CN207941370U - Crucible molten aluminum emission-control equipment - Google Patents

Crucible molten aluminum emission-control equipment Download PDF

Info

Publication number
CN207941370U
CN207941370U CN201820190434.6U CN201820190434U CN207941370U CN 207941370 U CN207941370 U CN 207941370U CN 201820190434 U CN201820190434 U CN 201820190434U CN 207941370 U CN207941370 U CN 207941370U
Authority
CN
China
Prior art keywords
docking section
connecting tube
hemispherical groove
molten aluminum
mounting plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820190434.6U
Other languages
Chinese (zh)
Inventor
朱海涛
李振飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou China Environmental Technology Co Ltd
Original Assignee
Suzhou China Environmental Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou China Environmental Technology Co Ltd filed Critical Suzhou China Environmental Technology Co Ltd
Priority to CN201820190434.6U priority Critical patent/CN207941370U/en
Application granted granted Critical
Publication of CN207941370U publication Critical patent/CN207941370U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)
  • Manufacture And Refinement Of Metals (AREA)

Abstract

The utility model discloses a kind of crucible molten aluminum emission-control equipments, it includes waste gas absorption mechanism, the water scrubber of the waste gas absorption mechanism is connected by waste gas absorption pipe, the wind turbine and discharging mechanism of the water scrubber are connected by pipeline, the absorbing mechanism includes the absorbing cover for absorbing exhaust gas, connect the first connecting tube of the absorbing cover, connect the second connecting tube of the waste gas absorption pipe, movable sleeve has the first docking section in first connecting tube, welding is equipped with the second docking section on the end of the second connecting tube of docking, also there is the mounting plate being set in first connecting tube between first docking section and second docking section, first docking section and mounting plate, multiple containers are collectively formed with mounting plate in second docking section respectively, it is mounted on ball in each container.The device can improve the efficiency for absorbing exhaust gas.

Description

Crucible molten aluminum emission-control equipment
Technical field
The utility model is related to emission-control equipment technical fields, and in particular to a kind of crucible molten aluminum emission-control equipment.
Background technology
As environmental requirement is continuously improved in society, each manufacturing type enterprise need to be handled exhaust gas, waste water, and In molten aluminum enterprise, during molten aluminum, a large amount of exhaust gas is will produce, once exhausted air quantity is excessive, body will be brought to Manufacturing Worker Injury on body, therefore, it is necessary to handle exhaust gas.
Chinese Patent Application No. is that No. 201620192568.2 patent discloses a kind of band and skim and emission-control equipment Aluminium waste smelting equipment, including smelting furnace, device for removing slag and emission-control equipment, the emission-control equipment includes that waste heat returns Receive room, dust storage chamber, spray chamber and adsorption chamber;It is provided with Waste Heat Recovery pipe in the Waste Heat Recovery room;Setting in the dust storage chamber There are the first dust-collecting cavity, the second dust-collecting cavity and third dust-collecting cavity;The spray equipment is by transmission device, the second motor and rotary spray Disk forms.
Chinese Patent Application No. is that No. 201420378416.2 patent discloses a kind of electrolytic aluminium waste Flash Gas Compression Skid System, is wrapped Waste gas absorption cover, waste gas absorption pipe, air exhauster, exhaust-gas treatment room and delivery pipe are included, the air inlet of the air exhauster passes through exhaust gas Absorption tube is connected on waste gas absorption cover, the gas outlet of the air exhauster by waste gas absorption pipe be connected to exhaust-gas treatment room into On gas port, the delivery pipe is connected on the gas outlet of exhaust-gas treatment room.
There is the emission-control equipment for disclosing and using the exhaust gas that molten aluminum generates in above-mentioned patent, to effectively reduce The exhaust gas that molten aluminum generates in air;But in practical molten aluminum production process, workshop may because weather, wind direction etc. it is extraneous because The source of element, the exhaust gas that same molten aluminum equipment generates is slightly different under different extraneous factors, if not considering exhaust gas source difference Factor, then there is extraneous factor, exhaust gas just can not be maximumlly sucked away.
Therefore, a kind of crucible molten aluminum emission-control equipment is herein proposed to improve the efficiency for absorbing exhaust gas.
Utility model content
The purpose of this utility model is to provide a kind of crucible molten aluminum emission-control equipments, to improve the effect for absorbing exhaust gas Rate.
To achieve the above object, the utility model provides the following technical solutions:A kind of crucible molten aluminum emission-control equipment, The water scrubber of the waste gas absorption mechanism is connected including waste gas absorption mechanism, by waste gas absorption pipe, connected by pipeline described in The wind turbine and discharging mechanism of water scrubber, the absorbing mechanism include for absorbing the absorbing cover of exhaust gas, the connection absorbing cover Second connecting tube of the first connecting tube, the connection waste gas absorption pipe, movable sleeve has first pair in first connecting tube Socket part is located at welding on the end of the second connecting tube of docking and is equipped with the second docking section, is located at first docking section and described the Also have between two docking sections and is set in mounting plate in first connecting tube, it is first docking section and mounting plate, described Multiple containers are collectively formed with mounting plate in second docking section respectively, and ball is mounted in each container.
First docking section has the first mounting hole through its upper and lower surface, and second docking section is above and below it Second mounting hole on surface, first mounting hole are fixedly connected with described first with second mounting hole by running through a bolt Connecting tube and the second connecting tube.
Also with the first hemispherical groove, second docking section also has second hemispherical for first docking section Groove, the mounting plate upper and lower surface all have opposite with first hemispherical groove, second hemispherical groove respectively The third hemispherical groove answered, first hemispherical groove and the third hemispherical groove, second hemispherical groove The container is collectively formed with the third hemispherical groove.
First docking section has the first notch of the formation that is recessed downwards from its upper surface, first hemispherical groove It is formed from the first notch to lower recess;Second docking section has the second notch of the formation that is recessed upwards from its lower surface, Second hemispherical groove is recessed from second notch and is formed upwards.
The bottom surface of second notch is concordant with the end face of the second connecting tube, the upper surface of the mounting plate and described first The end face of connecting tube is concordant.
Compared with prior art, the advantageous effect of the utility model crucible molten aluminum emission-control equipment is:Absorbing cover and One connecting tube, mounting plate can be rotated around the second connecting tube, to change the entrance that absorbing cover absorbs exhaust gas at any time, be absorbed Cover can dock different exhaust gas sources, to can guarantee that absorbing cover is always ensured that the outlet with exhaust gas is aligned, to ensure to improve Absorb the efficiency of exhaust gas.
Description of the drawings
Fig. 1 is the utility model crucible molten aluminum emission-control equipment dimensional structure diagram.
Fig. 2 is the waste gas absorption mechanism structural schematic diagram of the utility model crucible molten aluminum emission-control equipment.
Fig. 3 is that the first connecting tube of the waste gas absorption mechanism of the utility model crucible molten aluminum emission-control equipment and second connect The sectional view of take over connection type.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work The every other embodiment obtained, shall fall within the protection scope of the present invention.
It please refers to Fig.1 to Fig.3, the utility model is a kind of crucible molten aluminum emission-control equipment comprising exhaust air absorbing machine Structure 1, waste gas absorption pipe 2, water scrubber 3, wind turbine 4 and discharging mechanism 5.
As shown in Figure 1, the connection waste gas absorption pipe 2 of multiple waste gas absorption mechanisms 1 side by side, the connection of 2 end of waste gas absorption pipe To water scrubber 3, water scrubber 3 connects wind turbine 4 by pipeline again, and wind turbine 4 connects discharging mechanism 5 by pipeline again.Waste gas absorption pipe 2 It is fixed by holder 6.
As shown in Figure 2 to Figure 3, absorbing mechanism 1 includes absorbing cover 12, the first connecting tube 13 for connecting absorbing cover 12, connection Second connecting tube 14 of waste gas absorption pipe 2.The nozzle of first connecting tube 13 is aligned with the nozzle of the second connecting tube 14, the first connection Pipe 13 and the second connecting tube 14 are warp architecture.Movable sleeve has the first docking section 131 in first connecting tube 13, first pair Socket part 131 is circular configuration;Welding is equipped with the second docking section 141, the second docking on the end of the second connecting tube 14 of docking Portion 141 is circular configuration;First docking section 131 has the first mounting hole 130 through its upper and lower surface, the second docking section 141 Through the second mounting hole 140 of its upper and lower surface.First mounting hole 130 is fixedly connected with institute with the second mounting hole 140 by bolt 7 State the first connecting tube 13 and the second connecting tube 14.
Also there is the installation being set in the first connecting tube 13 between the first docking section 131 and the second docking section 141 Plate 15.
First docking section 131 is also with the first hemispherical groove 133, specifically, the first docking section 131 has from it Upper table downwards concave shape at the first notch 132, mounting plate 15 is contained in the first notch 131, and the first notch 132 is located at the The inside of one mounting hole 130, the first hemispherical groove 133 are formed from the first notch 132 to lower recess;Second docking section 141 Also there is the second hemispherical groove 143, specifically, the second docking section 141 has is recessed the second of formation from its lower surface upwards Notch 142, the second notch 142 are located at the inside of the second mounting hole 140, the bottom surface of the second notch 142 and the second connecting tube 14 End face is concordant.Second hemispherical groove 143 is recessed from the second notch 142 and is formed upwards.The bottom surface of first notch 132 is less than the The end face of one connecting tube 13.
Mounting plate is installed in the first connecting tube 13, and mounting plate 15 is circular configuration, the upper surface of mounting plate 15 and first The end face of connecting tube 13 is concordant.
Multiple containers are collectively formed with mounting plate, the second docking section and mounting plate in first docking section respectively, each to accommodate Ball is mounted in slot, specifically, 15 upper and lower surface of mounting plate all have respectively with the first hemispherical groove 133, the second half 143 corresponding third hemispherical groove 151 of bulbous recess, the first hemispherical groove 133 and third hemispherical groove 151, the Container is collectively formed with third hemispherical groove 151 in two hemispherical grooves 143, and ball is mounted in each container 16。
In the utility model, waste gas absorption pipe 2, water scrubber 3, wind turbine 4 and discharging mechanism 5 are existing equipment, are not done herein Excessive narration.
When work, absorbing cover 12 collects the exhaust gas generated when crucible molten aluminum, is entered in water scrubber 3 by waste gas absorption pipe 2 It is washed, then the exhaust gas for meeting discharge standard is emitted by the external world by discharging mechanism 5 by wind turbine 4.
Absorbing cover 12 is rotated with the first connecting tube 13, mounting plate 15 around the second connecting tube 14, to change absorbing cover 12 absorb the entrance of exhaust gas, so design, absorbing cover 12 can dock different exhaust gas sources, to can guarantee absorbing cover 12 always Guarantee is aligned with the outlet of exhaust gas, to ensure to improve the efficiency for absorbing exhaust gas.
It is obvious to a person skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and And without departing substantially from the spirit or essential attributes of the utility model, it can realize that this practicality is new in other specific forms Type.Therefore, in all respects, the present embodiments are to be considered as illustrative and not restrictive, this practicality is new The range of type is indicated by the appended claims rather than the foregoing description, it is intended that containing in the equivalent requirements of the claims will be fallen All changes in justice and range are embraced therein.Any reference numeral in claim should not be considered as limitation Involved claim.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art The other embodiment being appreciated that.

Claims (5)

1. a kind of crucible molten aluminum emission-control equipment comprising multiple waste gas absorption mechanisms, by waste gas absorption pipe connection described in The water scrubber of waste gas absorption mechanism, the wind turbine and discharging mechanism that the water scrubber is connected by pipeline, it is characterised in that:The suction It includes for absorbing the absorbing cover of exhaust gas, the first connecting tube of the connection absorbing cover, the connection waste gas absorption pipe to receive mechanism The second connecting tube, movable sleeve has the first docking section in first connecting tube, is located at the end of the second connecting tube of docking Upper welding is equipped with the second docking section, also has between first docking section and second docking section and is set in described the Mounting plate in one connecting tube, first docking section are collectively formed respectively with mounting plate, second docking section and mounting plate Multiple containers are each mounted on ball in the container.
2. crucible molten aluminum emission-control equipment as described in claim 1, it is characterised in that:First docking section, which has, to be run through The second mounting hole of its upper and lower surface, first installation are run through in first mounting hole of its upper and lower surface, second docking section Hole is fixedly connected with first connecting tube and the second connecting tube with second mounting hole by running through a bolt.
3. crucible molten aluminum emission-control equipment as described in claim 1, it is characterised in that:First docking section also has tool There are the first hemispherical groove, second docking section that also there is the second hemispherical groove, the mounting plate upper and lower surface to all have Third hemispherical groove corresponding with first hemispherical groove, second hemispherical groove respectively, described the first half Bulbous recess is collectively formed with the third hemispherical groove, second hemispherical groove and the third hemispherical groove The container.
4. crucible molten aluminum emission-control equipment as claimed in claim 3, it is characterised in that:First docking section has from it Upper table downwards concave shape at the first notch, first hemispherical groove formed from the first notch to lower recess;It is described There is the second notch of the formation that is recessed upwards from its lower surface, second hemispherical groove to be lacked from described second for second docking section Mouth is recessed and is formed upwards.
5. crucible molten aluminum emission-control equipment as claimed in claim 4, it is characterised in that:The bottom surface of second notch and the The end face of two connecting tubes is concordant, and the upper surface of the mounting plate is concordant with the end face of the first connecting tube.
CN201820190434.6U 2018-02-05 2018-02-05 Crucible molten aluminum emission-control equipment Expired - Fee Related CN207941370U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820190434.6U CN207941370U (en) 2018-02-05 2018-02-05 Crucible molten aluminum emission-control equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820190434.6U CN207941370U (en) 2018-02-05 2018-02-05 Crucible molten aluminum emission-control equipment

Publications (1)

Publication Number Publication Date
CN207941370U true CN207941370U (en) 2018-10-09

Family

ID=63699269

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820190434.6U Expired - Fee Related CN207941370U (en) 2018-02-05 2018-02-05 Crucible molten aluminum emission-control equipment

Country Status (1)

Country Link
CN (1) CN207941370U (en)

Similar Documents

Publication Publication Date Title
CN103251348A (en) Surface cleaning device
CN105944483A (en) Efficient environment-friendly dust removal device
CN110624338B (en) Metallurgical waste gas recycles green treatment facility
CN204091883U (en) A kind of Portable industrial dust catcher
CN107998804A (en) A kind of equipment for treating industrial waste gas with heat recovery
CN207941370U (en) Crucible molten aluminum emission-control equipment
CN212094827U (en) Dust collector for laser cutting
CN216227649U (en) Semiconductor LED gold thread welding machine
CN206823521U (en) A kind of sulphur absorption tower
CN108826461A (en) A kind of energy-saving ball blast room air purification exhaust system
CN201407086Y (en) Tail gas treating device
CN204134460U (en) Viscose rayon process gas recovery system
CN211051140U (en) Dust collector is used in production of fire prevention heat preservation building material
CN206404378U (en) Granulated carbon absorbent module for finish
CN208509494U (en) A kind of radiator of the electrical cabinet of crane
CN203355528U (en) Defluorination and desulfuration dust removal device
CN207899172U (en) A kind of water film dust removal device of practicality
CN205520039U (en) Circulating plasma cutting machine dust collector
CN218306840U (en) Gas circulation device for cladding
CN212310370U (en) Dust keeper for coating plate curing kiln
CN202146702U (en) Water curtain dust collecting device
CN210302978U (en) Environment-friendly dust removal device for chemical industry
CN205412542U (en) Metal dust device is removed to torrent
CN211219093U (en) Portable argon arc welding gun water cooling system
CN211476832U (en) Water retaining structure in vacuum condenser

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181009

Termination date: 20200205