station P/E sensors(3), oxygen Quick action emergency valve(4), gas emergency cut-off valve(5)With early warning system HMI(7)Output end be separately connected early warning system PLC(6) Input terminal;Descaling machine ontology P/E sensors(1)Acquisition actual use point oxygen/combustion gas real-time pressure, oxygen valve station P/E are passed Sensor(2)Acquisition valve station exports every pipeline real-time pressure, gas valve station P/E sensors(3)Acquisition valve station exports every pipeline Real-time pressure, oxygen emergency stop valve(4)Main line oxygen, gas emergency cut-off valve can be quickly cut off in an emergency situation(5) Main line combustion gas, early warning system HMI can be quickly cut off in an emergency situation(7)It is set according to leak threshold, alarm indication is provided;
In process of production, oxygen valve station P/E sensors(2), gas valve station P/E sensors(3)It is sensed with descaling machine ontology P/E Device(1)Collected real-time pressure is sent to early warning system PLC(6), early warning system PLC(6)Determine that pipeline is by comparing It is no to have leakage, and relevant operation is executed according to leakage class;When minor leakage alarm occurs, only in early warning system HMI(7)Prompt, operating personnel are not involved in control;When medium leak alarm occurs, cleaning is only provided and starts to start, without Operation uses, and when occurring medium leak alarm in cleaning, this cleaning can be kept to complete, and lower block slab cleaning cycle is prevented to open Begin, until alarm release;Oxygen emergency stop valve (4), gas emergency cut-off valve (5) is automatically closed in serious leak alarm.
CN201820122431.9U 2018-01-25 2018-01-25 Hot scarfing machine oxygen/fuel gas pipeline leakage Integrated Early Warning System Active CN207952572U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820122431.9U CN207952572U (en) 2018-01-25 2018-01-25 Hot scarfing machine oxygen/fuel gas pipeline leakage Integrated Early Warning System

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820122431.9U CN207952572U (en) 2018-01-25 2018-01-25 Hot scarfing machine oxygen/fuel gas pipeline leakage Integrated Early Warning System

Publications (1)

Publication Number Publication Date
CN207952572U true CN207952572U (en) 2018-10-12

Family

ID=63734970

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820122431.9U Active CN207952572U (en) 2018-01-25 2018-01-25 Hot scarfing machine oxygen/fuel gas pipeline leakage Integrated Early Warning System

Country Status (1)

Country Link
CN (1) CN207952572U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108145111A (en) * 2018-01-25 2018-06-12 上海东震冶金工程技术有限公司 Hot scarfing machine oxygen/fuel gas pipeline leakage Integrated Early Warning System

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108145111A (en) * 2018-01-25 2018-06-12 上海东震冶金工程技术有限公司 Hot scarfing machine oxygen/fuel gas pipeline leakage Integrated Early Warning System

Similar Documents

Publication Publication Date Title
CN207952572U (en) Hot scarfing machine oxygen/fuel gas pipeline leakage Integrated Early Warning System
CN109386738A (en) A kind of gas pipeline valve chamber main pipeline booster monitoring, alarming and interlock protection device
CN109578817A (en) A kind of gas pipeline terminal main line pressure drop rate monitoring, alarming interlocking method
CN107883056B (en) Real-time online safety valve monitoring system and safety valve leakage monitoring method
CN106870942B (en) Pipe pressure type explosion-proof valve
CN109555976A (en) Gas pipeline terminal main line pressure drop rate monitoring, alarming interlock and method
CN109404742A (en) Gas pipeline valve chamber main pipeline booster monitoring, alarming and protective device, method
CN108145111A (en) Hot scarfing machine oxygen/fuel gas pipeline leakage Integrated Early Warning System
CN203732253U (en) Pressure switch detection device
CN109357165A (en) A kind of gas pipeline Trunk Line pressure drop rate monitoring alarm and method
CN202182748U (en) Safety intelligent gas meter
CN204006095U (en) A kind of boiler fire inspection wind system
CN204330069U (en) A kind of air cooling tower liquid level detection device
CN204022516U (en) A kind of anti-penetration water purifier exempting low-tension switch
CN204228228U (en) Cork dry quenching disposable dust remover material-level detecting device
CN105387558A (en) Chilled water tail end system and fault detection method thereof
CN105755202A (en) Oxygen pipeline system and anti-blasting device of extra-large converter oxygen lance valve station
CN205664855U (en) Pipe detection device
CN202544026U (en) Pipeline type water drinking device
CN204556193U (en) A kind of woven hose inwall pick-up unit
CN212327281U (en) Automatic inspection device for fire-fighting water fire-extinguishing system
CN211315804U (en) Intelligent automatic reset leakage-proof coal gas drainage monitoring system
CN213272604U (en) Gas negative pressure injection type combustor with safety protection
CN204864675U (en) Novel end tries water device
CN209445069U (en) A kind of gas pipeline valve chamber main pipeline booster monitoring, alarming and interlock protection device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant