CN207936217U - Hot-water heating a heatable brick bed plate temperature controls heater - Google Patents
Hot-water heating a heatable brick bed plate temperature controls heater Download PDFInfo
- Publication number
- CN207936217U CN207936217U CN201721873684.1U CN201721873684U CN207936217U CN 207936217 U CN207936217 U CN 207936217U CN 201721873684 U CN201721873684 U CN 201721873684U CN 207936217 U CN207936217 U CN 207936217U
- Authority
- CN
- China
- Prior art keywords
- control
- water
- temperature
- heating
- bed plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Heat-Pump Type And Storage Water Heaters (AREA)
Abstract
A kind of hot-water heating a heatable brick bed plate temperature control heater is made of shell, supply unit, cyclic water tank, water pump, electric heater and controller;The cyclic water tank, supply unit, water pump and controller are fixedly mounted on shell, and electric heater is mounted on cyclic water tank;Temperature sensor is provided in the cyclic water tank, top is provided with filler, and water tank bottom is provided with water outlet and water return outlet;The water pump is fixedly mounted on water outlet;The water outlet position of the cyclic water tank is installed by solenoid electric valve;The controller control connection water pump, electric heater, temperature sensor and solenoid electric valve;The supply unit connects water pump, electric heater and controller by control circuit.Advantageous effect is:Keep hot-water heating a heatable brick bed plate heating system easy for installation, intelligentized control method heating operation, a heatable brick bed plate temperature can automatic control and adjustment keep, it is easy to use comfortable.
Description
Technical field:
The utility model belongs to energy saving, heating equipment, field of furniture, more particularly to a kind of domestic water-heating a heatable brick bed plate temperature control
Heater.
Background technology:
The invention of hot-water heating a heatable brick bed plate has the living habit for sleeping heatable brick bed using greatly solving the Yellow River northern area people, no
But environmental protection, dustless pollution-free, heating effect is naturally soft, unlike electric blanket heat supply is excessively dry, so having very much development
Foreground.Existing hot-water heating a heatable brick bed plate for the heat supply of a heatable brick bed plate and temperature control all without good settling mode, the mode of heating is very
It is various, be substantially used cooperatively by existing domestic heating equipment, the accessories such as auxiliary circulating pump and control valve, mounting arrangements compared with
For inconvenience;It is that operation and control is experienced by user itself in terms of temperature control and regulation, waterway circulating, temperature is opened when temperature is low
Waterway circulating is closed when high, the heat supply temperature control of a heatable brick bed plate is very inconvenient, and the operating temperature of a heatable brick bed plate is very uneven, serious shadow
Ring usage comfort.
Invention content:
The purpose of this utility model is exactly to solve the mating installation inconvenience of hot-water heating a heatable brick bed plate, heating system temperature control tune
Inconvenient problem is saved, hot-water heating a heatable brick bed plate temperature control heater a kind of easy for installation, and being capable of auto-adjustment control temperature is provided.
To achieve the goals above, technical solution used by the utility model is:It will be in hot-water heating a heatable brick bed plate heating system
The equipment such as cyclic water tank, heater, water pump, solenoid electric valve, in conjunction with hot-water heating a heatable brick bed plate heating system feature, Integrated design is one
Independent easy utensil structure, using temperature sensor monitors hot-water heating a heatable brick bed plate heating system heat supply temperature, according to temperature sensor
Monitoring temperature realizes hot-water heating a heatable brick bed plate heat supply using intelligent controller automatic controlled electric heater, water pump, solenoid electric valve operation
The cycle and auto-adjustment control hot-water heating a heatable brick bed plate temperature of system.
The utility model hot-water heating a heatable brick bed plate temperature controls heater by shell, supply unit, cyclic water tank, water pump, electrical heating
Device and controller composition;The cyclic water tank, supply unit, water pump and controller are fixedly mounted on shell, electric heater peace
Installing is set on cyclic water tank;Temperature sensor is provided in the cyclic water tank, top is provided with filler, and water tank bottom is set
It is equipped with water outlet and water return outlet;The water pump is fixedly mounted on water outlet;The water outlet position installation electricity of the cyclic water tank
Magnetic control valve;The controller control connection water pump, electric heater, temperature sensor and solenoid electric valve;The supply unit
Water pump, electric heater and controller are connected by control circuit.
The housing bottom and side open up heat emission hole.
The controller by temperature monitoring module, loop control module, electric heating control module, solenoid valve control module and
Timing control module connection composition;The temperature monitoring module and timing control module are connected separately temperature sensor and follow
Ring control module;Limit and temperature upper limit position at a temperature of the temperature monitoring module is provided with;The loop control module setting
There are starting mode of pump control and water pump to stop control;The electric heating control module is provided with electrical heating startup control and electrical heating stops
Only control;The solenoid valve control module is provided with the first control of valve position and the second control of valve position;The temperature monitoring module is logical
Excess temperature lower limit control connection starting mode of pump control, by the way that temperature upper limit position control connection water pump stops control, electrical heating stops
Only control and the first control of valve position;The timing control module control connection electrical heating starts control and the second control of valve position.
It is provided with regulating device on the controller, is limited at a temperature of temperature monitoring module and temperature upper limit position passes through tune
Regulating device adjusting control.
The loop control module stops the startup that control controls connection water pump respectively by starting mode of pump control and water pump
And stopping.
The electric heating control module starts control by electrical heating and electrical heating stopping controls control connection electricity respectively and adds
The startup and stopping of hot device.
The solenoid valve control module controls connection Electromagnetic Control respectively by the first control of valve position and the second control of valve position
The the first valve position and the second valve position of valve.
The timing control module timing response time is set as 120 seconds, automatic clear when timing stops.
The solenoid electric valve uses One In and Two Out type two-position three-way valve.
The beneficial effects of the utility model are:Keep hot-water heating a heatable brick bed plate heating system easy for installation, intelligentized control method heating is made
Industry, a heatable brick bed plate temperature can automatic control and adjustment keep, it is easy to use comfortable.
Description of the drawings:
Attached drawing 1 is the structural schematic diagram of hot-water heating a heatable brick bed plate heating system.
Attached drawing 2 is the structural schematic diagram of the utility model.
Attached drawing 3 is the controller architecture schematic diagram of the utility model.
In figure:Cyclic water tank 1, water inlet line 11, solenoid electric valve 111, water return pipeline 12, temperature sensor 13, Jia Shui
Mouth 14, water outlet 15, water return outlet 16, hot-water heating a heatable brick bed plate 2, electric heater 3, water pump 4, heating equipment 5, heat exchanger 6, controller 7, temperature
Spend monitoring modular 71, at a temperature of limit 711, temperature upper limit position 712, loop control module 72, starting mode of pump control 721, water pump
Stop control 722, electric heating control module 73, electrical heating startup control 731, electrical heating stopping control 732, solenoid valve control mould
Block 74, the first control of valve position 741, the second control of valve position 742, timing control module 75, shell 8, supply unit 9.
Specific implementation mode:
It, below will be to the technology of the utility model to keep the purpose of this utility model, technical solution and advantage clearer
Scheme is described in detail.
As shown in Fig. 1, the hot-water heating a heatable brick bed plate heating system that the utility model hot-water heating a heatable brick bed plate temperature control heater is applied
It is made of cyclic water tank 1, hot-water heating a heatable brick bed plate 2, electric heater 3, water pump 4, heating equipment 5, heat exchanger 6 and controller 7;Described follows
Ring water tank 1 connects and composes enclosed circulation pipeline with hot-water heating a heatable brick bed plate 2 by water inlet line 11 and water return pipeline 12;The cycle
Temperature sensor 13 is installed on pipeline;Installation settings has electric heater 3 and water pump 4 on the water inlet line 11;Described
Heat exchanger 6 is fixed in heating equipment 5;The water inlet line 11 is arranged in parallel heat exchanger by solenoid electric valve 111
Heat supplying pipeline 112 and electric heater heat supplying pipeline 113, the fixed installation of heat exchanger 6 are connected on heat exchanger heat supplying pipeline 112;Institute
The control connection of controller 7 electric heater 3, water pump 4, solenoid electric valve 111 and the temperature sensor 13 stated.The Electromagnetic Control
Valve 111 includes that heat exchanger heat supplying pipeline 112 is unimpeded and 113 unimpeded two states of electric heater heat supplying pipeline, under normal condition
In the state that heat exchanger heat supplying pipeline 112 is unimpeded.
As shown in Fig. 2, the utility model hot-water heating a heatable brick bed plate temperature controls application of the heater in hot-water heating a heatable brick bed plate heating system,
It only needs the utility model hot-water heating a heatable brick bed plate temperature control heater utilizing water inlet line 11 and return water in hot-water heating a heatable brick bed plate 2 when installation
Pipeline 12 is connected composition circulation waterway and be can be used, convenient and efficient.The utility model hot-water heating a heatable brick bed plate temperature controls heater by shell
Body 8, supply unit 9, cyclic water tank 1, water pump 4, electric heater 3 and controller 7 form;The cyclic water tank 1, supply unit 9,
Water pump 4 and controller 7 are fixedly mounted on shell 8, and electric heater 3 is mounted on cyclic water tank 1;The cyclic water tank 1
In be provided with temperature sensor 13, top is provided with filler 14, and water tank bottom is provided with water outlet 15 and water return outlet 16;It is described
Water pump 4 is fixedly mounted on water outlet 15;15 position of water outlet of the cyclic water tank 1 is installed by solenoid electric valve;The control
The control connection of device 7 water pump 4, electric heater 3, temperature sensor 13 and solenoid electric valve;The supply unit 9 passes through control circuit
Connect water pump 4, electric heater 3 and controller 7.1 bottom of the shell and side open up heat emission hole.
As shown in Fig. 3, the controller 7 of the utility model hot-water heating a heatable brick bed plate temperature control heater is by temperature monitoring module
71, loop control module 72, electric heating control module 73, solenoid valve control module 74 and the connection composition of timing control module 75;
The temperature monitoring module 71 and timing control module 75 is connected separately temperature sensor 13 and loop control module 72;
Limit 711 and temperature upper limit position 722 at a temperature of the temperature monitoring module 71 is provided with;The loop control module 72 is set
It is equipped with starting mode of pump control 721 and water pump stops control 722;The electric heating control module 73 is provided with electrical heating and starts control
System 731 and electrical heating stop control 732;The solenoid valve control module 74 is provided with the first control of valve position 741 and the second valve
Position control 742;711 control connection starting mode of pump control 721 of limit, passes through temperature at a temperature of the temperature monitoring module 71 passes through
Spend the control connection water pump stopping of upper limit 712 control 722, electrical heating stops control 732 and the first control of valve position 741;Described
The control connection electrical heating of timing control module 75 starts control 731 and the second control of valve position 742.The loop control module 72
Stop the startup and stopping that control 722 controls connection water pump 4 respectively by starting mode of pump control 721 and water pump;The electricity adds
Thermal control module 73 starts control 731 by electrical heating and electrical heating stops control 732 and controls opening for connection electric heater 3 respectively
Dynamic and stopping;The solenoid valve control module 74 passes through the first control of valve position 741 and the second control of valve position 742 company of control respectively
Connect the first valve position and the second valve position of solenoid electric valve 111.Regulating device, temperature monitoring module are provided on the controller 7
Limit 711 and temperature upper limit position 712 pass through regulating device adjusting control at a temperature of 71.
In conjunction with shown in attached drawing, the utility model hot-water heating a heatable brick bed plate temperature controls heater and is applied to hot-water heating a heatable brick bed plate heating system
Operation principle:
1) when 13 monitoring temperature of temperature sensor limits 711 at a temperature of being reduced to temperature monitoring module 71, lowest temperature
Position 711 sends instructions to the starting mode of pump control 721 of loop control module 72, and 721 control water pump 4 of starting mode of pump control, which starts, to be made
Industry, hot-water heating a heatable brick bed plate heating system utilizes 6 heat supply of heat exchanger by heat exchanger heat supplying pipeline 112, while timing control module 75 is opened
Beginning timing, when timing is not up to 120 seconds, 13 monitoring temperature of temperature sensor reaches the temperature upper limit position of temperature monitoring module 71
When 712, the water pump that temperature upper limit position 712 sends instructions to loop control module 72 stops control 722, and water pump stops control 722
The heat supply that stops operation of control water pump 4 terminates.
2) when 13 monitoring temperature of temperature sensor limits 711 at a temperature of being reduced to temperature monitoring module 71, lowest temperature
Position 711 sends instructions to the starting mode of pump control 721 of loop control module 72, and 721 control water pump 4 of starting mode of pump control, which starts, to be made
Industry, by 112 heat supply of heat exchanger heat supplying pipeline, while timing control module 75 starts timing, when timing reaches 120 seconds, temperature
When 13 monitoring temperature of sensor is not up to the temperature upper limit position 712 of temperature monitoring module 71, timing control module 75 sends instruction
Start control 731 and the second control of valve position 742 to electrical heating, electrical heating starts 731 control electric heater 3 of control and starts, simultaneously
Second control of valve position 742 control solenoid electric valve 111 is transformed into the unimpeded state of electric heater heat supplying pipeline 113, hot-water heating a heatable brick bed plate
Heating system utilizes 3 heat supply of electric heater, 13 monitoring temperature of temperature sensor to reach temperature by electric heater heat supplying pipeline 113
When the temperature upper limit position 712 of monitoring modular 71, the water pump that temperature upper limit position 712 sends instructions to loop control module 72 stops control
System 722, water pump stops 722 control water pumps 4 heat supply that stops operation of control and terminates, while temperature upper limit position 712 sends instructions to electricity
The electrical heating of heating control module 73 stops the first control of valve position 741 of control 732 and solenoid valve control module 74, and electrical heating stops
Only 732 control control electric heater 3 of control stops operation, and the first control of valve position 741 control solenoid electric valve 111 is transformed into heat exchange
112 unimpeded state of device heat supplying pipeline.
3) another situation is heated when hot-water heating a heatable brick bed plate heating system is controlled only with the utility model hot-water heating a heatable brick bed plate temperature
Device heat supply, no heat exchanger 6 do not need solenoid electric valve 111 at this time, do not need the work of timing control module 75, temperature sensor
When 13 monitoring temperatures limit 711 at a temperature of being reduced to temperature monitoring module 71, at a temperature of limit 711 send instructions to cycle control
The starting mode of pump control 721 of molding block 72,721 control 4 initiating task of water pump of starting mode of pump control, electrical heating start control 731
Electric heater 3 is controlled to start using circulation waterway heat supply, when 13 monitoring temperature of temperature sensor reaches temperature monitoring module 71
When temperature upper limit position 712, the water pump that temperature upper limit position 712 sends instructions to loop control module 72 stops control 722, while temperature
The electrical heating that degree upper limit 712 sends instructions to electric heating control module 73 stops control 732, and water pump stops 722 control of control
Water pump 4 stops operation, and electrical heating stops 732 control control electric heater 3 of control and stops operation, and heat supply terminates.
Claims (9)
1. a kind of hot-water heating a heatable brick bed plate temperature controls heater, it is characterised in that:By shell, supply unit, cyclic water tank, water pump, electricity
Heater and controller composition;The cyclic water tank, supply unit, water pump and controller are fixedly mounted on shell, electrical heating
Device is mounted on cyclic water tank;Temperature sensor is provided in the cyclic water tank, top is provided with filler, water tank bottom
Portion is provided with water outlet and water return outlet;The water pump is fixedly mounted on water outlet;Pacify at the water outlet position of the cyclic water tank
Fill solenoid electric valve;The controller control connection water pump, electric heater, temperature sensor and solenoid electric valve;The power supply
Device connects water pump, electric heater and controller by control circuit.
2. hot-water heating a heatable brick bed plate temperature as described in claim 1 controls heater, it is characterised in that:The housing bottom and side are opened
If heat emission hole.
3. hot-water heating a heatable brick bed plate temperature as described in claim 1 controls heater, it is characterised in that:The solenoid electric valve uses one
Into scene 2 type two-position three-way valve.
4. hot-water heating a heatable brick bed plate temperature as described in claim 1 controls heater, it is characterised in that:The controller is by temperature monitoring
Module, loop control module, electric heating control module, solenoid valve control module connect composition with timing control module;The temperature
Degree monitoring modular and timing control module are connected separately temperature sensor and loop control module;The temperature monitoring module
Limit and temperature upper limit position at a temperature of being provided with;The loop control module is provided with starting mode of pump control and water pump stops control
System;The electric heating control module is provided with electrical heating and starts control and electrical heating stopping control;The solenoid valve control module
It is provided with the first control of valve position and the second control of valve position;Limit control connection water pump opens at a temperature of the temperature monitoring module passes through
Dynamic control controls connection water pump stopping control by temperature upper limit position, electrical heating stops control and the first control of valve position;The meter
When control module control connection electrical heating start control and the second control of valve position.
5. hot-water heating a heatable brick bed plate temperature as claimed in claim 4 controls heater, it is characterised in that:Tune is provided on the controller
Regulating device, limit and temperature upper limit position pass through regulating device adjusting control at a temperature of temperature monitoring module.
6. hot-water heating a heatable brick bed plate temperature as claimed in claim 4 controls heater, it is characterised in that:The loop control module passes through
Starting mode of pump controls and water pump stops startup and stopping that control controlling connection water pump respectively.
7. hot-water heating a heatable brick bed plate temperature as claimed in claim 4 controls heater, it is characterised in that:The electric heating control module is logical
Cross the startup and stopping that electrical heating starts control and electrical heating stops controlling control connection electric heater respectively.
8. hot-water heating a heatable brick bed plate temperature as claimed in claim 4 controls heater, it is characterised in that:The solenoid valve control module is logical
Cross the first valve position and the second valve position that the first control of valve position and the second control of valve position control connection solenoid electric valve respectively.
9. hot-water heating a heatable brick bed plate temperature as claimed in claim 4 controls heater, it is characterised in that:The timing control module timing
Response time is set as 120 seconds, automatic clear when timing stops.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721873684.1U CN207936217U (en) | 2017-12-28 | 2017-12-28 | Hot-water heating a heatable brick bed plate temperature controls heater |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721873684.1U CN207936217U (en) | 2017-12-28 | 2017-12-28 | Hot-water heating a heatable brick bed plate temperature controls heater |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207936217U true CN207936217U (en) | 2018-10-02 |
Family
ID=63647557
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721873684.1U Expired - Fee Related CN207936217U (en) | 2017-12-28 | 2017-12-28 | Hot-water heating a heatable brick bed plate temperature controls heater |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207936217U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108204627A (en) * | 2017-12-28 | 2018-06-26 | 宁夏可可科技发展有限公司 | Hot-water heating a heatable brick bed plate temperature controls heater |
-
2017
- 2017-12-28 CN CN201721873684.1U patent/CN207936217U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108204627A (en) * | 2017-12-28 | 2018-06-26 | 宁夏可可科技发展有限公司 | Hot-water heating a heatable brick bed plate temperature controls heater |
CN108204627B (en) * | 2017-12-28 | 2023-09-29 | 宁夏可可科技发展有限公司 | Water heating kang plate temperature control heater |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101576282A (en) | Separated self-service geothermal radiant heating system | |
CN108204627A (en) | Hot-water heating a heatable brick bed plate temperature controls heater | |
CN207936217U (en) | Hot-water heating a heatable brick bed plate temperature controls heater | |
CN201706576U (en) | Individual self-service geothermal radiation heating supply system | |
CN104019561A (en) | Solar energy water heater with instantaneous heating function and self-stabilized output temperature | |
CN201093700Y (en) | Electric water heater with automatic speed changing capacity adding device | |
CN207936219U (en) | Hybrid hot-water heating a heatable brick bed plate heating system | |
CN208139413U (en) | A kind of photovoltaic thermo-electric generation heating system | |
CN202328466U (en) | Indoor heat supply device based on concentrated heat supply system | |
CN208075095U (en) | One kind being used for domestic hot water's coolant controlled intelligent domestic system | |
CN214664782U (en) | Directly adjust heating secondary net weather compensation arrangement | |
CN105352025B (en) | Construction integrated solar heat pump heating system based on self adaptive control | |
CN202012982U (en) | Life hot water system with multiple heat sources which are complementary | |
CN201206897Y (en) | Cyclic heating integral air source heat pump water heater | |
CN201743363U (en) | Pump-free cycle energy-saving water-heating blanket | |
CN212179203U (en) | Electric water heater with cold-hot water separation function | |
CN114076415A (en) | Efficient instant heating type solar water heater | |
CN206656494U (en) | Graphene carbon electric boiler | |
CN103836715B (en) | A kind of solar gas compound energy hot-water heating system | |
CN209042515U (en) | A kind of electric heating plumbing fixture | |
CN219955461U (en) | Energy-saving device for heating domestic water by using heat of heating water | |
CN202973355U (en) | Household independent heating and domestic hot water supply control system | |
CN202501564U (en) | Intelligent energy-saving domestic hot water circulating system | |
CN207936215U (en) | Electric water-heating a heatable brick bed plate heating system | |
CN203454425U (en) | Household hot water instant available integrated system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181002 Termination date: 20211228 |
|
CF01 | Termination of patent right due to non-payment of annual fee |