CN207937589U - Buckle formula three-phase four-wire electric energy meter on-spot check gauge - Google Patents

Buckle formula three-phase four-wire electric energy meter on-spot check gauge Download PDF

Info

Publication number
CN207937589U
CN207937589U CN201820090828.4U CN201820090828U CN207937589U CN 207937589 U CN207937589 U CN 207937589U CN 201820090828 U CN201820090828 U CN 201820090828U CN 207937589 U CN207937589 U CN 207937589U
Authority
CN
China
Prior art keywords
phase
energy meter
electric energy
line
line electric
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820090828.4U
Other languages
Chinese (zh)
Inventor
陈通
陈劲游
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201820090828.4U priority Critical patent/CN207937589U/en
Application granted granted Critical
Publication of CN207937589U publication Critical patent/CN207937589U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

the utility model discloses a buckle formula three-phase four-wire electric energy meter on-spot check gauge, including three-phase four-wire electric energy meter check gauge main part and set up the three-phase four-wire electric energy meter check gauge circuit board in three-phase four-wire electric energy meter check gauge main part, three-phase four-wire electric energy meter check gauge main part is the L type, three-phase four-wire electric energy meter check gauge main part both sides are equipped with respectively fixes the adjustable connecting device on three-phase four-wire electric energy meter with the check gauge, be equipped with the display input equipment in the three-phase four-wire electric energy meter check gauge main part, be equipped with voltage elasticity probe group in the three-phase four-wire electric energy meter check gauge main part, signal elasticity probe group, be equipped with current signal input group in the three-phase four-wire electric energy meter check gauge main part, during on-spot check-up, only need connect the check gauge on-by the three-phase four-wire.

Description

A kind of buckle-type three-phase and four-line electric energy meter on-site calibrator
[technical field]
The utility model belongs to measuring instrument instrument, specifically examines and installs the one of electric energy meter error and wiring at the scene Kind buckle-type three-phase and four-line electric energy meter on-site calibrator.
[background technology]
In electric energy meter international recommendation and vertification regulation (and international and domestic standard), it is specified that the calibrating of electric energy meter in laboratory Under the conditions of carry out.But in this way calibrating out electric energy meter at the scene under the conditions of show on earth howWith the presence or absence of differenceDifference Have muchThis is a problem.Due to electric energy meter work must at the scene under the conditions of carry out, display reading is again directly and charging Correlation, thus user pay much attention to electric energy meter field reading whether correct problem.Therefore no matter theoretically or from practice On, it is a major issue by extensive concern that degree electric energy meter is accurate on earth at the scene.These are and field-checking It is related.
Field-checking is to carry electric energy meter on-site calibrator, is accessed at the scene by the power grid where the electric energy meter of school, Compare by school electric energy meter and tester at the same time in electric energy reading, to obtain by the error of school electric energy meter.But it is existing It is independent design to have the shape of electric energy meter on-site calibrator, cannot be mounted on tester in the space of electric energy metering box, therefore survey Amount voltage, electric current and when signal, need movable leadframe to connect, and when verification needs operating personnel on duty, while checking time is limited, Make it difficult to the electric energy meter error under verification to a variety of operating conditions.
[utility model content]
The utility model overcomes the deficiency of above-mentioned technology, provides a kind of buckle-type three-phase and four-line Watt-hour meter's field test Tester when field-checking three-phase and four-line electric energy meter, need to be only connected to by the three-phase and four-line electric energy meter of school by buckling, be made by instrument Field-checking when it is on duty without operating personnel, and checking time is unrestricted, thus can verify under a variety of operating conditions three Four line electric energy meter error of phase.
To achieve the above object, the utility model uses following technical proposal:
A kind of buckle-type three-phase and four-line electric energy meter on-site calibrator includes three-phase and four-line powermeter verification instrumeter main body 1 with And it is set to the three-phase and four-line electrical energy meter calibration circuit board in three-phase and four-line powermeter verification instrumeter main body 1, the three-phase and four-line electricity Energy table tester main body 1 is L-type, and 1 both sides of three-phase and four-line powermeter verification instrumeter main body, which are respectively equipped with, is fixed on tester Adjustable connecting device 2 on three-phase and four-line electric energy meter, the three-phase and four-line powermeter verification instrumeter main body 1 are equipped with display input and set Standby 3, the three-phase and four-line powermeter verification instrumeter main body 1 is equipped with the voltage contacted with three-phase and four-line electric energy meter phase terminal terminal Elastic probe group 4 exports terminal activation signal elastic probe group 5, the three-phase and four-line electric energy with three-phase and four-line electric meter signal Table tester main body 1 is equipped with current signal input group 6, and the current signal input group 6 includes and three-phase and four-line electric energy meter The Ia current signals input interface of Ia+ electric current input lines connection, the Ib electricity being connect with three-phase and four-line electric energy meter Ib+ electric current input lines The Ic current signal input interfaces for flowing signal input interface, being connect with three-phase and four-line electric energy meter Ic+ electric current input lines.
The voltage elastic probe group 4 includes the Ua phase line electricity contacted with three-phase and four-line electric energy meter Ua phase terminal terminals Compression elasticity probe, the Ub phases line voltages elastic probe and three-phase and four-line contacted with three-phase and four-line electric energy meter Ub phase terminal terminals The Uc phases line voltages elastic probe of electric energy meter Uc phase terminal terminals contact connects with three-phase and four-line electric energy meter Un phase terminal terminals Tactile Un phases line voltage elastic probes, the signal elasticity probe groups 5 include to be exported with the active pulse of three-phase and four-line electric energy meter The active pulse input signal elastic probe of signal terminal contact connects with the idle pulse output signals terminal of three-phase and four-line electric energy meter Tactile idle pulse input signal elastic probe, the 485 signal elasticity contacted with 485 signal terminal of three-phase and four-line electric energy meter are visited Needle, the clock signal elastic probe contacted with three-phase and four-line clock of power meter signal terminal.
The adjustable connecting device 2 includes 7 He of zig-zag type link block that lower end can be inserted into three-phase and four-line electric energy meter bottom The engaging lug 8 being set in three-phase and four-line powermeter verification instrumeter main body 1, between 7 upper end of the engaging lug 8 and zig-zag type link block It is connected by connecting rod 9.
7 upper end of zig-zag type link block is equipped with threaded hole, and the connecting rod 9 is the screw thread being threadedly coupled with threaded hole Bar.
7 upper end of zig-zag type link block, which is equipped with, makes the through-hole that connecting rod 9 passes through, and the connecting rod 8 is equipped with chamfer Lance tooth group 10, the zig-zag type link block 6 are equipped with the elastic card for being fastened with chamfer lance tooth group 10 Button 11.
The connecting rod 9 is cylindrical or square column type.
The display input equipment 3 is operation touch-screen or keyboard & display screen.
Remote communication module is set on the three-phase and four-line electrical energy meter calibration circuit board and realizes remote verification.
The utility model has the beneficial effects that:
The utility model tester main body designs for L-type, can be clamped with by school three-phase and four-line electric energy meter close and firm, fully Space after being installed using electric energy meter in electricity box, tester, which is buckled in, can be closed door of meter casing, be added after the three-phase and four-line electric energy meter of school Upper seal, and can cover by school three-phase and four-line electric energy meter connection terminal knob box, so that tester is voluntarily run, field-checking is without behaviour Make human attendance, thus checking time is unrestricted, can verify the three-phase and four-line electric energy meter error under a variety of operating conditions;This reality Directly be buckled in by the three-phase and four-line electric energy meter of school with novel tester, and by elastic probe directly with three-phase and four-line electric energy meter Phase line, zero curve ramp, the connection of signal terminal, are not necessarily to voltage lead and signal lead, eliminate the trouble of wiring and raising The safety of verification electric energy meter.
[description of the drawings]
Fig. 1 is that the utility model tester main body snaps connection one schematic diagram of embodiment with three-phase and four-line electric energy meter;Fig. 2 is The utility model tester main body side view;
Fig. 3 is the adjustable connecting device embodiment that the utility model tester main body is snapped connection with three-phase and four-line electric energy meter Two schematic diagrames;
Fig. 4 is part A enlarged drawing in Fig. 3.
[specific implementation mode]
It is described in further detail below in conjunction with the accompanying drawings with the embodiment of the utility model:
Embodiment one:
As depicted in figs. 1 and 2, a kind of buckle-type three-phase and four-line electric energy meter on-site calibrator includes three-phase and four-line electric energy Table tester main body 1 and the three-phase and four-line electrical energy meter calibration circuit board being set in three-phase and four-line powermeter verification instrumeter main body 1, The three-phase and four-line powermeter verification instrumeter main body 1 is L-type, convenient for three-phase and four-line powermeter verification instrumeter main body 1 is buckled in three-phase On four line electric energy meters, and make full use of the space in electric energy meter electricity box so that after three-phase and four-line powermeter verification instrumeter main body 1 is installed Also it can be closed door of meter casing, 1 both sides of three-phase and four-line powermeter verification instrumeter main body are respectively equipped with three-phase and four-line electrical energy meter calibration Instrument is fixed on the adjustable connecting device 2 on three-phase and four-line electric energy meter, and the three-phase and four-line powermeter verification instrumeter main body 1 is equipped with aobvious Show that input equipment 3, the display input equipment 3 are operation touch-screen or keyboard & display screen, the three-phase and four-line electrical energy meter calibration Instrument main body 1 is equipped with the voltage elastic probe group 4 contacted with three-phase and four-line electric energy meter phase terminal terminal and three-phase and four-line electric energy Table signal output end button activation signal elastic probe group 5, the three-phase and four-line powermeter verification instrumeter main body 1 are equipped with current signal Input group 6, the current signal input group 6 include the Ia electric currents letter being connect with three-phase and four-line electric energy meter Ia+ electric current input lines Number input interface, the Ib current signals input interface being connect with three-phase and four-line electric energy meter Ib+ electric current input lines, with three-phase and four-line electricity The Ic current signal input interfaces of energy Table I c+ electric current input lines connection.
The three-phase and four-line electric energy meter be equipped with Ua phase terminals terminal, Ub phase terminals terminal, Uc phase terminals terminal, Un phase terminals terminal, active pulse output signals terminal, idle pulse output signals terminal, 485 signal terminals and clock Signal terminal, the voltage elastic probe group 4 include the Ua phase lines contacted with three-phase and four-line electric energy meter Ua phase terminal terminals Voltage elastic probe, the Ub phases line voltages elastic probe contacted with three-phase and four-line electric energy meter Ub phase terminal terminals and three-phase four The Uc phases line voltages elastic probe and three-phase and four-line electric energy meter Un phase terminal terminals of line electric energy meter Uc phase terminal terminals contact The Un phases line voltage elastic probes of contact, the signal elasticity probe groups 5 include defeated with the active pulse of three-phase and four-line electric energy meter Go out the active pulse input signal elastic probe and the idle pulse output signals terminal of three-phase and four-line electric energy meter of the contact of signal terminal The idle pulse input signal elastic probe of contact, the 485 signal elasticity contacted with 485 signal terminal of three-phase and four-line electric energy meter are visited Needle, the clock signal elastic probe contacted with three-phase and four-line clock of power meter signal terminal.
The adjustable connecting device 2 includes 7 He of zig-zag type link block that lower end can be inserted into three-phase and four-line electric energy meter bottom The engaging lug 8 being set in three-phase and four-line powermeter verification instrumeter main body 1, between 7 upper end of the engaging lug 8 and zig-zag type link block It is connected by connecting rod 9,7 another upper end of the zig-zag type link block is equipped with threaded hole, and the connecting rod 9 is to connect with threaded hole screw thread The threaded rod connect.
In use, removing three-phase and four-line connection box of electric energy meter terminal box cover, three-phase and four-line powermeter verification instrumeter main body 1 is buckled in On electric energy meter, make Ua phases line voltages elastic probe, Ub phases line voltages elastic probe, the Uc phase line electricity in voltage elastic probe group 4 Compression elasticity probe, Un phases line voltages elastic probe respectively with Ua phase terminals terminal, the Ub phase terminals of three-phase and four-line electric energy meter Terminal, Uc phase terminals terminal, the contact of Un phase terminal terminals, while making the active pulse input in signal elasticity probe groups 5 Signal elastic probe, idle pulse input signal elastic probe, 485 signal elastic probes, clock signal elastic probe respectively with The active pulse output signals terminal of three-phase and four-line electric energy meter, idle pulse output signals terminal, 485 signal terminals, clock signal Terminal contacts;Three-phase and four-line electric energy meter bottom is then inserted into 7 lower end of zig-zag type link block, and by being stuck in three-phase and four-line electric energy meter Connecting rod 9 on 1 engaging lug 8 of tester main body connects zig-zag type link block 7, and connecting rod 9 is to connect with threaded hole screw thread It connects, three-phase and four-line powermeter verification instrumeter main body 1 can be buckled on three-phase and four-line electric energy meter after tightening connecting rod 9, then lead to Two split core type current transformers or Current Transformer are crossed respectively in the Ia+ electric currents input line of three-phase and four-line electric energy meter, Ib+ electric currents In input line, Ic+ electric current input lines, its signal is respectively connected to Ia current signals input interface in current signal input group 6, Ib current signals input interface, Ic current signal input interfaces complete the installation of three-phase and four-line powermeter verification instrumeter main body 1 simultaneously It can carry out the field-checking of three-phase and four-line electric energy meter.
At this point, three-phase and four-line powermeter verification instrumeter main body 1 does not cover electric energy meter display screen 12, live copy reading is not influenced by school Three-phase and four-line electric energy meter, while remote communication module can also be set on three-phase and four-line electrical energy meter calibration circuit board and realize long-range school It tests.
The embodiment two of adjustable connecting device 2:
As shown in Figure 3 and Figure 4, such as 7 upper end of zig-zag type link block of adjustable connecting device 2, which is equipped with, makes connecting rod 9 pass through Through-hole, the connecting rod 8 is equipped with chamfer lance tooth group 10, the zig-zag type link block 7 be equipped with for it is straight The Elastic buckle 11 that angle lance tooth group 10 is fastened, wherein the connecting rod 9 is cylindrical or square column type.
When buckle, the upper end of zig-zag type link block 7 need to be only lived with finger pad, thumb depresses cylindrical type or square column with cap Shape connecting rod 9,11 upper end of Elastic buckle are fixed in chamfer lance tooth group 10 referring to enlarged drawing A, thus by three-phase Four line powermeter verification instrumeter main bodys 1 are buckled on single-phase electric energy meter, only need to be by the operating handle that releases of Elastic buckle 11 when removing 112 pressures can unclamp.
Example the above is only the implementation of the present invention is not intended to limit the invention, all in the spirit and principles in the present invention Within made by any modification, equivalent replacement or improvement etc., should all be included in the protection scope of the present invention.

Claims (8)

1. a kind of buckle-type three-phase and four-line electric energy meter on-site calibrator, it is characterised in that:It include three-phase and four-line electrical energy meter calibration Instrument main body (1) and the three-phase and four-line electrical energy meter calibration circuit board being set in three-phase and four-line powermeter verification instrumeter main body (1), institute It is L-type to state three-phase and four-line powermeter verification instrumeter main body (1), and three-phase and four-line powermeter verification instrumeter main body (1) both sides are set respectively Have the adjustable connecting device (2) tester being fixed on three-phase and four-line electric energy meter, the three-phase and four-line powermeter verification instrumeter master Body (1) is equipped with display input equipment (3), and the three-phase and four-line powermeter verification instrumeter main body (1) is equipped with and three-phase and four-line electricity The voltage elastic probe group (4) of energy table phase terminal terminal contact exports terminal activation signal with three-phase and four-line electric meter signal Elastic probe group (5), the three-phase and four-line powermeter verification instrumeter main body (1) are equipped with current signal input group (6), the electric current Signal input group (6) includes the Ia current signals input interface being connect with three-phase and four-line electric energy meter Ia+ electric current input lines and three The Ib current signals input interface of four line electric energy meter Ib+ electric current input lines of phase connection is inputted with three-phase and four-line electric energy meter Ic+ electric currents The Ic current signal input interfaces of line connection.
2. a kind of buckle-type three-phase and four-line electric energy meter on-site calibrator according to claim 1, it is characterised in that:The electricity Compression elasticity probe groups (4) include the Ua phases line voltages elastic probe contacted with three-phase and four-line electric energy meter Ua phase terminal terminals, The Ub phases line voltages elastic probe and three-phase and four-line electric energy meter Uc phase lines contacted with three-phase and four-line electric energy meter Ub phase terminal terminals The Uc phases line voltages elastic probe of ramp contact, the Un phase line electricity contacted with three-phase and four-line electric energy meter Un phase terminal terminals Compression elasticity probe, the signal elasticity probe groups (5) include to be connect with the active pulse output signals terminal of three-phase and four-line electric energy meter Tactile active pulse input signal elastic probe, the idle arteries and veins contacted with the idle pulse output signals terminal of three-phase and four-line electric energy meter Rush input signal elastic probe, the 485 signal elastic probes contacted with 485 signal terminal of three-phase and four-line electric energy meter and three-phase four The clock signal elastic probe of line clock of power meter signal terminal contact.
3. a kind of buckle-type three-phase and four-line electric energy meter on-site calibrator according to claim 1, it is characterised in that:It is described can It includes that lower end can be inserted into the zig-zag type link block (7) of three-phase and four-line electric energy meter bottom and be set to three-phase to adjust attachment device (2) Engaging lug (8) in four line powermeter verification instrumeter main bodys (1) leads between the engaging lug (8) and zig-zag type link block (7) upper end Cross connecting rod (9) connection.
4. a kind of buckle-type three-phase and four-line electric energy meter on-site calibrator according to claim 3, it is characterised in that:It is described it Font link block (7) upper end is equipped with threaded hole, and the connecting rod (9) is the threaded rod being threadedly coupled with threaded hole.
5. a kind of buckle-type three-phase and four-line electric energy meter on-site calibrator according to claim 3, it is characterised in that:It is described it Font link block (7) upper end, which is equipped with, makes the through-hole that connecting rod (9) passes through, and the connecting rod (9) is equipped with chamfer lance tooth Group (10), the zig-zag type link block (7) are equipped with the Elastic buckle for being fastened with chamfer lance tooth group (10) (11)。
6. a kind of buckle-type three-phase and four-line electric energy meter on-site calibrator according to claim 4, it is characterised in that:The company Extension bar (9) is cylindrical or square column type.
7. a kind of buckle-type three-phase and four-line electric energy meter on-site calibrator according to claim 1, it is characterised in that:It is described aobvious Show that input equipment (3) is operation touch-screen or keyboard & display screen.
8. a kind of buckle-type three-phase and four-line electric energy meter on-site calibrator according to claim 1, it is characterised in that:Described three Remote communication module is set on four line electrical energy meter calibration circuit board of phase and realizes remote verification.
CN201820090828.4U 2018-01-19 2018-01-19 Buckle formula three-phase four-wire electric energy meter on-spot check gauge Expired - Fee Related CN207937589U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820090828.4U CN207937589U (en) 2018-01-19 2018-01-19 Buckle formula three-phase four-wire electric energy meter on-spot check gauge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820090828.4U CN207937589U (en) 2018-01-19 2018-01-19 Buckle formula three-phase four-wire electric energy meter on-spot check gauge

Publications (1)

Publication Number Publication Date
CN207937589U true CN207937589U (en) 2018-10-02

Family

ID=63649770

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820090828.4U Expired - Fee Related CN207937589U (en) 2018-01-19 2018-01-19 Buckle formula three-phase four-wire electric energy meter on-spot check gauge

Country Status (1)

Country Link
CN (1) CN207937589U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108008344A (en) * 2018-01-19 2018-05-08 陈劲游 Buckle formula three-phase four-wire electric energy meter on-spot check gauge

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108008344A (en) * 2018-01-19 2018-05-08 陈劲游 Buckle formula three-phase four-wire electric energy meter on-spot check gauge

Similar Documents

Publication Publication Date Title
CN108008344A (en) Buckle formula three-phase four-wire electric energy meter on-spot check gauge
CN101470145B (en) Insulation resistance test system
CN101806876A (en) Electronic type transformer checking system
CN102091424B (en) Calibrating device for AC and DC leakage current tester
CN102298132A (en) Calibrating device of grounding conduction resistance tester
CN201926755U (en) Calibrating device for AC/DC leakage current tester
CN207689657U (en) Buckle type single-phase electric energy meter on-site calibration instrument
CN202075403U (en) Calibrating device of grounded on-resistance tester
CN207937589U (en) Buckle formula three-phase four-wire electric energy meter on-spot check gauge
CN207937588U (en) Buckle type three-phase three-wire electric energy meter on-site calibration instrument
CN205067714U (en) Single -phase electric energy meter calibrating installation and single -phase electric energy meter credible test platform that resets
CN203799003U (en) Integrated online verification calibrator for voltage-withstand tester
CN103901382B (en) A kind of calibration detection apparatus of time current table
CN209044027U (en) NEW ADAPTIVE tripping outlet logic tester
CN108152785A (en) Buckle type three-phase three-wire electric energy meter on-site calibration instrument
CN204882853U (en) Electric energy meter pressure resistance test installation
CN206906496U (en) A kind of no-load voltage ratio tester for transformer
CN108008345A (en) Buckle type single-phase electric energy meter on-site calibration instrument
CN207020295U (en) A kind of insulating check device and insulating check instrument
CN212060551U (en) Single-phase electric energy meter on-site inspection instrument
CN210090657U (en) Active detector of electric energy metering device
CN220490989U (en) Calibrator with multiple relay calibration functions
CN105699758B (en) Power-factor meter with metering interface and its method
CN205861886U (en) A kind of High-accuracy direct current coulomb meter, coulometer
CN209086293U (en) Over-voltage protection of mobile phone chip test probe card

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181002

Termination date: 20220119